Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County Building & Sanitation Department 108 8"' Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 NO. Ci Ben Job Address 0 L{ IL' C. e. //1 Co [y2 C C Al rat/ en Nature of Work 3/7-- � Building Permit fib. /y_tili 2'1C3 -0o 3t(- o o - o � 1 Use of fuilding S� ,,yu,, w,y4 e`�if'�T eG'� " Owner t[.1,, 'C IC Contractor C lift.a Amount of Permit S 37Z0, £5 Date Z-/(o•O5 Clerk Permit No: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 86 Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 39 7 Parcel/Schedule NoJ 3 _b3LI_m 04) AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE 1107 FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERM BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTCTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. �/,(� Garfom.003 Brassy KNOWL�AN ACB[ Run Alm . TAND nit � !�^'— ids`\°y /'\ A Qipt * 53SS 22 74. // 2-14.05 cg'W 543 Job Address: OL/ / / C Q_ I t 1 1 e_1401 -0.5L__ 1 Lot No: G mstitBlockiVg, Subd./Exemption: nil 3-� end 1-4Ve5 2 Owner•AddT�e�s 1A�I IWin 2:t_F - T GSvc 1262 Carlinal Ph: r_N37R- 1.1 gaet Wk Ph: Ex-9011+ 965 - Ile CD 3 Contractor:(� l2envu• C.LitAact . Addre�s : Ott 7 1cnu.ti i*-oa_ C 5 Ph: 946-:4159- .3 75 -2. Li Lie. No. 4 Architect/Engineer: Address: Ph: Lic. No. 5 Sq. Ft of Building: 3, L,, Sq. Ft. of Lotr�tc: rusa Height: 5- /Mat_ Noof Floors: 6 Use of Building: 1e ti J ti% _ -/} J �GIAASO� 4 G�.A_.c¢�Q - 7 Describe Work: a heft - / t�---�❑�Remove 8 Class of Work: kl New o Addition ❑ Alteration ❑ Move 9 Garage: 0 Single Double Carport: ❑ Single ❑ Double 10 ' ,C Driveway Permitr. p- On -Site Sewage Disposal p� ,ite Plan (Septic) II Valuation of Work: $ a, CR) Adjusted Valuations: $ log 558' 12I• _ ../4/a/r-an . . %itz oTI A SE ARATE EIEC CAL PERMIT IS REQUIRED AND MU E ISSUED BY THE STATE OF COLORADO. Plan Chec f�: )� /y . 70 /To6t.10Fee:/7 Permit Fee: 1 , .). /` 21a./6-- THIS PERMIT BECOMES NULL AND MED IF WORK OR CONSTRUCTION THIS AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR, IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. Dated Permit Issued: 35 70,164-(SL7,01% - 3 7 JQ, Q5 I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE Oroup: Const. Type: C COMPLETED WITHIN WHETHER SPECIFIED HERELN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CON ' UCTION. Zoning: Setbacks: 1� I P ` ..r AP" I•... Manu.: ome: - ISDS No.dr Fee: r OF 0 DE ♦ e-••. I.4 ' APPR' . /DATE / /A' DATE AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE 1107 FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERM BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTCTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. �/,(� Garfom.003 Brassy KNOWL�AN ACB[ Run Alm . TAND nit � !�^'— ids`\°y /'\ A Qipt * 53SS 22 74. // 2-14.05 cg'W 543 VALUATION/FEE DETERMINATION Applicant Z1i AddressC', /Z l i Date A. 2g s/ Finished (Livable Area): Main l(t 32 Upper Lower Other Total Square Feet Valuation Basement: Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: Crawl Space: Valuation gc?O x 6.0 Valuation Decks/Patios: Covered Valuation Open Valuation 72E Va ILx(L Total Valuation Subdivision AIM M .0-4444417 Lot/Block Lot C Contractor'Pe 3(;s(Ox79,rg: zg7, �6 es 5 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. 1 Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes 7 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do apply. Yes ✓ 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? Yes 2 4. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing stter accordance with the IRC or per stamped engineered design? Yes 6. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes iZ 7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and so s? Yes 8. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Yes 9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? j Yes 1/ 10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof raltyi or joists or trusses? Yes 11. Does the building section drawing or other detail include the method of positive connection of all columns and 'earns? Yes 12. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing (undi bed) grade contours? Yes 13. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase,YI certifications or phase II EPA certification? Yes No r/ 3 14. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IRC? Yes NotvX 15. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping ro s and/or basements comply with the requirements of the IRC? Yes No 16. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes L No 17. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify sglazing for these areas? Yes afe No 18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the p}an? Yes tJ No 19. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes 1 " No 20. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will not be accepted wit it. Yes t/ No 21. Will this be the only residential structure on the parcel? Yes 1/ No If no -Explain: 22. Have two(2),cbmplete sets of construction drawings been submitted with the application? Yes 17 23. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft. long? Yes No 4 24. Have you designed or had this plan designed while considering building and other construction code requirements? Yes ✓ No 25. Do your plans comply with all zoning rules and regulations in the County related to your properties zone istrict? Yes No 26. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes No 27. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes ✓ No 28. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit'? Yes / No 29. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes // No 30. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $47.00 re -inspection fee? Yes ✓ No 31. Are you aware that you are required to call for all inspections required under the !RC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes ✓ No 32. Are you aware that the Permit Application must be signed by the Owner or a written authority being ren for an Agent and that the party responsible for the project must comply with the IRC?/ Yes 1/ No 5 33. Are you aware that prior to submittal of a building permit application you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 67,.5-8601. Yes �/ No 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of�Pplicable inspection. Yes !/ No 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building pen application? Your attention in this is appreciated. Yes No 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes IV No (please check with the building department about this requirement) I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. at -C .n,(nnr Signature of Owner Date Phone: 74 - (days); Project Name: r; j B 5 �z- -ci '7 cI (o zj - q 3 U L' (evenings) Project Address: $\\ lot altritiN qk S-1/41-44 "tn.S pc,�Lrn Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. BpminregOct2004 O !/G C?" trt 6 Applicant Pio: Building PLAN REVIEW CHECKLIST Date /z -2a -0,i Engin = red Foundation riveway Permit yed Site Plan /Sceptic Permit and Setbacks /rade/Topography 30% Attach Residential Plan Review List ��Ivlinimum Application Questionnaire /0741.Subdivision Plat Notes Fire Department Review ✓Valuation Determination/Fees —Red Line Plans/Stamps/Sticker AA' Attach Conditions A-0-kfi Par Application Signed iirif an Reviewer To Sign Application cyclarcel/Schedule No. 40# Snowload Letter- Manf. Hms. GENERAL NOTES: Planning/Zoning Property Line Setbacks 30ft Stream Setbacks Flood Plain Building Height Zoning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes Dec 28 04 10:46a District 1 970-945-1318 p.l Garfield County Road and Bridge, District 1 7300 Hwy 82, Glenwood Springs, CO 81601 970-945-1223 ph. 945-1318 FAX Date: 12-28-04 To: Building & Planning From: Bobby Branham Re: Driveway permit exemption For.- WASRios 720 Latigo Loop P.O. Box 1252 Carbondale CO 81623 Location: Sect, Twn, Rng. 3-8-88 Scope of Work: Obtain building permit Road and Bridge Concerns: This property lies outside the system of maintained county roads, and is therefore exempt from County driveway permit requirements. 7* - Bobby Branham Dist.1 Road and Bridge GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 108 Eighth Street, Suite 201 Glenwood Springs, Coloradof 81601 Phone (970) 9454212 INDIVIDUAL SEWAGE DISPOSAL PERMIT PROPERTY C y� Owner's Named IL, !lI(7 Present Address ^ / H �i /1 Phone /t03 w System Location f w C R, /l1 flldl"1 ' Y1E 746,3_034_ (�{'. - o4/ PO 1 C&J _ — fr .1AJ r�i n 1G i6�1 fr.a, Permit ' A r'e Parcel No. a-€(6 3 -034 -D0 -041 This does not constitute a building or use permit. ?D. ,bo), /252 C4.416. Legal Description 01 Assessor's Parcel No SYSTEM DESIGN Septic Tank Capacity (gallon) Other Percolation Rate (minutes/inch) Number of Bedrooms (or other) Required Absorption Area - See Attached Special Setback Requirements: Date (r-- '7—oirr Inspector -, Ls is5 FINAL SYSTEM INSPECTION AND APPROVAL (as installed) Call for Inspection (24 hours notice) Before Covering Installation System Installer 04/h1�.K Septic Tank Capacity () 0 0 Septic Tank Manufacturer or Trade Name Septic Tank Access within 8" of surface Absorption Area • " `"^ ` Absorption Area Type and/or Manufacturer or Trade Name r( i r't 4-1 ' )r' - Adequate compliance with County and State regulations/requirements Other to. ,0-,) Date Inspector (d RETAIN WITH RECEIPT RECORDS AT CONSTRUCTION SITE •CONDITIONS: 1. All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter 25, Article 10 C.R.S. 1973, Revised 1984. 2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con- nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a requirement of the permit and cause for both legal action and revocation of the permit. 3. Any person who constructs,alters. or installs an individual sewage disposal system in a manner which involves a knowing and material variation from the terms or specifications contained in the application of permit commits a Class 1, Petty Offense (8500.00 fine — 6 months in jail or both). White - A DDI ,r A •m nen. rep. ass No 9'3 97 Gac Job Address 016 T i i Owner �gtcc ) W , tit VicOr"- ContractorY.Z,iiCE", Setbacks: Front Rear Assessor's Parcel No 21163 -0Y- 100 -t1// g nom' H Date 2—//0'05 ,BUILDING PERMIT�c,A�RD pa [`� L F 1 g/623 Address ?a, ?ME /29 Clnjic 379-4)5 7 Phone # 943 - f�CO3 AddressCht 7 i y v Phone # V45- 1109 a RH LH '" Zoning' 379'- 27 t P 6 v eiC6fe1- Soils Test Footing irf7 -057/1— Foundation 3 s?Foundation4-Z3 -0510-- Grout Underground Plumping Rough Plumbing 3-41-05" Framing S -LI -0S 14— Insulation .f 9-nT- Roofing Drywall .- l i -WTD Gas Piping 41-41 INSPECTIONS Weatherproofing Mechanical Electrical Rough (State) Electrical Final (State) Finan—nrhS9)tehecklist Completed'? Certificate Occupancy # Date Septic System # dic,3S Date al "•-/et5 Final GI- ZS'eirni-- Other NOTES (continue on back) C INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued..&!T oned Area Permit No.9317 • AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector spd IMMEDIATELY BECOME NU LJr AND VOID. Use 5 F Address ofLegal Desction Owner Dfek, a Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing _ -17 -04_ Foundation ),- Z 3-05- rich Underground Plumbing y 5 CS -y -- Insulation T q-oi- Rough Plumbing f-4-03-7 Drywall 5_/3 ...erg-af Chimney & Vent 5-c/-0 J Electric Final (by State Inspector) 7lf1 Gas Piping S-q-ofl I Final 7....-42_05-4— Electric Rough (By State Inapector)51 J Septic Final 6- 22-ct (- Framing S 4 -oar I (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVEDDO NOT DESTROY THIS CARD Date L' y_ IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC 1