HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLC0-7-15-3794
American Soda/Solvay Chemicals
Storage Building
1821 CR 215 Parachute, CO
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IECC, IFC, AND THE
MANUFACTURERS INSTALLATION SPECIFICATIONS .
2) BUILDING IS APPROVED AS TYPE V-B CONSTRUCTION, S-1 OCCUPANCY .
3) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC
REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR
FINAL/COMPLETION INSPECTION.
4) OPEN-HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 1500 PSF .
5) ALL HIGH STRNGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR.
APPROVAL REPORT IS REQUIRED AT FRAME INSPECTION.
6) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION.
7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION.
8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR FINAL/COMPLETION APPROVAL.