HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-6-15-3683
Mike Fergen/Climate Control
Convert Open Storage to Enclosed Office Space
1537 CR 130
Glenwood Springs, CO
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND
MANUFACTURERS INSTALLATION SPECIFICATIONS.
2) BUILDING IS TYPE IIB CONSTRUCTION, F1, B OCCUPANCIES.
3) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC
REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR
FINAL/COMPLETION INSPECTION.
4) ENGINEER APPROVAL OF EXISTING FOUNDATION AND STRUCTURAL FRAMING
REQUIRED AT FOUNDATION INSPECTION. ENGINEERED STRUCTURAL ALTERATION
DETAILS ARE REQUIRED FOR FOUNDATION AND FRAMING INSPECTIONS.
5) ACCESSIBILTY PER 2009 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003 REQUIREMENTS.
6) ELECTRICAL PERMITTING & INSPECTIONS BY THE COLORADO STATE ELECTRICAL BOARD.
7) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION.
8) ELECTRICAL FINAL APPROVAL I5 REQUIRED FOR FINAL/COMPLETION INSPECTION.
9) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
10) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.