HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT B LC0-6-15-3 690 Clifford Cerise Ranch Co, LLC Cerise Pit Office/Scale Building 86 CR 104 Carbondale, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS . 2) ALL WORK MUST COMPLY THE CURRENT LAND USE CHANGE PERMIT . 3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS . 4) PRIOR TO CONSTRUCTION, CONTACT THE LOCAL FIRE PROTECTION DISTRICT FOR PERTINENT IFC REQUIREMENTS . FIRE DISTRICT FINAL APPROVAL LETIER IS REQUIRED FOR CO/FINAL INSPECTION . 5) ACCESSIBLE PARKING, SIGNAGE, BUILDING ACCESS ROUTE/ENTRY, AND PORTABLE TOILET FACILITIES AS REQUIRED PER 2009 IBC, CHAPTER 11 AND ICC/ANSI A117 .1-2003. 6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION . 7) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 8) UGHT ANO VENTILATION PER 2009 IBC, CHAPTER 12 .