Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County Building & Sanitation Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 Job Address NO. Gig 5 / -f ofVo/78/-oo-co3 ©oc.-4 6). rerr?rmit41 D 1/ Nature of Work Building Permit Ri-R,...)Fo.tsr Use of Building r Owner ? erT � ►e$ 4 Ca. Contractor Amount of Permit $ /00 GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 W' Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970.945-8212 / Fa: 970-384-3470 / Inspection Line: 970-584-5005 C:7457 � Permit No: / 57 Parcel/Schedule No: 2,y-ci� �-rt txj Job Add ,ISL t, L f3 g4..- F+ n cir` Pr�+� 1C1.1 A Y3 �, • ' 1 Lot No: Block No: Subd / Exemption: 2 Owner: WSH-1.FmcwT m es,/1- co Aildress .-S-///e' Ph: Wk Ph: 3 ntractor- KINiAGER 1J'Iori d%Lr— p/p/d�1�'' /�1r V'iCref# �N 4/G-T'(/%✓ss: "� PIy .02�i'g, /ILic. No. J� 7�} 4 Architect/Engineer: Address: Ph: Lic. No. 5 Sq. Ft. Building: ` Sq. Ft. of Lot: Height: Nwof Floors: `— 6 Use of Building,/J mS 7 Describe Woils r, Qto( ,2c �,� .-S/i i --6- 8 Class of Work. W New 7 Alteration c Remove J Addition J Move 9 10 Garage: ❑ Single ❑ Double Carport: 7 Single '.J Double o Driveway Permit ❑ On -Site Sewage Disposal J Site Plan 11 Valuation of Work: 9 J1 Q'.0 CSG I Adjusted Valuations: S 12 Special Conditions: A ISSUED THIS AUTHORIZED CONSTRUCTION I APPLICATION PROVISIONS COMPLETED GRANTING TO IAC OF'.,rj, SEPARATE HEREBY VIOLATE NOTICE ELECTRICAL PERMIT IS REQUIRED AND BY THE STATE OF COLORADO PERMIT BECOMES NULL AND VOID IF WORK OR 15 NOT COMMENCED WrIHLN 180 DAYS OR WORK IS SUSPENDED OR ABANDONED OD OF 180 DAYS AT ANY TIME AFTER WORK I5 CERTIFY THAT ] HAVE READ AND EXAMINED AND KNOW THE SAME TO BE TRUE AND OF LAWS GOVERNING THIS TYPE OF WORK WITHIN WHETHER SPECIFIED HEREIN OF A PERMIT DOES NOT PRESUME TO GIVE OR CANCEL ` i PROVISIONS OF ANY OTHER ad.REGLILA /1 CONS •` UCTION OR THE l` UC11ON MUST BE CONSTRUCTION OR IF FOR A1 COMMENCED THIS CORRECT ALL WILL BE OR NOT THE AUTHORITY STATE OR PERFORMANCE I Plan Check Fee: Permit Fee: to -0 l\J LD Total Fee: OaLibRI Dated Permit Issued: T/f 305 OCC Group: Const. Type: Zoning: Setbacks: Manu. Home: ISIS No. & Fee: /',�� j�4 R / DATE `fI\ � 1.3 o APPROV t s • , PLNG DEPT. r • TE APPROVAL/DATE AGREEMENT PERMISSION I5 HEREBY GRANTED TO THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRAI, TUR OR OWNER To CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30 28.201 CRS AS AMENDED THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FUMY COMPILED WITH IN THE LCOATION ERECTION, CONSTRUCTION. AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLMES BY GARFIELD COUNTY FOR ERRORS OMISSIONS OR DISCREPENCIES THE RESPONSI BILIN FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARIICTECT DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST Garfom.003 1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL) The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to al] IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, anchor State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # X7457 Signature`] BpcontOct2004 Date Assessor s r'arce, No '- jU - L -lit , tc, D Date -"q(3/(1> BUILDING PERMIT CARD Job Address FSC W , "rk�ie� ,CeV6 3S a ti Owner Lt& 4ress 73 6-scrEvtALA. Phon_# 02(FS-2' I7 r7 Contractor ~ Crt -v- Address 6-f Q) S7StC Phone # ;V) 125s- Setbacks: Front Rear) RH LH Zoning Ke- /f Soils Test L Footing Foundation Grout Underground Plumbing Rough Plumbing Framing Insulation Roofing Drywall Gas Piping 1 -19 -os ?z -4k 19,.,,E INSPECTIONS NOTES Weatherproofing Mechanical Electrical Rough (State) Electrical Final (State) Final/0417e Or/Checklist Completed9 Certificate Occupancy # Date Septic System # Date Final Other (continue on back)