HomeMy WebLinkAboutPermit CardINSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
lst/.bZoned
39
Date Issu Area Permit No.. ...
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID. ,
e Lk. t
Use irt
Pit
Address or Legal Description
Owner
Contractosj
Side
Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing E Driveway
Foundation . -,, V4
Underground Plumbing Insulation
Rough Plumbing Drywall
Chimney & Vent
Gas Piping --J j_. Final //-s-05- .I . !�A`,
Septic Final -y,„fls 1
Framing
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND,
APPROVED
Date
THIS PERMIT IS NOT TRANSFERABLE
PLACED OUTSIDE - COVER'VVITH CLEAR PLASTIC