HomeMy WebLinkAboutEnvelope Compliance Certificate 12.19.20142009 /ECC COMcheck Software Version 3.9.4 Envelope Compliance Certificate Section 1: Project Information Project Type: New Construction Project Title : Plus Five LLC. Construction Site: Parachute, CO Owner/Agent: Kent Edwards Pius Five LLC. 2278 1.114 Road Grand Junction, CO 81505 970-216-1818 Section 2: General Information Building Location (for weather data): Climate Zone: Building Space Conditioning Type(s): Vertical Glazing / Wall Area Pct.: Activity Type(st Office Workshop Parachute, Colorado 5b Nonresidential 3% Section 3: Requirements Checklist Floor Area 3200 3600 Designer/Contractor: Amanda Decker Ford Construction Company, Inc. 560 25 Road Grand Junction, CO 81505 970-245-9343 ad@fordconstruction.org Envelope PASSES: Design 7% better than code. Climate -Specific Requirements: Component NamelDescription Gross Area or Perimeter Cavity Cont. Proposed Budget R -Value R -Value U -Factor U-Factor{a) Floor 1: Slab-On-Grade:Unheated Exterior Wall 1: Metal Building Wall, Single Layer Door 1: Insulated Metal, Swinging Door 2: Insulated Metal, Non -Swinging Door 3: Insulated Metal, Non -Swinging Door 4: Insulated Metal, Non -Swinging Exterior Wall 2: Metal Building Wall, Single Layer Window 1: Vinyl Frame, Pert. Type: Energy code Pane with Low -E, Clear , SHGC 0.70 Window 2: Vinyl Frame, Perf. Type: Energy code Pane with Low -E, Clear , SHGC 0.70 Window 3: Vinyl Frame, Perf. Type: Energy code Pane with Low -E, Clear , SHGC 0.70 Window 4: Vinyl Frame, Perf Type: Energy code Pane with Low -E, Clear , SHGC 0.70 Window 5: Vinyl Frame, Pelt Type: Energy code Pane with Low -E, Clear , SHGC 0,70 Window 6: Vinyl Frame, Perf.. Type; Energy code Pane with Low -E, Clear , SHGC 0.70 Window 7: Vinyl Frame, Perf. Type: Energy code Pane with Low -E, Clear , SHGC 0.70 Mineral Fiber Mineral Fiber default, Double default, Double default. Double default. Double defau:t Double default, Double default, Double 5200 801 13,0 21 196 196 196 1283 13.0 15 — 15 15 15 15 15 15 5.6 5.6 0.069 0.100 0.071 0.071 0.071 0.069 0.550 --- 0.55D 0.069 0.700 0.503 0,50,E 0.500 0.069 0.350 0.350 0.55D 0.350 — 0.550 0.350 0.550 0.350 0.550 0.350 --- 0.550 0.350 Project Title: Plus Five LLC., Report date: 12/19/14 Data filename: F:1Jobs1673-Plus Five LLC'.BIdg DeptComCheck Two .n the Loop cck Page 1 of 10 Door 5: Insulated Metal, Swinging 21 --- 0.100 0.700 Door 6: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. 21 --- --- 0.800 0.800 Type: Energy code default, Double Pane with Low -E, Clear , SHGC 0.70 Exterior Wall 3: Metal Building Wall, Single Layer Mineral Fiber 1739 13.0 5.6 0.069 0.069 Window 8: Vinyl Frame, Perf. Type: Energy code default, Double 15 --- 0.550 0.350 Pane with Low -E, Clear , SHGC 0.70 Window 9: Vinyl Frame, Perf. Type: Energy code default, Double 15 -- — 0.550 0.350 Pane with Low -E, Clear , SHGC 0.70 Window 10: Vinyl Frame, Perf. Type: Energy code default, Double 15 --- --- 0.550 0.350 Pane with Low -E, Clear , SHGC 0.70 Window 11: Vinyl Frame, Perf. Type: Energy code default, Double 15 — — 0.550 0.350 Pane with Low -E, Clear , SHGC 0.70 Door 7: Insulated Metal, Swinging 21 — --- 0.100 0.700 Door 8: Insulated Metal, Non -Swinging 252 -- --- 0.071 0.500 Door 9: Insulated Metal, Swinging 21 --- --- 0.100 0.700 Door 10: Insulated Metal, Swinging 21 --- --- 0.100 0.700 Exterior Wall 4: Metal Building Wall, Single Layer Mineral Fiber 1751 13.0 5.6 0.069 0.069 Door 11: Insulated Metal, Swinging 21 --- --- 0.100 0.700 Door 12: Insulated Metal, Non -Swinging 252 --- --- 0.071 0.500 Roof 1: Metal Building. Screw Down 5818 19.0 5.6 0.063 0.055 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: d1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. kr 2. Windows, doors, and skylights certified as meeting leakage requirements. Er 3. Component R -values & U -factors labeled as certified. d4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. i 5. 'Other' components have supporting documentation for proposed U -Factors. E(6. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. d7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building enve'ope are equ pped with motorized dampers. E,,r&. Cargo doors and loading dock doors are weather sealed. 0"9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or cau.k. 10.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: O Building entrances with revolving doors. [� Doors not intended to be used as a building entrance. LJ Doors that open directly from a space less than 3000 sq. ft. in area. ▪ Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors, [] Doors opening directly from a sleeping/dwelling unit. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.4 and to comply with the mandatory requirements in the Requirements Checklist. JOLE &E. /1414 Lt..11y/E /41..dA 6ce. /1-09 Name - Title Signaturii Date Project Title: Plus Five LLC. Report date: 12/19/14 Data filename: F:IJobs11673-Plus Five LLCIBIdg Dept1ComCheck Two in the Loop cck Page 2 of 10 2009 IECC COMcheck Software Version 3.9.4 Interior Lighting Compliance Certificate Section 1: Project Information Project Type: New Construction Project Title : Plus Five LLC. Construction Site: Owner/Agent: Parachute, CO Kent Edwards Plus Five LLC. 2278 t-1/4 Road Grand Junction, CO 81505 970-216-1818 Section 2: Interior Lighting and Power Calculation A Area Category Designer/Contractor: Amanda Decker Ford Construction Company, Inc. 560 25 Road Grand Junction, CO 81505 970-245-9343 ad@fordconstruction.org B Floor Area (h2) C Allowed Watts / ft2 D Allowed Watts (B x C) Office Workshop 3200 3600 Section 3: Interior Lighting Fixture Schedule A Fixture ID : Description 1 Lamp / Wattage Per Lamp / Ballast 1 1.4 Total Allowed Watts = 3200 5040 8240 B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Office (3200 sq.ft.) Linear Fluorescent 1: A: 48" T8 32W: Electronic: Linear Fluorescent 2: B: 48" T8 32W: Electronic: Workshop (3600 sq.ft.) Linear Fluorescent 3: C: Other: Electronic: Linear Fluorescent 4: CEM: Other: Electronic: Section 4: Requirements Checklist 3 28 96 2688 2 14 64 896 6 10 324 6 2 324 Total Proposed Watts = 3240 648 7472 Interior Lighting PASSES: Design 9% better than code. Ighting Wattage: 1 Total proposed watts must be Tess than or equal to total allowed watts. Allowed Watts Proposed Watts 8240 7472 Complies YES Controls, Switching, and Wiring: •,7(t 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to `� vertical fenestration. l!d 3. , Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: Project Title: Plus Five LLC. Data filename: F:IJobs\1673-Plus Five LLCIBIdg Dept\ComCheck Two in the Loop.cck Report date: 12/19/14 Page 3 of 10 [� Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. • Daylight spaces enclosed by walls or ceiling height partitions and conta ning two or fewer light fixtures are not required to have a separate switch for general area lighting. 1/4'. Independent controls for each space (switch/occupancy sensor). 5. 6. 0-7. Medical task lighting or artlhistory display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. © 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires, dual switching of alternate rows of luminaires, altemate luminaires, or alternate lamps, switching the middle lamp luminaires independently of other lamps, or switching each luminaire or each lamp. Exceptions: [Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. Master switch at entry to hotel/motel guest room. Individual dwelling units separately metered. Exceptions: • Only one luminaire in space. jAn occupant -sensing device controls the area. j "The area is a corridor, storeroom, restroom, public lobby or sleeping unit. o Areas that use less than 0.6 Watts/sq.ft. d9. Automatic lighting shutoff control in buildings larger than 5,000 sq ft. Exceptions: © Sleeping units, patient care areas, and spaces where automatic shutoffwould endanger safety or security. 10.Photocelllastronomical time switch on exterior lights. Exceptions.' • Lighting intended for 24 hour use d1u ' 1.Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: Electronic high -frequency ballasts, Luminaires on emergency circuits or with no available pair. Section 5:, Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.4 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signa e Project Title: Plus Five LLC. Report date: 12/19/14 Data filename: F:IJobs11673-Plus Five LLC1BIdg DeptlComCheck Two in the Loop.cck Page 4 of 10 2009 IECC COMcheck Software Version 3.9.4 Exterior Lighting Compliance Certificate Section 1: Project Information Project Type: New Construction Project Title : Pius Five LLC. Exterior Lighting Zone: 2 (Light industrial area with limited nighttime use) Construction Site: Owner/Agent: Designer/Contractor: Parachute, CO Kent Edwards Amanda Decker Plus Five LLC. Ford Construction Company, Inc. 2278 1-1/4 Road 560 25 Road Grand Junction, CO 81505 Grand Junction- CO 81505 970-216-1818 970-245-9343 ad@fordconstruction.org Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts l Unit (B x C) Light poles (Parking area) 39040 ft2 0.06 Yes 2342 2000 Door & wall (Main entry) 3 ft of door width 20 Yes 60 426 Other doors (Other door (not main entry)) 96 ft of door width 20 Yes 1920 1356 Total Tradable Watts* = 4322 3782 Total Allowed Watts = 4322 Total Allowed Supplemental Watts"" = 600 * Wattage tradeoffs are only allowed between tradable areasrsurfaces. A supplemental allowance equal to 600 watts may be applied toward compliance of both non -tradable and tradable areasisurfaces. Section 3: Exterior Lighting Fixture Schedule A Fixture ID : Description / Lamp 1 Wattage Per Lamp / Ballast B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Light poles ( Parking area 39040 ft2). Tradable Wattage HID 2: Metal Halide: Standard: 1 5 400 2013 Door & wall ( Main entry 3 ft of door width) Tradable Wattage HID 3: Metal Halide: Pulse start: 1 1 400 400 Compact Fluorescent 1: Reflector 26W. Electronic: 1 1 26 26 Other doors ( Other door (not main entry) 96 ft of door w:dth): Tradable Wattage Compact Fluorescent 2: Reflector 26W: Electronic: 1 6 26 156 HID 4: Metal Halide: Pulse start: 1 3 400 1200 Total Tradable Proposed Watts = 3782 Section 4: Requirements Checklist .fighting Wattage: 1. Within each non -tradable: areasurfac e,. total proposed watts must be less than or equal to total allowed watts. Across all tradable areas/surfaces, total proposed watts must be less than or equal to total allowed watts. Compliance: Passes. Project Title: Plus Five LLC. Report date: 12/19/14 Data filename: F:IJobs\1673-Plus Five LLCIBtdg Dept1ComCheck Two in the Loop.cck Page 5 of 10 �ontrols, Switching, and Wiring: 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. 4'3. Lighting not designated for dusk -to -dawn operation is controlled by either a a photosensor (with time switch), or an astronomical time switch. O5.. -Lighting designated for dusk -to -dawn operation is controlled by an astronomical time switch or photosensor. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. Exterior Lighting Efficacy: /6. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumen/watt. Exceptions: © Lighting that has been claimed as exempt and is identified as such in Section 3 table above. D Lighting that is specifically designated as required by a health or life safety statue, ordinance, or regulation. [j Emergency lighting that is automatically off during normal building operation. O Lighting that is controlled by motion sensor. Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.4 and to comply with the mandatory requirements in the Requirements Checklist. 11d4-4/4- / a, ps-5fid4i mace 5 Name - Title Signature( Dale Project Title: Plus Five LLC. Report date: 12/19/14 Data filename: F:IJobs11673-Plus Five LLC1BIdg Dept\ComCheck Two in the Loop.cck Page 6 of 10 2009 IECC COMcheck Software Version 3.9.4 Mechanical Compliance Certificate Section 1: Project Information Project Type: New Construction Project Title : Plus Five LLC. Construction Site: Owner/Agent: Parachute, CO Kent Edwards Plus Five LLC. 2278 I-1/4 Road Grand Junction, CO 81505 970-216-1818 Section 2: General Information Building Location (for weather data): Parachute, Colorado Climate Zone: 5b Section 3: Mechanical Systems List Quantity System Type & Description Designer/Contractor: Amanda Decker Ford Construction Company, Inc. 560 25 Road Grand Junction, CO 81505 970-245-9343 ad@fordconstruction.org 1 Shop HVAC System (Single Zone) : Heating: 2 each - Radiant Heater, Propane, Capacity = 150 kBtulh No minimum efficiency requirement applies Fan System. None 1 1st Floor HVAC System (Multiple -Zone) : Heating: 1 each - Duct Fumace, Propane, Capacity = 110 kBtu/h Proposed Efficiency = 95.00% Ec, Required Efficiency = 80 00% Ec Cooling. 1 each - Hydronic Coil, Capacity = 48 kBtuTh. No Economizer , Economizer exception: None No minimum efficiency requirement applies Fan System: Fan -1st Floor Office 1 Downstairs -- Compliance (Motor nameplate HP method) : Passes Fans: 1st Floor SA Supply, Multi -Zone VAV, 1600 CFM. 0,5 motor nameplate hp 1st Floor RA Return, Multi -Zone VAV, 1375 CFM, 0.5 motor nameplate hp Unisex Bath Fan Exhaust. Single -Zone VAV, 75 CFM, 0.1 motor nameplate hp Women's RR Fan Exhaust, Single -Zone VAV, 75 CFM, 0.1 motor nameplate hp Men's RR Fan Exhaust, Single -Zone VAV, 75 CFM, 0.1 motor namepate hp 1 2nd Floor HVAC System (Multiple -Zone) : Heating: 1 each - Duct Furnace, Propane, Capacity = 110 kBtulh Proposed Efficiency = 95.00% Ec, Required Efficiency = 80.00% Ec Cooling: 1 each - Hydronic Coil, Capacity = 48 kBtu.h, No Economizer , Economizer exception: None No minimum efficiency requirement applies Fan System: Fan -2nd Floor Office 1 Upstairs -- Compliance (Motor nameplate HP method) : Passes Fans: 2nd Floor SA Supply, Multi -Zone VAV, 1750 CFM, 0.5 motor nameplate hp 2nd Floor RA Return. Multi -Zone VAV, 1675 CFM, 0.5 motor nameplate hp Unisex RR Fan Exhaust, Single -Zone VAV, 75 CFM. 0.1 motor nameplate hp 1 Water Heater 1: Gas Instantaneous Water Heater, Capacity. 50 gallons, Input Rating 36 Btu/h Proposed Efficiency: 0.79 EF, Required Efficiency: 0.58 EF Project Title: Plus Five LLC. Report date: 12/19/14 Data filename: F:1Jobs11673-Plus Five LLCIBIdg Dept\ComCheck Two in the Loop.cck Page 7 of 10 Section 4: Requirements Checklist Requirements Specific To: Shop HVAC System : None Requirements Specific To: 1st Floor HVAC System : {(1. Equipment minimum efficiency: Duct Furnace (Propane): 80.00 % Ec d2. Minimum one temperature control device per zone 13. Balancing and pressure test connections on all hydronic terminal devices '4. Systems serving more than one zone must be VAV systems Exception(s): ❑ Where pressure relationships must be maintained l] Zones or supply air systems with at least 75% of reheatinglrecooling energy site recovered or site solar © Zones with humidity requirements for special processes El Zones with cfm <300 and flow rate <10% of total design flow rate O Outside air needed to meet IMC Chapter 4 Dual -duct VAV mixing boxes installed to minimize mixing 6. Controls capable of resetting supply air temp (SAT) by 25% of SAT -room temp difference Exception(s): (] Systems that prevent reheating, retooling or mixing of heated and cooled supply air • Seventy five percent of the energy for reheating is from site -recovered or site solar energy sources. (] Zones with peak supply air quantities of 300 cfm (142 Us) or less. 63/7. VAV fans with static pressure sensors are placed in a position such that the controller setpoint is no greater than one-third the total design fan static pressure. If placement results in the sensor being located downstream of major duct splits, multiple sensors are installed in each major branch. Exception(s): o Systems with DDC of individual zone boxes reporting to the central control panel and reset of static pressure setpoint based on the zone requiring the most pressure. !ZS/. Systems with DDC of individual zone boxes reporting to the central control panel has static pressure setpoint reset based on the zone requiring the most pressure. 2(9. Meets the condenser heat recovery requirement for service water heating Exception(s): O Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. • Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. E4/10.Chilled water pumping systems with multiple chillers must automatically reduce chil'ed water flow rates proportionately when chillers are not operating Requirements Specific To: 2nd Floor HVAC System : ii. Equipment minimum efficiency: Duct Furnace (Propane): 80.00 r.: Ec 2(2. Minimum one temperature control device per zone 6214 Balancing and pressure test connections on al hydronic terminal devices z / 4. Systems serving more than one zone must be VAV systems Exception(s): [] Where pressure relationships must be maintained O Zones or supply air systems with at least 75% of reheatinglrecooling energy site recovered or site solar o Zones with humidity requirements for special processes O Zones with cfm <300 and flow rate <10% of total design flow rate U Outside air needed to meet IMC Chapter 4 26. Dual -duct VAV mixing boxes instated to minimize mixing g. Controls capable of resetting supply air temp (SAT) by 259. of SAT -room temp difference Exception(s): © Systems that prevent reheating, retooling or mix.ng of heated and cooled supply air O Seventy five percent of the energy for reheating is from site -recovered or site solar energy sources. d['] Zones with peak supply air quant'ties of 300 cfm (142 Us) or less. U `. VAV fans with static pressure sensors are placed in a position such that the controller setpoint is no greater than one-third the total design fan static pressure. If placement results in the sensor be.ng located downstream of major duct splits, multiple sensors are installed in each major branch. Project Title: Plus Five LLC. Report date: 12/19/14 Data filename: F:1Jobs11673-Plus Five LLC1BIdg Dept\ComCheck Two in the Loop.cck Page 8 of 10 Exception(s): U Systems with DDC of individual zone boxes reporting to the central control panel and reset of static pressure setpoint based on the zone requiring the most pressure. /8. Systems with DDC of individual zone boxes reporting to the central control panel has static pressure setpoint reset based on the zone requiring the most pressure. 4/9. Meets the condenser heat recovery requirement for service water heating Exception(s): • Facilities that employ condenser heat recovery for space heating with a heat recovery design exceeding 30% of the peak water-cooled condenser load at design conditions. 0 Facilities that provide 60% of their service water heating from site solar or site recovered energy or from other sources. f 10. Chilled water pumping systems with multiple chillers must automatically reduce chilled water flow rates proportionately when chillers are a not operating Requirements Specific To: Water Heater 1 : Z1. Water heating equipment meets minimum efficiency requirements: Gas Instantaneous Water Heater efficiency: 0.58 EF '2. First 8 ft of outlet piping is insulated 4Hot water storage temperature controls that allow setpoint of 90°F for non -dwelling units and 110'F for dwelling units. . Heat traps provided on inlet and outlet of storage tanks Generic Requirements: Must be met by all systems to which the requirement is applicable: yd1. Plant equipment and system capacity no greater than needed to meet loads Exception(s): [l Standby equipment automatically off when primary system is operating [7..UMultiple units controlled to sequence operation as a function of load . Minimum one temperature control device per system ce3. Minimum one humidity control device per installed humidification/dehumidification system d4. Load calculations per ASHRAE/ACCA Standard 183. zj 5. Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup Exception(s): [] Continuously operating zones 3/6. Outside -air source for ventilation; system capable of reducing OSA to required minimum j7. R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly Exception(s): © Ducts located within equipment D Ducts with interior and exterior temperature difference not exceeding 15 F. f8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181B tapes and mastics 10. Hot water pipe insulation: 1.5 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in. Chilled water/refrigerant/brine pipe insulation: 1.5 in. for pipes <=1.5 in. and 1.5 in. for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes <=1.5 in. and 3 in. for pipes >1.5 in. Exception(s): [] Piping within HVAC equipment. • Fluid temperatures between 55 and 105°F. O Fluid not heated or cooled with renewable energy. [) Piping within room fan -coil (with AHRI440 rating) and unit ventilators (with AHRI840 rating). Z11. ❑ Runouts <4 ft in length. Operation and maintenance manual provided to building owner j12.Thermostatic controls have 5°F deadband Exception(s): [] Thermostats requiring manual changeover between heating and cooling [] Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority having jurisdiction. 1. 13.Balancing devices provided in accordance with IMC 603.17 "14.Demand control ventilation (DCV) present for high design occupancy areas (>40 person/1000 ft2 in spaces >500 ft2) and served by systems with any one of 1) an air -side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor airflow greater than 3000 cfm. Exception(s): Q Systems with heat recovery. Project Title: Plus Five LLC. Report date: 12/19114 Data filename: F:1Jobs11673-Plus Five LLC1BIdg Dept\ComCheck Two in the Loop.cck Page 9 of 10 • Multiple -zone systems without DDC of individual zones communicating with a central control panel. D Systems with a design outdoor airflow less than 1200 cfm. Lj Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 4"15. Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings Exception(s): D Gravity dampers acceptable in buildings <3 stories d16.Automatic controls for freeze protection systems present (l>(J 7.Three-pipe systems not used 18. Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70% outside air fraction or specifically exempted Exception(s): U Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. O Systems serving spaces that are heated and not cooled to less than 60°F. O Where more than 60 percent of the outdoor heating energy is provided from site -recovered or site solar energy. ▪ Heating systems in climates with less than 3600 HDD. o Cooling systems in climates with a 1 percent cooling design wet -bulb temperature less than 64°F. • Systems requiring dehumidification that employ energy recovery in series with the cooling coil. O Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements: a) at least 75 percent of exhaust flow rate, b) heated to no more than 2°F below room setpoint temperature, c) cooled to no lower than 3°F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling. Section 5: Compliance Statement Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2009 IECC requirements in COMcheck Version 3.9.4 and to comply with the mandatory requirements in the Requirements Checklist. /ace," M - av Name - Title Signature; _ Date f Section 6: Post Construction Compliance Statement • HVAC record drawings of the actual installation, system capacities. calibration information, and performance data for each equipment provided to the owner. • HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechan ca contractor. La Written HVAC balancing and operations report provided to the owner The above post construction requrements have been completed. Principal Mechanical Designer -Name Signature Date Project Title: Plus Five LLC. Report date: 12/19/14 Data filename: F:IJobs11673-Plus Five LLC1BIdg DeptlComCheck Two in the Loop.cck Page 10 of 10