Loading...
HomeMy WebLinkAboutApplication- Permit- Garfield County ' Building & Sanitation Department 108 8"' Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 Job Address NO. Ci 4`P 0-35-5- OP S Nature of Work Building Permit t9/ r 101.0.- on- 0(7 9 Use of Building /I(Ai CIA Owner S�1'% /J / / , 1 L to 1 l) u OQ C \ ULJ>< C % Contractor / E (A_(/YlQuj.S2 Amount of Permit $ 5-65-20,9 Date Clerk ��-ll DS' GARFIELD COUNTY BUILDING PERMIT APPLICATION GARFIES D COUNTY (GIENWOOD SPRINGS), COLORADO TELEPHONE: (970) 943-8212 9 INSPECTION LINE: (970)384 5003 PERMIT NO. b PARCELSCHEDULE No.al85-o(0A - 00-at7 KaADDRESS: 0355 CauA%1Ty 'ken D 132 aIexit 000n S PG S. Ca n6I71 TOT NO. BLOcKNO. SUEDIV1s1ON/FIffIWITON q 4 t- 79kin S all 2 OMER -//an rani) t Sgit CHJa o355 Cty RD, iia 115-9657 a`� CIO 3 1 464 DieUm *PJ Com VT. Co , PP.c . BRA .3.317 cS . CO lit 'Y45-7Soz 345/ esr aIm"'a it iLLe _/CNQcK Pc3-►R s�.f/ IS =MI 9 .4 FLOPSOILDNO 5oet, 0 04,0.0E40T g 79 Nce&s %7'1-- waran®A 6 MEW B131/010 GP4a/eeW 7 DINICIIMI"OI` /Veil} a1,4/ST-ede, r, -ort/ — efssw/G.P-ci7i/k✓ooD 8 aASWWnL 44. wnM DL1fAatm trove warova 9 a..raN� maw =M eAncan 1=1.1.11 V E / 10 �/ cotlue.ArGnem ma-muaecava¢.� ufd5 r .Z4JAw.w S.,1,7%9K ctin// M cX,sr.#t/t �,�,«� 1.4,1,07UMW. �� ,3c� neo Aa@®YaosTfl( �5 ffl5o,6L) .ROAD eljA.`pbil refLA.J.40 0704:4 -3s - p-ri-k4,..4-. 4-+Q`1 1D/7/ 6 a -- NOTICE A SEPARATE ELECTRICAL PERMIT IS MGM= AND MUST 98 ISSUED COLORADO.-$-ife7 THIS PIIEM4f BECOMES NULL AND VOID IF WORK OK BY THE SATE OF CONSTRUCTION CONSTRUCTION OR DAYS AT ANY TIME APPLICATION AND OF LAWS WHETHER. SPECIFIED PRESUME TO GIVE PERMIT FEE: 2202.13 152. 3/28.50 PIAN HECK - TOTAL FEE: DATE PERMIT ISSUED: SeeS7. D Z, . AMEN WORK 13 AFTER WORK I HEREBY KNOW THE GOVERNDHP1HISTYPE TIERED,/ AUTHORITY L. 18 NOT COMMENCED WIDEN 130 DAYS, OR IF SUSPENDED OK ABANDONED FORA PERIOD OF 130 IS COMMENCED. CEI TI Y'HAT I HAVE READ AND EXAMIDHID THIS SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF WORK WILL BE COMPLIED WITH OR NOT. THE GRANTING OF A PERMIT DOES NOT ID VIOLATE OR CANCEL THE PROVISIONS OF ANY LAW REGULATING CONSTRUCTION OR THE e Op GROUP: NST: TYPE: J4..3 S3 O ER. STATE OR PERFORMANCE OF - DZ .25 ZONING: SETBACKS:O ea _ PI ,AA � � j ; I MAME HOME: ISDS N Fes: C.)TV • PERMISSION IS HERESY GRANTED TO THE DETAILED ON PLANS AND SPECIFICATIONS AGREEMENT CONTRACTOR AND/OR THE AGENT TT OF THE CONTRACTOR OR OWNER TO CONSTRUCT TICE STRUCTURE AND REVIEW® BY THE BUHDINGDEPARIMFNT. IN CONSIDERATION OF 11IE ISSUANCE OF ME PFBMHf, THE SIGNER HEREBY AGREES TO COMPLY WITH AL. BUILDING CODES AND LAND USE REGULATIONS ADOPTED GARFIED COUNTY PURSUANT TO AUTHORDY GIVEN 114 30.22.201 CRS AS ASCENDED. ESE SIGNER FUSILIER AGREES THAT IP TBE ABOVE SAID ORDINANCES ARE NOT FUI COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF TIE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FR THE COUNTY AND THAT 1ffiN AND THERE IT SHAH, BECOME MBI. AND VOHI. THE ISSUANCE OF A PERMIT BASED UPON PLANS. SPECIFICATIONS AND OMR DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING S CORRECTION OF ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DMA OR FRO PREVENTING BUILDING OPERATION BEING CARTED ON THEREUNDER WHEN VKBATION OF THE CODE OR ANY CTHFAORDINANCE OR REGULATION OFTHIS IURISDICTION. TEL REVIEW OF THE SUBMITTED PLANS AND SPECIFIC AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONS RRS}OMISIBn x h33 CR HABIL/MG BY GiARFIE n cowry FOR DORS. OM ESKRNB OR DISC EPANCIES. TMs RESPONSIBILITY FOR DIES DURING corantucnoN RESTS SPECIFICALLY WITHTBR ARCIHrxcr, DESIGNER, BUILDER AND OWNER. COMMENTS ARE TNIENDFDTO OF TIE OWNERS BITTEREST. (IMormsa3 I HEREBY ACD4OWIFDG E THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. det- a� aa$,5 PLAN REVIEW CHECKLIST Applicanagitse# 4 37 Date 3'l7• etc Building ✓Engineered Foundation L•iriveway Permit `Surveyed Site Plan i\,/, -Septic Permit and Setback Pr I..t ✓Grade/Topography 30% LA A -Attach Residential Plan Review List `Minimum Application Questionnaire Planning/Zoning Property Line Setbacks 30ft Stream Setbacks Flood Plain Building Height Zoning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes Valuation Determination/Fees Red Line Plans/Stamps/Sticker �ach Conditions Apiplication Signed elan Revie . - •_ • •lication Parcel/Sc 40# Snowload Letter- Manf. Hms. GENERAL NOTES: 5000 S F iota = S'i 9 :Co J11_.22.2005 9:22AM D M NEIMRN CONSTR CI M. ` NEUMAN CONSTRUCTION CO. FACSIMILE TRANSMITTAL, via 945-6865 FROM: nl✓lo.- NO.126 P.12 (970)945-7502 910 1Sh Sava Pa Roe 2317 Glenwood springs. Colorado 81802 DATE : 9%21.05 Total Pages, including This Sheet: -2- Rt e eori ✓ {stater Gmurc- — , reams} entLe. P(e.a.st_ &t oictacim-DL teiti tyin 42-A ;oG- An c ,�,®,�-s -- 04 ainilM Cu, .tA . COU L w( a ol,,aMs This facsimile transmission 1s intended for the addressee only. Any person who is not the addressee & communicates ehe contents of this transmission to a third party may be subject to both criminal end civil penalties. Please call cur phone number collect if you ere an unintended recipient of this fax transmission. 22.2BB5 9:22q. Utl •LI• LUUS c.uara 9 � July 21,2005 DnCONSTR nAnn tp.1268 P.2'2 CWL, Canyon Engineering, Inc.; Duane Neuman D.M. Neuman 'Construction 310 19Th PG. Box 2317 Glenwood Springs, CO 31602 RE: Pour Square Chtuoh Door Frame Modification Dear Duane: At your roquest, 1 have reviewed a modification that you nae durigg the construction of the Four Square Church in West Gleawaod Springs. This letter report summarizes my findings. Following initial kerning, h was discovered that a 6' doorway was framed slightly smeller than the door assembly. In order for the door frame to fit, it was necessary to replace one 2x6 trimmer from each side of the Sane and with a 1x6 trimmer. The door is now framed with one 2x6 and one 1x6 trimmer on each side. The existing header is now coming on the angle 1x6 on each side. You have nailed the new lx6 to the 2x6 with 10d nails at 6" const. In addition, you have added a Simpson A35 framing anchor between the bottom of the header and the face of the 2x6 nimmet. The modifications that you have made are acceptable from an engineering standpoint. If you or the building official have any question, plane Si free to contact me. Thank you. Sincerely, CANYON GINF�ER(NG, INC Charles Peterson, P.E. Engineer lim'aoiWMiteR1tGUS % eArias tads/ P.O. Bon 398 • Glenwood Springs, CO 81602 • (970) 945'5138 • FAX (970) 945-5138 Garfield County Building and Planning 108 8th Street Suite 201 Glenwood Springs, CO 81601 970.945.8212 Plan analysis based on the 2003 International Building Code Project Number: Date: March 16, 2005 Project Name: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. Contractor: Neuman Occupancy: A-3 Architect: Miller Construction: V -B Engineer: Peterson Report By: Andy Schwaller This only a partial list of possible code related items.See 2003 IBC for other code items. SPRINKLER SYSTEM: NFPA 13 sprinkler system throughout the building Sprinkler system used to increase the allowable area and height. -- Sec. 504.2 and 506.3 FRONTAGE INCREASE: Perimeter of the entire building = 300 feet. Perimeter which fronts a public way or accessible open space = 150 feet. Minimum width of public way or accessible open space = 25 Allowable area increased 20.83% for frontage increase. -- Sec. 506.2 FL NAME OCC MAX FLR AREA ALLOWED RATIO STATUS 1 Church Worship Area A-3 ok 3059 25250 0.12 ok 1 Class room A-3 ok 338 25250 0.01 ok 1 Class room A-3 ok 177 25250 0.01 ok 1 foyer, hall, b -room A-3 ok 1426 25250 0.06 ok TOTAL FOR FLOOR 5000 25250 0.2 ok BUILDING TOTAL 5000 25250 0.2 ok -- Sec. 503, 504, 506 and Table 503 The actual height of this building is 21.0 feet. Page # 2 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. PROPERTY DESCRIPTION: North Side has a property line. - Distance to property line = 80.0 East Side has a property line. - Distance to property line = 90.0 South Side has a property line. - Distance to property line = 260.0 West Side has a property line. - Distance to property line = 180.0 EXTERIOR WALL FIRE RATINGS AND OPENING PROTECTION Sec. 602, Tables 601 and 602, and Sec. 704 NORTH EAST SOUTH WEST OCC BRG NON OPNG% BRG NON OPNG% BRG NON OPNG% BRG NON OPNG% WALL BRG UP/PR WALL BRG UP/PR WALL BRG UP/PR WALL BRG UP/PR A-3 0 -hr 0 -hr NL/NL 0 -hr 0 -hr NL/NL 0 -hr 0 -hr NL/NL 0 -hr 0 -hr NL/NL The exterior walls may be of COMBUSTIBLE material. -- Sec. 602.5 Exterior walls are required to be fire -rated for exposure to fire: 1. From Both sides when fire separation is 5 feet or less. 2. On the interior side only when separation is greater than 5 feet. -- Sec. 704.5 Then maximum percent of area of unprotected opening has been adjusted for an automatic sprinkler system. -- Sec. 704.8.1 up/pr = Maximum percent of openings in the exterior wall. -- Table 704.8 up - The maximum percent if all openings are unprotected. pr - The maximum percent if all openings are protected. If some are protected and some are not, then use formula in Sec. 704.8 Openings in lhr walls are required to be protected with 3/4 hour assemblies. -- Sec. 704.12 and Sec. 715.4 Openings in walls required to be greater than lhr are required protected with 1 1/2 hour assemblies. -- Sec. 715.4 NL = No fire protection requirements for openings. NP Openings are not permitted in this wall. Note: Unlimited unprotected openings are allowed in walls not required to fire-resistant. -- Table 704.8, Note: g. * = These walls may be required to have a parapet wall 30 inches above the roofing. The parapet wall is required to have the same fire rating as the wall and shall have noncombustible faces for the uppermost 18 inches. -- Sec. 704.11 Exception 1: A parapet wall is not required when the wall is not required to be fire -resistive. Page # 3 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. FIRE RESISTANCE RATINGS FOR BUILDING ELEMENTS Table 601 ELEMENT MATERIAL RATING NOTES Structural Frame Any 0 hour Interior Bearing wall Any 0 hour Interior nonbrg wall Any 0 hour Floor/Ceiling Assembly Any 0 hour Roof/Ceiling Assembly Any 0 hour Stairs Any None NOTES: DRAFTSTOPPING: Draftstopping is not required in buildings equipped throughout with an automatic sprinkler system in accordance with NFPA 13. -- Sec. 717.3.3 Exception (floor) and Sec. 717.4.3, Exception (attic) Opening in the partitions shall be protected by self-closing doors with automatic latches constructed as required for the partitions. -- Sec. 717.4.1.1 EXIT REQUIREMENTS: FL NAME NUMB MIN MIN PANIC CORRIDOR DOOR NOTES OCC EXITS WIDTH HDWR RATING SWING 1 Church Worship Area 437 2 65.6 Yes N/A Out 1 12 1 Class room 48 1 7.2 No N/A N/R 1 Class room 25 1 3.8 No N/A N/R 1 foyer, hall, b -room 285 2 42.8 Yes N/A Out 1 12 TOTAL FOR FLOOR 795 3 119.3 Yes N/A Out 3 12 FOOTNOTES: 1. Two exits are required from this area since the occupant load exceeds allowable in Table 1014.1 3. Number of exits in this area is based on Table 1018.1 12. Panic hardware is required when the occupant load is 100 or more. -- Sec. 1008.1.9 Page # 4 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. NOTES FOR EXIT TABLE Door swing is based on Section 1008.1.2 Occupant load is based on Section 1004 and Table 1004.1.2 Exit width is in inches and based on Section 1005.1 & Table 1005.1 Width shown for all areas is based on other egress components. Width shown for 1st floor is based on other egress components. Width shown for other floors & basements is based on stairways. For the minimum width of doors, see Section 1008.1.1. For the minimum width of corridors, see Section 1016.2. For the minimum width of stairways, see Section 1009.1. Exits shall be continuous from the point of entry into the exit to the exit discharge. -- Sec. 1003.6 EXIT SEPARATION In areas where 2 exits are required, the minimum separation is 1/3 of the maximum diagonal of the area or floor measured in a straight line between exits or exit access doorways.-- Sec. 1014.2.1, Exception 2 Note: In areas with more than 2 exits, at least 2 exits must be 1/3 of the maximum diagonal of the area or floor measured in a straight line between exits or exit access doorways. Additional doorways shall be arranged so that if one becomes blocked, the others will be available - - Sec. 1014.2.2 Multiple means of egress shall be sized such that the loss of any one means of egress shall not reduce the available capacity by more than 50 percent. -- Sec. 1005.1 EXIT SIGNS Exits and exit access doors shall be marked by an approved exit sign. Signs shall be placed where the exit or the path of egress travel is not immediately visible. No point to be more than 100 feet from an exit sign. - - Sec. 1011.1 Exception 1: Exit signs are not required in rooms or areas which require only one exit. Exception 2: Main exterior exit doors which obviously and clearly are identifiable as exits need not be signed when approved. Exit signs shall be internally or externally illuminated. - - Sec. 1011.2 Exit sign shall be illuminated at all times including during loss of primary power. -- Sec. 1011.4 & Sec. 1011.5.3 Page # 5 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. BOLT LOCKS: Manually operated flush bolts and surface bolts are not permitted. -- Sec. 1008.1.8.4 Exception 2: Where a pair of doors serves a storage or equipment room, manually operated edge- or surface -mounted bolts are permitted on the inactive leaf. LOCKS AND LATCHES: Egress doors shall be readily openable from the egress side without the use of a key or any special knowledge or effort. -- Sec. 1008.1.8 Locks and latches shall be permitted to prevent operation where any of the following exists: Exception 2: The main door or doors in Group A areas with an occupant load of 300 or less are permitted to be equipped with key operating locking devices from the egress side provided: Exception 2: The main door or doors in churches are permitted to be equipped with key operating locking devices from the egress side provided: 2.1 The locking device is readily distinguishable as locked. 2.2 A readily visible durable sign is posted on the egress side stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED Exception 3: Where egress doors are used in pairs, automatic flush bolts shall be permitted to be used, provided the door leaf having the automatic flush bolts has no doorknob or surface -mounted hardware. ADDITIONAL DOORS: Where additional doors are provided for egress purposes, they shall conform to the requirements in Section 1008.1 LANDINGS AT DOORS: 1. There shall be a floor or landing on each side of a door. -- Sec. 1008.1.4 2. Such floor or landing shall be at the same elevation on each side of the door. -- Sec. 1008.1.4 3. The floor or landing shall not be more than 1/2 inch lower than the threshold. -- Sec. 1008.1.6 4. Landings shall have a width not less than the width of the stairway or width of the doorway, whichever is the greater. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing dimension to less than one half it required width. The minimum length in the direction of exit travel is 44 inches. -- Sec. 1008.1.5 5. The space between two doors in series shall be 48 inches plus the width of door swinging into the space. -- Sec. 1008.1.7 Page # 6 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. EXIT ACCESS TRAVEL DISTANCE: The maximum travel distance in Group A is 250 feet. Table 1015.1 BUILDING ACCESSIBILITY 1. In addition to accessible entrances required by Sections 1105.1.1 through 1105.1.6, at least 50 percent of all public entrances shall be accessible. -- Sec. 1105.1 2. At least one accessible entrance shall be provided to each tenant, dwelling unit and sleeping unit in a facility. -- Sec. 1105.1.6 3. Where parking is provided, accessible parking spaces hall be provided in compliance with Table 1106.1 -- Sec. 1106.1 4. At least one accessible route shall connect each accessible level. - - Sec. 1104.4 See exceptions. 5. Accessible routes shall coincide with or be located in the same area as a general circulation path. Where the circulation path is interior, the accessible route shall also be interior. - - Sec. 1104.5 6. On floors where drinking fountains are provided, at least 50 percent, but not less than one fountain shall be accessible. -- Sec. 1109.5 In areas with fixed seating, accessible wheelchair spaces shall be provided in accordance with Table 1108.2.2.1 At least one seat for a companion shall be provided beside each wheelchair space. -- Sec. 1108.2.5 Dispersion of wheelchair space clusters shall be based on the availability of accessible routes to various seating areas including seating at various levels in multi-level facilities. -- Sec. 1108.2.4 Each assembly area where audible communications are integral to the use of the space shall have an assistive listening system. -- Sec. 1108.2.7 Receivers shall be provided for assistive listening systems in accordance with Table 1108.2.7.1. -- Sec. 1108.2.7.1 ROOFING REQUIREMENTS: 1. The roofing on this building is required to be Class C. -- Table 1505.1 Roofing may be of No. 1 cedar or redwood shakes and No. 1 shingles. - - Exception c STANDPIPE AND HOSE SYSTEMS -- Sec. 905 Exception: Class I standpipes are allowed in buildings with an automatic sprinkler system. A standpipe system is not required. Page # 7 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. FIRE ALARM SYSTEM -- Sec. 907 A manual fire alarm system is required. -- Sec. 907.2.1 Exception: Manual alarm boxes are not required if the notification appliances will activate upon sprinkler waterflow. If the automatic sprinkler system is connected to building fire alarm system, automatic heat detection is not required. -- Sec. 907.2 LIGHT AND VENTILATION 1. Every space intended for human occupancy shall be provided with natural light. The minimum net glazed area shall not be less than 8% of the floor area. -- Sec. 1205.1 and 1205.2 Any room is permitted to be considered as a portion of an adjoining room where one half of the area of the common wall is open and unobstructed and provided not less than one tenth of the floor area or 25 square feet, whichever is greater. -- Sec. 1205.2.1 Artificial light shall be provided that is adequate to provide an average illumination of 10 foot candles over the area of the room at a height of 30 inches above the floor. -- Sec. 1205.3 2. Natural ventilation of an occupied space shall be through windows, doors, louvers or other openings to the outdoors. -- Sec. 1203.4 The minimum openable area to the outdoors shall be 4 percent of the floor area. -- Sec. 1203.4.1 Any room is permitted to be considered as a portion of an adjoining room where unobstructed openings are provided that have an area not less than 8% of the floor area of the interior room but no less than 25 square feet. -- Sec. 1202.3.1.1 When openings are below grade, clear space measured perpendicular to the opening shall be one and one half times the depth of the opening. -- Sec. 1203.4.1.2 3. Rooms containing bathtubs, showers, spas and similar bathing fixtures shall be mechanically ventilated. -- Sec. 1203.4.2.1 CEILING HEIGHTS: Occupiable spaces, habitable spaces and corridors shall have a ceiling height of not less than 7 feet 6 inches. Bathrooms, toilet rooms, kitchens, storage rooms and laundry rooms shall be permitted to have a ceiling height of not less than 7 feet. -- Sec. 1208.2 Page # 8 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. WALL AND CEILING FINISH: 1. Wall and ceiling finish materials are required to comply with Sec. 803.5 and Table 803.5. 2. Textile wall coverings shall have Class A flame spread index and shall be protected by automatic sprinklers or meet the criteria in Section 803.6.1.1 or 803.6.1.2. -- Sec. 803.6.1 3. Carpet and similar textile materials used as a ceiling shall have a Class A flame spread index and be protected by automatic sprinklers. - - Sec. 803.6.2 4. Expanded vinyl wall coverings shall comply with the requirements for textile wall and ceiling materials. -- Sec. 603.7 5. Toilet room floors shall have a smooth, hard nonabsorbent surface that extends upward onto the walls at least 6 inches. - - Sec. 1210.1 6. Walls within 2 feet of urinals and water closets shall have a smooth, hard nonabsorbent surface, to a height of 4 feet above the floor. - - Sec. 1210.2 INSULATION NOTES: 1. Insulating materials shall have a flame -spread rating of no more than 25 and a smoke developed index of not more than 450. -- Sec. 719 2 (concealed installation) and Sec. 719.3 (exposed installation) 2. Where such materials are installed in concealed spaces, the flame spread and smoke developed limitations do not apply to facings, coverings and layers of reflective foil that are installed behind and in substantial contact with the unexposed surface of the ceiling, wall or floor finish. -- Sec. 719.2.1 Foam plastic insulations are required to be protected. -- Sec. 2603 ACCESSIBLE FACILITIES: NOTE: Except as noted, section numbers listed below are from ICC/ANSI A117.1-1998 WATER FOUNTAINS AND WATER COOLERS: Accessible units must comply with the following: 1. Spout is to be within 36 inches of the floor. -- Sec. 602.4 2. Spout arranged for parallel approach shall be located 3 1/2 inches maximum from the front edge. Units with a forward approach shall have the spout 15 inches minimum from the vertical support and 5 inches maximum from the front edge of the unit. - - Sec. 602.5 3. Spouts shall provide a flow of water 4 inches height minimum. - - Sec. 602.6 Page # 9 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. TOILET FACILITIES: 1. A 60 inch diameter turning space or T-shaped space is required in the toilet room. -- Sec. 603.2.1 and 304.3 Doors shall not swing into the clear floor space for any fixture. 603.2.3 See exception for rooms used for individual use. 2. Water closet shall be mounted adjacent to a side wall or partition. The distance from the side wall or partition to the centerline of the water closet shall be 16 to 18 in. Sec. 604.2 3. When the accessible water closet is not in a compartment: Clearance around the water closet shall be 60 inches minimum, measured perpendicular to the side wall, and 56 inches minimum, measured perpendicular to the rear wall. -- Sec. 604.3.1 4. When the accessible water closet is in a compartment: Wheelchair accessible compartments shall be 60 inches wide minimum measured perpendicular to the side wall, and 56 inches deep minimum for wall hung water closets and 59 inches deep for floor mounted water closets, measured perpendicular to the rear wall. -- Sec. 604.8.1.1 Compartment doors shall not swing into the minimum required compartment area. -- Sec. 604.8.1.2 Page # 10 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. 5. Grab bars shall have a circular cross section with a diameter of 1 1/4 inch minimum and 2 inches maximum, or shall provide equivalent graspability. -- Sec. 609.2 The space between the wall and the grab bar shall be 1 1/2 inches. Sec. 609.3 Grab bars shall be mounted in a horizontal position 33 inches minimum and 36 inches maximum above the floor. -- Sec. 609.4 a. Side wall grab bars are required to start within 12 inches of the backwall and extend to 54 inches from the back wall. (The minimum length of the bar is 42 in) -- Sec. 604.5.1 b. The rear bar shall be 24 in long minimum, centered on the water closet. Where space permits, the bar shall be 36 in long minimum, with the additional length provided on the transfer side. -- Sec. 604.5.2 6. The top of the water closet seats shall be 17 to 19 inches above the floor. -- Sec. 604.4 7. Accessible urinals shall be of the stall type or wall hung with the rim at 17 inches maximum above the floor. -- Sec. 605.2 8. Accessible lavatories shall be mounted with the rim 34 inches maximum above the floor. -- Sec. 606.3 9. Sinks shall be 6 1/2 inches deep maximum. -- Sec. 606.5 10. Water supply and drain pipes under lavatories shall be insulated or otherwise treated to protect against contact. -- Sec. 606.6 11. Mirrors shall be mounted with the bottom edge of the reflecting surface 40 inches maximum above the floor. -- Sec. 603.3 FIXTURE COUNT TABLE: NAME NUMBER RATIO WATER CLOSETS LAVS TUB DRINKING OCC M/F MALE FEMALE M F SHOWER FOUNTAIN 1st. floor Church Worship Area 437 50/50 2 3 2 2 0 1 Ratio = 1 per 150 75 200 200 -- 1000 Class room 48 50/50 1 1 1 1 0 1 Ratio = 1 per 150 75 200 200 -- 1000 Class room 25 50/50 1 1 1 1 0 1 Ratio = 1 per 150 75 200 200 -- 1000 foyer, hall, b -room 285 50/50 2 3 1 1 0 1 Ratio = 1 per 125 65 200 200 -- 500 TOTAL FOR FLOOR 3 6 2 2 0 2 BUILDING TOTAL 3 6 2 2 0 1 International Plumbing Code Section 403 and Table 403.1 Page # 11 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. In each bathroom or toilet room, urinals shall not be substituted for more than 67 percent of the required water closets. -- IPC Sec. 419.2 NOTE: The number of fixtures for a floor may not match total number of fixtures per area. The number of fixtures for the building may not match the total for the floors. The number of fixtures for each area and floor are rounded up to the next whole number. Totals are not rounded up until the total is obtained. If the fixtures only serve an area, use number shown for each area. If the fixtures serve an entire floor or building, use number shown for totals. Page # 12 Code review for: Project Id.: Sonlight Church Address: 355 County Rd. 132, Glenwood Spr. GLAZING REQUIREMENTS All glazing in hazardous locations is required to be of safety glazing material. -- Sec. 2406.1 Locations: -- Sec. 2406.3 1. Glazing in swinging doors except jalousies. 2. Glazing in fixed and sliding panels of sliding patio door assemblies and panels in sliding and bifold closet door assemblies. 3. Glazing in storm doors. 4. Glazing in all unframed swinging doors. 5. Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs and showers. Glazing in any portion of a building wall enclosing these compartments where the bottom exposed edge of the glazing is less than 60 inches above a standing surface. 6. Glazing in fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24 -inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. Exception: Panels where there is an intervening wall or other permanent barrier between the door and glazing. 7. Glazing in an individual fixed or operable panel, other than those locations described in items 5 and 6 above, than meets all of the following conditions: 7.1 Exposed area of an individual pane greater than 9 square feet. 7.2 Exposed bottom edge less than 18 inches above the floor. 7.3 Exposed top edge greater than 36 inches above the floor. 7.4 One or more walking surfaces within 36 inches horizontally of the plane of the glazing. See Exceptions. 8. Glazing in guards and railings regardless of the area or height above a walking surface. 9. Glazing in walls and fences enclosing indoor and outdoor swimming pools, hot tubs and spas where all of the following are present: 9.1 The bottom edges of the glazing on the pool or spa side is less than 60 inches above the walking surface. 9.2 The glazing is within 60 inches of the water's edge. 10. Glazing adjacent to stairways, landings and ramps within 36 inches horizontally of a walking surface when the glass is less than 60 inches above the plane of the walking surface. 11. Glazing adjacent to stairways within 60 inches horizontally of the bottom tread of a stairway in any direction when the exposed glass is less than 60 inches above the nose of the tread. See Exceptions. Page 1 of 1 Andy Schwaller From: Ron L. Biggers [rbiggers@ci.glenwood-springs.co.us] Sent: Thursday, October 20, 2005 5:27 PM To: Andy Schwaller Subject: Sonligth Church, Cty RD. 132, Approved Andy, Today I reinspected the Sonligt Church, 0355 County Road, Glenwood Springs and approved their sprinkler and fire alarm systems. D. Neuman said he had already taken the building department sign -off card to you, if you want me to sign it let me know. Ron Biggers 970-384-6433 Fire Sprinklers Save Lives i nnniflnnc Central Regional Administrative Center 12/10/2004 Rev. Bernie Masimer Glenwood Springs Sonligbt Foursquare Church 355 County Road 132 Glenwood Springs CO 81601-5512 Dear Pastor Bernie: ii INTERNATIONAL CHURCH OF THE. FOURSQUARE (iOSPEI. Please fmd enclosed the Corporate Resolution approving the church's request to build a new church sanctuary and to obtain a loan from Alpine Bank. Also please find enclosed a PT -22 "Church Construction Progress Report" form. Please advise those who will prepare the legal documents, such as loan papers, that the correct legal name of the corporation is International Church of the Foursquare Gospel. ICFG is a religious corporation organized under the laws of the State of California. Paperwork needing signatures should be sent to the Properties Department at 1910 West Sunset Blvd., Ste. 200, PO Box 26902, Los Angeles, California 90026-0176. This approval is granted with the understanding that, since this loan is in the name of the International Church of the Foursquare Gospel, the loan payments will be made payable to (and mailed to) the International Foursquare Loan Fund at the corporate office address. The International Church of the Foursquare Gospel will reissue the payments to the mortgagee. Please give a copy of the resolution to the bank and also show them the PT -22 form. Explain to them that our procedure for making construction loan draws is as follows: 1. The church will fill out a PT -22 form and attach to it contractors invoice, receipts, statements, etc. to support the amount requested. 2. 1 will then obtain the approval of the draw from your District Supervisor. 3. 1 will then fax or email the PT -22 form and attachments and any form the bank may want us to use and make the request of the bank for the draw. 4. The bank can then fund the draw however you have agreed to do that with them. (Some banks pay the bills directly while others send the funds to the church for the church to pay them.) When you send in your first draw request, please include instructions as to how I am to communicate to the bank to make the draw. (Contact name, email address or fax number, special form to use, etc.) If you have any questions about the process of making loan draws, please give me a call. Sincerely,'er Michael Margheim ICFG Central RAC HERBERT E. SCHNEIDA U, JR., REGIONAL ADMINISTRATOR 1425 N UNION BLVD., STE.I00, COLORADO SPRINGS, CO 80909 ILL (7191575-0444 TOLL-FREE. (866) 660-2722 FAX (719) 575-0459 E-MAIL' cennulrac(gfoursqual OL CORPORATE RESOLUTION RESOLVED: By the Executive Staff Committee of the Board of Directors of International Church of the Foursquare Gospel, a religious corporation, the unanimous vote of the church membership present at a duly called meeting, the vote of the church council of the GLENWOOD SPRINGS, COLORADO #30733 Foursquare Church having been received and the recommendation of the Rocky Mountain District Supervisor having been secured in accordance with corporation Bylaws, that approval be granted to build a church facility, located at 0355 County Road 132, at a cost of Three Hundred Ninety Two Thousand Dollars($392,000) and that approval be granted to obtain a loan from Alpine Bank of up to Six Hundred Thousand Dollars ($600,000), with Three Hundred Forty Four Thousand Five Hundred Dollars ($344,500) being a construction loan with interest only during construction of Chase Manhattan Prime +0.5%, until construction is completed, then to be converted to a term loan and combined with loan #2043500031 with Alpine Bank with interest at Chase Manhattan Prime Rate plus 0.5% adjusted annually, amortized over 30 years, to assist with aforesaid construction, said loan to be secured by a mongage or deed of trust on the following described property: P ARCEL 1: A PARCEL OF LAND SITUATED IN GOVERNMENT LOT 4 OF SECTION 6, TOWNSHIP 6 SOUTH. RANGE 89 WEST OF THE SIXTH PRINCIPAL MERIDIAN, COUNTY OF GARFIELD, STATE OF COLORADO; SAID PARCEL BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHWEST CORNER OF SECTION 34, TOWNSHIP 5 SOUTH, RANGE 89 WEST OF THE SIXTH PRINCIPAL MERIDIAN, A G.L.O. BRASS CAP STANDARD MONUh1EN'r IN PLACE, SAID CORNER ALSO BEING AT THE NORTH LINE OF SAID LOT 4, TOWNSHIP 6 SOUTH, RANGE 89 WEST OF THE SIXTH PRINCIPAL MERIDIAN; THEN N.89'S0'00'E. ALONG THE NORTH LINE OF SAID LOT 4, A DISTANCE OF 352.83 FEET TO A REBAR AND ALUMINUM CAP: THEN 8.19'19'00"E. A DISTANCE OF 197.07 FEET TO A REBAR AND CAP, PLS N 29030; THEN S.28'20'00"E. A DISTANCE OF 234.50 FEET TO A REBAR AND CAP, PIS N 29030 (FROM WHICH A REBAR AND CAP, PLS N 29030, WITNESS CORNER BEARS S.72'10'OO"W. A DISTANCE OF 10.60 FEET); THEN S.72'10'OO"W. A DISTANCE OF 131.18 FEET TO A REBAR AND CAP, PLS N 29030; THEN N.86'42'l7"W. A DISTANCE OF 263.32 FEET TO A REBAR AND CAP, PIS N 7972 AT THE EASTERLY LINE OF THAT PROPERTY DESCRIBED IN BOOK 643 AT PAGE 686 OF THE GARFIELD COUNTY RECORDS; THEN S.89'S0'OO"W. ALONG THE SOUTHERLY LINE OF SAID PARCEL, 4 DISTANCE OF 133.52 FEET TO A REBAR AND CAP, PIS N 7972; TEEN 5.89'08'30"W. ALONG SAID SOUTHERLY LINE, A DISTANCE OF 314.40 FEET; THEN N.0r06'00"W. ALONG THE WESTERLY LINE OF SAID PARCEL, A DISTANCE OF 416.48 FEET TO A REBAR AND CAP, PIS N 29030 AT TILE NORTH LINE OF SAID GOVERNMENT LOT 4 OF SECTION 6; THEN N.8902'50" E. ALONG SAID NORTH LINE, A DISTANCE OF 314.56 FEET; TO THE POINT OF BEGINNING, SAID PARCEL CONTAINING 7.190 ACRES. MORE OR LESS. ALSO KNOWN AS: LOT 1, FIRST AMENDED BETZ SUBDIVISION EXEAIPTION PLAT, ACCORDING TO THE PLAT RECORDED MAY 6, 1998 AS RECEPTION NO. 524696. PARCEL 2: A PARCEL OF LAND SITUATED W GOVERNMENT LOT 4 OF SECTION 6, TOWNSHIP 6 SOUTH, RANGE 89 WEST OF THE SIXTH PRINCIPAL MERIDIAN, COUNTY OF GARFIELD, SIATE OF COLORADO; SAID PARCEL BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS; BEGINNING AT A REBAR AND CAP, PLS N 7972 AT THEEASTERLY LINE OF THAT PROPERTY DESCRIBED IN BOOK 643 AT PAGE 686 OF THE GARFIELD COUNTY RECORDS FROM WHICH THE SOUTHWEST CORNER OF SECTION 34, TOWNSHIP 5 SOUTH. RANGE 89 WEST OF THE SIXTH PRINCIPAL MERIDIAN, A G.L.O. BRASS CAP STANDARD MONUMENT IN PLACE, BEARS N.18'44'47"W. A DISTANCE OF 479%1 FEET; THEN S.8642'37"E. A DISTANCE OF 263.32 FEET TO A REBAR. AND CAP, PIS N 29030; THEN N.72'10'OO"E. A DISTANCE OF 131.18 FEET (FROM WHICH A REBAR AND CAP, PLS 29030, WITNESS CORNER BEARS S.72'10'OO"W. A DISTANCE OF 10.60 FEET); THEN S.28'20'00'E. A DISTANCE OF 60.00 FEET TO A REBAR AND CAP, PLS X 29030;; THEN S.26'20'OO"E. A DISTANCE OF 160.05 FEET TO A REBAR AND CAP, PIS 29030;; THEN S.02'16'O0"E. A DISTANCE OF 3.62 FEET TO A REBAR AND CAP, PLS 429030;; TIIEN S.79127'54" W. A DISTANCE OF 153.86 FEET; THEN S.13'06'21"E. A DISTANCE OF 153.04 FEET TO REBAR AND CAP, PLS X 29030; THEN 8.89'50'06"W. A DISTANCE OF 155.54 FEET; THEN N.31'25'00" W. A DISTANCE OF 412.98 FEET; TO THE POINT OF BEGINNING, SAID PARCEL CONTAINING 2.68 ACRES, MORE OR 1 FSS. ALSO KNOWN AS: LOT 2, FIRST AMENDED BETZ SUBDIVISION EXEMPTION PLAT, ACCORDING TO THE PLAT RECORDED MAY 6, 1998 AS RECEPTION N0.524696. FURTHER RESOLVED: That any two of the following individuals acting together, are hereby authorized to sign on behalf of and in name of aforesaid Corporation and under its corporate seal all instruments necessary to provide for purchase, sale, loan, easement, lease or other real property transactions: Jack W. Hayford, Glenn C Bun is, Jr., Michael P. Larkin, James C. Scott, Jr., Sterling Brackett, Arthur J. Gray, II, Jeffrey L. Bird, Lynda 1. Gupton, David Mee, Adam Davidson. END OF RESOLUTION 1 Sterlline Brackett Secretary of INTERNATIONAL CHURCH OF THE FOURSUARE GOSPEL, a religious corporal ion of California, do certify that the above is a true and correct copy of a resolution duly adopted by the Executive Staff of the Board of Director of aforesaid corporation ata meeting held on the 9th day of December, 2004; that the resolution was unanimously adopted; that rhe resolution has not been rescinded, but is in full force and effect. Slate of California ) County of Los Angeles) On December 9, 2004 before me, Slerl1+ly Brackett Name of Person signing Dated al ngeles, California this 91h da of December, 04. 44. - GABRIELA PENA Commission # 1456794 7 < Nola! y Public - Cahtornto z1.. re X's."r ,,. nnn-kss County 1 Gabedp Prue Rema of Notary S($erary personally appeared personalty known to me proved lo me the basis of satisfactory evidence to be the person whose name's subscribed to the within instrument and acknowledged to me that he executed the same In his opacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted. executed the Instrument. Cir 25tIna to *S° stet 4Ic L C1 p „ &tag `ek 130 C del ostvial, Chi 4111 r.F OCC Cam G4 0,S� Atst.. 2/Sio &.p 81 gi :1M 7 yam _D ' 4)4kr-30 3 ; 35' - ZS 'dy COUNTY OF GARFIELD - BUILDING DEPARTMENT CORRECTION NOTICE 108 8th St., Suite 201 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at o25-5 c /32 Permit No. '95196, I 97' - I have this day inspected this structure and these premises and found the following corrections needed: - dam. � AQ�l- 141' (R6P-4, You are hereby notified that the above correction must be inspected before covering. When correction(s) h.ve been made, call for inspection at 970384-5003. Date Building Inspector Phone (970) 9454212 A 20 ) 0,222 No. Job Addr s�� ` Owner III Z�S; / ' Contractornt\ rti 0 c-! Assessor's Parcel No vt /W l-i0kg-60- Date 479-/i-ni s "5 UILDING PERMIT CARD S tbacks: Front Rear Address i tjv-C>.-- Phone �r Address fl L Phone RH LH INSPECTIONS Soils Test Footing a 8.7-01 Foundation 5-3-o 7)4 - Grout Underground Plumbing 5 -9 -or -Mit -- Rough 1 - Rough Plumbin %-/ -05- Framing 7- .lits-rM- Insulation %-fd'-Rt"/A - Rooting Drywall 6-3 -0 Gas Piping 1-70641":OF7,1�- +Stn. -o5 c �a '," e-x.4H GJ R - ok av— Snctubeo (y -LI -crud NOTES .57 Zoning Weatherproofing Mechanical Electrical Rough (State) Electrical Final ( tate) Cert hecklist Co Opted? Certificate Occupancy # / �5 Date Septic System # - Date Final Other (continue on back) INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued -01/0V Zoned Area Permit No C1 AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Use Address or Legal Desc ' doe $ S a S CR_ 1- Owner�t +Y}t..lr (JQ%cContractor AA. 0 e E..F,i'►ti,n t, Setbarkt Front Side Side Rear This Card Must Be Posted So It is Plainly -visible From The Street Until Final Inspection. INSPECTION RECORD Footing y f.-5(.7%-- a 4( Driveway Foundations 3 tn.- /1.__ Underground Plumbing Insulation 7_6 - Rough Plumbing5_9, ___ Drywall S-3-- 06-91--____ Chimney & Vent 7-// as ,f9 -7,,i Electric Final (by State Inspector) 1 Gas Piping 7, / L -p.5" /Ont. Final /O-7, DS rg. Electric Rough (By State Iospector)7-6-5- Septic Final Notes: Sptuvk-c c 7 -t6 --or Framing IP 7-(b—osi — (To include Roof in place and Windows and Doors installed). ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WIIETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. TIIIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado APPROVEDDO NOT DESTROY THIS CARD Date By IF PLACED OUTSIDE COVER WITH CLEAR PLASTIC 1 1 1 1 SOISJLSUHT FoLIRSQUARE 1 CNURC.F - 0355 Couf1TY RoA 132. 1 GLEN IA00D SPRI Nq-9 I Co 1 1 1 1 INix APA..icatc 4 Rett ItzE.MMlT3 L 1 go IL Slum( iw41/2 pct pi cArnai 28 1 ptaitetwer CALcutATtorts MVAC- L t' CAt,cULATtCNS �4 1 ,1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with _ decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. YesA 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes No Not necessary for this project ,( Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes '+. No Not necessary for this project 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No Not necessary for this project r, Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes X Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes X No Not necessary for this project If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes No Not necessary for this project Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes_ No Not necessary for project X Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes X No Not necessary for this project 10. Do the plans include design loads as required under the IBC or IRC for roof snowlo ds, (a minimum of 40 pounds per square foot in Garfield County)? Yes X/ No Not necessary for this project 11. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes No Not necessary for this project X 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes X No Not necessary for this project 13. Is the wind speed and exposure design included in the plan? Yes $ No Not necessary for this project 14. Does the building section drawing include size and spacing of floor joists, wall studs, 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ceiling joists, roof rafters or joists or trusses? Yes X No Not necessary for this project 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes % No Not necessary for this project Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes No Not necessary for this project 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project X 18 Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes No Not necessary for this project X 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes No Not necessary for this project, X 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes X No Not necessary for this project 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes X No Not necessary for this project 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes No Not necessary for this project 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes X No Not necessary for this project 4 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No Not necessary for this project 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes X No Not necessary for this project 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes X No Not necessary for this project 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes )( No Not necessary for this project 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes x No 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes X No Not necessary for this project 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes X No 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes X No 32. Do you understand that approval for design and/or construction changes are required rior to the implementation of these changes? Yes X No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes __/ No 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes X No 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes / No 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $47.00 re -inspection fee? Yes )( No 38. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes .( No 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes ./ No 40. Are you aware, that on the front of the building permit application you will need to fill in the ParceV Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes 1( No 4L Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes X No (Please check with the 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 building department about this requirement) 1 hereby acknowledge that 1 have read, understand, and answered these questions to the best of my ability. Signature Dat Phone: (00-4V-5 163 days); (evenings) Project Name: Project Address: .355-- G2-- /3Z 6, S . Note: If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm Oct2004 7 1 1 1 1 t 1 1 1 1 1 1 1 1 1 h 5020 COUP!) Rune 15-1 Glenwood Springs. t'olor xiu ti 44i Phone: 970-945-7988 970-945-845- Iipgeo@hpgeoi ec if.c4Pi PRELIMINARY SUBSOIL STUDY FOR FOUNDATION DESIGN PROPOSED CHURCH 0335 MITCHELL CREEK GLENWOOD SPRINGS, COLORADO JOB NO. 101 294 MAY 3, 2001 PREPARED FOR: SONLIGHT FOURSQUARE CHURCH ATTN: BERME MASIMER P,@: X37 GLENWOOD SPRINr_iGS COLORADO 81602 C� 1512 d .z A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 HEPWORTH - PAWLAK GEOTECHNICAL, INC. May 3, 2001 Sonlight Foursquare Church Attn: Bernie Masimer P.O. Box 217 Glenwood Springs, Colorado 81602 Job No. 101 294 Subject: Report Transmittal, Preliminary Subsoil Study for Foundation Design, Proposed Church, 0335 Mitchell Creek Road, Glenwood Springs, Colorado Dear Bernie: As requested, we have conducted a preliminary subsoil study for the proposed church at the subject site. Subsurface conditions encountered in the exploratory borings drilled in the proposed building area, below a thin topsoil layer, consist of 15 to 26 feet of medium stiff to stiff clay overlying relatively dense sandy gravel at depths of 16 to 27 feet. The upper soils are low density and tend to settle under loading. Groundwater was not encountered in the borings at the time of drilling. The proposed church can be founded with a drilled pier foundation that extends into the underlying dense gravel subsoils and designed for an allowable end bearing pressure in the range of 10,000 to 12,000 psf and a skin friction value of 1,200 to 1,500 psf. As an alternative, spread footings designed for an allowable soil bearing pressure of 1,500 psf may be used for support of the structure provided that some risk of long term settlement can be tolerated. The report which follows describes our exploration, summarizes our findings, and presents our recommendations. It is important that we provide consultation during design, and field services during construction to review and monitor the implementation of the geotechnical recommendations. If you have any questions regarding this report, please contact us. Sincerely, HEPWORTH - PrLAKGEOTECHNICAL, INC. )44-C Daniel E. Hardin, P.E. Rev. by: SLP DEII/ksw TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY 1 PROPOSED CONSTRUCTION 1 SITE CONDITIONS 2 GEOLOGIC HAZARDS 2 FIELD EXPLORATION 2 SUBSURFACE CONDITIONS 3 FOUNDATION BEARING CONDITIONS 3 PRELIMINARY DESIGN RECOMMENDATIONS 4 DRILLED PIERS 4 FOUNDATION ALTERNATIVE 5 FOUNDATION AND RETAINING WALLS 5 FLOOR SLABS 7 UNDERDRAIN SYSTEM 7 SITE GRADING 8 SURFACE DRAINAGE 8 LIMITATIONS 9 FIGURE 1 - LOCATION OF EXPLORATORY BORINGS FIGURE 2 - LOGS OF EXPLORATORY BORINGS FIGURE 3 - LEGEND AND NOTES FIGURES 4 & 5 - SWELL -CONSOLIDATION TEST RESULTS FIGURE 6 - GRADATION TEST RESULTS TABLE I - SUMMARY OF LABORATORY TEST RESULTS 1 1 a 1 1 1 1 11 1 1 1 1 1 1 11 1 1 1 1 PURPOSE AND SCOPE OF STUDY This report presents the results of a subsoil study for a proposed church to be located at 0335 Mitchell Creek Road, Glenwood Springs, Colorado. The project site is shown on Fig. 1. The purpose of the study was to develop preliminary recommendations for the foundation design. The study was conducted in accordance with our proposal for geotechnical engineering services to Sonlight Foursquare Church, dated April 6, 2001. We understand that this report will be considered in the purchase/sale of the lot where our client is the buyer. A field exploration program consisting of exploratory borings was conducted to obtain information on subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification, compressibility or swell and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation. This report summarizes the data obtained during this study and presents our conclusions, design recommendations and other geotechnical engineering considerations based on the proposed construction and the subsoil conditions encountered. PROPOSED CONSTRUCTION Design plans for the church had not been developed at the time of our study. We assume the church will be a two story masonry structure over a walkout basement level. Ground floor will be slab -on -grade. Grading for the structure is assumed to involve cut depths between about 5 to 15 feet. We assume relatively light foundation wall loadings and moderate to possibly heavy column loads, typical of the proposed type of construction. When building location, grading and loading information have been developed, we should be notified to re-evaluate the recommendations presented in this report. H -P GEOTECH 11 • • • • • • • 1' -2- SITE CONDITIONS The site is occupied by several existing wood frame buildings including the residence, sheds and barns. The building area slopes down to the east at grades of 10% to 25 % with a relatively flat topographic bench in the area of the existing buildings. The hillside slope steepens above and below the building area. There has been some minor cutting and filling due to past site development. Vegetation in the building area consists of grass and scattered trees with oak brush on the steeper slopes above and below the site. GEOLOGIC HAZARDS Based on the geologic hazards mapping prepared by Lincoln-DeVore (1978), there are no geologic hazards which will adversely impact the proposed development. FIELD EXPLORATION The field exploration for the project was conducted on April 17, 2001. Three exploratory borings were drilled at the locations shown on Fig. 1 to evaluate the subsurface conditions. The borings were advanced with 4 inch diameter continuous flight auger powered by a truck -mounted Longyear BK-51HD drill rig. The borings were logged by a representative of Hepworth-Pawlak Geotechnical, Inc. Samples of the subsoils were taken with 13/8 inch and 2 inch I.D. spoon samplers. The samplers were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoils. Depths at which the samples were taken and the penetration resistance values are shown on the Logs of Exploratory Borings, Fig. 2. The samples were returned to our laboratory for review by the project engineer and testing. 12 -3- SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Fig. 2. The subsoils in the building area (Borings 1 and 2) consist of about 1 foot of topsoil overlying medium stiff to stiff slightly sandy to sandy silty clay. Dense silty sandy gravel was encountered below the clay at a depth of 16 to 27 feet. Boring 3 was drilled in the proposed parking area and encountered 2 feet of granular fill and 3 feet of stiff sandy clay overlying dense silty sandy gravel with cobbles. Drilling in the dense gravel with auger equipment was difficult due to the cobbles and boulders and drilling refusal was encountered in the deposit. Laboratory testing performed on samples obtained from the borings included natural moisture content and density, Atterberg limits and gradation analyses. Results of consolidation testing performed on relatively undisturbed drive samples of the sandy clay, presented on Figs. 4 and 5, indicate moderate to high compressibility under loading and wetting. Results of a gradation analysis performed on a small diameter drive sample (minus 1' inch fraction) of the underlying coarse granular subsoils are shown on Fig. 6. Atterberg limits testing shows the clay soils are medium plastic. The laboratory testing is summarized in Table I. No free water was encountered in the borings at the time of drilling and the clay subsoils were moist. The deeper gravel soils were slightly moist. FOUNDATION BEARING CONDITIONS The subsoils encountered to a depth of about 16 to 17 feet consist of low density and compressible clay. These soils tend to settle under loading. We assume the church could have long roof spans and relatively heavy column loads in the sanctuary area and moderate to light wall loads elsewhere. Significant differential loading on the clay at this site could result in large differential settlement and possible building distress. A relatively low risk foundation system with regard to potential settlement caused by loading the clay is straight -shaft drilled piers that extend into the underlying dense 1 -4- sandy gravel subsoils. In addition to their ability to reduce settlements, the piers have the advantage of providing relatively high load capacity. PRELIMINARY DESIGN RECOMMENDATIONS The following recommendations are presented for planning and preliminary design. When building locations and grading plans have been developed, we should be contacted for additional analysis to develop site specific design level recommendations. DRILLED PIERS Considering the subsoil conditions encountered in the exploratory borings and the nature of the assumed construction, we recommend straight shaft piers drilled into the underlying sandy gravels for building support. The design and construction criteria presented below should be observed for a straight -shaft drilled pier foundation system. 1) The piers should be designed for an allowable end bearing pressure in the range of 12,000 psf and a skin friction of 1,200 to 1,500 psf for that portion of the pier embedded in gravel. Pier penetration through the upper clay deposit should be neglected in the skin friction calculations. 2) All piers should have a minimum total embedment length of 10 feet and a minimum penetration into the gravel of 2 feet or refusal. 3) The pier holes should be properly cleaned prior to placement of concrete. The natural clays are generally stiff which indicates that casing of the holes should not be required. Some caving and difficult drilling may be experienced in the bearing soils due to gravels and cobbles. Placing concrete in the pier hole immediately after drilling is recommended. 4) The pier drilling contractor should mobilize equipment of sufficient size to achieve the design pier sizes and depths. 5) Free water was not encountered in the borings made at the site and it appears that dewatering will probably not be needed. 14 -5- 6) A representative of the geotechnical engineer should observe pier drilling operations on a full-time basis. FO1NNDAMN ALTERNATIVE If the church is a relatively lightly loaded building, then spread footings placed on the sandy clay soils can be used with some risk of long term foundation settlement and distress. The design and construction criteria presented below should be observed for a spread footing foundation system. I) 2) 3) 4) 5) Footings should be designed for an allowable soil bearing pressure of 1,500 psf. Based on experience, we expect settlement of footings designed and constructed as discussed in this section will be about 1 to 2 inches which could occur over a long time period. Heavily reinforced continuous wall foundations rather than isolated pads should be used to limit the effects of differential settlement. The footings should have a minimum width of 18 inches for continuous walls and 2 feet for isolated pads. Exterior footings and footings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 36 inches below exterior grade is typically used in this area. Continuous foundation walls should be reinforced top and bottom to span an unsupported length of at least 12 feet. A representative of the geotechnical engineer should observe all footing excavations prior to concrete placement to evaluate bearing conditions. FOUNDATION AND RETAINING WALLS Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a slight amount of deflection should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of 55 pcf for backfill consisting of the on-site fine grained soils and 45 pcf for backfill consisting 16 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -6- of imported granular materials. Cantilevered retaining structures which are separate from the building and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of 45 pcf for backfill consisting of the on-site fine grained soils and 35 pcf for backfill consisting of imported granular materials. All foundation and retaining structures should be designed for appropriate surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The pressures recommended above assume drained conditions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain should be provided to prevent hydrostatic pressure buildup behind walls. Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum standard Proctor density at a moisture content near optimum. Backfill in pavement and walkway areas should be compacted to at least 95 % of the maximum standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall since this could cause excessive lateral pressure on the wall. Some settlement of deep foundation wall backfill should be expected even if the material is placed correctly and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of 0.30 . Passive pressure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 300 pcf. The coefficient of friction and passive pressure values recommended above assume ultimate soil strength. Suitable factors of safety should be included in the design to limit the strain which will occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against the H -P GEOTECH 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -7- sides of the footings to resist lateral loads should be compacted to at least 95 % of the maximum standard Proctor density at a moisture content near optimum. FLOOR SLABS The upper fine-grained soils encountered in the borings possess variable compressibility potential and slab settlement could occur if the subgrade soils were to become wet. Slab -on -grade construction may be used provided precautions are taken to limit potential settlement and the risk of distress to the building is accepted by the owner. To reduce the effects of some differential settlement, nonstructural floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. Slab reinforcement and control joints should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of base course gravel should be placed immediately beneath slabs -on -grade. This material should consist of minus 2 inch aggregate with less than 50% passing the No. 4 sieve and less than 12% passing the No. 200 sieve. The gravel will provide slab support and help break capillary moisture rise. Required fill beneath slabs can consist of a suitable imported granular material, excluding topsoil and oversized rocks. The fill should be spread in thin horizontal lifts, adjusted to at or above optimum moisture content, and compacted to at least 95 % of the maximum standard Proctor density. All topsoil and loose or disturbed soil should be removed and the subgrade compacted prior to fill placement. UNDERDRAIN SYSTEM Although free water was not encountered during our exploration, it has been our experience in mountainous areas that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below -grade construction, such as 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -8-- retaining walls, crawlspace and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free-dra ni , %casinos wahe ia&. &SI should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1% to a suitable gravity outlet. Free -draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 2 feet deep. SITE GRADING The risk of construction -induced slope instability at the site appears low provided the building is located as planned, and cut and fill depths are limited. We assume the cut depth for the basement level will not exceed about 15 feet. Fills should be limited to about 8 to 10 fret deep, especially at the downhill side of the lot where the slope steepens. Embankment fills should be compacted to at least 95% of the maximum standard Proctor density near optimum moisture content. Prior to fill placement, the subgrade should be carefully prepared by removing all vegetation and topsoil and compacting to 95 % standard Proctor density. The fill should be benched into the portions of the hillside exceeding 20% grade. Permanent unretained cut and fill slopes should be graded at 2 horizontal to 1 vertical or flatter and protected against erosion by revegetation or other means. The risk of slope instability will be increased if seepage is encountered in cuts and flatter slopes may be necessary. If seepage is encountered in permanent cuts, an investigation should be conducted to determine if the seepage will adversely affect the cut stability. This office should review site grading plans for the project prior to construction. SURFACE DRAINAGE The following drainage precautions should be observed during construction and maintained at all times after the church has been completed: 1$ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -9- 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95 % of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We reconunend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in paved areas Free -draining wall backfill should be capped with about 2 feet of the on-site soils to reduce surface water infiltration. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. LI IIT&TIONIS This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either expressed or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory borings drilled at the locations indicated on Fig. 1, the proposed type of construction and our experience in the area. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory borings and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear to be different from those described in this report, we should be notified at once so re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for planning and preliminary design purposes. We are not responsible for technical interpretations 109 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -10- by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Additional analysis should be conducted for design level recommendations. We recommend on-site observation of pier drilling, excavations for foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. Sincerely, HEPWORTH - PAWLAK Daniel E. Hardin, gE.! 244.3 1 Reviewed by: �o�•. •'.z`'�! viSi•N Gifsuinitar Steven L. Pawlak, P.E. DEHlksw REFERENCE Lincoln-DeVore, 1978. Geologic Hazards of the Glenwood Springs Metropolitan Area, Garfield County, Colorado. Colorado Geological Survey Open File Report 78- 10. H -P GEOTECH 20 1 1 1 1 1 1 1 1 1 1 5825 I 5900 5875 I t 5925 \ ` \ \ \ 5850 \ \ \ I 1 \ \ 1 I 1 \ \ \ 1 1 \ \ \ 1 1 \ \ 1 1 1 1 \ \ 1 1 / \ \ 1 / 1 1 1 1 I 11 1 1 I EXISTING NG c APPROXIMATE; 1 1 1 I • y� I O I 1 1 1 BORING 3 / 1 1 I 1 9 0 I 1 I 1 11 0 / ► I I `�1 N / ; i 1 BORING 2 • / 1 1 I EXISTING \ z 1 1 I 1 r; IWINGS 1 1 \ ` 1 \ i 1 LJ $ 1 1 1 1;l 1 1 1 1 1 1 0 5925 \1 1 1 1- / 1 1 1 I 1 1 I 11 1 1 EXISIfING • 1 / 1 1 1° BORING 11 /1 \ 1 I 1 1 1 1 1 1 I \ I 1\ 1 \ 1 1 1 I I \ 1 \ 1 I I 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 I 1 \ 1 I \ \ \ I 11 \\� 1 I 1 1 1 / I I I 5875 - ' 1 5800 5775 5850, 5825, 1 1101 294 HEPWORTH-PAWLAK GEOTECHNICAL, INC_ LOCATION OF EXPLORATORY BORINGS 1 Fig. 1 1 1 1 1 1 1 1 1 BORING 1 ELEV.= 5812 0 n 7/12 5 rl a5/12 11-21.5 00=102 -200=91 t 0 10/12 1 r J 8/12 I C=23.9 oor99 -200=94 10/12 a35/4.10/0 W0=i2 +4=57 -200=13 BORING 2 ELEV.= 5823' 14/12 5/12 11-24.3 00=97 -200=92 15/12 Note Explanation of symbols is shown on 19g. 3. rf BORING 3 ELEV.= 5811' 12/12 111).17.4 00=113 - 200-80 LL -38 P1=22 35/3,10/0 11-3.8 - 200=30 0 5 10 15 20 25 30 35 —J I Ps 0 L W 0. 0 0 LOGS OF EXPLORATORY BORINGS 294 HEPWORTH-PAWLAK GEOTECHNICAL, INC. Fig. 2 22 LEGEND: -7 M r RLL sand and gravel, silty, medium dense, moist, brown, mostly 3/4 inch road base. TOPSOIL; organic sandy day, soft, Sightly moist to moist. dark brown. CLAY (CO; silty. sandy to sfightiy sandy, scattered gravel, medium stiff to stiff, moist, reddish brown to dark brown. calcareous zones. GRAVEL (Gib); sandy, silty, with cobbles, posslle boulders, dense, moist, brown. Relatively undisturbed drive sample; 2—inch I.D. California liner sample. Drive sample; standard penetration test (SPT). 1 3/8 inch I.D. split spoon sample, ASTU 0-1586. Drive sample blow count indicates that 7 bows of a 140 pound hammer falling 30 inches were required to drive the California or SPT sampler 12 Indies. Practical rig refusal. NOTES: 1. Exploratory borings were drilled on April 17. 2001 with a 4—Inch diameter continuous flight power auger. 2. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan provided 3. Elevations of exploratory borings were obtained by interpolation between contours on the site pion provided. Logs are drawn to depth. 4. The exploratory boring locations and elevations should be considered accurate only to the degree irnplied by the method used. 5. The lines between materiels shown on the exploratory boring logs represent the approximate boundaries between material types and transitions may be gradud. 6. No free water was encountered in the borings at the tine of drilling. Fluctuation in water level may occur with time. 7. Laboratory Testing Results: WC = Water Content ( % ) DD = Dry Density ( pcf ) +4 = Percent retailed on No. 4 sieve. —200 = Percent passing No. 200 sieve. LL=Liquid Lknit(X) PI Plasticity Index ( % ) 101 294 I HEPWOR TH- PAWLAK I LEGEND AND NOTES I ng. 3 om •rase on 0 1 2 3 4 5 6 0 K c 0 w 2 O Moisture Content = 21.5 percent Dry Density = 102 pcf Sample of: Slightly Sandy Clay From: Borang 1 at 5 Feet 0.1 No movement upon wetting 1.0 10 APPLIED PRESSURE — ksf 100 Moisture Content = 23.9 percent Dry Density = 99 pcf Sample of: Slightly Sandy Clay From: Boring 1 at 15 Feet 4 No movement upon wetting 0.1 101 294 1.0 10 APPUED PRESSURE — ksf 100 HEPWORTH—PAWLAK I SWELL CONSOLIDATION TEST RESULTS GEOTECHNICAL, INC. Fig. 4 1 1 1 1 1 1 1 1 0 1 2 1 -it 3 a 4 0 1 Moisture Content = 24.3 percent Dry Density = 97 pcf Sample of: Slightly Sandy Cloy From: Boring 2 at 10 Feet • L 6 7 8 9 No movement upon wetting 0.1 1.0 10 APPUED PRESSURE — ksf 100 101 294 ' HEPWORTH—PAWLAK 1 SWELL CONSOLIDATION TEST RESULTS Fig. 5 25 1 1 1 1 1 1 1 1 1 1 1 1 1 24 NE 71R O 45 TOIL 13 MOL OOEIL NINE 4 M. 1 IR >o ED 50 40 10 A O 0 100 USSINUSOID SIRES I>rAS SCONE OPENINGS Sir We 11rt r sr r 100 S • S OM OE - - WIN —�- -- �� .S• ism WM W— SWI. • WI SW a • .a -- •• NW — •S WM 'SW S AI —_ IS —__ -S_SS -- ---_C ---_ ---__ 5 —5 NIS 411• MEM 5 —• 5 MIIS ME WS MEWS 5 5 .001 102 d05 a .012 107 .074 111 294 L10 2>0 4.75 DIAMETER OF PARTICLES IN MIWMETERS LSA, 100 R3 752 122 127 205 CLAY 70 9Lr FINE 1034119E I FINE�L1 GRAVEL 57 X LIQUID LIMIT X SAND 30 X SILT AND CLAY 13 % PLASTICITY INDEX SAMPLE OF: Silty Sandy Gravel FROM: Boring 1 at 30 Feet HEPWORTH—PAWL AK GEOTECHNICAL, INC. GRADATION TEST RESULTS 10 A 70 00 00 40 20 ID 10 0 Fig. 6 g�•1xaiZ tizi[de, 1 1 1 1 1 1 z J Ia V Z I_ 1- n I ill _a 0 JH Q OC ' 3~m < 3 0 F- ¢ ¢ aQ I . G Wu, 1 JOB NO. 101 294 1 1 1 1 r BOIL OR BEDROCK TYPE Slightly Sandy Clay Slightly Sandy Clay Slightly Sandy Clay 0 Sandy Clay Silty Sand with Gravel 1 1111 0 i o t F g ! z = 1 N N 0t g ' K M 1 oe as 2 o. a i r 0) v 0) a) 1— N0 rn co 0 co R g 30 Lii_ o t N. IA a. Q4 2 G' N 0 a) N a) 0) r $ W z 0 0 1 s 3 r La N 23.9 N M N 17.4 m f7 Y F g i i, 30 O N CD 0 a r N 0) 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 L 1 IZ/1U U4 11: J0 Job 4.201u 004 Jan Inns TESTI Trusfab Inc , Nen Cade CO 51647 a«. Tars T1 COMMON Inuarnn sm.. 4201 SR1 s Sep 132000 k Indestrles, Inc. 10 11:10:51 2004 Page -(2-01 5-2-10 4_ 10-1.12 15-0-14 -, 2000 2.500304q 34.11-2 , 35-104 449-5 1 50-00 129 2-0-0 5.3.10 411.2 4-11-2 4-11-2 5-0-0 5-0-0 4-11-2 4114 411.2 53.10 2-0-0 5.00 12 4h6 064 4a1% r E 2,4 0 0 6,8 11 H 2, 11 448 USS K4s6* L 4X10 4 D f \I \II e- N -O Y 12212MO 410- X W V LF 416-5- AJ S R Q P _ 6116 415 = ,. _ 5x15 = UdLs = 45 = 12902 . 426= 416= OS= GA,/ mo Aso 6 6 It Rs� rte- 5-10-5 , 15.0-14 , 26-0-0 2-0-0 LOADING (PM) SPACING 2-0-0 TCLL 40.0 pleas Increase 1.00 TC% 10.0 umber brasses 1.00 BCLL 0.0 Rep Stress Ince YES eWL 10.0 Coda UBCIAtIS516 GSI TC 0.57 EC 016 W6 0.72 OAaoe9 30-0-0 50-00 34.11-2 43-1-11 50-0-0 , 2-0-0 179 la, 0 DE?L In poo) WOO PLATES GRIP Va1(LL) -0.10 T -V •91e MI120 1601123 Itorz�) T.977 (TL)012 P We 111W LL Min Wen = 240 Weight: 313 6 Salle =1:115. LUMBER BRACMIG TOP CHORD 2 X 3 SPPS 1660E 1 SE TOP Q10RD SheBhed a 3.59 n Purlio, ssc.Pt sed serewle- BOT CHORD 2 X 8 $WS 155W 1 S BLOT CHORD Rigid Sing directly new or 1508 ac breol g. WtSS 2 X 4 W Stud•BIWsrP WEBS 1Raw Y midst! F-U,G-11,I-7,J-T.C-Y, MP W3 2 X 4 SPFS 2100E 1.BE, W2 2 X 4 SPF -5 2100? 1.8E WI 2 X 4 SPF -5 2108E I.09, WI 2 X4 SPF -5 210W 1.5E W2 2 X4 SPF -5 2100E IJt, W3 2 X 45PF-52100F 1.0C W92 XS SPP32100F 1.11E, W82 X4 SPF -5 2100F ISE W9 2 X 1 SPFS 2100E 11E, We 2 X 4 SPP -52100E 1St REACTIONS Ob'si2e) Y=3480/038, P•345043.8 Mac Hoye Y=45000M1 rase 6) Max urih y.a481med Ata 7). F-6180oS at. 7) FORCES (a) - Fsst Load Case Only TOP CHORD A -11400,19-0.-98S. GD= -5411, O-E•-•a1S2. to -5297,? -G -4966, a 4943 1i-1=4943, I -J 4988, J -X -629 . K -L•-5392, Ld/=-5411, M -N=-900, N-089. 61•=4/39, 1a -P -S38 SOT CHORD X -Y=4719. W.X=6124. V -W=4669, U.V=4696, U-2=3936, Z-AA=3536, TaVw383S, S -T4098, R-5=4500. 0-R=5124. P. 4719 WEBS C,X8434, D-11-3* D -W=-038. F-efh142, P41=.421. G•U=-127, W1k1707. N-7=1707, I -Ts -427. J -T4621. JA+142, I: 5=338, UO=339, M.0.434, C -Y=-4617, MP 4127 NOTES 1) Tae Ines hes been designed for the And bads generated by 5S mph "lids el 25 name ground lend. using 5.0 pas by CMN deed bad end 5.0 psi boll= chord deed toed. 1 W mi from hormone ooerinn, an an occupant colegc.Y 1. wndhbn 1 e.Otosed bui&fmg. of dimensions 100 6 by 100 S With e,gecens C ASCE TC per LISCANMW11 end mita!, or cardamom oat, they en exposed 10 And If porches exist. they ere not espased to wand The Mrher DOL .axone is 133, and be pale g4 increase le 1.33 2) Design loads based on 40.0 pet specified roof vow laid. 3) unbalanced snow bads have bean considered far fins design. NBC section 15313) 4) Yens truss Ilei been designed for • 10.0 paf bottom chord the bed non0oecunenl w*h airy ober lira loads Per Table No. 16-8.000 44. 5) Bearing al Plats) Y. P considers paretic! la gran sae using ANSI?PI 1-1095 angle m grain formula. Wilding designer should wedgy aplady d bong Sodium 8) Panda rncJen al Conecban (by others) of bus to heating pia capable of WIhslrhding 045 Ib OE at loin Y sal 544 m uplift at OW P. 7) Tha ins Pa ken dayprd with ANSVTPI 1-1905 cr4•ro, LOAD G16(6) 9andWd 1) Brow: .enter 41010141F1 .00 Pave Increase.1.00 Uniform loads (p1) Vat A-9•-1000. 541=100.0, H -N -100.0, N-&-100.0. 7 -45 -20.0.2 -Ase -B0 0. P.M -20.0 in 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1./1Uh V4 11: J7 Trutt TEST Cie 7U 404 ITrws T,. SC1550RS 12-01_ 4.1-2 11-0-12 JJJJ 11(UJrAb DIY 4201 SR1 sSep132 18-04 X25-0.0 31.11_10 WJ DUJ i /AT* Indus -Ines, Inc. FII Dec 10 11:11 10 2001 Plage 1 31-11-4 45-10-14 +50-60 111.01 2-0-0 4-1-2 0-11.10 6-11.10 6-11.10 6-11-10 6-11-10 6.11-10 4-1-2 24.0 6.00 rii BA 7.5 4010= G 244 II -12N 12X12 IJ 4.2 6412=c 4x6 6 W ic arm II see ,_.A._41.2 2-0-0 50-04 Maw Offsets 43J11D3-0)S0-3-8,Edge) gdieL 11.10$ - 7� fdw .7u:a 6 i ,_- LOADING (p40 SPACING 2-0-0 Cil GER In 0ec) vain TCLL 40.0 Page lama ILO TC 0.16 Varl(LL) •1.03 S +675 TCDL 10.0 Lumber Increase 1.00 BC 0.80 Venal) -155 S 4118 BCL. 0.0 Rap threes Inc: YES WB 0.10 K ort(1L) 146 N We BODL 70.0 Code UBC/ANS65 161 LC 11 Min 8de8 a 240 U T V 71514116 WBS 441 % 502 ..2.0011T S 417$11116= R D P 715/6116 WBZ 5x12 44 11.0-12 11 - , 25-00 , 0-1-11-10 , 36114 45-10-14 0 6216 LT: N 346 11 50-04 1 24.0 0 Scale a 11125 PLATES cost 1w20 7/8/123 11116 12762 Wdek: 2761b LUMBER TOP CHORD Z X 6SW-6 2100F 1.SE SOT CHORD 2 X ISMS 2100E 14E WEBS 2 X 4 WW Sludtcepl' W1 2 X 6 6PFS 1650E 1.5E. W5 2 X 4 SPFS 2100E 1 SE W2 2 X 4 SPF$ 2100F 11E, W2 2 X 4 SPP -5 2100F 1 6 W4 2 X 4 SPF -S sloops W6 2 X 4 SW$ 21O0F 1 B we 2 X4SPTs 2100E 1 BE. W92 X 4 SP/1-5 2100F 1 BE W9 2 X 4 SPF -5 2100E I.SE B RAKING TOP CHORD Sheathed or 2-1400 puffins. c0npt and verticals. B OT CHORD Rigid cling dimly applied or 10.0-0 ons basal. net 6-11-2 a bowing: T-V,P-R. WEBS 1 Pew el midpl E -T, W R1AC11014$ gala) 74320610.53. N=320603-6 Mas Hurt X43/3(lead rase 5) Max UpIIkX4-599(Wad base 7). N=-699(Iwl rate 7) FORCES Ob) • Firm Load Case Orly TOP CHORD *5=43, 8.C-7139, C-0=-6906, D-14.9605. Ef--8372, Ffr--9322, G-11.4322,11-14.9322.140.964713. J-Ke-QB06. K{4-7138, L -W42. 671=3186, L- N=-3166 DOT CHORD W -X'-0. V•W=6780. tJ-W3i O, Tin=0330, $-70-7147, R4=7441. G -R 0. P-8330, O-0-43790, N-040 WEBS G-SC741. C -W' -1535, E -W-.443. r-Teag7, f4R-887,N-0---413, K -C4-1530. C-442464. E -T -A82, 6-1'7938. 0-R=1945,1.W-462. K -0=2464.0-W67. L•0 6557 NOTES 1) This was hes been designed for die and heeds generated by 65 mph winds el ZS 6 above ground level, using 50 psi lop chord dead load and 5.0 par bream chord dad Wad.100 mi from krrcane orawdine, on an occuPseaeaOtgol 1, Media I enclosed Welding. Of dimensions 100 It by 1017 8 weh exposure C ASCE 7,43 per UICARSIg% 11 end vestals w condemn exist. they are expeagiWwWd. If porches must trey ars nci eapued lo send. The lumber POL )ne,Nse is 1.33, aid the pips gip increase is 1.33 2) Dion Wad is bred a 40.0 pd swarmed roar &was led. 3) Unbalanced snow toads have been considered for la design. (UBC section 16383) 4) All pare we 141120 plaits unless otherwise indicated 5) This Kiss hu dean designed for a 10.0 pal bar Bawd at toed nese neunM ail, any oda Eve Wads per Table No. 16.8. UBC 94 6) Besting at Pall) X. N considers pan14e1 le grain sdue sig 77$-4701 1-095 angle to grain formula, Belding designer should verify seemly M bearing taxa. 7) Provide mechanised connection (by others) or Inca to bearing plate capable M withstanding 51191b troth d joint X and 699 Ib uplift al Iiia N. 5) The bus hes been designed with ANSI/TPI 1-1995 criteria. LOAD CASE'S) BWtlnd L 1101/27/2005 13:32 FAX 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECORD DATE LOCATION 2i 2,u�.� �`��.f 21001 SHEPHERD RESOURCES INC 1 AIA POST OFFICE SOX 1624 AVON COLORADO 81620 T970 949 3302 F970 949 5121 W W W.SRIARCHITECT.COM -1.2-7-05 27'05 FILE CATEGORY i ICD 11 PRESENTITO MIcHPet.- 1+pf5 0 TELEPHONE O FACSIMILE COMMENTS PROJECT NO Otto PROJECT NAME RE 5614 U CE }'r Gf 111tt[t I PLUMP,1N6t MAR ROUTING 0 CONFERENCE )RESEARCH 0 MEMORANDUM FAX ND. cj2c� 7155$ NO PAGES 829 Use aoup 4-3 O Chir Vcy — wry, wen Fut f OCL '1E 1a2.4-•l.Z 1GTUY 2� I_Ntr 3 441 .57 ewe, 47S tgEr �r *rtherroLlit 3l •S7 on' 7..lEer OB Lyp35 er-e E itis- 1 n'L " Q. 3 = GJ I matt i Agit- e - Ust r rn t •T Eszt -0+e4 Ace-csedzy 5- 11 COPIES TO EY Zoe Wbr 1/27/2005 13:32 FAX 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECORD Zion SHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1614 AVON COLORADO 61620 T970 949 3302 F970 949 5121 W W W.SRIARCMITECT.COM DATE LOCATION FILE CATEGORY PROJECT NO PRESENT/TO PROJECT NAME RE ROUTING 0 TELEPHONE ❑ CONFERENCE 1 RESEARCH 0 FACSIMILE FAX NO. NO PAGES 0 MEMORANDUM COMMENTS Mtic%r. ZOG, tlrt.rzl50= 1.3? o — • ).44<ue, zoto %la -75 2175 az_ row Zn(, !o l un = LW? ae m_ L1.Ja.latr r f lS t 7b(o N l re¢-2Co = 1.03 oft t¢1NL11%kt Etokt'MNS '' ra. t tea- Ian = 1i Orz 5 uict_ n.IV (Jkuti_ 51% 1 lett) . 111 COPIES TO BY 51 01/27/2005 13:32 FAX 1 1 1 1 1 1 1 1 1 1 1 1 1 CHAPTER 29 PLUMBING SYSTEMS SECTION 2901 GENERAL 2901.1 Scope. The provisions of this chapter and the. Interna- tional Plumbing Code shall govern the erection, installation. al- teration, repairs, relocation, replacement, addition to, use or tnaintenance of plumbing equipment and systems. Plumbing systems and equipment shall be constructed, installed and maintained in accordance with the International Plumbing Code_ Private sewage disposal systems shall conform to the In- remarional Private Sewage Disposal Code. al 003 [P] SECTION 2902 MINIMUM PLUMBING FACILITIES 2902.1 Minimum number or fixtures. Plumbing fixtures shall be provided for die type of occupancy and in the minimum number shown in Table 2902.1 Types of occupancies not shown in Table 2902.1 shall be considered individually by the building official. The number of occupants shall be determined by this code. Occupancy classification shall be determined in accordance with Chapter 3. TABLE 2902.1 MTYMUM NUMBER OF REQUIRED PLUMBING FACILTnESa No. CLASSIFICATION 115E GROUP WATER CLOSETS )SEE SECTION 4193 OF THE INTEAN47IONAL PLUMBING CODE FOR URINALS) LAVATORIES SATHUBS OR SHOWERS DR/MONO FOUNTAINS (SEE SECTION 410.1 OPINE WTERMATION1L PLLaNBiNG CODE) OITIER DESCRIPTION MALE FEMALE MALE _ FEMALE I Assembly (sin Sections 2902.2, 2902.5 and 2902.6) A-1 Theaters usually with fixed seen and other buildings for the performing airs and motion ukases i per 125 1 per 65 1 per 200 — 1 per 500 1 service sink 42 Nightclubs, ban, taverns, dance hills and buildings for similar purposes 1 pe 40 1 per 40 1 per 75 — 1 pee 500 1 service oink Restaurants., banquet halls end food tourer 1 per 75 1 pet 75 1 per 200 — 1 per 500 t service sink A-3 Auditrltiums without permanent seating. an galleries' exhibition halls. museums. lecture halls, libraries. arcades and gymnasiums I per 125 1 per 65 1 per 200 — •1 per 500 1 advice sink • Passenger terminals and transportation facilities_ 1 pa 500 I per 500 1 per 750 — I per 1.000 1 .service sink 43 Places ' and other religious services. Churches without assembly halls 1 per."1 h#'-00 — Ea 1,000 i pc 150 service sink 44 Coliseums, arenas. sooting riska, pools and tennis courts for indoor sporting events and ac"V1iC4 I per 75 for the first 1,500 and I 12D for the remainder rvraeding 1.500 I per 40 for the first 1.500 and 1 60 for the Per remainder exceeding 1.500 1 pc 200 1 per 150sink 1 1,000 1 service 45 Statlium.s. amusement parks. bleachers and grandstands forI sporting ds and outdoor activities 1 per 75 for the first I.500 and per 120 for theremainder exceeding 1,500 1 per 40 for the first 1.500 and 1 per 60 for du rcrttainder exceeding 1,500 1 Der 200 1 per 150 — t per 1.000 t service sink 1 {continued) e 01/27/2005 13:33 FAX jp0314 Clear width. Protruding objects shall nor reduce he minitnum clear width of accessible routes as required in Section 1104. 03.4 Floor surface. Walking surfaces of the means of egress sba have a slip•resivant surface and be securely attached. 100},5 Elevation change. Where changes in elevation of less than 12 inches (3D5 mm) exist in the means of egress. sloped stafaces shall be used. Where the slope is greater than one unit vertical in 20 units horizontal (5 -percent slope), ramps comply- ing with Section 1010 shall be used. Where the difference in el- evation is 6 inches (152 mm) or less, the ramp shall be equipped with either handrails or floor finish materials that contrast with adjacent floor finish materials. 1. A single step with a maximum riser height of 7 inches (17 S mm) is permitted for buildings with occupancies in Groups F, 11, R-2 and R-3 as applicable in Section 1012, and Groups S and U at exterior doors not re- quired to be accessible by Chapter 11. 2. A stair with a single riser or with two risers and a tread is permitted at locations not required to be accessible by Chapter 11, provided that the risers and treads comply with Section 1009.3. the minimum depth of the tread is 13 inches (330 mm) and at least one hand- rail complying with Section 1009.11 is provided within 30 inches (762 nun) of the centerline of the normal path of egress travel on the stair. 3. An aisle serving seating that bas a difference in eleva- tion less than 12 inches (305 mm) is permitted at loca- tions oot required to be accessible by Chapter 11, provided that the risers and treads comply with Sec- tion 1024.11 and the aisle is provided with a handrail complying with Section 1024.13. • Anyc angeinelevationinacorridorservingnonambulatory ; cions in a Group 1-2 occupancy shall be by means of a ramp 9k _doped walkway. • 1043.6 Means of egress continuity- The path of egress travel y: Song ameana of egress shall not be interrupted by any building :eS eat other than a means of egress component as specified in Ihis chapter. Obstructions shall not be placed in the required ry tyid6l of a means of egress except projections perrnitted by this ". The required capacity of a means of egress system • 144 not diminished along the path of egress travel. h 10133 Elevators, escalators and moving walks. Elevators, es- eaLlatus and moving walk shall not be used as a component of a -•„*.teleited Means of egress from any other part of the building. Exception: Elevators used as an accessible means of egress to accordance with Section 1007.4. SECTION 1004 OCCUPANT LOAD +'1 �ailpn occupant load. In determining means of egress 2:, the number of occupants for whom means of •t"me+hties shall be provided shall be established by the number computed in accordance with Sections 1.1 li¢pugh 1004.1.3. Rj 00 4 MEANS OF EGRESS 1004.1.1 Actual number. The actual number of occupants for whom each occupied space. floor or building is de- signed. 1004.1.2 Number by Table 1004.1. The number of occu- pants computed at the rate of one occupant per unit of area as prescribed in Table 1004.1.2. TABLE 1004.1.2 MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT OCCUPANCY FLOOR AREA IN 50. Fr. PER OCCUPANT Agricultural building 300 gross Micron hangars 500 gross Airport terminal Baggage claim Baggage handling concourse Waiting areas 20 gross 300 gross 100 gross 15 gross Assembly Gaming Room (keno. clots. etc.) 11 gross Assembly with fixed scam See Section 1003.2.2.9 Assembly without fixed seats Concentrated (chain only—rot fixed) Standing space t)ncoreeaNaoed (tables and chairs) o net 15 net Bowring centras, allow 5 pawns for each law including 15 fat of runway. and for additional 21E2S 7 net Business areas t00 Emu Courtrooms—other than find seating teas 40 net Domdtories 50 gross Educational asuman area Sbops and otter vocational room areas —. 20 net Exercise rooms 511snoss K-5 fabrication and manufacturing areas 200 gross Indusuialescas 100 gross Institutional areas Inpadcnt treatment areas Outpatient areas Sleeping areas 240 gross 100 gross 120 gross Kitchens, commercial 200 gross Library Reading rooms Stack area 50 net l DD gross Locker rooms 50 gross Mercantile Areas on other nous Basement and grade floor areas Storage. stock- shipping ares 60 gross 30 gross 300 gross Parking ger 200 gross Residential 200 gratis Skating rinks. swimming pools Rink and pool Deets 50 gross 15 gross Stages and platforms CIS net Arcesrory mirage areas. mechanical equipment room 300 gross Warehouses 500 gross For SI: I square foot = 0.0929 m2. 7)3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Church HVAC Load Calculations for Bait Ohm R V HVAC LOADS Prepared By: High Altitude Heating And Air Rifle, Colorado Thursday, January 27, 2005 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1' Project Report Project Title: Project Date: Company Name: Company City: Reference City: Daily Temperature Range: Latitude: Elevation: Altitude Factor: Elevation Sensible Adj. Factor: Elevation Total Adj. Factor: Elevation Heating Adj. Factor: Elevation Heating Adj. Factor: Winter: Summer: Church Monday, January 24, 2005 High Altitude Heating And Air Rifle, Colorado Outdoor Dry Butt 10 94 Total Building Supply CFM: Square ft. of Room Area: Volume (ft, of Cond. Space: 40 5500 0.817 0.860 0.973 0.880 0.880 Outdoor Wet Bulb 0 65 0 4,428 94,827 Total Heating Required With Outside Air: Total Sensible Gain: Total Latent Gain: Total Cooling Required With Outside Air. Glenwood Springs, Colorado High Degrees ft. Indoor Indoor Grains Rel.Hum Dry Bulb Difference 30 80 47 50 70 0 159,617 Btuh 131,737 Btuh 68,516 Btuh 200,252 Btuh CFM Per Square ft.: Square ft. Per Ton: Air Turnover Rate (per hour): 0.000 189 0.0 159.617 MBH (Based On 0.880 Derating) 66 % 34 % 16.69 Tons (Based On Sensible + Latent) 23.47 Tons (Based On 75% Sensible Capacity) (and 0.973 Total Derating) Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. Jf/ 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 t Miscellaneous Report Winter. Summer: Calculate: Use Schedule: Roughness Factor: Pressure Drop: Minimum Velocity: Maximum Velocity: Minimum Height: Maximum Height: Infiltration: Above Grade Volume: Total Building Infiltration: Total Building Ventilation: Main Trunk Yes Yes 0.00030 0.1000 650 900 0 0 10 94 in.wg./100 ft. ft./min ft./min in. in. Winter 0.430 AC/hr X 94.827 Cu.ft. 40,776 Cu.ft./hr X 0.0167 680 CFM 0 CFM ,System 1— Infiltration & Ventilation Sensible Gain Infiltration & Ventilation Latent Gain M Infiltration & Ventilation Sensible Loss Multiplier: ultiplier: Multiplier: r % NN:A.0ktr e..AG..de..w.w:_L. As.. 0 65 30 50 Runouts Yes Yes 0.00030 0.1000 in.wg./100 ft. 450 ft./min 750 ft./min 0 in. 0 in. Summer 0.150 AC/hr X 94.827 Cu.ft. 14,224 Cu.ft./hr X 0.0167 237 CFM 0 CFM 80 70 21.56 = (1.10 X 0.817 X 24.00 Summer Temp. Difference) 0.03 = (0.68 X 0.817 X 0.06 Grains Difference) 62.88 = (1.10 X 0.817 X 70.00 Winter Temp. Difference) 46.94 0.06 Load Preview Report Building System 1 AED Excursion Duct Loads 4,428 131,737 68,516 200,252 140,463 1,663 7,333 0 4,428 131,737 68,516 200,252 140,463 1,663 7,333 0 0x0' 883 883 25,498 510 26,008 35,881 Zone 1 4,428 105,355 68,006 173,361 104,582 1,663 7,333 0 1-Sanctury 2,700 83,296 60,004 143,300 59,896 953 5,797 0 0-0• 2 -Storage 112 907 0 907 5,034 80 63 0 0-0' 3-Classroom/Sound&Video 218 5,392 4,000 9,392 1,905 30 375 0 0-0* 4 -Men's & Women's Bathroom 418 2,801 1 2,802 13,350 212 195 0 0-0' 5 -Classroom 399 9,538 4,001 13,539 14,585 232 664 0 0-0' 6 -Foyer 336 2,016 0 2,016 6,370 101 140 0 0-0' 7 -Hall 245 1,405 0 1,405 3,442 55 98 0 0-0* 37 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 System 1 - - Ade _uate Exposure Diversi Test Glass Sensible Gain, Btuh 15,00 10,00 5,00 Test For Adequate Exposure Diversity 41.6% Diff. from Avg. (883 Btuh Excursion) 0 1 1 1 1 Bam 9am 10am 11am 12pm fpm 2pm 3pm 4pm 5pm 6pm 7pm / Average Glass Load Over 12 Hours / 1.3 x Average / Hourly Glass Load -- SYSTEM DOES NOT HAVE ADEQUATE EXPOSURE DIVERSITY. — System is on N, E, S, W rosette. Peak load exceeds 12 -hour average load by 41.6%. AED Excursion (amount by which peak exceeds 1.3 x average): 883 Btuh Definition: A system has adequate exposure diversity if the peak -hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. CAElite\Rhvacw\Proiects\Hirsh Altitiirterr:hiirrhl rhv Th. in...4a n7 nnnc •n e1 ••• 1 1 1 t 1 1 1 1 1 1 1 1 1 1 1 1 1 System 1- Psychrometric Chart ZC Zone (Room) Condition LC Leaving Coil Condition SD Supply Duct Temperature Rise OC Outdoor Condition EC Entering Coil Condition DTF Draw Through Fan Sensible Gain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Detailed Room Loads - Room 1 - Sanctuty (Average Load Procedure) Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Design Loss: Actual Loss: N -Wall-12B-0bw 54 X 8 E -Wa11-128-0bw 50 X 8 S -Wall-12B-0bw 54 X 8 S -Door -11 P 3 X 7 N -GIs-1 D-cvo shgc-0.56 100%S (6) E -GIs-1 D-cvo shgc-0.56 0%S (2) S -GIs-1 D-cv-o shgc-0.56 54%S (6) UP -Roof -17A-20 50 X 54 Floor -22A -pm 158 ft..Per. Subtotals for Structure: Infil.: Win.: 386.2, Sum.: 134.7 People: 200 lat/per, 230 sen/per: Room Totals: Htg. & clg. 50.0 ft. 54.0 ft. 2,700.0 sq.ft. 30.0 ft. 81,000.0 cu.ft. 0 0 CFM 0 in. 0 ft./min. 0.100 in.wg./100 ft. 0.000 in.wg./100 ft. Occurrences: System Number: Zone Number: Supply Air: Supply Air Changes: Required Vent.: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: 1 1 1 0 CFM 0.0 AC/hr 0 CFM 0 CFM 0 % 0 CFM 0 % 386 CFM 135 CFM 360 0.097 6.8 2,444 1.6 0 583 376 0.097 6.8 2,553 1.6 0 609 339 0.097 6.8 2,302 1.6 0 549 21 0.290 20.3 426 8.7 0 183 72 0.570 39.9 2,874 24.5 0 1,764 24 0.570 39.9 958 66.5 0 1,596 72 0.570 39.9 2,874 30.0 0 2,160 2700 0.043 3.0 8,127 1.5 0 3,947 158 1.180 82.6 13,051 0.0 0 0 35,609 0 11,391 1,264 19.214 24,287 2.298 4 2,905 300 60,000 69,000 59,896 60,004 83,296 r trIira%G6vatihDrnia.-IeW;nk n u:,, ,a..u^k. ...J.' .�... 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Detailed Room Loads - Room 2 - Storage (Average Load Procedure) Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Design Loss: Actual Loss: N -Wall-12B-Obw 16 X 8 UP-Ceil-16A-19 7 X 16 Floor -22A -pm 16 ft..Per. Subtotals for Structure: Infil.: Win.: 39.1, Sum : 13.6 Room Totals: Htg. & clg. 7.0 ft. 16.0 ft. 112.0 sq.ft. 8.0 ft. 896.0 cu.ft. 0 0 CFM 0 in. 0 ft./min. 0.100 in.wg./100 ft. 0.000 in.wg./100 ft. 128 112 16 128 C•1EIite\Rhvacw\Proiects\Hich Altitude(Churrh) rhv 0.097 0.049 1.180 Occurrences: System Number: Zone Number: Supply Air: Supply Air Changes: Required Vent.: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: 6.8 3.4 82.6 869 384 1,322 2,575 19.211 2,459 5,034 1.6 3.6 0.0 2.297 1 1 1 0 CFM 0.0 AC/hr 0 CFM 0 CFM 0 °% 0 CFM 0 °% 39 CFM 14 CFM 0 0 0 0 0 0 207 406 0 613 294 907 The rcrho Inn•m... n7 7nr1C 9A.99 All 41 Detailed Room Loads - Room 3 - Classroom/Sound&Video (Average Load Procedure) Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air. Runout Duct Size: Runout Air Velocity: Design Loss: Actual Loss: UP-Ceil-16A-19 15.6 X 14 Floor -22A -pm 14 ft..Per. Subtotals for Structure: Infil.: Win.: 0.0, Sum.: 0.0 People: 200 lat/per, 230 sen/per: Room Totals: Htg. & clg. 15.6 ft. 14.0 ft. 218.0 sq.ft. 8.0 ft. 1,747.0 cu.ft. 0 0 CFM 0 in. 0 ft./min. 0.100 in.wg./100 ft. 0.000 in.wg./100 ft. Occurrences - System Number: Zone Number: Supply Air: Supply Air Changes: Required Vent.: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: 1 1 1 0 CFM 0.0 AC/hr 0 CFM 0 CFM 0 % 0 CFM 0 % 0 CFM 0 CFM 218.4 0.049 3.4 749 3.6 0 792 14 1.180 82.6 1,156 0.0 0 0 1,905 0 792 0 0 0 0 0 0 20 C1EIitnMRhvarw%Prninrtt Winh ARib ,dalrk,.rrh\ rh., 4,000 4,600 1,905 4,000 5,392 iL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Detailed Room Loads - Room 4 - Men's & Women's Bathroom (Average Load Procedure) Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers. Runout Air: Runout Duct Size: Runout Air Velocity: Design Loss: Actual Loss: 74 -Wall-12B-0bw 19 X 8 W -Wall-12B-0bw 22 X 8 UP-Ceil-16A-19 22 X 19 Floor -22A -pm 41 ft..Per. Subtotals for Structure: Infil.: Win.: 100.2, Sum.: 35.0 Room Totals: Htg. & clg. 22.0 ft. 19.0 ft. 418.0 sq.ft. 8.0 ft. 3,344.0 cu.ft. 0 0 CFM 0 in. 0 ft./min. 0.100 in.wg./100 ft 0.000 in.wg./100 ft 152 176 418 41 328 0.097 0.097 0.049 1.180 Occurrences: System Number: Zone Number: Supply Air: Supply Air Changes: Required Vent.: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: C'\Elite\RhVaCwlProiects\Minh Altiti irialr'hi irrhl rhv 6.8 1,032 6.8 1,195 3.4 1,434 82.6 3,387 7,048 19.213 6,302 13,350 1.6 1.6 3.6 0.0 2.299 1 1 1 0 CFM 0.0 AC/hr 0 CFM 0 CFM 0 % 0 CFM 0 % 100 CFM 35 CFM 0 246 0 285 0 1,516 0 0 0 2,047 1 754 1 2,801 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 Detailed Room Loads - Room 5 - Classroom (Average Load Procedure) Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers. Runout Air. Runout Duct Size: Runout Air Velocity: Design Loss: Actual Loss: W -Wall-12B-Obw 21 X 8 S -Wall-12B-Obw 19 Y 8 W -GIs-1 Dcvo shgc-0.56 0%S (2) S -GIs-1 Dcvo shgc-0.56 54%S (2) UP-Ceil-16A-19 19 X 21 Floor -22A -pm 40 ft.. Per. Subtotals for Structure: Infil.: Win.: 97.8, Sum.: 34.1 People: 200 lat/per, 230 sen/per: Room Totals: Htg. & clg. 19.0 ft. 21.0 ft. 399.0 sq.ft. 8.0 ft. 3,192.0 cu.ft. 0 0 CFM 0 in. 0 ft./min. 0.100 in.wg./100 ft 0.000 in.wg./100 ft 144 0.097 128 0.097 24 0.570 24 0.570 399 0.049 40 1.180 Occurrences: System Number. Zone Number: Supply Air: Supply Air Changes: Required Vent.: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: 1 1 1 0 CFM 0.0 AC/hr 0 CFM 0 CFM 0 % 0 CFM 0 98 CFM 34 CFM 6.8 978 1.6 0 233 6.8 869 1.6 0 207 39.9 958 66.5 0 1,596 39.9 958 30.0 0 720 3.4 1,369 3.6 0 1,447 82.6 3,304 0.0 0 0 8,436 320 19.216 6,149 20 C:1ElitelRhvacw\Projects1High Altitude(Church).rhv 14,585 0 4,203 2.297 1 735 4,000 4,600 4,001 9,538 Thursday January 97 Wig 1n•99 ARA Detailed Room Loads - Room 6 - Foyer (Average Load Procedure) Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Design Loss: Actual Loss: S -Wall-12B-Obw 16 X 8 S -Door -11 P 6 X 7 UP-Ceil-16A-19 21 X 16 Floor -22A -pm 16 ft.. Per. Subtotals for Structure: Infil.: Win.: 39.1, Sum.: 13.6 Room Totals: Htg. & clg. 21.0 ft. 16.0 ft. 336.0 sq.ft. 8.0 ft. 2,688.0 cu.ft. 0 0 CFM 0 in. 0 ft./min. 0.100 in.wg./100 ft. 0.000 in.wg./100 ft. Occurrences: System Number: Zone Number: Supply Air: Supply Air Changes: Required Vent.: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: 1 1 1 0 CFM 0.0 AC/hr 0 CFM 0 CFM 0 % 0 CFM 0 % 39 CFM 14 CFM 86 0.097 6.8 584 1.6 0 139 42 0.290 20.3 853 8.7 0 365 336 0.049 3.4 1,152 3.6 0 1,218 16 1.180 82.6 1,322 0.0 0 0 3,911 0 1,722 128 19.211 2,459 2.297 0 294 6,370 0 2,016 (` \Fli1nAD6va.vADe..is..•n1L11.J. AI • .• ,rt. •.% L. 4b Detailed Room Loads - Room 7 - Hall (Average Load Procedure) Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Design Loss: Actual Loss: Htg. & clg. 7.0 ft. 35.0 ft. 245.0 sq.ft. 8.0 ft. 1,960.0 cu.ft. 0 0 CFM 0 in. 0 ft./min. 0.100 in.wg./100 ft 0.000 in.wg./100 ft Occurrences: System Number: Zone Number: Supply Air: Supply Air Changes: Required Vent.: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: 1 1 1 0 CFM 0.0 AC/hr 0 CFM 0 CFM 0 % 0 CFM 0 17 CFM 6 CFM W -Wall-12B-Obw 7 X 8 W -Door -11 P 6 X 7 UP-Ceil-16A-19 7 X 35 Floor -22A -pm 7 ft.. Per. Subtotals for Structure: Infil.: Win.: 17.1, Sum.: 6.0 Room Totals: 14 42 245 7 56 CiElitetRhvacwlPreiertc1Hinh Altih Idatrhi ,rrh1 rhv 0.097 0.290 0.049 1.180 6.8 95 20.3 853 3.4 840 82.6 578 2,366 19.214 1,076 3,442 1.6 8.7 3.6 0.0 2.304 0 23 0 365 0 888 0 0 0 1,276 0 129 0 1,405 TL J 1 n-7 nnnr •n nn AlI CIVIL ENGINEERING An Employee -owned Company LAND SURVEYING DRAINAGE REPORT FOR SONLIGHP FOURSQUARE CH Cf 1517 Blake Avenue, Suite 101 Glenwood Springs, CO 81601 970.945.8676 phone 970.945.2555 fax PRELIMINARY PLAN SUBMITTAL PREPARED FOR: Sonlight Foursquare Church 0355 County Road 132 Glenwood Springs, CO 81601 (970) 945-9657 PREPARED BY: High Country Engineering, Inc. 1517 Blake Avenue, Suite 101 Glenwood Springs, CO 81601 (970) 945-8676 HCE JOB NO. 2041002.00 x0518 February 21, 2005 k:\wp\204\1002\preliminary-drainage.doc Prepared By: Scott Gregory, E.I. Reviewed By: Roger D. Neal, P.E. Colorado Registered Professional Engineer No. 29975 www.hceng.com 14 Inverness Drive Easr, Suite F-120 Englewood, CO 80112 303.925.0544 phone 303.925.0547 fax TABLE OF CONTENTS SECTION PAGE INTRODUCTION 3 HYDROLOGY 3 EXISTING HYDRAULIC CONDITIONS 3 PROPOSED HYDRAULIC CONDITIONS 3 EROSION PROTECTION 4 SUMMARY 4 REFERENCES 5 APPENDIX 6 DRAWINGS: Figure 1. Vicinity Map Figure 2. SCS Soils Survey Map Figure 3. Existing Drainage Basin Map Figure 4. Proposed Drainage Basin Map Pg. 2 K:1wp1204U 002\preliminary-drainage.doc 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 VICINITY MAP SCALE: 1" = 2000' • ..‘c„,) \ , i.: . o . * Ar • r l_.,\ •:''C: — ) . --\\ L 1.• ‘' t , % -`'.:•:,':'F*-. I ' 7': -'•.i__> -r -1. 4 ''3, 3344 I 4,, .35 3 % // . , 1/4 1.3 IC,', i 4 , , „ • . -- P:, :?,..,:, 4 • „ i - ,f .1 f (3 : .'in - - 'ti\- - c-- II 1/41- _ - .. %Ay, I - •,.. • ,71' , ""--r- '.' ^ .'",--_&::, k. 1 ir--*: • ;ELY :_,.. • • ' ' '' '' m • -,72 , - ',..'ic<•,',. "...z- ,.,,-zr7-----__.[-: ,' ... /2() -• ;11.. .2---,...<- ‘'-,,,;) -, r., :,..,_15'ir ' --„,„..-,--,.--:- -,...--,,,,----•-•„... `', ,."-- .- ' : :. fitkarj!--':2-""2(^^1"..t. •• g'• rs, .... • • • •,. ' .-.s.e.c•--....• •'' • , •• • - ...... :-:-_,--...., ---7.4-+'" ,..-• „:-• : ''''•--./7-----' I N -7 -?!If•--; • ' ,•'---J• ' • .77r- -z-,, . ' .. 'e; ; 15! ,.4 ... - . ,,„, • 1,„•-• ,,,I, -, n. . =4—'0 - for -.' :2, ; . < - ,,,..51,2i.3•6.4./.., '-•.• -,- 2- -• ,.-- -c.c•-•,::- - ' ' AL--• , - 't • ( Dec4,r33S„' ft. • - ) _ f 3 4: • • cr‘kt . • ‘ 11/1PC'-41" • ,--`3-,',.4., I N.,33 "ir .failei31 r -. 1 ce- -74t 2 i aT. y L, . , .:':: I, LI.:Ni. - - - . ,i ' ' '2. ' r•-• - 7a.,,, ii:i 7 - 7, • •• 1- :'1 _-, 1,.‘r. -, z„-•-., a -. ..I g it i i ••••• -=1,-..-., -..,,t-f,,,,,,,,,, ,_ -- - g . • la .,,,, , r, ----0700 - ‘.:11:%:", ; ' ' .CI --C '''• t ;31•-. , --„,... . "..._‘-- , \-, -. --..„. N-,...,.....„- .., , ..„• . .•.. , 4/1\-:.:„ -it . • \ \ L It vf VI' \ • \'' 91 .:, ‘: \ ' \''' , • \.. N \ -,,,, , •,,,, . \..) - - - -- • \--, -.-.--. - - I , r ' ':;,:a., . ("N:..t__,.:-ke 1 1 Le• Le ri I •-.. ' - - i•OCCP - 4-______ ' %-kr7Z 'VA:, _ --P-----: ,-, ;, . - I : i...."-7\8 ry-ve.21- ,NNT---1;si.---- N( c-, -_-/- 14 ! 1 i - - -.:34-.- 3 ----Th ----1 17 1-4Y4A.C4.1% . . -'S--37.-' - S • ( f K 1 N. i \ I' '.'; ' -fTh'- \-C\. i ri "t -1-::1 ' > ' ( / 1 ',---4 ' -‘, . ‘< \ i • -‘,,,,,, . _ 2 — - }I, _ I ' . \ -2: ' I : \ .. ---_--' ` 5 . i - ' '. '" ". :L ;:' th 11)e : -") y -----A--- IN , -.loci ' 1 R.:,,,,,/ t,:-.,- - • i . J.: - -,,...--- \ I • / / j ,ft / ix .1 -\ _., , . ( -- ) ^ ) /k -k-, I 1 1 ^/.--) i I : ../.•.: _-,---TT4-‘,J 1 l ' HIGH COUNTRY ENGINEERING, INC. Id INVERNESS DRIVE EAST. STE F.120. ENGLEWOOD, CO 50112 PHONE (30319250544 FAX 130319250547 I SI7 BLAKE AVENUE. STE I 01, GLENWOOD SPRINGS. CO 516121 PHONE 1970194543076 FAX 1970/ 9454555 WwvAncEms.com SONUGHT FOURSQUARE CHURCH GARFIELD COUNTY COLORADO SONLIGHT FOURSQUARE CHURCH VICINITY MAP DRAWN SY: SPG SCALE. I" 4 2000' CHECKED BY' RDN PROJECT No 2041002.00 DATE' 2/25/05 PAGE FILE. .1 /SDSKPROJ/204/ 1 002/DWG/NC MAP DWG INTRODUCTION The proposed Sonlight Foursquare Church improvements consist of constructing a new church building. The project site is located in Govemment Lot 4, Section 6 of Township 6 South and Range 89 West of the Sixth Principal Meridian, County of Garfield, State of Colorado; being all parts of I,ot 1 and Lot 2 of the first amended Betz subdivision exemption plat. The proposed site is bounded on the east by County Road 132, private property along all other sides. I-70 is approximately 1000 feet south of the site. Please see Figure 1: Vicinity Map. HYDROLOGY The hydrologic methods for the on-site basins and all offsite basins are based on the methodology presented in the Natural Resources Conservation Service (MRCS) publication "Procedures for Determining Peak Flows in Colorado" (1980), and the computer program AutoCAD Hydrology TR -55 Tabular Method. Stream gage record analysis in western Colorado indicates that elevation 7500 feet is approximately the dividing elevation between rainfall derived critical flood events (below 7500 feet) and snowmelt derived events (above 7500 feet). Since the on-site and offsite basins are below 7500 feet in elevation, peak flows in this area will be primarily rainfall derived. The onsite storm drainage system should be more than adequate to handle on-site spring snowmelt runoff. The 25 year, 24-hour storm was used to size the proposed drainage culverts. The calculations are provided in the appendix. EXISTING HYDRAULIC CONDITIONS The existing runoff from Storm King Mountain is what mostly affects this site. Historically the runoff sheet flows through the site to a roadside swale along County Road 132, and then southerly to the intersection with US Highway 6 &24 where it is collected in drainage facilities and routed to the Colorado River. There are several offsite basins to the north and west of the site that contribute to the flow in the roadside swale along County Road 132. These basins are rather large and display debris flow characteristics. The roadside swale along County Road 132 is considerably small and will not adequately convey a major storm event. The existing pattern of flow is that minor, nuisance flows will be carried by the ditch until capacity is reached and excess flows will over top the road and sheet flow to Mitchell creek. The approximate flow carried by the roadside ditch is 0.18 cfs. The proposed site is not located in a FEMA designated floodplain and is not in an area designated as subject to alluvial or shallow flooding. PROPOSED HYDRAULIC CONDITIONS The proposed site will incorporate an existing house and playground along with the proposed church facility and parking area. The overall drainage patterns under developed conditions are proposed to be similar to those of existing (historic) conditions. The proposed parking area will be constructed of a compacted gravel surface and perimeter swales to route flows toward the intersection of the driveway and County road 132. The proposed church will have concrete sidewalks around the east and south sides that drain towards the parking area and a small drainage swale around the west and north sides that carry flows away from the building and towards the parking area then into the drainage swales. There is an existing 12" cmp culvert under the driveway that conveys flow under the intersection of the driveway and County Road 132 that is adequate to allow flows to continue in the road side ditch as it was historically. The existing roadside swale is considerably small and not adequate to convey enough flow to warrant the use of an 18" pipe, the county minimum standard, and the existing 12" cmp is in good condition therefore we are proposed to leave the existing pipe under the driveway. See the appendix for the culvert capacity calculations. The developed peak flows created a minor increase compared to the existing peak flows during the 100 year storm event, the timing of the peak flows to the discharge locations being ahead of the major off-site basins, and the downstream conveyance structures having adequate capacity to convey the minor increase in the stormwater flows, detention will not be required for this site. However there is an existing small detention basin at the intersection of the driveway and County Road 132 which we are proposing to be increased to 610 cubic feet of storage to provide for sedimentation and water quality capture purposes. See Appendix A for hydraulic calculations. EROSION PROTECTION During construction activities, we recommend placing straw bales at the entrance to the culvert to prevent sediment -laden runoff from continuing downstream. Straw bales should also be located in swales around the building, see the proposed grading plan for specific locations. Any portion of the existing roadside swales that are disturbed during construction should be revegetated immediately but no greater than 30 days without establishing vegetation. Sediment control fences shall be installed in areas that will be subject to sheet flow across the construction site. The existing detention basin will be increased in size as stated above. These structures should be checked and cleaned after storm events to reduce adverse impacts to users downstream. SUMMARY The purpose of this study is to outline a storm water management system to accommodate the runoff from this development in accordance with the regulations by Garfield County, Colorado. This report is in conformance with Garfield County, Colorado Storm Water Management Criteria. REFERENCES 1. National Oceanic and Atmospheric Administration: Precipitation -Frequency Atlas of the Westem United States, Volume III -Colorado. Silver Springs, MD 1973. 2. United States Department of Agriculture, Soil Conservation Service: Soil Survey of Rifle Area, Colorado, Parts of Garfield and Mesa Counties, May 1992. EXDR-25 TR -55 Tabular Hydrograph Method Input Summary Description EX -25 Rainfall Distribution Type II Ia/P Interpolation On Total Area 8.7882 ac Peak Time 726.0000 min Peak Flow 6.3167 cfs Given Input Data: Subarea D/S Subareas Description Area (ac) CN Tc Tt Rainfall (min) (min) (in) EX1 Support Data: Subarea Name: EX1, Row: 1 Sheet Flow 8.7882 75 6.3318 2.7905 2.2000 Description Mannirig's n 0.0300 Flow Length 300.0000 ft Two Yr, 24 hr Rainfall 1.2000 in Land Slope 0.3124 ft/ft Computed Sheet flow time > 3.5413 min Shallow Concentrated Flow Description' Surface Flow Length Watercourse Slope Velocity Computed Shallow flow time unpaved 1317.3086 ft 0.2378 ft/ft 7.8679 fps > 2.7905 min *************************** Total Time of Concentration > 6.3318 min ***t***************n******** shallow concentrated Flow Description Surface Flow Length Watercourse Slope Velocity Computed Shallow flow time Unpaved 1317.3086 ft 0.2378 ft/ft 7.8679 fps > 2.7905 min r*see*arta+**a*+**** Total Time of Travel ***************MM > 2.7905 min Composite Runoff curve Number calculator Description Area (ac) Curve Number Page 1 Total Area EXDR-25 0.0247 87 0.5625 89 0.0354 98 0.3728 98 7.7928 73 > 8.7882 75 < weighted CN Page 2 EXDR-100 TR -55 Tabular Hydrograph Method Input Summary Description EX -100 Rainfall Distribution Type II Ia/P interpolation On Total Area 8.7882 ac Peak Time 726.0000 min Peak Flow 9.4236 cfs Given Input Data: Subarea D/S Subareas Area CN Tc Tt Rainfall Description (ac) (min) (min) (in) Ex]. Support Data: Subarea Name: EX1, Row: 1 sheet Flow 8.7882 75 6.3318 2.7905 2.6000 Description Manning's n 0.0300 Flow Length 300.0000 ft Two Yr, 24 hr Rainfall 1.2000 in Land Slope 0.3124 ft/ft Computed Sheet flow time > 3.5413 min Shallow Concentrated Flow Description Surface unpaved Flow Length 1317.3086 ft watercourse slope 0.2378 ft/ft velocity 7.8679 fps Computed Shallow flow time > 2.7905 min *************************** Total Time of Concentration > 6.3318 min **************************** Shallow Concentrated Flow Description surface unpaved Flow Length 1317.3086 ft watercourse Slope 0.2378 ft/ft velocity 7.8679 fps Computed Shallow flow time > 2.7905 min ******************** Total Time of Travel > 2.7905 min ********************* composite Runoff Curve Number Calculator Description Area (ac) Curve Number Page 1 Total Area EXDR-100 0.0247 87 0.5625 89 0.0354 98 0.3728 98 7.7928 73 > 8.7882 75 < Weighted CN Page 2 PRDR-25 TR -55 Tabular Hydrograph Method Input Summary Description PR -25 Rainfall Distribution Type II Ia/P Interpolation On Total Area 8.7882 ac Peak Time 726.0000 min Peak Flow 6.9935 cfs Given Input Data: subarea D/S Subareas Area CN Tc Tt Rainfall Description (ac) (min) (min) (in) PRI support Data: Subarea Name: PR1, Row: 1 Sheet Flow 8.7882 76 6.0737 2.5503 2.2000 Description Manning's n 0.0300 Flow Length 300.0000 ft Two Yr, 24 hr Rainfall 1.2000 in Land :slope 0.3164 ft/ft Computed Sheet flow time > 3.5234 min shallow Concentrated Flow Description Surface unpaved Flow Length 1317.3086 ft watercourse slope 0.2847 ft/ft Velocity 8.6089 fps Computed Shallow flow time > 2.5503 min Total Time of concentration > 6.0737 min **************************** shallow concentrated Flow Description surface unpaved Flow Length 1317.3086 ft Watercourse Slope 0.2847 ft/ft velocity 8.6089 fps Computed Shallow flow time > 2.5503 min ******************** Total Time of Travel > 2.5503 min ********************* Composite Runoff Curve Number calculator Description Area (ac) Curve Number Page 1 Total Area PRDR-25 0.3728 98 0.0354 98 0.5544 98 0.1312 98 0.0449 89 0.0903 89 0.0630 87 0.0247 87 7.4715 73 > 8.7882 76 < weighted CN Page 2 PRDR-100 TR -55 Tabular Hydrograph Method Input Summary Description PR -100 Rainfall Distribution Type II Ia/P Interpolation On Total Area 8.7882 ac Peak Time 726.0000 min Peak Flow 10.2702 cfs Given Input. Data: Subarea D/S Subareas Area CN Tc Tt Rainfall Description (ac) (min) (min) (in) PR1 Support Data: Subarea Name: PR1, Row: 1 Sheet Flow 8.7882 76 6.0737 2.5503 2.6000 Description Manning's n 0.0300 Flow Length 300.0000 ft Two Yr, 24 hr Rainfall 1.2000 in Land Slope 0.3164 ft/ft Computed Sheet flow time > 3.5234 min Shallow Concentrated Flow Description Surface Unpaved Flow Length 1317.3086 ft watercourse Slope 0.2847 ft/ft velocity 8.6089 fps Computed Shallow flow time > 2.5503 min ***rax********************* Total Time of Concentration > 6.0737 min **************************** Shallow Concentrated Flow Description Surface unpaved Flow Length 1317.3086 ft watercourse Slope 0.2847 ft/ft velocity 8.6089 fps Computed Shallow flow time > 2.5503 min ******************** Total Time of Travel > 2.5503 min ********************* Composite Runoff Curve Number Calculator Description Area (ac) Curve Number Page 1 Total Area PRDR-100 0.3728 98 0.0354 98 0.5544 98 0.1312 98 0.0449 89 0.0903 89 0.0630 87 0.0247 87 7.4715 73 > 8.7882 76 < Weighted CN Page 2 ditch behind building Channel Calculator Given Input Data: Shape Solving for Flowrate Slope Mannirig's n Height Bottom width Left slope Right slope Computed Results: Depth Velocity Full Flowrate Flow area Flow perimeter Hydraulic radius Top width Area Perimeter Percent full Critical Information Critical depth Critical slope Critical velocity Critical area Critical perimeter Critical hydraulic radius Critical top width Specific energy Minimum energy Froude number Flow condition Trapezoidal Depth of Flow 7.0000 cfs 0.0200 ft/ft 0.0200 2.0000 ft 0.0000 ft 10.0000 ft/ft (v/H) 1.5000 ft/ft (V/H) 1.9057 ft 5.0282 fps 7.9622 cfs 1.3922 ft2 4.2056 ft 0.3310 ft 1.4610 ft 1.5333 ft2 4.4137 ft 95.2851 % 1.8336 ft 0.0246 ft/ft 5.4312 fps 1.2889 ft2 4.0465 ft 0.3185 ft 1.4058 ft 2.2986 ft 2.7505 ft 0.9081 Subcritical Page 1 ditch on sw side parking area channel Calculator Given input Data: Shape Solving for Flowrate Slope Manning's n Height Bottom width Left .slope Right slope computed Results: Depth Velocity Full Flowrate Flow area Flow perimeter Hydraulic radius Top width area Perimeter Perce9t full Critical Information Critical depth Critical slope Critical velocity Critical area Critical perimeter Critical hydraulic radius Critical top width Specific energy Minimum energy Froude number Flow condition Trapezoidal Depth of Flow 7.0000 cfs 0.0324 ft/ft 0.0200 2.0000 ft 0.0000 ft 3.0000 ft/ft (v/H) 3.0000 ft/ft (v/H) 1.8782 ft 5.9530 fps 8.2769 cfs 1.1759 ft2 3.9596 ft 0.2970 ft 1.2521 ft 1.3333 ft2 4.2164 ft 93.9100 % 1.9391 ft 0.0273 ft/ft 5.5851 fps 1.2533 ft2 4.0879 ft 0.3066 ft 1.2927 ft 2.4289 ft 2.9086 ft 1.0830 Supercritical Page 1 FYI IIS - = MN = M - - - I= N 0 SONUGHT FOURSQUARE CURCH GARFILED COUNTY. COLORADO SONUGHT FOURSQUARE CHURCH SOILS MAP HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST. STE F-120. ENGLEWOOD. CO 8011 PHONE(303) 9250544 FAX 1303)9250547 1517 HAKE AVENUE. STE 101 GLENWOOD SPRINGS.COS1901 PHONE (*70) 9454979 FAX 1970) 945-2555 NO DATE REVISION BY E CENTER OF COLOOPA 1600-922.1987 OPf34 OH7m INu[TU RNVEP CALL zanirtss OAr3 n ADVMCE NM = MN = MN INN yD R 2 8 D SONUGHT FOURSQUARE CURCH GARFILED COUNTY. COLORADO SONLIGHT FOURSQUARE CHURCH PROPOSED DRAINAGE MAP HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST. STE F -12O. ENGLEWOOD. CO 50111 PHONE (303)1125OS44 FAX 13031 B25OL7 1517 BLAKE AVENUE. STE IGI. GLENWOOD SPRINGS, C0111601 PHONE 15701 NSIS70 FAX 1970) 9452553 ...RB MCENE COM CIECIrED RDN c•, 2/25/05 DRI NO DATE REVISON BV a CENTER OF COLORADO (SC0-922-1913-1 05134 IN COWER `E mSSO•]S•OvME E BEFORE EE OR NAREU4EWQGOMMBBENES Is Ns IIS a e-- no o o a EXDRI 0 1 g (Q1 N 2 8 O SONIJGHT FOURSQUARE COACH GARFlLED COUNTY. COLORADO SONLIGI- f FOURSQUARE CHURCH EXISTING DRAINAGE PLAN C0UA �,A� �`. r HCE t \� U\, 2 '^-.-. HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, SIE F-120. ENGLEWOOD.CO SO II PHONE 13O5)B]BC5a FAX ISOLBaO547 1517 BLAKE AVENUE. STE 101. GLENWOOD SPRINGS. CO Bl 801 PHONE(B]O)9<NS]B FAY IB]OI BES2553 VORI HaNG COM ° Wx SPO NO DATE REVISON BY CCEMEROFC20RGAl l 1E00.922-1982 OR 534 �18m pAYS ry ADVANCE Sp °EvvTw W Ra«"o INC`HRER tante oEnmry RON o f 1/25/05BEFOREmlp E%DRI