HomeMy WebLinkAboutApplication- PermitGarfield County
h. Building & Sanitation Department
108 86 Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
NO.
Job Address ! / i t ) 3 Q (/ Q J 1 v ,`Ikes,,
Nature of Work
Use of Building
Building_Permit01g1- r.)%-��
Contractor
Amount of Permit $
(Ran7. 15
Date
Clerk
S- 16-b4
)6a4
eggeettaidsts gas'
491PRM1fIT EAPPLIC;
GARFIELD COUNTY qUILDIN TION Agate -
708 e8, Suet sus 201, Glenwood Springs, CO 11101
Phone: 17044_42i21 F.x9110-8844470 / Inspection Law: 870984-1001
Permit No. CT
Parcel l Schedule No: 218104307007
PERMISSION I5 HEREBY GRANTED TO THE APPLICANT ASAWIER, CONTRACTOR AND/0R THE ADEM OF THE CONTRACTOR OR OWNER TO
CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING
DEPARTMENT.
N CONST ERATIDN OF THE ISSUANCE OF THE PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND
USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN W 10.28.201 CRS AS AMENDED. TLE SIGNER
FURTHER AGREES THAT IF TLE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LOCATOR. ERECTION, CONSTRUCTION
AND USE OF THE ABOVE DESCRIED STRUCTURE, TLE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AID THAT THEN AND
THERE IT SHALL BECOME NULL AND VOD.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT TLE BUILDING OFFICN . FROM
THEREAFTER REQUIRING THE CORRECTOR OF ERRORS IN SAID BANS, SPECIFICATIONS AND OTHER DMA OR FROM PREVENTING
BUILDING OPERATION BEND CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION
OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PANS AND SPECIFICATIONS AND INSPECTORS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN
ACCEPTANCE OF ANY RESPTNSEl1T1ES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DIBCREPAN- CES. THE
RESP IISIBILRY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTOR RESTS SPECIFICALLY MTH THE ARCHITECT,
DESIGNER, BUILDER. AND OWNER COMMENTS INTENDED 70 BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
I HEREBY ACKNOWLEDGE THAT I NAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL)
fo1`f ekg37;1 g Glnv
reap "hoe t
CO.
(!7o5
Job Address: LOT 7 - RAPIDS VIEW LANE - THE RAPIDS ON THE COLORADO SUBDIVISION - NEW CASTLE B j 0 4 7
1
Lot No. 7
Mad Na N/A IFabmwm.: The Rapids on the Colorado
2
owner Rapids Development
Mors 2102 West Arapahoe Drive
Littleton. CO 80120-3008
Pk 301798-1640
w - Pe: 301798-1640
3
tirdon
Rapich Development
Cornoratkn
Addrn: 2102 Wert Arapahoe Drive
1,IWatoa_ CO 80I 204008
pt 303-795-164o
Leese Na Owner
4
Anidoen 1 Emdenr. Mountain
Crass Fnetnnedno_ Inc
Address: 8261/2 Grand Avenue
Glenwood $orinoe CO S160L
•
ph; 970-523-1555
License ism 35964
8
Sq. Pt of Balding; Ling
Area 1786 Gar 758
Sq, ft of Lot:
2.11 Acres
Height:
_Nineteen Peet
Nether ef Flans:
One
8
un of Belding: Single Family Residence - Subject To Declaration of Protective Covenants Recorded 09/09/1997 as Reception
No.113156 In Book 1032 at Pace_ anh. o(Ckrh of GarOeld Conal Cakndo.
7
.�d.
Defib Wok New Coodtrnctlon "_ O r / i+
_. _ 1
8
CV dost 7(7( Nsw 0 AYaestbm Rene
Addme. 0 Mne
9
Cangn 0 as. XX Three Car Garage
0 DnSe
Cwt: Sloth ❑
Dade 0
10
DinowaY remit:
Exempt - Letter Attached
O. SAe Sewage Disposal Repos)
Ete Pla.
Surveyor Plan attached
jI
-
RSDS Application Attached
11
Vdunia of Work $165,000 Including 18D$
�� / 02 ,
Adjusted %tee S _ J
R.
�, f.y sato? ion/ lP • / ell -an .7r
—fACKe4 @ r / Q'Jcs-//492€ AV �2'e�jpa�J
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE
Pae Check Fn:
B4 7e 7 8
Permit Fac g/
/ 3 o 7.35
STATE OF COLORADO.
THIS PERMIT BECOMES NULL AND VOID F WORK OR CONSTRUCTION
AU ORQED IS NOT COMMENCED WITHIN 180 DAYS, OR, F CONSTRUE TION
Total Fn:
��� . /�
Dae Perna Isar
OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY
TME AFTER WORN IS COInNCED.
TIME
Q�
R J p- `.I
K (i(
Pe-
�lite-
1 CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW
THE SATE TO BE TRUE AND CORRECT. ALL PROVlSIa l OF LAWS GOVERNING Aerie:
Agriarltunl / industrial
THIS TYPE OF WORN WILL BE COMPLETED WITHIN WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOLATE OR CANCEL TIE PROVISIONS OF ANY OTHER STATE
Setbacks:
Prov snarl
Side ' 25 Feet
Rea- 25 F
OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF Mau Hon:
CONSTR TION. Not Applicable
Ra.,.� ._ (Iop�ant . ...-.on
st.RIgpld l .2' 15, 2004
ilt
�yy
/
" .i, Sir/ 't �,-'i %�
BIdg Dapr /WPM v ,. I ��'App.ov. •. ' — i/
PERMISSION I5 HEREBY GRANTED TO THE APPLICANT ASAWIER, CONTRACTOR AND/0R THE ADEM OF THE CONTRACTOR OR OWNER TO
CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING
DEPARTMENT.
N CONST ERATIDN OF THE ISSUANCE OF THE PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND
USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN W 10.28.201 CRS AS AMENDED. TLE SIGNER
FURTHER AGREES THAT IF TLE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LOCATOR. ERECTION, CONSTRUCTION
AND USE OF THE ABOVE DESCRIED STRUCTURE, TLE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AID THAT THEN AND
THERE IT SHALL BECOME NULL AND VOD.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT TLE BUILDING OFFICN . FROM
THEREAFTER REQUIRING THE CORRECTOR OF ERRORS IN SAID BANS, SPECIFICATIONS AND OTHER DMA OR FROM PREVENTING
BUILDING OPERATION BEND CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION
OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PANS AND SPECIFICATIONS AND INSPECTORS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN
ACCEPTANCE OF ANY RESPTNSEl1T1ES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DIBCREPAN- CES. THE
RESP IISIBILRY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTOR RESTS SPECIFICALLY MTH THE ARCHITECT,
DESIGNER, BUILDER. AND OWNER COMMENTS INTENDED 70 BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
I HEREBY ACKNOWLEDGE THAT I NAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL)
fo1`f ekg37;1 g Glnv
reap "hoe t
CO.
(!7o5
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1997 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancx,,use and the issuance of a
Certificate of Occupancy -r the dwelling under building permit # (-12 37 .
/0097,
`e
Signa
Bpcont03/2004
Date
VALUATION/FEE DETERMINATION
Applicant, Rya, heve'arc co r. Subdivision Rctp1ds on At Coloro.d0
Address 0(53 1," Una) Cietfrk Lot/Block Co t `7
Date 4!)-r Contractor pW,
Finished (Livable 1 - e iDj 7+ l (tQ /23 2 3
Main
Upper
Lower
Other
Total Square Feet
Valuation
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Crawl Space:
Valuation 755 X "8
Valuation ) 7 4, y C
Decks/Patios:
Covered
Valuation
Open
Valuation 233 ', /2
Total Valuation
136 9
J4, 074i
2 74.
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. Adequate and complete
information will prevent delays in the plan review process. Reviewing a plan and the discovery that
required information has not been provided by the applicant may result in the delay of the permit
issuance and in proceeding with building construction. The owner or contractor may be required to
provide this information before the plan review may proceed. This causes delays because other plans
that are in line for review may be given attention before the new information may be reviewed after
it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. If you do not, it may be
helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code".
This book is available to you through this department at our cost. Also, please consider using
a design professional for assistance in your design and a construction professional for
construction of your project.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line.
A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, an 80 M.P.H.
windshear, wind exposure B, windload of 15 pounds per square foot, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 106.3.1
(7.) Any site plan for the placement of any portion of a structure within 50 ft. of a
property line and not within a previously surveyed building envelope on a subdivision
final plat shall be prepared by a licensed surveyor and have the surveyors signature and
professional stamp on the drawing. Any structure to be built within a building envelope
of a lot shown on a recorded subdivision plat, shall include a copy of the building
envelope as it is shown on the final plat with the proposed structure located within the
envelope.
Yes kic
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a comer lot. Special
setbacks do apply.
Yes b(
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses?
Yes %c
4. Does the site plan indicate the location and direction of the County or private road accessing
the property? Yes ok
2
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces's and soffits?
Yes
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes DC
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes D�
11. Does the building section drawing or other detail include the method of positive connection
of all columns and beams?
Yes {X
12. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing (undisturbed) grade contours?
Yes pq
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase II EPA certification?
Yes No
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes csc No
3
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform
Building Code?
Yes 11. No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes 01. No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these areas?
Yes a No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes g( No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? The building permit application will not be
accepted without it.
Yes K. No
21. Will this be the only residential structure on the parcel?
Yes Y No If no -Explain:
22. Have two (2) complete sets of construction drawings been submitted with the application?
Yes eC
23. Do you understand that the minimum dimensions a home can be on a lot is 20ft.wide and
20ft. long?
Yes k No
24. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes No
4
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties zone district?
Yes x No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes ck No
27. Do you understand that approval for design and/or construction changes are required prior to
the application of these changes?
Yes V\ No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building permit?
Yes D` No
29. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoons. All inspections must be
called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for
inspections will delay your inspection one (1) day. Inspections are to be called in to
384-5003.
Yes 'X( No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a $47.00 re-inpsection fee?
Yes No
31. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occuparky and occupancy of the building?
Yes No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the Uniform Building Code?
Yes C No
33. Are you aware as part of the submittal for a building permit you are required to show proof
of a driveway access permit from Garfield County Road & Bridge Department or if
applicable the State Highway Department ? If a permit is not necessary, then a letter stating
that information is required. You can contact the Garfield County Road & Bridge
5
Department at 625-8601 or refer to the phone book for the State Highway Departments
phone number.
Yes t< No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building permit application? Your attention in this is appreciated.
Yes K No
36. Do you know that the local fire district may require you to submit plans for their review of
fire safety issues? Yes No (please check with the
building department about this requirement)
37. Are you aware, that if you receive your water and/or sewer from an Association, District, or
Municipality you will be required to provide the County with a copy of the Tap Permit (or
evidence of an exemption) at the time of the building permit application submittal?
Yes No N/A
38. If you are within five (5) miles of the City of Rifle or the Town of Parachute, have you
checked with them concerning water shed protection zone permit requirements for ISDS and
other activities? Yes DC No N/A
I hereby acknowledge that I have read, understand and answered these questions to the
best of ppy abili
Signature of Owner
Phone: 30,3—?7f- /6 VO (days);
Date
303 --79 g-/6 i«D (evenings)
Project Name: /D 5 v i!/ Hifi " o -o? 0
//
Project AddresstilL 7 /&$"/OS f /' ��% �✓911/r
Notes: If you have answered "No" on any of the questions, you may be required to provide this
information at the request of the Building Official prior to beginning the plan review process.
Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a
Geotech
HEPWORTH - PAWLAK GEOTECHNICAL
March 31. 2003
Rapids Development Corporation
Attn: Gene Hilton
2102 West Arapahoe Drive
Littleton, Colorado 30120-3008
Hepworth-Pawlak Geotechnical, Inc
5020 Couny Road 154
Glenwood Springs, Colorado 81601
Phone: 970-945-7988
Fax: 970-945-8454
email•. hpgeo®hpgeotech.com
Job No. 103 198
Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot 7, The
Rapids on the Colorado, County Road 335, Garfield County. Colorado.
Dear Mr. Hilton:
As requested. Hepworth-Pawlak Geotechnical, Inc. performed a subsoil study for
design of foundations at the subject site. The study was conducted in accordance with
our agreement for geotechnical engineering services to Rapids Development
Corporation dated March 5. 2003. The data obtained and our recommendations based
on the proposed construction and subsurface conditions encountered are presented in
this report. Hepworth-Pawlak Geotechnical, Inc. previously conducted percolation
testing for the subdivision development and presented our findings in reports dated May
12. 1995 and August 8, 1996, Job No. 195 217.
Proposed Construction: The proposed residence will be a one or two story wood
frame structure located in the area of the pits shown on Figure 1. Ground floor will be
either structural over a crawlspace or slab -on -grade. Cut depths are expected to range
between about 3 to 4 feet. Foundation loadings for this type of construction are
assumed to be relatively light and typical of the proposed type of construction.
If building conditions or foundation loadings are significantly different from those
described above, we should be notified to re-evaluate the recommendations presented in
this report.
Site Conditions: The site was vacant at the time of our field exploration. The ground
surface in the building envelope is relatively flat with a gentle slope down to the
northwest. There is about 2 feet of elevation difference across the building envelope. A
steep fill slope had been constructed on the north-northwest side of building envelope.
The Colorado River is located about 125 feet to the north-northwest and about 10 feet
lower in elevation. Vegetation consists of sparse grass and weeds.
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating two exploratory pits at the approximate locations shown on Figure 1. The
logs of the pits are presented on Figure 2. The subsoils encountered, below about l/ to
Parker 303-841.7119 • Colorado Springs 719-633-5562 • Silverthome 970.468-1989
Rapids Development Corporation
March 31, 2003
Page 2
-2-
11 feet of topsoil and 3 feet of medium stiff silt and sand in Pit 1, consist of relatively
dense, slightly silty sandy gravel with cobbles and boulders to the pit depths of 3 to 4
feet. Results of swell -consolidation testing performed on a relatively undisturbed
sample of the silt and sand, presented on Figure 3, indicate low compressibility under
existing moisture conditions and light loading and a low collapse potential (settlement
under constant load) when wetted. The sample showed high compressibility upon
increased loading after wetting. No free water was observed in the pits at the time of
excavation and the soils were slightly moist to moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soils designed for an allowable soil bearing
pressure of 1,000 psf for support of the proposed residence. The upper fine grained soils
tend to compress after wetting and there could be some post -construction settlement if
the bearing soils become wetted. Footings bearing entirely on the underlying dense
gravels can be designed for an allowable soil bearing pressure of 3,000 psf. Footings
should be a minimum width of 18 inches for continuous walls and 2 feet for columns.
The topsoil and loose disturbed soils encountered at the foundation bearing level within
the excavation should be removed and the footing bearing level extended down to the
undisturbed natural soils. Voids created by the removal of large rocks should be
backfilled with compacted sand and gravel or with concrete. Exterior footings should
be provided with adequate cover above their bearing elevations for frost protection.
Placement of footings at least 36 inches below the exterior grade is typically used in this
area. Continuous foundation walls should be reinforced top and bottom to span local
anomalies such as by assuming an unsupported length of at least 12 feet. Foundation
walls acting as retaining structures should be designed to resist a lateral earth pressure
based on an equivalent fluid unit weight of at least 50 pcf for the on-site soil as backfill.
Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support
lightly loaded slab -on -grade construction. The upper fine grained soils are
compressible when wetted under load. To reduce the effects of some differential
movement, floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints
should be used to reduce damage due to shrinkage cracking. The requirements for joint
spacing and slab reinforcement should be established by the designer based on
experience and the intended slab use. A minimum 4 inch layer of sand and gravel, such
as 3/4 -inch road base, should be placed beneath slabs -on -grade for subgrade support.
This material should consist of minus 2 inch aggregate with less than 50% passing the
No. 4 sieve and less than 12% passing the No. 200 sieve.
Job # 103 198
Rapids Development Corporation
March 31, 2003
Page 3
-3-
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum standard Proctor density at a moisture content near optimum. Required fill
can consist of the on-site soils devoid of vegetation, topsoil and oversized rock.
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95% of the maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 6 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement
and walkway areas.
4) Roof downspouts and drains should discharge well beyond the limits of
all backfill.
5) Landscaping which requires regular heavy irrigation should be at least 5
feet from foundation walls.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
warranty either express or implied. The conclusions and recommendations submitted in
this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Figure 1 and to the depths shown on Figure 2, the proposed type
of construction, and our experience in the area. Our findings include interpolation and
extrapolation of the subsurface conditions identified at the exploratory pits and
variations in the subsurface conditions may not become evident until excavation is
performed. If conditions encountered during construction appear different from those
described in this report, we should be notified at once so re-evaluation of the
recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes.
We are not responsible for technical interpretations by others of our information. As
the project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
Job # 103 198
•
i2apids Development Corporation
' March 31, 2003
Page 4
-4-
changes may require additional analysis or modifications to the recommendations
presented herein. We recommend on-site observation of excavations and foundation
bearing strata and testing of structural fill by a representative of the geotechnical
engineer.
If you have any questions or if we may be of further assistance, please let us know.
Respectfully Submitted,
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
Jordy Z. 4.dmson, Jr., P.
Reviewed by:
Steven L, Pawlak, P.
JZA/ksw
attachments Figure 1 - Loc a+' : xploratory Pits
Figure 2 - Logs of Exploratory Pits
Figure 3 - Swell -Consolidation Test Results
Job It 1°3 198
L -,e tech
NOTE: CONTOUR LINES SHOWN
ARE PRIOR TO SITE GRADING
FOR SUBDIVISION DEVELOPMENT
1 �
LOT 6
544
BUILDING —rr.\
APPROXIMATE SCALE
5
4er
LOT 7
ENVELOPE
\ y
\
\ ■ PIT 2 \
\ A \
\
PROPERTY \ % / \
UNE / \
\ \
/ \ \ \\
/- \/--1
PIT
/
ee
/
LOT 8
/
NEW OO
P
090
103 198
HEPWORTH—PAWLAK
GEOTECHNICAL, INC.
LOCATION OF EXPLORATORY PITS
Figure 1
1
0
0
PIT 1 PIT 2
0
5 5
10
LEGEND:
—1
N TOPSOIL; silt and sand. scattered rock, organics, moist, dark brown.
•
10
SILT AND SAND (ML—SM); slightly clayey, stratified, medium stiff, slightly moist, light brown,
slightly porous.
GRAVEL COBBLES AND BOULDERS (GP—GM); sandy, slightly silty, dense, slightly moist,
light brown, subrounded to rounded rock.
2" Diameter hand driven liner sample.
NOTES:
1. Exploratory pits were excavated on March 21, 2003 with o backhoe.
2. Locations of explorotory pits were measured approximately by toping from features shown on the site
plan provided.
3. Elevations of exploratory pits were not measured and Togs of explorotory pita are drawn to depth.
4. The exploratory pit locations should be considered accurate only to the degree implied by the method
used.
5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries
between material types and transitions may be gradual.
8. No free water was encountered in the pits at the time of excavating. Fluctuations in water level may
occur with time.
7. Laboratory Testing Results:
WC an Water Content ( % )
DD - Dry Density ( pcf )
Depth — Feet
103 198
HEPWORTH—PAWLAK
GEOTECHNICAL, INC.
LOGS OF EXPLORATORY PITS I Figure 2
Compression %
Of CP ?
Moisture Content = 3.1 percent
Dry Density = 96 pcf
Sample of: Sandy Silt
From: Lot 7. Pit 1 at 2 1/2 Feet
w
wo
Compression
upon
wetting
0.1 1.0 0 100
APPLIED PRESSURE — ksf
103 198
HEPWORTH—PAWLAK
GEOTECHNICAL, INC.
SWELL CONSOLIDATION TEST RESULTS
Figure 3
Applicant
PLAN REVIEW CHECKLIST
&P/Od Date 8-SOf�
/ Building
✓Engineered Foundation
%i4. Driveway Permit 1-1104, 1
�rveyed Site Plan
GrSeptic Permit and Setbacks
3.70 3Parn-
Grde/Topography 30%
Attach Residential Plan Review List
../Minimum Application Questionnaire
✓ Subdivision Plat Notes
,". Fire Department Review
Valuation Determination/Fees
Red Line Plans/Stamps/Sticker
✓Attach Conditions
pplication Signed
Plan Reviewer To Sign Application
Water and Sewer
V Parcel/Schedule No.
40# Snowload Letter- Manf. Hms.
Planning/Zoning
Property Line Setbacks
30ft Stream Setbacks
(/
Flood Plain 5 ,../p
Building Height
Zoning Sign -off
Road Impact Fees
HOA/DRC Approval
Grade/ opography 40%
Planning Issues
Subdivision Plat Notes
laga-
esgat i` gem.
GENERAL NOTES:
Alwrg (if -"F-s- 73PsulS Furs( ?itaf 1-1 Na 160 Siam tFoteig
3p& �r. (i0n aj
Rapids On The Colorado Architectural Control Committee
2102 West Arapahoe Drive
Littleton, CO 80120-3008
303-798-1640
July 9, 2004
Building and Planning Department - Garfield County
Suite 201
108 Eighth Street
Glenwood Springs, CO 81601
RE: Building Permit Requirement — Architectural Control Committee = Rapids on the Colorado Lot 7
Notice To: Building Inspector
In accordance with building permit requirements, this notice is to advise you that the Rapids on the
Colorado Architectural Control Committee ('ACC") has reviewed and approved the attached house
plans and site plans.
Lot 7 — Rapids on the Colorado subdivision.
Thank you for your assistance.
Very t
Gene R. Hilton, Chairman
Architectural Control Committee
O//1L/Lou4 UL:46 bLObbZI
KUHU AND b4CUVt YHUt tll
Garfield County
Garfield County Road and Bridge Department
July 12, 2004
Gene Hilton
2102 West Arapahoe Drive
Littieton, CO 80120-3008
Re: The Rapids on the Colorado
Lots 1 through 33
CC: Garfield County Building and Planning Department
Dear Mr. Hilton
The property you own is beyond the county road in a private subdivision; therefore, you do
not need a driveway permit from Garfield County any of the above mentioned lots.
If you have any questions or pmblenu, please feel free to contact me.
cerdy.
aq
Mall
District Foreman
Garfield County Road and Bridge Department
P.O. Bots 476
0567 County Pond 382
RL&, co IMO
!lone: 970.6214601
!4: 970425-8627
Oct 20 05 06:57a p.1
TIT
View Permit 543629
Requestor
Site
Electrical and Plumbing Permits Online
Company Name.
First Name:
Last Name:
Address:
City:
State:
Zipcode:
Phone:
Fax:
Email Address:
License Number
Property Type:
Property Owner:
Job Site Address:
City:
State:
Lpcode:
County:
Power
Baling Type:
Construction Type:
Poise Construction:
Square Feet
Tnm:
FLATOPS ELECTRIC
STEVEN
HISCOCK
3720 CR 214
SILT
CO
81852
(970) 876-5520
970-876-5520
netopsesopns.net
3344
PRIVATE
HILTON
0153 RAPIDS VIEW
NEW CASTLE
CO
GARFIELD
HOLY CROSS - GLENWOOD SPRINGS
RESIDENTIAL
NEW
RESIDENTIAL NEW
1800
N
Inspections
Inspected Date
Type
Status
07/1_8/2005
FINAL
ACCEPTED
01/19/2005
ROUGH IN }ACCEPTED
Status/Actions
Permit Number: 543629
Type: ELECTRICAL
Fay," L
RIPROirff marmot ran
LEGAL QESCR/P/pN
LOT 7
SON Tiff COLORADO
COUNTY OF GARFIELD
STATE OF COLORADO
FINISHED FLOOR ELEVATION CERTIFICATION
1 certify that the finished Row elevation for the house shown on
this 2C is 550285. This elevation is based on benchmark
used to establish the Rood plain as shown . j final plat of
Rapids on the Colorado subdivision.
IMPROVEMENT LOCATION CER77F7CATE
I HEREBY CERTIFY THAT THIS IMPROVEMENT LOCATION CERTIFICATE WAS
PREPARED FOR GENE HILTON, 77i4r IT S Nor A LAND SURVEY PIAT
OR IMPROVEMENT SURVEY PLOT, AND THAT R /S NOT 7D BE RELIED UPON FOR
THE ESTABLISHMENT OF FENCE, BUILDING, OR OTHER FUTURE IMPROVEMENT
LINES.
I FURTHER CERTIFY THAT THE IMPROVEMENTS ON THE ABOVE DESCRIBED PARCEL
ON MIS DATE, 9/16/05, EYCEPT UTILITY CONNECTIONS ARE ENBRELY wow
THE BOUNDARIES OF THE P.; EL, EXCEPT AS SHOWN, THAT THERE ARE NO
ENCROACHMENTS BED PREMISES BY IMPROVEMENTS ON ANY
ADJOINING • - r . a l.: TED, AND THAT THERE IS NO APPARENT
EADENCE r - SIG ROSSTNG OR BURDENING my PART OF SAID
L , son `L. 13501
617 jv
T''
• tear
•rr D
ROMAN 8 1x0 MC
Ann L SS
/retestlm.t Lend &minor
LS 73691
4772 2/4 RG
Set Catered°
(9)0) 8211-2947
10?
!RR RAPIDS ON MS COLORADO
tar can= COLORADO
DA IE.-
9/16/O4PRO[ 1 RAPIDS-HOUSES&•/LCs
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT Permit
109 8th Street Suite 303
Glenwood Springs, Colorado 81601
Phone (303) 945-8212
INDIVIDUAL SEWAGE DISPOSAL PERMIT
PROPERTY
NE - - 3988
Assessor's Parcel No.
This does not constitute
a building or use permit.
�IC�, t� Gnca 'T98
Owner's Name tt' , a -J .�,i�.4-rese• t Address k `� 1, �• Phon '(otic)
i
System Location Colo--3rP, �Fultz
Legal Description of Assessor's Parcel No
SYSTEM DESIGN
erdAL
(94/ -0(13 -D7 OC'7 /rf 7
Septic Tank Capacity (gallon) Other
Percolation Rate (minutes/inch)
Required Absorption Area - See Attached
Special Setback Requirements:
Date Inspector
FINAL SYSTEM INSPECTION AND APPROVAL (as installed)
Call for Inspection (24 hours notice) Before Covering Installation
System Installer
Septic Tank Capacity
Septic Tank Manufacturer or Trade Name
Septic Tank Access within 8" of surface
Absorption Area
Absorption Area Type and/or Manufacturer or Trade Name
Adequate compliance with County and State regulations/requirements
Number of Bedrooms (or other)
Other %� .� `[
Date /1/1/0Inspector '}'t"6'S %.4--02�- `-'f( \ t5 1^ a -Ce- fee .
RETAIN WITH RECEIPT RECORDS AT CONSTRUCTION SITE 3s96 q'
•CONDITIONS:
1 All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter
25. Article 10 C R.S. 1973, Revised 1984.
2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con-
nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a
requirement of the permit and cause for both legal action and revocation of the permit.
3 Any person who constructs.alters. or installs an individual sewage disposal system in a manner which involves a knowing and material
variation from the terms or specifications contained in the application of permit commits a Class 1, Petty Offense ($500.00 fine — 6
months in )ail or both).
White - APPLICANT Yellow - DEPARTMENT
COUNTY OF GARFIELD - BUILDING DEPARTMENT
CORRECTION NOTICE
108 8th St., Suite 201 Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at 0 /55 e
Permit No. 702S 2
Ota
I have this day inspected this structure and these
premises and found the following corrections needed:
,/ _ -c •r�ca�c
eau}-Q
You are hereby notified that the above correction must be inspected
before covering.
When correction(s),`have been made, call for inspection at 970-384-5003.
Date /— / Q 20
Building Inspector /gt.7
Phone (970) 945-8212
No. 1 a� t
Assessor's Parcel NoIC(`lI-n(13- i%-rn7
Date S 1b
BUILDING PERMIT CARD
Contractor
Addres
Address
S�pgcks: Frond
Soils
'
St TCI ,
est
Footing _ q-/ 7 -044
Foundation
Grout
Underground Plumbin
Rough Plumbing ILO
Framing / "41 0
Insulation I - 5 -OS
Roofing
Drywall 2 - 7' OS'�}r`
Gas Piping t -4 -os (Nwt-.
Rear
f`
RH LH
ECTIONS
Phone #
Zoning
Weatherproofing
Mechanical
Electrical Rough (State) /_(V5
Electric I final ( tate) /g' -`S'
Final // hecklist Completed'?
Certificate Occup ncy # ..56103
Date /�- 7- cir
Septic System # 3cIW
Date to -64
Final II-4-05-
Other
I--oS
Other
NOTES
(continue on back)
Ices