HomeMy WebLinkAboutOWTS Report from Ford ConstructionOWTS REPORT
FOR
PLUS FIVE LLC.
PARACHUTE, COLORADO
FORD CONSTRUCTION
COMPANY, INC.
560 25 Rd / Grand Junction / Colorado / 81505
Ph. (970) 245-9343 / Fax (970) 245-5090
December 19, 2014
Dear Ms. Decker,
Due to Regulation 43 being in effect as of June 30, 2014, this addendum has been written to
modify the existing ISDS report prepared by Michael A. Berry, P.E. of Huddleston -Berry
Engineering & Testing, LLC., dated February 21, 2014. The effected project is Plus Five LLC.
near Parachute, Colorado.
Plus Five LLC. involves 2.545 acres west of Parachute in the Travelers Highlands Subdivision,
Block 10, Lots 3-24. A two-story 40 ft x 40 ft office and 60 ft x 60 ft shop are proposed for this
site. The estimated number of employees for the designed system is 15 (see pg 2 of HB Report).
A closed loop system has been designed for the shop drainage to be recycled, therefore no water
from the washing of trucks is included in this OWTS design.
Infiltrator Systems Quick4 Standard Chambers are still proposed for this system. The measured
percolation rate was found to be an average of 10 minutes/inch, but a rate of 30 minutes/inch was
used in the design calculations for conservatism (see pg 1 of HB Report). The maximum daily
flow of the OWTS and absorption bed are calculated below:
Base Commercial Flow: (15 employees)*(20 GPDlemployee) = 300 GPD
Standard Bed Area: (300 GPD)1(0.5) = 600 Square Feet
Adjusted Area For Bed and Chambers: (600 SF)*(1.2)*(0.7) = 504 Square Feet
# of Quick4 Chambers: (504 SF)/(12 SF/Chamber) = 42 Chambers Minimum
Due to the water reclaim system in the shop, the adjusted flow to the septic tank allows for the
resizing of the sewage storage. Therefore, a 1,000 Gallon tank is proposed to be installed. For
future use, a proposed back-up absorption bed has been sized and spaced a minimum of 6 ft from
the edge of this previously calculated bed (as per Regulation 43).
These calculations have been utilized in the design of the OWTS at Plus Five LLC. Details for
the septic system are shown of Sheet C.2 of the building construction plans. A reduced -sized
plan is provided with this letter.
11V130 038 N
ILA Ei
0
It
n -,1q m_ - "..
fel; rir rr D Gi `n w
fes{ pn nN zAtf
LT
CG
0, NC] uj tN VR
0
L f414''''':1 �ii .U14�
•"' p.,.;
e] t pI r]
l� U0 hl1C-' r1)
Nn \z] G 07, (ix
' 'LN2'2 rrl`I
+i C] .Uf] P
yri z 6 v
r]
*
rn w at n
'�u 1G
u be cu F�'� K6
my
nC T_ n
v.� i 6
n n
z
U T)
3t yV ^
n
/ 'OS C3`33`: SuO:12E7„v ,r•,L
O?C; NTH; SSTI Ch 36
gf
0
Ga
0
0
0
311N3AV MOaa'dOS
M
Qa
2ND STREET
5 31'2500' C
100 00'
m 7.
n
>
0 Vt g
cm
O O I2It
-Y
0uLl
ul z S
z
N u'
1
•
ac
OH
}0_
1Ine G SOdO d
2
u
'00 00'
rom
34'28'00- w 700.00'
3RD STREET
i
t �b
:1:7:!!!!!!!!!:!:
K2 frU L- ) ,OCYY]bN4�aN[}'iiyrn� L )li^r?miG�.)i YI•�]U nNfM^29atii' 0�xi `M!,eg Xu.kv it Ste'-tit-�z'�1:te•n si'°.iy =tax,:•1 �`.i `f-u']or E'-_�1 (,r']o
Kd N��SrnY is �'.?14yr1Gf-r] liq 2 ^
Nn ;34.kM /7 r4 n
0A rF x 3J,;
FG Yz
In -pt fid •5'^i "£12 -Mve ci ^i`-�- a rn:.]'
'F', L]h+]' 11 LI rl rn s'V ;)fl 1'�, ((ll )`
4 Ir Q. 7--oC.j$ r .P.N .(2 �], nz
i i'''' -"0v].r ,3o{!ms .e ,nF,
t- (n(ll� 31.5q i 4Ah
M�h tie 4$
PC �'G- U :110Ai4 rjt
rzNy=o 4'9_. ti r
7/ r -. n 1 G i'i '4 -ug i -t ] f_ u i
n
2"r 6] 'P `"'i fir^ .p5421 :n w ffpl Lf
L[l N Z Ni^ Na L�N-
U LM r S
c
n
9
0
b2
c9
N
9
PLUS FIVE LLC.
PARCEL NO. 2409-284-03-001
PARACHUTE, COLO.
UTILITIES PLAN
FORD CONSTRUCTION
COMPANY, INC.
560 25 road GRAND JCT CO 81505
PHONE (970) 245-9343 FAX (970) 245-5090
Huddleston -Berry
Fnginccring & Testing, LI.(
Ford Construction Company, Inc.
560 25 Road
Grand Junction, Colorado 81505
Attention: Ms. Amanda Decker
Subject: [SDS Design
Two in the Loop
Parachute, Colorado
Dear Ms. Decker,
640 while Avenue
Grand Junction, CO 81501
Phone: 970-255-8005
Fax: 970-255-6818
11uddle5loaL1 erry or hresiuin.net
www.HBET GJ.com
February 21, 2014
Project1100972-0002
At your request, Huddleston -Berry Engineering & Testing, LLC (1 IBET) completed design of an
Individual Sewage Disposal System ([SDS) for the Two in the Loop project near Parachute,
Colorado. The site location is shown on Figure 1. A site plan is included as Figure 2.
Individual Sewage Disposal System
Subsurface investigation at the site included five test pits as shown on Figure 2 — Site Plan. As
indicated on the attached logs, the soils at the site consisted primarily of clayey sand.
Percolation testing was conducted in the vicinity of the proposed ISDS in TP -1 and TP -3. The
percolation hole in TP -2 collapsed and as a result, testing was not completed in this pit. The
percolation rate in the native soils ranged from 8 to 12 minutes -per -inch with an average of
approximately 10 minutes -per -inch. The percolation testing data are attached.
In addition to the percolation rate of the subsurface materials, the seasonal high groundwater
elevation is an important factor in determining the suitability of the site for Individual Sewage
Disposal Systems. For ISDS suitability, the seasonal high groundwater elevation should be at
least four feet below the bottom of the proposed absorption bed. As indicated on the logs,
groundwater was not encountered at the site at the time of the investigation. In general, 1-IBET
believes that the seasonal high groundwater elevation at this site is deeper than 10.0 feet below
the existing ground surface.
Two hi the Loop
1100972-0002
02/21/14
BuddWinn-Derry
Seepage Bed Design
The proposed construction at the site is anticipated to include 60 ft x 60 ft shop with attached
two-story 40 ft x 40 ft office. The current number of employees is approximately 10; however,
company growth is anticipated. Therefore, 15 employees will be assumed for the ISDS design.
Showers will not be provided at the facility; however, the shop will include a floor drain which
will discharge into the septic system after going through an oil/sand separator. Approximately
once per week, the shop floor will be washed. In addition, an exterior wash bay is proposed for
washing trucks. Based upon information provided to HBET, at the peak during the winter
months, 10 to 15 trucks will be washed during a week using an average of 500 gallons of water
for every 2 to 3 trucks. This water will also discharge into the septic system after going through
the oil/sand separator.
Infiltrator Systems Quick4 Standard Chambers are proposed in lieu of a conventional gravel
absorption bed. For conservatism, a soil percolation rate of 30 minutes -per -inch will be utilized
for the absorption field design. The maximum daily flow of the sewage disposal system and bed
area are calculated below.
Base Commercial Flow = (15 employees)(20 GPD/employee)
= 300 GPD
Supplemental Flow From Washing = ((l5 trucks/week)/(5 days/week))(500 gallons/2
trucks) + (500 gallons/week floor wash)/(5
days/week)
= 850 GPD
Average Daily Flow = (300 GPD) + (850 GPD) =1,150 GPD
Maximum Daily Flow = (1,150 GPD)(1.5) = 1,725 GPD
Standard Bed Area = [(1,725 GPD)(30 min/in)°'$]/5 = 1,890 Square Feet
Reduced Area for Infiltrators = (1,890 ft2)(0.60) =1,134 Square Feet
# of Quick4 Chambers = (1,134 / 9.2) =124 Chambers Minimum
System Installation
The installation of the septic tank, plumbing lines, absorption bed, etc. should be completed in
accordance with Garfield County regulations and Infiltrator Systems specifications. In addition,
the following construction procedures are recommended:
The septic tank and distribution box should be placed level over native soils that have
been scarified to a depth of 8 to 12 inches, moisture conditioned, and recompacted to
a minimum of 95% of the standard Proctor maximum dry density, within ±2% of
optimum moisture content. However, up to 3 -inches of washed rock or pipe bedding
passing the 1 -inch sieve may be used as a leveling course under the septic tank and/or
distribution box.
W ‘206b .%LL PROIECT5'00972 - Ford Construction Co Inc'80972.0002 Tnn In the Loop1200. Gea'00972.0002 LR022111 dx 2
Two in the Loop
100972-0002
02/21/14
iiuddlcstnn•i erty
e.. , psi- ISL
■ The bottoms of trenches and backfill around the septic tank and distribution box
which will support sewer or effluent lines should be compacted to at least 90 percent
of the standard Proctor maximum dry density, within ±2% of optimum moisture
content. Pipe bedding should have a maximum particle size of 1 -inch,
• Vehicular or heavy equipment traffic and placement of structures should not encroach
within 10 feet of the septic tank or distribution box.
Inspection Schedule
Huddleston -Berry Engineering & Testing LLC should be retained to monitor the construction of
the ISDS. The following schedule of observation and/or testing should be followed:
■ Observe the absorption bed excavation prior to placement of Infiltrator chambers.
• Observe placement of the septic tank, distribution box, and all connecting sewer and
effluent lines prior to backfill. Verify proper fall between inverts.
• Observe and verify installation of the Infiltrator absorption bed prior to placement of
cover and backfill.
General Notes
The ISDS design was based upon the results of the subsurface investigation and on our local
experience. The design is valid only for the proposed construction.
We are pleased to be of service to your project. Please contact us if you have any questions or
comments regarding the contents of this report.
Respectfully Submitted:
Huddleston t >� r Engineering and Testing, LLC
Michael A. Berry, P.E.
Vice President of Engineering
W1.2008 Al. t. PROIEC.15'00172.Fad Constmrtian Co Inc 00972-0002 Tv.o In Oke Loop\200 - Geo' 009720002 LRO221 to doe
ATTACHMENTS
\11.k - ,• . r.
- it 11 //•••
1;,j•
•
c'k
fi„"” • •••'•)-t_•:600
• . • •••••••;,, • _ ; , • • •-••••...
:••••• •-•LV•• 2"..;
tl
•
-•
•
\ . • - • ---..--..-. kz-?..11 r---• 1,--- ------' •
—•- •••: \---:‘,.....„....j":?':Q
! ' A 1.. ' A• ' -- • 7 \,\,...\,_.S r-1.:‘ ,.•
- 0.::,..,..,,.......3. -.-,2„.,....:, • ,..., .p.,,,.. .c. ‘,.:1------:.••__-_-,2. ..„.......,2,2, .-211,,,,sii, 4--.---4-N.,
) ••1-...,,p- `'• .--.-1...-Z--1...k... 1" I
,. i ...\,.......,....es.\.\ ....c...,_10 -......„2„...:„1t........„,
•
*•
•
"0.,..- \‘‘ SV. 11).., '..,.... , '• - . e:f...:":":;".}......."4 i ..-, -•• 17::-.
/
-,
. il 1,.......,_.. !..§..-,......, --......,.. •-..., -"•:-.,.......... - t.....7,.., -.b.. t ..•
N' 8....: ''' " '--- '..... ... % ' ' T -'-','''.v._; ....=.',........-.. , ,. :Z., ,.. •„
.....,--
. .. ‘• A.,' ,!.. :11 Y • -•;•"....-+-
...r.,,.,...L ,-2,77-,... •..,`,1 •-",'--,.
1 •-•-•-,
\---..S‘'--\, r ,•,11 .....• (
•. ,1.. r ' ...Z. /
1.\ 1 I i`•:, CL7.7f. \ Y "'" i7.i i•JI r••:..r,.......•:::„:, \---
: N ,
1
,•••
11(
4 \
,1 ....-..
'._...ii .- ,.... , 1, •,,,,... Cs, •-•'., !„,
17-, ) `Z,','1\_.)...,1."?. -e- :------;.-:•.':- • .i-.., /, ;'s r -S 1 C'-,,,_..
'').,,11. ' T -Lt -4--7-, .7., V•7'. .'-,r-z.-.'"--' ' .° ',-.."•!---; ,-; .., } -
-=-7.1. .1 '-__,.. ,-,- ..„/, ....),----• •
.,...„‘„, .___-- , ,, ,-,t...., .7). ,_...-•,,, ,.....,•,,... .
„.„..............__€._...,,.. ..
..---....,„;..1.74„.,.\\._. -•- ....:-_-___--..-_„;7 .;,..f..--.52 , -..-1,,,,, ..•.--• ...._•,„
.1 .
(I j_.,.„_7 -a"--=--....,_, l• •••;.• )!...
1:-.--,..__, `,. , ..—__.----•-•-Y11 (V: '
:.,„7:::„.......z. e.v.z.„...,..,...„=„.,..„._-_... 11, ).,, V • ..L_____,'-=-=-2,),....7-•• .., /,....";•if?..„,. --"-' ..--. •:----, r-7:-..-;• . ---.' .
,.., . I. •
,
,,,I.,....6,,..,_ ,...7-_,..,_, ",i7k:.:4-...-:ts„..:j•--;._!.,.•:=• -_,\ '‘' l\ '-'1
.;,,..: t-,,,1-1,-,/ ..-:.--•-•11.."‘•=-..47", l''' - . . ,( 1__,, )1.17- .77--7'-: .5 - ; i)1:.,..!!_:_ri-j,r__-,-__.-'' \ 6 , ' - ••
7 . • 7 1 : _ - _ '''',17:1'-•1: , „i::::::..,-:--' • .--!.:;7--41- 6,3c.r." • \ i , . -:,,:,>:L•, - ,. • .••••:, '.. _ -.:.'12,(21•., •-1•\''
--....
''---..z-▪ • 41.
.„.:,..„,_._ 1 .1 ) !) 1,11,,-1:-.•. N-7----....•`,...- ' \ -; '_ '., •. .
,,,(..: -.-- •,.• .........),,,,,,' ' ,•;',,
11,:' c,1:',..-;'-' ilktl. ,,,•• II 7 _ ,... , . . . . . . - • "----71. -_' - S' i. ' •,' ; ; . ' ;;: ,) : ( r): 1.:1\ ' . t --•,?,',-,1,2:;‘:'‘:::1..-s. •--r) ‘
.,.'•:,..:;‘,...1 ,-. ' -
, - 1' s•-••:....--.--- b,,,,...--_., j ,, I ; ._
,-- - •-r="- _,,:..--"1309,-0.•.- , 1:-•;•\•)i • .)
t.: --. •••-•; -•;:.'•--:' ..-.;,....r
...) . c,:,.,,,-.) -..-=••• "... __ ., i 1 1) irgi:;,-.. ,,,..„,41 , 1, ...::: , j•f,-:-• ..---9..,,
....X. -.....
ill. ./.."-__C- '' ----) :,•(,)=-.-.,'...„;`:::::?—) (,,, ,,;;:b—c----"--,.._,
-,/1Q-- pt. - ,W ;ri'Vf.,.it /Fr ••#!;,...V7—A.I.L------).„, S
"1„ ' v.'," - ; ..,.1);!\••`•-•:,% II / • .••••,0) -1 .I. i-_, - . f ''• ., .! - 2 7_
;,....-_-_,-7 iiWi'i7.----", , ' ;,-..,:`,..•-•12. .- .,-.....,1i/ ,)
.\,'j' `V) \- i ) . •:::\ •
i •'?...._ .---j• zi? ilf,..„t, ,'Sils: . 1 5 .2,
) .) iC :-..Z,:tri--,_...J,H, (:1.1 '1.--••• / - I. ., , : ;
'' •,•'.......:!,r, ) . •••,.---•••• -; 7
.... - •
-',{ N, — •:,-,.....,- (/- .-._.'0...--
J, A . ,
, ).7.....-3-• , c ,,_••_,
.1„.,, ,..... , :1,li :.- L.) --.).., .
.1. (.-',•- --,.., , , „ , . - . • (ic.'::,..,./ ..r. , --,-
'•) 'z' k
' -,1k:,._,11-..,,--.- • i',-, ' '-----
_,,ii_,,--.; ----,,A
-7:7 4„). .../ •••' ' 'I -1'.--
-
-" •••••="•
t c • \"•:\ •••
eri••
?.•
?„.0
- -••:
,r ••,
#v
1)
• 7:'•••••••••
•••,
;
0° • V
4 k
\
‚4.
4
50444' k
4
4/..
,--•
.it k
23 ) •
•
/,....-•••• • •
so \ • .
("0
r•V
046
•!
5130
5114
• , -
• - r • ..")
520°
/
/
Ns
4.
4.
+5010
)
5018
44
•
5018+
Site Location
-------- 1/%. ‘‘'•
i '--1:-...c.i...,2,, .:•-i.:__.•:,\Z",,.>4
ei ? ) r I r3C
-. . , , , L „•-,C
•61:•-' : 1
•::, k.s,
—74--
--e
" '-' -1- ( ''''4" - \\ •7.'' \
. ..'
1rz.. , 0. \ •
--- 0
.1,, i)../.d .•,-
_. . -.f
0,••:. .,....,
,• 1 . k . • V.
t\\IN1. ..,r
•
/"-li '1,.f *••:‘
)
,
/,,./ /
....
/
• .• •
/.•••e • ;
./ 3,12! ,
• /..-•
r •
5045
\s
(`•••
,•5311\k.:: "1„0°
I/
*.%
t
52
4.
•
,r( •
; .
,//4 •
- • "
5150
'••
00
-17 S
)#01'1'
#
• -r -'•
, •_, ,
-f." . / •
9 • •
, .••• r * 't
. •...
Li-- •-7
' .
(.)
. 1
I, I
•\)„,
„--
••:01 • \
. \
.--) rgf.
USGS Parachue, Colorado Qundrangle,7.5 Minute Series, 1962.
1,1 ••- •.
4 (
• } 1
7-;
)-
FIGURE 1
Site Location Map
NOT TO SCALE
0
w
NOT TO SCALE
5
N i
f
p
Za
my
gg N
rd- yzoF
00 20°
wet >4 KO D
0Roma
Z
uom
O
05 E co E
A00w
/
4
W la
0 Go >"' col w
O 0 0
1-
7
=r .1 Q
E- 0.
as
00
b. 2u
G
Project No.: 00972-0002
Date: 02/21/14
u w
o
N W
M z
Lcti
0 o
g". <
,-+UW
Q <
t
ow=
zcau
crop*
G p
:oak)
cn
3
d
2
`
o t
"
lailliZ
-•-
CLIENT
PROJECT
i:°
"
c
Ford
Huddleston -Berry Engineering & Testing, LLC
640 White Avenue, Unit B
Grand Junction, CO 81501
970-255-8005
970-255-6818
Construction PROJECT
NAME
LOCATION
TEST PIT NUMBER TP -1
PAGE 1 OF 1
Two in the Loop
NUMBER 00972-0002 PROJECT
Parachute. CO
DATE
EXCAVATION
EXCAVATION
LOGGED
NOTES
STARTED
BY
1127114 COMPLETED 1/27/14 GROUND
ELEVATION
WATER
TIME OF
END OF
EXCAVATION
TEST PIT SIZE
dry
CONTRACTOR Client GROUND
LEVELS:
EXCAVATION
EXCAVATION
METHOD Backhoe AT
NWB CHECKED BY MAB AT
dry
AFTER
---
DEPTH
(ft)
0
13- O
0
MATERIAL DESCRIPTION
SAMPLE TYPE
NUMBER
RECOVERY %
(ROD)
BLOW
COUNTS
(N VALUE)
POCKET PEN.
(uf..
DRY UNIT WT.
(Pcf)
MOISTURE
CONTENT (%)
ATTERBERG
LIMITS
FINES CONTENT
(%)
LIQUID
LIMIT
0
gJ
0.
PLASTICITY
INDEX
-�`;
!vi
i` j
til
oil
Clayey SAND and GRAVEL (gw), brownish gray, moist, medium
dense
2
1
Clayey SAND (SC) with traces of Gravel, brown, moist, medium
dense
•"" Lab Classified GB1 '"'
•
til:/i-4/;1:51
dot
GB
1
11
31
18
13
40
Bottom of test pit at 3.5 feet.
i9-_,_=,1+
'
'
-•=
.,640
:.
1-li►ddleston-Berry Engineering & Testing, LLC
White Avenue, Unit B
9G Grund Junction, CO 81501
970.255-8005
970-255-6818
Construction PROJECT
NAME
LOCATION
TEST PIT NUMBER TP-2
PAGE 1 OF 1
Two in the Loop
CLIENT
PROJECT
Ford
NUMBER 00972-0002 PROJECT
Parachute, CO
DATE
EXCAVATION
EXCAVATION
LOGGED
NOTES
STARTED
BY
1127/14 COMPLETED 1/27/14 GROUND
ELEVATION
WATER
TIME OF
END OF
EXCAVATION
TEST PIT SIZE
CONTRACTOR Client GROUND
LEVELS:
EXCAVATION
EXCAVATION
dry
METHOD Backhoe AT
NWB CHECKED BY MAB AT
dry
AFTER
---
d
0
V
al. O
MATERIAL DESCRIPTION
SAMPLE TYPE
NUMBER
RECOVERY %
(ROD)
BLOW
COUNTS
(N VALUE)
POCKET PEN.
(a)
DRY UNIT Wr.
(pd)
MOISTURE
CONTENT (%)
ATTERBERG
LIMITS
FINES CONTENT
(%)
Ca 1-
Din a 5
PLASTIC
LIMIT
O
0_
- -",..'•11:
- -if
-
1
!711'. 0
:114.4
0,10
i
•
r••b:
!•1
!•
Clayey SAND and GRAVEL (gw), brownish gray, moist, medium
dense
1
_
2
Ir. •
Y-
Y-
Clayey SAND (sc) with traces of Gravel, brown, moist, medium
dense
Bottom of test pit at 3.0 feet.
CLIENT
PROJECT
HuddlestonerryEnginering&Testing, LLC
640 White Avenue, Unit B
Grand Junclion, CO 81501
970-255-8005
Q970-255-6818
Ford Construction PROJECT
NAME
LOCATION
TEST PIT NUMBER TP -3
PAGE 1 OF 1
Two in the Loop
NUMBER 00972.0002 PROJECT
Parachute CO
DATE STARTED
1127/14 COMPLETED 1/27/14 GROUND
ELEVATION
TEST PIT SIZE
EXCAVATION
CONTRACTOR Client GROUND
WATER LEVELS:
EXCAVATION
METHOD Backhoe AT
TIME OF EXCAVATION
dry
LOGGED BY
NWB CHECKED BY MAB AT
END OF EXCAVATION
dry
NOTES
AFTER
EXCAVATION
---
I GRAPHIC
LOG
SAMPLE TYPE
NUMBER
RECOVERY %
(ROD)
BLOW
COUNTS
(N VALUE)
POCKET PEN.
(tsf)
MOISTURE
CONTENT(%)
ATTERBERG
FINES CONTENT
(%)
LIMITS
MATERIAL DESCRIPTION
m 9 g
L
PLASTIC
Limn-
PLASTICITY
IMB
PLASTICITY
INDEX
0-
J J
0
0.0
\PM 1
Clayey SAND and GRAVEL (gw), brownish gray. moist, medium
-
• L:
4."-,b1
dense
1 .
•
Clayey SAND (sc) with traces of Gravel, brown, moist, medium
dense
_ -1
2.5
•'
--
/7
5.0
•
••
-
/
7.5
•" •
r�_
10.0
y'.>l�'i
Bottom of test pit at 10,0 feel.
a,
•
CLIENT
PROJECT
. Huddleston -Berry Engineering& Testing, LLC
4, 640 White Avenue, Unit B
1' Grand Junction, CO 81501
970-255-8005
970.255-6818
Ford Cobsirtctlan PROJECT
LOCATION
NAME
TEST PIT NUMBER
Two in 1 h E Lcao#
TP -4
PAGE 1 OF 1
NUMBER 00972-0002 PROJECT
Parachute. CO
DATE
EXCAVATION
EXCAVATION
LOGGED
NOTES
STARTED
BY
1/27/14 COMPLETED 1/27/14 GROUND
ELEVATION
WATER
TIME
END
LEVELS:
OF EXCAVATION
OF EXCAVATION
EXCAVATION
TEST PIT SIZE
CONTRACTOR Client GROUND
dry
METHOD Backhoe AT
NWB CHECKED BY MAB AT
dry
AFTER
---
a. tit I
0
0.0
GRAPHIC
LOG
MATERIAL DESCRIPTION
SAMPLE TYPE
NUMBER
RECOVERY %
(RQD)
BLOW
COUNTS
(N VALUE)
POCKET PEN.
(ts()
DRY UNIT WT.
(Pei)
MOISTURE
CONTENT (%)
ATTERBERG
LIMITS
FINES CONTENT
(%)
LIQUID
LIMIT
PLASTIC
LIMIT
PLASTICITY
INDEX
r� 1
4
OilClayey
Clayey SAND and GRAVEL (gw), brownish gray, moist, medium
dense
_
2.5
SAND (SC) with traces of Gravel, brown, moist, medium
dense
HMC
1
111
7
_int
-
5.0j'!.•
/
;
***Lab Classified GB1 'I*
Li
GB
1
6
30
17
13
50
:11
7.5
_ Jul
_ 1/.
10.0
Bottom of test pit at 10.0 feel.
Huddleston -Berry Engineering & Testing, LLC
640 White Avenue, Unit B
Gruid Junction, CO 81501
970-255-8005
970.255-6818
Construction PROJECT
NAME
LOCATION
TEST PIT NUMBER TP -5
PAGE 1 OF 1
Two in the Loop
+.,.
-
'
;:=s
CLIENT
PROJECT
wo
, ,
•,
Ford
NUMBER 00972.0002 PROJECT
Parachute, CO
DATE
EXCAVATION
EXCAVATION
LOGGED
NOTES
STARTED
BY
1/27/14 COMPLETED 1/27/14 GROUND
ELEVATION
WATER LEVELS:
TIME OF EXCAVATION
END OF EXCAVATION
EXCAVATION
TEST PIT SIZE
CONTRACTOR Client GROUND
dry
METHOD Backhoe AT
NWB CHECKED BY MAB AT
dry
AFTER
--
EF MATERIAL
0
0.0
I GRAPHIC
LOG
DESCRIPTION
SAMPLE TYPE
NUMBER
RECOVERY %
(ROD)
BLOW
COUNTS
(N VALUE)
POCKET PEN.
(tsf
5s.
"
ce
0
MOISTURE
CONTENT (%)
ATTERBERG
LIMITS
FINES CONTENT I
(%)
LIQUID
LIMIT
PLASTIC
LIMIT
PLASTICITY
INDEX
-
0... r
''4
4s•.i:
Clayey SAND and GRAVEL (gw), brownish gray. moist, medium
dense
'
2.5
_
5.0
p
�/• .
J'
T•
4
Clayey SAND (sc) with traces of Gravel, brown, moist, medium
dense
MC
H 1
100
11
GB
7.5
10.0
Bottom of test pit at 10 0 feet.
PERCOLATION TESTING
Project Name: Two in the Loop
Testing Conducted By: NB
Location: Parachute, CO
Pit Dimensions: Length
Water Level Depth:
SOIL PROFILE
Depth Description
Project No. 00972 0002
Test Pit No. TP -1
Date: 1/27/2014
Supervising Engineer: M. Berry
; Width
Not Encountered X
; Depth 3.5 ft
Remarks
0-1 ft
Sandy Silty CLAY and GRAVEL (gw), brownish gray, moist, hard to very stiff
Change
(in.)
1-3.5 ft
Sandy Silty CLAY (cI) with traces of Gravel, brown, moist, stiff
5
1.75
0.625
10
5
3.25
15
6.875
1.875
Test Number: 1
Top of Hole Depth: 3.5 ft
Diameter of Hole: 4 in.
Depth of Hole: 17 in.
Time
(min.)
Water
Depth
(in.)
Change
(in.)
0
1.125
5
1.75
0.625
10
5
3.25
15
6.875
1.875
20
_
7.75
0.875
25
8.75
1
30
9.625
0.875
35
10
0.375
40
10.75
0.75
45
10.875
0.125
50
11.25
0.375
55 _
11.875
0.625
60
12.5
0.625
_
Rate (min/in): I 11 1
Average Percolation Rate (min/In):
Test Number:
Top of Hole Depth:
Diameter of Hole:
Depth of Hole:
Time
(min.)
Water
Depth
(In.)
Change
(in.)
Rate (min/in):
Test Number:
Top of Hole Depth:
Diameter of Hole:
Depth of Hole:
Time
(min.)
Water
Depth
(in.)
Change
(in.)
Rate (min/in):
PERCOLATION TESTING
Project Name: Two in the Loop
Project No. 00972 0002
Test Pit No. TP -3
Location: Parachute, CO Date: 1/27/2014
Testing Conducted By: NB Supervising Engineer: M. Berry
Pit Dimensions: Length ; Width ; Depth
Water Level Depth:
SOIL PROFILE
Depth Description
Not Encountered X
10 ft
Remarks
0-1 ft
Sandy Silty CLAY and GRAVEL (gw), brownish gray. moist, hard to very stiff
Change
(in.)
1-10 ft
Sandy Silty CLAY (cl) with traces of Gravel, brown, moist, stiff
5
1.875
0.875
10
2.5
0.625
15
3.375
0.875
Test Number: 1
Top of Hole Depth: 0 ft
Diameter of Hole: 4 in.
Depth of Hole: 16 in.
Time
(min.)
Water
Depth
(in.)
Change
(in.)
0
1
5
1.875
0.875
10
2.5
0.625
15
3.375
0.875
20
4
0.625
25
4.75
0.75
30
5.25
0.5
35
6.125
0.875
40
6.75
0.625
45
7.375
0.625
50
7.875
0.5
55
,
8.5
0.625
60
8.875
0.375
_
Rate (min/in): 9 I
Average Percolation Rate (min/in):
Test Number: 2
Top of Hole Depth: 5 ft
Diameter of Hole: 4 In.
Depth of Hole: 16 in.
Time
(min.)
Water
Depth
(in.)
Change
(in.)
0.625
1.25
_
0.625
2
0.75
3.125
1.125
4.125
1
5
0.875
6
1
7
1
7.75
0.75
8.5
0.75
9
0.5
9.75
0.75
10.125
0.375
_
Rate (min/in): I 8
Test Number: 3
Top of Hole Depth: 7 ft
Diameter of Hole: 4 in.
Depth of Hole: 18 in.
Time
(min.)
Water
Depth
(in)
Change
(in.)
1.25
3.25
2
5
1.75
6.5
1.5
8
1.5
9.25
1.25
10
0.75
11
1
11.625
0.625
12.25
0.625
13
0.75
13.375
0.375
14
0.625
Rate (min/in): 12 1