HomeMy WebLinkAbout1.02 Preapp SummaryArticle 4-101.A
Preapplication Conference
Summary
Ursa Operating Company
and Battlement Mesa Partners
Major Impact Review Application
Battlement Mesa PUD Phase I
BMC B
OAProject No. 014-1829
GARFIELD COUNTY
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, Colorado 81601
Telephone: 970.945.8212 Facsimile: 970.384.3470
www.garfield-countv.com
PRE -APPLICATION CONFERENCE SUMMARY
CONFERENCE DATE: September 11, 2015 (Director extended pre -app for 6 months from
original expiration of March 11, 2015)
PROJECT: "Extraction of Natural Resources" to drill for natural gas within the Battlement
Mesa Planned Unit Development (PUD)
COUNTY PROCESS REQUIREMENT: Special Use Permit processed via the Major Impact
Review process
OWNER(S): URSA (Minerals Lessee & Operator)
Battlement Mesa Partners (Surface / Well Pad)
Battlement Mesa Land Investments (Surface / Well Pad & Pipeline)
Battlement Mesa Parcel 5, LLC (Pipeline)
Savage (Joan, John, Roy, Marshall& Daniel) (Pipeline)
Tonder (David & Mary Ann) (Pipeline)
Stierberger (Edward A Revocable Trust) (Pipeline)
Battlement Mesa Land Investments Parcel OHS, LLC (Pipeline)
Battlement Mesa Golf Course, LLC (Pipeline)
Battlement Mesa Land Investments Parcel Fairways, LLC (Pipeline)
Lyons (John and Jody & Family Partnership, LP) (Pipeline)
PROJECT REPRESENTATIVE: Rob Bleil (URSA Operating Company)
PRACTICAL LOCATION: Battlement Mesa PUD (Parachute, Colorado)
PARCEL(S): "B" Well Pad: 240913406004; "D" Well Pad: 240708100152; Pipelines:
240708100152, 240718418028, 240708100152, 240717100001,
240717100002, 240717100003, 240708400018, 240708400188,
240708100152, 240718100005, 240707109001, 240707400008,
240707400010, 240707400007, and 240707301001
I. GENERAL PROJECT DESCRIPTION
Applicant (URSA Operating Company) proposes to extract natural gas that lies below the
surface of the Battlement Mesa Planned Unit Development (BMPUD).
1
The project includes the development of two well pads ("D" and "B" Pads) and a network of
co -located natural gas and water pipelines in the PUD as shown on the draft site plan attached
to this summary. This development plan represents the first phase of the development of well
pads inside the Battlement Mesa PUD. Note, as the site plan indicates, there are two
additional well pads that are anticipated to be developed that are outside the PUD (Tompkins
Pad and B&V Pad) and are not considered in this review as they are not located in the PUD
and allowed as a use -by -right in the Rural Zone District; however, they will be served by the
same pipeline network proposed within the PUD.
The pipeline system (co -located water and gas) proposed for this phase will be sized to serve
as the gathering system for the future pads anticipated for development in the PUD so that
future phases will only consist of pad development.
The Applicant is considering including an injection for waste water disposal on one or both
pads in the PUD. Injection Wells are not explicitly included as a standalone use in the 1978
Land Use Code and because they are not include in the definition of "Extraction", the Applicant
will need to amend the text of the PUD to include the use as an allowable use (such as a
Special Use, Conditional Use or Use -By -Right) in the PUD, then make an application for its
development.
Haul routes for the development of the two pads and the pipelines will primarily be via the
Una Bridge, Stone Quarry Road and County Road 300 route.
Size of the gas / water lines will range in sizes from 8 inch up to 12 inch depending on the
engineering requirements associated with their use. Anticipated ROW widths are 25 ft
permanent easement(s) for all associated pipelines/waterlines
There is no compression proposed for this phase (or any phase) of the well pad development.
Because the two proposed well pads are located on different properties with different
ownership, the Applicant will submit separate applications for each location that will all be
tracked together in the same process. Additionally, the pipeline network will also need to be
submitted in a separate Pipeline Development Plan Application that will also track along with
the well pad applications. The proposed process for the applications are as follows:
October 20, 2014: Application is submitted to Garfield County
November 18, 2014: Deadline for County Staff to render a decision regarding technical
completeness of the application
December 18, 2014: Anticipated Technically Complete Application determination by
the County Staff
Jan -- Feb, 2015: Site Visit for the Planning Commission
2
February 12, 2015: Planning Commission Hearing
February 13, 2015: Planning Commission Hearing (continued from 02/12/15, if
necessary)
Feb — Mar, 2015: Site Visit for the Board of County Commissioners (BOCC)
March 17, 2015: BOCC public hearing (likely to be held in Battlement Mesa)
March 24, 2015: BOCC public hearing (continued from 03/17/15, if necessary)
April 7, 2015: BOCC to sign a Resolution of their decision from their public
hearing(s)
Note, this schedule is a suggested or draft schedule only to be used as a general guide for
planning purposes. Actual dates for any public meetings and hearings will be properly noticed
according to state law and the County's Land Use and Development Code.
11. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS
(DEVELOPMENT CODE / COMPREHENSIVE PLAN, STATE STATUTES, ETC.)
The County approved Resolution 82-121 on May 24, 1982 which provides the zone districts
and the uses permitted in each zone district within the BMPUD. "Extraction of Natural
Resources" is listed in each zone as a `special use'. Section 10.0 (SR Supplementary
Regulations) found on page 24 provides the process by which the special use is to be
administered. This is stated here:
'Where preceding general standards or the following supplemental regulations do not
adequately describe what is permitted or required, reference shall be made to the officially
adopted Garfield County Zoning Resolution of January 2, 1979, including the zoning
amendment, adopted October 15, 1979, (79-132) and to the officially adopted Garfield County
Subdivision Regulations of January 2, 1979, and amendments of October 15, 1979. '
As a result, the County shall require that in order to extract natural resources (drill for natural
gas) within the PUD, the property owner (or their designee) shall be required to render an
application for a Special Use Permit to the County. This application shall require the owner to
demonstrate that they comply with the standards / criteria found in the County's zoning code
on January 2, 1979, including the zoning amendment, adopted October 15, 1979, (79-132).
The process for the review of this Special Use Permit application shall be that of the "Major
impact Review' process in the County's Unified Land Use Resolution (LUDC) of 2008, as
amended.
Further, the County will evaluate and permit each well pad separately; however, they may be
submitted and processed under the Major Impact Review process and tracked together.
3
A. Process
Based on this, the process for the SUP will follow the process for a "Major Impact Review" in
Section 4-105 of the LUCD. That process is provided here for convenience as it is found in
Table 4-102 and highlighted in the red bold box. Additionally, a process flow chart has been
attached for your review.
I
'S
BOA
tJ�ii62rd
D I•
PC -1r
4-103
Section 4-101.
Appicante Relnevf Procedure
A
Q
�'
!!
U
a.
.I
Table
B
N
a
4
4-102:
C
c
un
p
C
«
1
D
e
a
II4
5
�
r5
1
Common
E F
.
CI
m v
O 1
2
2
cc
.2_
Review
G
o
iy
O•
D
Procedures
H
a
Z.
o
id
r
1?
o
it
4
and
Required
Notice
Additional
Requirements
Board of AMJuShientS
Or County Camnrlsslnner$
Diredor
Planning Commission
Administrative Review
El
r
4-104
United Impact Review
4
4
Q
1
0
BoCC
r
r
J
®Q
4-105
Major Impact Revlew
J
1
Q
1
g2 PC
BOCC
r
1
nap
Notice required for PC and BOCC hearings.
MaliG.
r_«-•n,=u�Y;•r-cr_�r.•1•�-•�in�Eiiil/M
M
9
-
-
-li
...,
4-107
Minor Temporary housing Fadttly
r
J
4
r_
D
r
r
-
a-
4-108
ROW . d a .. . or • T.
r
r
El
1
12 PC
BOCC
r
r
r
1
®
and
4-109
Develop. In the 100 -Year Floodplain
r
J
QQ
• _
D
•
•
mum
Per Adminisealive Review, se lion 4-103
4-110
+ •• �•� ;
• 77;
J
J
J
J
J-
BOA
■■
J
J
41
4111
4.112
Location and Extent Review
CaaUp t0 the BOCC
CI
J
■�
II
r.
J
PC
BOCC
r
J
■
•II
NM
• ~
• •,� at le clays but no
more than 30 calendar . , : 1q -, +.
4-113
Rezoning
Q
•
1
J
Q
PC
BOCC
III
-e7
r
r■:
�' a.�=h 4,1=. w:r._re.•...""€" .-i
4.114
Code Tea Amendment
■
r
■
r
r
PC
BOCC
■■
r
■
*. . . J .•. er
.
KUM
Administrative Interpretation
-----_
0
--IIII--
4-117
AOnlinlseawe tnterpretauon Appeal
r
r
1
_
BCW
QM
-IIIIIIIIIMIIIIIIIIIIIIIIMIIMMIll
4.118
W3Jvvr of Standards
E-
Determined by companion
application.
Notice
as
required by companion application.
4-119
FAc
Accommodation Pursuant to Feaerat
Act
■
1
■
1
.4
BOCC 1
.■
J
B. Submittal Requirements:
The following submittals shall be required for a Special Use Permit Application.
1. Please submit, in narrative form, the nature and character of the Special Use requested.
Submit plans and supporting information (Le. letters from responsible agencies). Include
specifications for the proposed use including, but not limited to, the hours of operation, the
number and type of vehicles accessing the site on a daily, weekly and/or monthly basis,
and the size and location of any existing and/or proposed structures that will be used in
conjunction with the proposed use, and provisions for electric power service and any other
proposed utility improvements. Be specific.
4
2. if you will be using water or will be treating wastewater in conjunction with the proposed
use, please detail the amount of water that would be used and the type of wastewater
treatment. if you will be utilizing well water, please attach a copy of the appropriate well
permit and any other legal water supply information, including a water allotment contract
or an approved water augmentation plan to demonstrate that you have legal and adequate
water for the proposed use.
3. Submit a site plan /map drawn to scale that portrays the boundaries of the subject
property, all existing and proposed structures on the property, and the County or State
roadways within one (1) mile of your property. If you are proposing a new or expanded
access onto a County or State roadway, submit a driveway or highway access permit.
4. Submit a vicinity map showing slope / topography of your property, for which a U. S. G. S.
1:24,000 scale quadrangle map will suffice.
5. Submit a copy of the appropriate portion of a Garfield County Assessor's Map showing
the subject property and all public and private landowners adjacent to your property (which
should be delineated). In addition, submit a list of all property owners, private and public,
and their addresses adjacent to or within 200 ft of the site. This information can be
obtained from the County Assessor's Office. You will also need the names (if applicable)
of all mineral interest owners of the subject property, identified in the County Clerk and
Recorder's records in accordance with §24-65.5-101, et seq. (That information may be
found in your title policy under Exceptions to Title).
6. Submit a copy of the deed and a legal description of the subject property.
7. if you are acting as an agent for the property owner, you must attach an acknowledgement
from the property owner that you may act in his/her behalf. If the property is owned by a
corporate entity (such as an LLC, LLLP, etc.) please submit a copy of a recorded
"Statement of Authority" demonstrating that the person signing the application has the
authority to act in that capacity for the entity.
8. Submit a statement that specifically responds to each of the following criteria from Section
5.03 of the Zoning Regulations:
(1) Utilities adequate to provide water and sanitation service based on accepted
engineering standards and approved by the Board of County Commissioners shall
either be in place or shall be constructed in conjunction with the proposed use.
(2) Street improvements adequate to accommodate traffic volume generated by the
proposed use and to provide safe, convenient access to the use shall either be in place
or shall be constructed in conjunction with the proposed use;
(3) Design of the proposed use is organized to minimize impact on and from
adjacent uses of land through installation of screen fences or landscape materials on
5
the periphery of the lot and by location of intensively utilized areas, access points,
lighting and signs in such a manner as to protect established neighborhood character;
9. Depending on the type of Special Use Permit requested, you may need to respond to
additional review standards in the Garfield County Zoning Resolution Section 5.00
[Supplementary Regulations] This may include uses such industrial uses [section 5.03.07
& 5.03.08) which are attached.
*See the required standards from the Resolution of January 2, 1979, including the
zoning amendment, adopted October 15, 1979, (79-132) attached as Exhibits A and
B. Any application shall provide responses to these standards that demonstrates
the proposed use can meet these criteria 1 standards.
10. A $525.00 Base Fee: Applicant shall sign the `Agreement for Payment" form and provide
the fee with the application.
11. Submit 3 copies (and 1 CD or DVD) of this completed application form and all the required
submittal materials to the Community Development Department. Staff will request
additional copies once the Special Use Permit application has been deemed technically
complete.
III. CRITERIA
The criteria that shall be used to evaluate the project includes the following as referenced in
Exhibit A attached hereto as well as the general criteria here from the land Use resolution
of 1978, as amended:
(1) Utilities adequate to provide water and sanitation service based on accepted
engineering standards and approved by the Board of County Commissioners shall either be
in place or shall be constructed in conjunction with the proposed use.
(2) Street improvements adequate to accommodate traffic volume generated by the
proposed use and to provide safe, convenient access to the use shall either be in place or
shall be constructed in conjunction with the proposed use.
(3) Design of the proposed use is organized to minimize impact on and from adjacent uses
of land through installation of screen fences or landscape materials on the periphery of the lot
and by location of intensively utilized areas, access points, lighting and signs in such a
manner as to protect established neighborhood character.
IV. APPLICATION REVIEW
a. Review by: Staff for completeness, recommendation and referral agencies for additional
technical review.
b. Public Hearing:
c. Referral Agencies:
X Planning Commission
X Board of County Commissioners
It is expected that the application will be sent to the
following County Departments and external agencies:
6
D Garfield County Road and Bridge
D Garfield County Attorney
Town of Parachute
• Garfield County Oil and Gas Liaison
D Battlement Mesa Metro District
D Garfield County Public Health Department
D RE -16 School District
D Colorado Parks & Wildlife
D Garfield County Vegetation Management
D Grand Valley Fire Protection District
D Colorado Oil and Gas Conservation Commission
D Colorado Department of Transportation
• Colorado Department or Water Resources
V. APPLICATION REVIEW FEES
a. Planning Review Fees: $525.00
b. Referral Agency Fees: $
c. Total Deposit: $525.00 (additional hours billed at an hourly rate)
General Application Processing
Planner reviews case for completeness and sends to referral agencies for comments. Case
planner contacts applicant and sets up a site visit. Staff reviews application to determine if
it meets standards of review. Case planner makes a recommendation of approval, approval
with conditions, or denial to the appropriate hearing body.
Disclaimer
The foregoing summary is advisory in nature only and is not binding on the County. The
summary is based on current zoning, which is subject to change in the future, and upon
factual representations that may or may not be accurate. This summary does not create a
legal or vested right.
Pre -application Summary Prepared bv:
Fred A. Jarman, AIC
If/I'll/ )
Date
Attachments: Exhibit A: Regulations from the 1978 Land Use Resolution
Exhibit B: Sections from the Battlement Mesa PUD (Resolution 79-132)
Exhibit C: Proposed URSA Field Development Plan Map
7
C. Section 4-105 Major Impact
Garfield County
Major Impact Review PIOUS!
(Section 4-105)
Sten 1: pre• application ur,fere ICC
*Applicant has 5 months to submit application
Step 2: ApplicltionSu!;Fri ri sI
Stop 1. Cnrnp rtrr r n,
•2o business days to revlaw
*If Incomplete, 60 days to remedy deficiencies
*Published, posted, and mailed to adjacent property owners within 200
feet and mineral owners, at least 30 days but no more than 60 days prior
to Planning Com mission public hearing
Step S: Referral
•21 day comment period
Step 6: Evolution by Director
Stcr irf5;anr:f'•gleir'9rif,;ir11i ifsmfck'1 and r e€ontrn,ndatiirr
Slrl:.. S, Imar. r I I :', ir'f' ,a'ul
*Published, posted, and mailed to edjecent property owners within 200 feet
and mineral owners, ■t least 30days but no more than 60days prior to
BOCC public hearing
Step 9; BOCC Decision
•Applicant has 1 year to meet any conditions of approval
B1
5.03.01 (8) Mobile Home -as an Accesso Use to a Workin
ra on
5
5
.t3.02
03.03
03.09
.03
_1 D •
A mobile home shall be allowed as an accessory
working farm or ranch operation as a Condit'
p ovided:
(3,)
The principal wage earner living in
me is a full time employee of the
o ranch operation that is presen
pr ,arily agricultural productio.
(2) The
or maso
(3)
(4)
(5)
•
ile home is placed
ry footer;
There sha
home shall
be no outside
e skirted;
No more than ,e sin
be allowed as a ac•
or ranch operati
The mobile hom
to others th
operation.
Row House; A
the minimum
square fee
the plat
lots an•
menta
Stu
CO
t
•
sha
those
on
•
s
na
e mobil
orking f
y devoted
permanent conc
torage and the mob
e --family mobile home sh
ssory use to a working f
to
use,
rm
0
ete .
11
1 not be rented for occupa
mployed by the farm or r
bdivision plat
of area for a row
, a minimum of six r
d the plat includes su
common to satisfy floor ar
der the appropriate Zone Dist
ust be approved when
ouse lot is 1,400
house lots appear
cient land area
ratio require-
ct Regulation.
ty must be
s are limi
cy
ch
on
o for the Arts and Crafts; All acti
ucted within a building and retail sa
one -of -a -kind goods produced on the lot.
Aircraft Landing Strip; Such strip may not be
with any reservation, regulation or requirement
Federal Aviation Administration.
5 Airport, Utility; Such airport shall be approved b
Federal Aviation Administration.
03.06 Airport, Air Carrier; Such airport shall be approved
the Federal Aviation Administrat
confl
f the
t
5.03,07
Industrial Operations: industrial Operations, including
extraction, processing, fabrication, industrial support
facilities, water impoundments, mineral waste disposal,
-52-
storage sanitary land -fill, salvage yard, access routes
and utility lines, shall be permitted, provided:
(.1) The applicant for a permit for industrial operations
shall prepare and submit to the Planning Director two
(2) copies of an impact statement on the proposed use
prescribing its location, scope, design and construction
schedule, including an explanation of its operational
characteristics. One (1) copy of the impact statement
shall be filed with the County Commissioners by the
Planning Director. The County Commissioners shall
review the impact statement to determine whether the
proposed industrial operation complies with the require-
ments of this Section and shall notify the Planning
Director of its decision in this regard, in writing,
within thirty (30) days from the date on which the
impact statement is filed with the Planning Director.
The impact statement shall show that the use shall be
designed and operated in compliance with all applicable
laws and regulations of the County, State and Federal
Governments, and will not have a significant adverse
effect upon:
(a) Existing lawful use of water through depletion or
pollution of surface run-off, stream flow or
ground water;
(b) Use of adjacent land through generation of vapor,
dust, smoke, noise, glare or vibration, or other
amanations;
(c) Wildlife and domestic animals through creation of
hazardous attractions, alteration of existing
native vegetation, blockade of migration routes,
use patterns or other disruptions;
(2) Truck and automobile traffic to and from such uses
shall not create hazards or nuisance to areas elsewhere
in the County;
(3) Sufficient distances
shall e su
from
abutting propertywhhmightotherwisebedamagedby
operations of the proposed uses;
(4) At the discretion of the County Commissioners
additional information supplementing the impact state-
ment may be required. Such request for additional
information shall be in writing and shall be given to
the applicant not later than forty-five (45) days after
-53-
the filing of the impact statement. The County Commis-
sioners shall then have an additional forty-five (45)
days from the date of submission of such additional
information within which to notify the Planning Director
of their decision in respect to said impact statement;
An application for permit for an industrial operation
shall be subject to the provisions under Section 8.01
in addition to the required impact statement. Any
provisions of Section 8.01 to the contrary notwith-
standing, the Building Official Shall have a period of
ten (10) days from notification by.the County Commissioners
of their decision as hereinabove provided, within which
to act upon such application;
(5) Permits shall be granted for those uses only with
the provisions that a satisfactory rehabilitation plan
for the affected land be submitted prior to commencement
ofsuch use;
(a) The plan for site rehabilitation shall be submitted
to" the Planning Director with the impact state-
ment, and must be approved by the County Commissioners
before a permit for conditional or special use
will be issued;
(b) The County Commissioners may require security
before a permit for special or conditional use is
issued, if required. The applicant shall furnish
evidence of a bank commitment of credit, or bond,
or certified check or other security deemed accept-
able by the County Commissioners in the amount
calculated by the County Commissioners to secure
the execution of the site rehabilitation plan in
workmanlike manner and in accordance with the
specifications and construction schedule established
or approved by the County Commissioners. Such
commitments, bonds, or check shall be payable to
and held by the County Commissioners:
5.03.08 Industrial Performance Standards: All industrial
operations in Garfield County shall comply with appli-
cable County, State, and Federal regulations regulating
water, air and noise pollution and shall not be conducted
in a manner constituting a public nuisance or hazard.
Operations shall be conducted in such a manner as to
minimize heat, dust, smoke, vibration, glare and odor
and all other undesirable environmental effects beyond
the boundaries of the property in which such uses are
located, in accord with the following standards:
-54-
(1) Volume of the sound generated: every use shall be
so operated that the volume of sound inherently and
recurrently generated does not exceed ninety (90)
decibles, with a maximum increase of five (5) decibles
permitted for a maximum of fifteen (15) minutes in any
one hour, at any point of any boundary line of the
property on which the use is located.
(2) Vibration generated: every use shall be so
operated that the ground vibration inherently and
recurrently generated is not perceptible, without
instruments, at any point of any boundary line of the
property on which the use is located;
(3) Emissions of smoke and particulate matter: every
use shall be so operated so as to comply with all
Federal, State and County air quality laws, regulations
and standards;
(4) Emission of heat, glare, radiation and fumes:
every use shall be so operated that it does not emit
heat, glare, radiation or fumes which substantially
interfere with the existing use of adjoining property
or which constitutes a public nuisance or hazard.
Flaring of gases, aircraft warning signals, reflective
painting of storage tanks, or other such operations
which may be required by law as safety or air pollution
control measures shall be exempted from this provision;
(5) Storage area, salvage yard, sanitary land -fill,
and mineral waste disposal areas:
(a) Storage of flammable, or explosive solids, or
gases, shall be in accordance with accepted
standards and laws and shall comply with the
National Fire Code;
(b) At the discretion of the County Commissioners all
outdoor storage facilities for fuel, raw materials
and products shall be enclosed by a fence or wall
adequate to conceal such,facilities from adjacent
property;
(C) No materials or wastes shall be deposited upon a
property in such form or manner that they may be
transferred off the property by any reasonably
foreseeable natural causes or forces;
(d) All materials or wastes which might constitute a
fire hazard or which may be edible by or otherwise
-55-
be attractive to rodents or insects shall be
stored outdoors in accordance with applicable
State Board of Health Regulations;
(6) Water pollution: in a case in which potential
hazards exist, it shall be necessary to install safe-
guards designed to comply with the Regulations of the
Environmental Protection Agency before operation of
the facilities may begin.
All percolation tests or ground water resource tests as
may be required by local or State Health Officers must
be met before operation of the facilities may begin.
•
initiative, the County Commissioners may, by resolution,
add to the uses listed for a Zoning District any other
similar use which conforms to the conditions set forth
in the .following special findings:
1) Such use is appropriate to the physiographic
eral environmental character of the District
h it is added;
h
h use does not create any more ha
n of the natural environment tha
ally resulting from the othe
ict to which it is added;
(2) S
alterati.
amount no
in the Dis
haze
oes not create
heat, smoke, odo
or mor
ormally r
distri
(3) Such use
vibration, dust,
objectionable in
the minimum amount
uses permitted in t
to or
the minimum
uses permitted
any
e offensive noise,
do , glare, or other
traffic hazards than
lting from the other
to which it is added;
(4) Such use is compa , e to the uses existing and
permitted in the distri • to which it is added.
When any use has be added
uses in any distr' t in accor
such use shall •. deemed to be
section of tho - district regulati
added thereto in the published text
at the fir convenient opportunity,
inditati that the addition was made
with t Section.
•
the list of permitted
ce with this Section,
sted in the appropriate
ns, and shall be
f this Resolution
th a notation
i accordance
5.03.10 Ap oval of Conditional and Special Uses: Us listed
Conditional under the appropriate zone Distr t
egulation shall be permitted based on compliance with
the requirements listed herein; where useb are lis, -d
as Special Uses they shall be permitted only:
I
RESOLUTION NO. 79-132
WHEREAS, on the 2nd day of January, 1979, this
Board of County Commissioners of Garfield County, Colorado,
adopted Resolution No. 79-1, concerning a Zoning Resolution
for the County of crfield, State of Colorado; and
WHEREAS, this Board is authorized by the provisions of
C.R.S. 1973, 30-28-109 through 30-28-116 to provide for the
approval of amendments to such Zoning Resolution; and
WHEREAS, pursuant to such authority, this Board
bas proposed certain text amendments to the said Zoning
Resolution, which were on file for public inspection in the
Office of the Garfield County Clerk and Recorder for a period
of thirty days beginning the 14th day of September, 1979; and
WHEREAS, a public hearing was held on the 15th day of
October, 1979, upon the question of the adoption of the pro-
posed text amendments, pursuant to public notice required by
law; and
WHEREAS, the public was, at such public hearing, given
the opportunity to voice its opinions regarding the proposed
text amendments, which opinions have been given full consid-
eration by this Board; and
WHEREAS, this Board has determined that certain of the
proposed text amendments are necessary to make the aforementioned
Garfield County Zoning Resolution consistent with Colorado
statutes and to improve the efficiency and clarity of said
Zoning Resolution;
NOW THEREFORE, BE IT RESOLVED, by the Board of County
Commissioners of Garfield County, Colorado, that the Garfield
County Zoning Resolution, adopted by this Board on the 2nd
day of January, 1979, and identified as its Resolution No. 79-1,
shall be and hereby is amended as follows:
AMENDMENTS TO GARFIELD COUNTY ZONING RESOLUTION.
Section 2.02.23 of the Garfield County Zoning Resolution shall
be amended by the deletion of the words "the Colorado Department
of Health and and by the addition of the words "to review and/
or enforce health and safety provisions or requirements which
are included in this Resolution,"at end of said section.
Section 2.02.43 of the Garfield County Zoning Resolution shall
be amended by changing the words "one thousand" to "five
hundred".
Section 2.02.47 of the Garfield County Zoning Resolution shall
be amended by changing the word "right" to "tight".
The Garfield County Zoning Resolution shall be amended by the
addition of a new section 2.02.56, which shall read as follows:
Salvage Yard: Any location which is maintained, used
or operated for storing, keeping, buying or selling
wrecked, scrapped, ruined, or dismantled motor vehicles
or motor vehicle parts, old or scrap copper, brass,
rope, rags, batteries, paper, trash, rubber or sythe-
tic petro -chemical debris, waste, appliances, or parts
thereof, iron, steal, and other old or scrap ferrous
or non-ferrous material.
Section 3.02.03 of the Garfield County Zoning Resolution shall
be amended by changing the word "events" to "gatherings".
Section 3.07.06 of the Garfield County Zoning Resolution shall
be amended by the addition of the following paragrpah:
(3) Side yard: 10 feet from side lot line or 1/2 the
height of the principal building, whichever is greater.
Section 3.09 of the Garfield County Zoning Resolution shall
be amended by changing the word "Spacial" to "Conditional".
Section 3.09.01 of the Garfield County Zoning Resolution shall
be amended by changing the word "special" to "conditional".
Section 4.08.03 of the Garfield County Zoning Resolution shall
be amended by the addition of the following, which shall be the
first sentence in said section.
Every Planned Unit Development Plan shall include a
detailed listing of districts within the PUD in which
specific uses shall be permitted, which listing shall
be in substantially the form contained in Section 3.00
hereof.
Section 4.08.05(7)(d) of the Garfield County Zoning Resolution
shall be amended to read as follows:
A list of the owners of properties located within 300
feet of the boundaries of the PUD and their addresses:
Section 5.02.01 shall ba amended by the addition of the
following sentence:
Occupancy of an existingrsmobiie hobe'patk and individual
spaces of an existing mobile home park shall be
governed by the provisions of Section 6.11 and 7.00
of this Resolution.
Section 5.03(1) of the Garfield County Zoning Resolution shall
be amended to read as follows:
Utilities adequate to provide water and sanitation
service based on accepted engineering standards and
approved by the Environmental Health Officer shall
either be in place or shall be constructed in con-
junction with the proposed use;
Page 1
AMENDMENTS TO GARFIELD COUNTY ZONING RESOLUTION
The word and number "thirty (30)" found in Sections 5.03.01
(A)(4) and (A)(5) of the Garfield County Zoning Resolution shall
be amended to read "fifteen (15)".
.0..The first sentence of Section 5.03.07(4) of the Garfield County
Zoning Resolution shall be amended to read as follows:
In the event the County Commissioners or Planning
Director determine that the impact of a proposed
industrial operation is such that information in
addition to the impact statement or other informa-
tion submitted is necessary for the informed evalu-
ation of such impact, such additional information
may be required.
Section 5.03.07 of the Garfield County Zoning Resolution shall
be amended by the addition of a new subparagraph, which shall
read as follows:
(6) The Planning Director may, upon the preliminary
determination that an industrial operation related
solely to the extraction of oil and gas from the
ground through conventional use of drilling and pumping,
and the extraction of sand and grave). affecting not more
than ten. acres has limited impact, waive the requirement
for the above-described impact statement, upon the
submittal of such information as the Planning Director
requires for the evaluation of the impact of such an
extractive operation. If the determination is later
made that additional information is required, subsection
(4) of this Section shall apply.
Section 8.01 of the Garfield County Zoning Resolution shall be
amended by the following words at the conclusion of the first
sentence thereof:
and all provisions of Building Code affecting the
subject property.
Section 9.02.01 of the Garfield County Zoning Resolution shall
bo amended to read as follows:
Applications A11 conditional use permit applications
shall be filed by the owner or owners of the subject
lot with the Planning Director on a form provided by
the Planning Director for this purpose and shall consist
of all information required of an application for a
permit and subject to all administrative procedures
thereof plus the following:
Supporting information, plans, letters of approval from
responsible agencies and other information to satisfy
requirements listed under Conditional and Special Uses
in the Supplementary Regulations.
Section 9.02.02 of the Garfield County Zoning Resolution shall
be amended to read as follows:
Action by the Planning Director: The Planning Director
shall utilize services of the Environmental Health Officer,
the Building Official, and Planning Department and other
county and state officials or agencies to arrive at a
determination that the proposed buildings, structure and
use is in compliance with all applicable zoning, sub-
division, building, health and sanitation regulations;
and if the proposed building, structure and use are in
compliance, the Planning Director shall make a•;
recommendation that the County'Commiasioners consider the
application with or without a public hearing.
Page 2
AMENDMENTS To GARFIELD COUNTY ZONING RESOLUTION
The Garfield County Zoning Resolution shall be amended by the
addition of a Sectio 9.02.03, which shall read as follows:
Action by theiCounty Commissioners: Upon receiving
an application for conditional use permit and recom-
mendation regarding public hearing from the Planning
Director, theiCounty Commissioners shall either (1)
grant the conditional use permit without conditions,
(2) provide the applicant with an opportunity for hear-
ing, subseguer<t to which the County Commissioners may
grant or conditionally grant the conditional use permit
on such conditions as are deemed necessary to effect the
purposes of this Resolution, or (3) schedule a public
hearing upon the conditional use application, at which
the applicantjand interested parties, including county
representatives, will be provided an opportunity to
express their!opinions regarding such application, sub-
sequent to which public hearing the County Commissioners
may grant, or:conditionally grant the conditional use
permit on such conditions as are deemed necessary to
effect the puiposes of this Resolution. A hearing
shall be heldlno later than 30 days following the receipt
of the Conditional Use Permit application unless such
time is extended by the County Commissioners. The
County Commis ioners may refer a request for conditional
use permit to the County Planning Commission for its
review and recommendation.
Public Noticeishall be provided in accordance with the
provisions ofisections 9.03.03(1) and (2), if public
r hearing held.'
The concurring vote of the majority of the County
Commissioners shall be necessary to decide that the
conditional use permit shall be conditionally granted
upon specific'conditions. The County Commissioners
shall take action on the conditional use permit appli-
cation and notify the applicant of their decision,
in writing, within fifteen (15) days following the
public hearing. The decision shell state specific
findings of fact relevant to all essential issues.
If the permitis conditionally granted, such decision
shall includelreasons for conditions imposed.
The first clause of Section 9.03.01 of the Garfield County Zoning
Resolution shall be emended to read as follows:
Application: 1111 special use permit applications shall
be filed by the owner or owners of the aubject lot with
the Planning Director on a form provided by the Planning
Director for this purpose and shall consist of all infor-
mation required of an application for a permit and sub-
ject to all administrative procedures thereof plus the
following:
I
The number "7.02.03";contained in Section 9.04.02 of the
Garfield County Zoning Resolution shall be amended to read
"9.05.036. !
Section 10.04.01 of the Garfield County Zoning Resolution shall
be amended to read ah follows:
Prior to final adoption of any amendment to this
Resolution, the County Commissioners shall hold a
public hearing thereon, at least thirty (30) days notice
of the time and place of which shall be given by at
least one publication in a newspaper of general circula-
tion in the County. Except for text amendments, notice
of such public hearing shall also be sent by mail at
least fi£teeni(15) days prior to such hearing to all
owners of record of property adjacent to the lot or
lots subject o the proposed amendment.
Section 11:00 of the Garfield County Zoning Resolution shall be
-3-
. AMENDMENTS Ti' GARFIELD COUNTY ZONING RESOLUTION
amended by the addition of a new paragraph, which shall read
as follows:
Unless otherwise specifically provided herein, time
limitations imposed upon the Board of County
Commissioners, the Planning Commission, or any other
County officer, or body by this Zoning Resolution shall
be interpretted as having no consequence other than
authorizing any interested party, upon the expiration
of such limitation, to request judicial relief in the
nature of mandamus, requiring the body or officer to
make the determinations or decisions required by this
Resolution. The expiration of any such time limitation
shall not in and of itself be considered the approval
or denial of any application, plan or question under
consideration.
The Garfield County zoning Resolution shall be amended by the
addition of new sections 3.11 through 3.11.09, which shall
read as follows:
3.11 R-MH/G/UD -- RESIDENTIAL -MOBILE HOME/GENERAL/
URBAN DENSITY
3.11.01 Uses, by right: Single-family, two-family
and multiple -family dwelling, boarding and rooming
house, and customary accessory uses including building
for shelter or enclosure of animals or property acces-
sory to use of the lot for residential purposes and
fences, hedges, gardens, walls and similar landscape
features; park.
3.11.03 Uses, conditionals Mobile Home as principal
use of the lot; Row House; Studio for conduct of arts
and crafts;
Home occupation;
Church, community building, day nursery and school.
3.11.03 Uses, special: Mobile Home Park;
3.11.04 Minimum Lot Area: 7500 square feet and as
further provided under Supplementary Regulations.
3.11.05 Maximum Lot Coverage: 50 percent
3.11.06 Minimum Setback:
(1) Front yard; (a) arterial streets: 75 feet from
street centerline or 50 feet from front lot line,
whichever is greater;
(b) Local street: 50 feet from street centerline or
25 feet from lot line, whichever is greater;
(2) Rear Yard: 25 feat from rear lot line;
(3) Side Yard: 10 feet from side lot line or 1/2 the
height of the principal building, whichever is greater.
3.11.07 Maximum Height of Buildings: 25 feet
3.11.08 Maximum Floor Area Ratio: 0.50/1.0 and as
further provided under Supplementary Regulations.
3.11.09 Additional Requirements: All uses shall be
subject to the provisions under Section S (Supplementary
Regulations).
-a-
AMENDMENTS TO GARFIELD COUNTY ZONING RESOLUTION
The first sentence of Section 5.03.01 of the Garfield County
Zoning Resolution shall be amended to read as follows:
A mobile home may be allowed as the principal use of
a lot as a special or conditional use, as provided
within the zone district provisions of this resolu-
tion, provided that each of the following conditions
is satisfied in the situation of a special use and that
the first three of the conditions are satisfied in
the situation of a conditional use:
The legend of zone district designations shall be amended by
the addition of the following:
R-MH/G/UD RESIDENTIAL -MOBILE HOME/GENERAL/URBAN DENSITY
BE IT FURTHER RESOLVED that the foregoing amendments
shall be effective immediately, that a copy of this amending
Resolution shall be filed and recorded with the Garfield
County and Recorder, and that all other provisions of the
said Garfield County Zoning Resolution shall remain in full
force and effect.
DATED this 15th day of October, 1979.
ATTEST:
BOARD OF COUNTY COMMISSIONERS
GARFIELD COUNTY, COLORADO
N ncy r k Page
Pleven J. Cex e, Chairman
Deputy Jerk of theOBoard
-5-
GARFIELD COUNTY
Community Development Department
108 81" Street, Suite 401
Glenwood Springs, Colorado 81601
- Telephone: 970.945.8212 Facsimile: 970.384.3470
www.garfield-county.com
PRE -APPLICATION CONFERENCE SUMMARY
CONFERENCE DATE: September 11, 2014
PROJECT: "Extraction of Natural Resources" to drill for natural gas within the Battlement
Mesa Planned Unit Development (PUD)
COUNTY PROCESS REQUIREMENT: Special Use Permit processed via the Major Impact
Review process
OWNER(S): URSA (Minerals Lessee & Operator)
Battlement Mesa Partners (Surface / Well Pad)
Battlement Mesa Land Investments (Surface / Well Pad & Pipeline)
Battlement Mesa Parcel 5, LLC (Pipeline)
Savage (Joan, John, Roy, Marshall& Daniel) (Pipeline)
Tonder (David & Mary Ann) (Pipeline)
Stierberger (Edward A Revocable Trust) (Pipeline)
Battlement Mesa Land Investments Parcel OHS, LLC (Pipeline)
Battlement Mesa Golf Course, LLC (Pipeline)
Battlement Mesa Land Investments Parcel Fairways, LLC (Pipeline)
Lyons (John and Jody & Family Partnership, LP) (Pipeline)
PROJECT REPRESENTATIVE: Rob Bleil (URSA Operating Company)
PRACTICAL LOCATION: Battlement Mesa PUD (Parachute, Colorado)
PARCEL(S): "B" Well Pad: 240913406004; "D" Well Pad: 240708100152; Pipelines:
240708100152, 240718418028, 240708100152, 240717100001,
240717100002, 240717100003, 240708400018, 240708400188,
240708100152, 240718100005, 240707109001, 240707400008,
240707400010, 240707400007, and 240707301001
I. GENERAL PROJECT DESCRIPTION
Applicant (URSA Operating Company) proposes to extract natural gas that lies below the
surface of the Battlement Mesa Planned Unit Development (BMPUD).
I
The project includes the development of two well pads ("D" and "B" Pads) and a network of
co -located natural gas and water pipelines in the PUD as shown on the draft site plan attached
to this summary. This development plan represents the first phase of the development of well
pads inside the Battlement Mesa PUD. Note, as the site. plan indicates,
there are to
additional well pads that are anticipated to be developed that are outside the PUD (Tompkins
Pad and B&V Pad) and are not considered in this review as they are not located in the PUD
and allowed as a use -by -right in the Rural Zone District; however, they will be served by the
same pipeline network proposed within the PUD.
The pipeline system (co -located water and gas) proposed for this phase will be sized to serve
as the gathering system for the future pads anticipated for development in the PUD so that
future phases will only consist of pad development.
The Applicant is considering including an injection for waste water disposal on one or both
pads in the PUD. Injection Wells are not explicitly included as a standalone use in the 1978
Land Use Code and because they are not include in the definition of "Extraction", the Applicant
will need to amend the text of the PUD to include the use as an allowable use (such as a
Special Use, Conditional Use or Use -By -Right) in the PUD, then make an application for its
development.
Haul routes for the development of the two pads and the pipelines will primarily be via the
Una Bridge, Stone Quarry Road and County Road 300 route.
Size of the gas / water lines will range in sizes from 8 inch up to 12 inch depending on the
engineering requirements associated with their use. Anticipated ROW widths are 25 ft
permanent easement(s) for all associated pipelines/waterlines
There is no compression proposed for this phase (or any phase) of the well pad development.
Because the two proposed well pads are located on different properties with different
ownership, the Applicant will submit separate applications for each location that will all be
tracked together in the same process. Additionally, the pipeline network will also need to be
submitted in a separate Pipeline Development Plan Application that will also track along with
the well pad applications. The proposed process for the applications are as follows:
October 20, 2014: Application is submitted to Garfield County
November 18, 2014: Deadline for County Staff to render a decision regarding technical
completeness of the application
December 18, 2014: Anticipated Technically Complete Application determination by
the County Staff
Jan — Feb, 2015: Site Visit for the Planning Commission
February 12, 2015: Planning Commission Hearing
2
February 13, 2015: Planning Commission Hearing (continued from 02/12/15, if
necessary)
Feb — Mar, 2015: Site Visit for the Board of County Commissioners (BOCC)
March 17, 2015: BOCC public hearing (likely to be held in Battlement Mesa)
March 24, 2015: BOCC public hearing (continued from 03/17/15, if necessary)
April 7, 2015: BOCC to sign a Resolution of their decision from their public
hearing(s)
Note, this schedule is a suggested or draft schedule only to be used as a general guide for
planning purposes. Actual dates for any public meetings and hearings will be properly noticed
according to state law and the County's Land Use and Development Code.
II. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS
(DEVELOPMENT CODE / COMPREHENSIVE PLAN, STATE STATUTES, ETC.)
The County approved Resolution 82-121 on May 24, 1982 which provides the zone districts
and the uses permitted in each zone district within the BMPUD. "Extraction of Natural
Resources" is listed in each zone as a `special use'. Section 10.0 (SR Supplementary
Regulations) found on page 24 provides the process by which the special use is to be
administered. This is stated here:
`Where preceding general standards or the following supplemental regulations do not
adequately describe what is permitted or required, reference shall be made to the officially
adopted Garfield County Zoning Resolution of January 2, 1979, including the zoning
amendment, adopted October 15, 1979, (79-132) and to the officially adopted Garfield County
Subdivision Regulations of January 2, 1979, and amendments of October 15, 1979. '
As a result, the County shall require that in order to extract natural resources (drill for natural
gas) within the PUD, the property owner (or their designee) shall be required to render an
application for a Special Use Permit to the County. This application shall require the owner to
demonstrate that they comply with the standards / criteria found in the County's zoning code
on January 2, 1979, including the zoning amendment, adopted October 15, 1979, (79-132).
The process for the review of this Special Use Permit application shall be that of the "Major
Impact Review' process in the County's Unified Land Use Resolution (LUDC) of 2008, as
amended.
Further, the County will evaluate and permit each well pad separately; however, they may be
submitted and processed under the Major Impact Review process and tracked together.
3
A. Process
Based on this, the process for the SUP will follow the process for a "Major Impact Review" in
Section 4-105 of the LUCD. That process is provided here for convenience as it is found in
Table 4-102 and highlighted in the red bold box. Additionally, a process flow chart has been
attached for your review.
B. Submittal Requirements:
The following submittals shall be required for a Special Use Permit Application.
1. Please submit, in narrative form, the nature and character of the Special Use requested.
Submit plans and supporting information (i.e. letters from responsible agencies). Include
specifications for the proposed use including, but not limited to, the hours of operation, the
number and type of vehicles accessing the site on a daily, weekly and/or monthly basis,
and the size and location of any existing and/or proposed structures that will be used in
conjunction with the proposed use, and provisions for electric power service and any other
proposed utility improvements. Be specific.
4
! A
Q
J
Table
B
s
Y
J
4-102:
C
✓
Common
E
p$6
✓
Review Procedures
and Required Notice
.1
4-103
Section 4-101.
' t. ws. �� it k,. .Sy
D
C
W
✓
F
C
_
G H 1
C
e
o gg
•N
C
D J J
Required Notice
Additional
Requirements
r t
e fp I5llt\s��
Administrative Review
-
✓
-
4-104
Limited Impact Review
✓
✓
✓
✓
✓
_
BOCC
J ✓
✓
✓
1
4-105
Ma'or Im.act Review
1
1
1
J
1
PC
BOCC
✓ 1
J
1
1
Notice r+uired for PC and BOCC heart .s.
4-106
Amendments to an Approved LUCP
1
1
■■..
D
.■
-
uyec o 7moror u. an a +••i ca onDetermination . -r section 4-106.
4-107
Minor Temporary Housing Facility
1
1
J
✓
-
D
1 1
1
-
4-108
Rao ytlon of a County Road or Public
J
J
id
J
✓
PC
BOCC
J J
✓
J
■PC
hearing requires inclusion in posted agenda.
BOCC hears . 1-.uires . bfication and mails ..
4-109
Develop. in the 100 -Year Floodplain
1
1
1
1
1
_
D
1 1
1
.
Per Administrative Review, section 4-103.
4-110
Develop. In the 100 -Year Floodplaln
Variance
J
✓
J
✓
J.
BOA
■■
1
1
✓
4-111
Location and Extent Review
1
1
■
J
J
■
PC
✓ ■
✓
✓
✓
Notice to be provided at least 7 calendar days but no
morethancalendaroa or is
4-112
Call -Up to the BOCC
Pg
...,
1
.
BOCC
✓ 1
BOCCoriginalapplication.a shall provide no Ice as required by the
t.
rewin.
li re
pplication. It no notice was required, notice
shall be adequate if Included In a posted agenda.
4-113
Rezoning
1
✓
✓
1
J
PC
BOCC
--
J
J
J
Notice required for PC and BOCC heanngs.
4-114
Code Text Amendment
■
..0■
1
1
PC
BOCC
■■
✓
-
Notice for PC and
da s poor to hearing BOCC hearings published 15
00001=1
BOA
....QMIQ
4-116
Administrative Interpretation
----._
D
-----
4-117
Administrative Interpretation Appeal
1
1
1
_
BOA
--
✓
II00
4-118
Waiver of Standards
1
Determined by companion application.
Notice as required by companion application.
4-119
Accommodation Pursuant to Federal
Fair Housln. Act
■
1
■
1
1
■ BOCC 1 ■■
1
■
B. Submittal Requirements:
The following submittals shall be required for a Special Use Permit Application.
1. Please submit, in narrative form, the nature and character of the Special Use requested.
Submit plans and supporting information (i.e. letters from responsible agencies). Include
specifications for the proposed use including, but not limited to, the hours of operation, the
number and type of vehicles accessing the site on a daily, weekly and/or monthly basis,
and the size and location of any existing and/or proposed structures that will be used in
conjunction with the proposed use, and provisions for electric power service and any other
proposed utility improvements. Be specific.
4
2. If you will be using water or will be treating wastewater in conjunction with the proposed
use, please detail the amount of water that would be used and the type of wastewater
treatment. If you will be utilizing well water, please attach a copy of the appropriate well
permit and any other legal water supply information, including a water allotment contract
or an approved water augmentation plan to demonstrate that you have legal and adequate
water for the proposed use.
3. Submit a site plan /map drawn to scale that portrays the boundaries of the subject
property, all existing and proposed structures on the property, and the County or State
roadways within one (1) mile of your property. If you are proposing a new or expanded
access onto a County or State roadway, submit a driveway or highway access permit.
4. Submit a vicinity map showing slope / topography of your property, for which a U. S. G. S.
1:24,000 scale quadrangle map will suffice.
5. Submit a copy of the appropriate portion of a Garfield County Assessor's Map showing
the subject property and all public and private landowners adjacent to your property (which
should be delineated). In addition, submit a list of all property owners, private and public,
and their addresses adjacent to or within 200 ft. of the site. This information can be
obtained from the County Assessor's Office. You will also need the names (if applicable)
of all mineral interest owners of the subject property, identified in the County Clerk and
Recorder's records in accordance with §24-65.5-101, et seq. (That information may be
found in your title policy under Exceptions to Title).
6. Submit a copy of the deed and a legal description of the subject property.
7. If you are acting as an agent for the property owner, you must attach an acknowledgement
from the property owner that you may act in his/her behalf. If the property is owned by a
corporate entity (such as an LLC, LLLP, etc.) please submit a copy of a recorded
"Statement of Authority" demonstrating that the person signing the application has the
authority to act in that capacity for the entity.
8. Submit a statement that specifically responds to each of the following criteria from Section
5.03 of the Zoning Regulations:
(1) Utilities adequate to provide water and sanitation service based on accepted
engineering standards and approved by the Board of County Commissioners shall
either be in place or shall be constructed in conjunction with the proposed use.
(2) Street improvements adequate to accommodate traffic volume generated by the
proposed use and to provide safe, convenient access to the use shall either be in place
or shall be constructed in conjunction with the proposed use;
(3) Design of the proposed use is organized to minimize impact on and from
adjacent uses of land through installation of screen fences or landscape materials on
5
the periphery of the lot and by location of intensively utilized areas, access points,
lighting and signs in such a manner as to protect established neighborhood character;
9. Depending on the type of Special Use Permit requested, you may need to respond to
additional review standards in the Garfield County Zoning Resolution Section 5.00
[Supplementary Regulations]. This may include uses such industrial uses [section 5.03.07
& 5.03.08] which are attached.
*See the required standards from the Resolution of January 2, 1979, including the
zoning amendment, adopted October 15, 1979, (79-132) attached as Exhibits A and
B. Any application shall provide responses to these standards that demonstrates
the proposed use can meet these criteria / standards.
10. A $525.00 Base Fee: Applicant shall sign the `Agreement for Payment" form and provide
the fee with the application.
11. Submit 3 copies (and 1 CD or DVD) of this completed application form and all the required
submittal materials to the Community Development Department. Staff will request
additional copies once the Special Use Permit application has been deemed technically
complete.
III. CRITERIA
The criteria that shall be used to evaluate the project includes the following as referenced in
Exhibit A attached hereto as well as the general criteria here from the land Use resolution
of 1978, as amended:
(1) Utilities adequate to provide water and sanitation service based on accepted
engineering standards and approved by the Board of County Commissioners shall either be
in place or shall be constructed in conjunction with the proposed use.
(2) Street improvements adequate to accommodate traffic volume generated by the
proposed use and to provide safe, convenient access to the use shall either be in place or
shall be constructed in conjunction with the proposed use.
(3) Design of the proposed use is organized to minimize impact on and from adjacent uses
of land through installation of screen fences or landscape materials on the periphery of the lot
and by location of intensively utilized areas, access points, lighting and signs in such a
manner as to protect established neighborhood character.
IV. APPLICATION REVIEW
a. Review by: Staff for completeness, recommendation and referral agencies for additional
technical review.
b. Public Hearing:
c. Referral Agencies:
X Planning Commission
X Board of County Commissioners
It is expected that the application will be sent to the
following County Departments and external agencies:
6
➢ Garfield County Road and Bridge
➢ Garfield County Attorney
➢ Town of Parachute
➢ Garfield County Oil and Gas Liaison
➢ Battlement Mesa Metro District
➢ Garfield County Public Health Department
➢ RE -16 School District
➢ Colorado Parks & Wildlife
➢ Garfield County Vegetation Management
➢ Grand Valley Fire Protection District
➢ Colorado Oil and Gas Conservation Commission
➢ Colorado Department of Transportation
➢ Colorado Department or Water Resources
V. APPLICATION REVIEW FEES
a. Planning Review Fees: $525.00
b. Referral Agency Fees: $
c. Total Deposit: $525.00 (additional hours billed at an hourly rate)
General Application Processing
Planner reviews case for completeness and sends to referral agencies for comments. Case
planner contacts applicant and sets up a site visit. Staff reviews application to determine if
it meets standards of review. Case planner makes a recommendation of approval, approval
with conditions, or denial to the appropriate hearing body.
Disclaimer
The foregoing summary is advisory in nature only and is not binding on the County. The
summary is based on current zoning, which is subject to change in the future, and upon
factual representations that may or may not be accurate. This summary does not create a
legal or vested right.
Pre -application Summary Prepared by:
Fred A. Jarman, Al
Attachments: Exhibit A: Regulations from the 1978 Land Use Resolution
Exhibit B: Sections from the Battlement Mesa PUD (Resolution 79-132)
Exhibit C: Proposed URSA Field Development Plan Map
C. Section 4-105 Major Impact
Approximately 5 months if submittal is complete
Garfield County
Major Impact Review Process
(Section 4-105)
Step 1: Pre -application Conference
•Applicant has 6 months to submit application
Step 2: Application Submittal
Step 3: Completeness Review
•20 business days to review
•If incomplete, 60 days to remedy deficiencies
Step 4: Schedule Hearing and Provide Notice
•Published, posted, and mailed to adjacent property owners within 200
feet and mineral owners, at least 30 days but no more than 60 days prior
to Planning Commission public hearing
Step 5: Referral
•21 day comment period
Step 6: Evalution by Director
Step 7: Planning Commission Review and Recommendation
Step 8: Schedule Hearing and Provide Notice
*Published, posted, and mailed to adjacent property owners within 200 feet
and mineral owners, at least 30 days but no more than 60 days prior to
BOCC public hearing
Step 9: BOCC Decision
*Applicant has 1 year to meet any conditions of approval
81
5.03.01 (B) Mobile Home as an Accessor Use' to a Workin
era ion
5
GUM or xcanon up
A mobile home shall be allowed as an
working farm or ranch operation as
ovided:
p
(I)
accessory
a Condit'
The principal wage earner living in
.me is a full time employee of the
ranch operation that is presen
Warily agricultural productio•
0
pra.
(2) The m
or maso
•
ile home is placed on
ry footer;
(3) There sha
home shall
(4)
be no outside
e skirted;
No more than
be allowed as a
or ranch operati
e
(5) The mobile hom
to others tha
operation.
3.02 Row House; A
the minimum
square fee
the plat
lots an
ments
03.03 Stu
co
03.04
.03
t
•
sin
ac
•#
sha
those
•
na
e. mobil
orking f
y devoted
permanent cone
torage and the mob
e -family mobile home sh
ssory use to a working f
to
use,
rm
0
ete .
I not be rented for occupa
employed by the farm or r
bdivision plat
of area for a row
a minimum of six ro
d the plat includes su
common to satisfy floor ar
der the appropriate Zone Dist
11
m
ust be approved wher
ouse lot is 1,400
house lots appear
icient land area
ratio require-
'ct Regulation.
cy
nch
on
o for the Arts and Crafts; All acti
ucted within a building and retail sa
one -of -a --kind goods produced on the lot.
'ty must be
s are limi
Aircraft Landing Strip; Such strip may not be
with any reservation, regulation or requirement
Federal Aviation Administration.
05 Airport, Utility; Such airport shall be approved b
Federal Aviation Administration.
03.06 Airport, Air Carrier; Such airport shall be approved
the Federal Aviation Administratio
confl
f the
5.03.07
t
Industrial Operations: Industrial Operations, including
extraction, processing, fabrication, industrial support
facilities, water impoundments, mineral waste disposal,
-52-
storage sanitary land -fill, salvage yard, access routes
and utility lines, shall be permitted, provided:
(.1) The applicant for a permit for industrial operations
shall prepare and submit to the Planning Director two
(2) copies of an impact statement on .the proposed use
prescribing its location, scope, design and construction
schedule, including an explanation of its operational
characteristics. One (1) copy of the impact statement
shall be filed with the County Commissioners by the
Planning Director. The County Commissioners shall
review the impact statement to determine whether the
proposed industrial operation complies with the require-
ments of this Section and shall notify the Planning
Director of its decision in this regard, in writing,
within thirty (30) days from the date on which the
impact statement is filed with the Planning Director.
The impact statement shall show that the use shall be
designed and operated in compliance with all applicable
laws and regulations of the County, State and Federal
Governments, and will not have a significant adverse
effect upon:
(a) Existing lawful use of water through depletion or
pollution of surface run-off, stream flow or
ground water;
(b) Use of adjacent land through generation of vapor,
dust, smoke, noise, glare or vibration, or other
amanations;
(c) Wildlife and domestic animals through creation of
hazardous attractions, alteration of existing
native vegetation, blockade of migration routes,
use patterns or other disruptions;
(2) Truck and automobile traffic to and from such uses
shall not create hazards or nuisance to areas elsewhere
in the County;
(3) Sufficient distances shall separate such use from
abutting property which might otherwise be damaged by
operations of the proposed uses;
(4) At the discretion of the County Commissioners
additional information supplementing the impact state-
ment may be required. Such request for additional
information shall be in writing and shall be given to
the applicant not later than forty-five (45) days after
-53-
the filing of the impact statement. The County Commis-
sioners shall then. have an additional forty-five (45)
days from the date of submission of such additional
information within which to notify the Planning Director
of their decision in respect to said impact statement;
An application for permit for an industrial operation
shall be subject to the provisions under Section .8.01
in addition to the required impact statement. Any
provisions of Section 8.01 to the contrary notwith-
standing, the Building Official shall have a period of
ten (10) daysfrom notification by.the County Commissioners
of their decision as hereinabove provided, within which
to act upon such application;
(5) Permits shall be granted for those uses only with
the provisions that a satisfactory rehabilitation plan
for the affected land be submitted prior to commencement
of -such use;
The plan for site rehabilitation shall be submitted
to the Planning Director with the impact state-
ment, and must be approved by the County Commissioners
before a permit for conditional or special use
will be issued;
(b) The County Commissioners may require security
before a permit for special or conditional use is
issued, if required. The applicant shall furnish
evidence of a bank commitment of credit, or bond,
or certified check or other security deemed accept-
able by the County Commissioners in the amount
calculated by the County Commissioners to secure
the execution of the site rehabilitation plan in
workmanlike manner and in accordance with the
specifications and construction schedule established
or approved by the County Commissioners. Such
commitments, bonds, or check shall be payable to
and held by the County Commissioners:
5.03.08 Industrial Performance Standards: All industrial
operations in Garfield County shall comply with appli-
cable County, State, and Federal regulations regulating
water, air and noise pollution and shall not be conducted
in a manner constituting a public nuisance or hazard.
Operations shall be conducted in such a manner as to
minimize heat, dust, smoke,vibration, glare and odor
and all other undesirable environmental effects beyond
the boundaries of the property in which such uses are
located, in accord with the following standards:
(a)
-54-
(1) Volume of the sound generated: every use shall be
so operated that the volume of sound inherently and
recurrently generated does not exceed ninety (90)
decibles, with a maximum increase of five (5) decibles
permitted for a maximum of fifteen (15) minutes in any
one hour, at any point of any boundary line of the
property on which the use is located.
(2) Vibration generated: every use shall be so
operated that the ground vibration inherently and
recurrently generated is not perceptible, without
instruments, at any point of any boundary line of the
property on which the use is located;
(3) Emissions of smoke and particulate matter: every
use shall be so operated so as to comply with all.
Federal, State and County air quality laws, regulations
and standards;
(4) Emission of heat, glare, radiation and fumes:
every use shall -be so operated that it does not emit
heat, glare, radiation or fumes which substantially
interfere with the existing use of adjoining property
or which constitutes a public nuisance or hazard.
Flaring of gases, aircraft warning signals, reflective
painting of storage tanks, or other such operations
which may be required by law as safety or air pollution
control measures shall be exempted from this provision;
(5) Storage area, salvage yard, sanitary land -fill,
and mineral waste disposal areas:
(a) Storage of flammable, or explosive solids, or
gases, shall be in accordance with accepted
standards and laws and shall comply with the
National Fire Code;
(b) At the discretion of the County Commissioners all
outdoor storage facilities for fuel, raw materials
and products shall be enclosed by a fence or wall
adequate to conceal such, facilities from adjacent
property;
(c) No materials or wastes shall be deposited upon a
property in such form or manner that they may be
transferred off the property by any reasonably
foreseeable natural causes or forces;
(d) All materials or wastes which might constitute a
fire hazard or which may be edible by or otherwise
-55-
.be attractive to rodents or insects shall be
stored outdoors in accordance with applicable
State Board of Health Regulations;
(6) Water pollution: in a case in which potential
hazards exist, it shall be necessary to install safe-
guards designed to comply with the Regulations of the
Environmental Protection Agency before operation of
the facilities may begin.
All percolation tests or ground water resource tests as
may be required by local or State Health Officers must
be met before operation of the facilities may begin.
•
initiative, the County Commissioners may, by resolution,
add to the uses listed for a Zoning District any other
similar use which conforms to the conditions set forth
in the following special findings:
1.) Such use is appropriate to the physiographic
eral environmental character of the District
whi h it is added;
(2) S► h use does not create any more haza • to or
alteration of the natural environment tha the minimum
amount no ally resulting from the other uses permitted
in the Dis ict to which it is added;
(3) Such use oes not create any '.re offensive noise,
vibration, dust, heat, smoke, odo-, glare, or other
objectionable in uences or mor traffic hazards than
the minimum amount ormally r-- sting from the other
uses permitted in th distrito which it is added;
(4) Such use is compa 'b e to the uses existing and
permitted in the distri'. to which it is added.
When any use has be: added ,o the list of permitted
uses in any distr' t in accor.: ce with this Section,
such use shall b deemed to be sted in the appropriate
section of tho district regulati'ns, and shall be
added theretin the published text •f this Resolution
at the fir convenient opportunity, s'th a notation
indi•cati that the addition was made in accordance
with th Section.
5.03.10 Ap •val of Conditional and Special Uses: Us- listed
Conditional under the appropriate Zone Distr t
egulation shall be permitted based on compliance with
the requirements listed herein; where uses are lis . -d
as Special Uses they shall be permitted only: .
i
RESOLUTION NO. 79-132
WHEREAS, on the 2nd day of January, 1979, this
Board of County Commissioners of Garfield County, Colorado,
adopted Resolution No. 79-1, concerning a Zoning Resolution
for the County of Garfield, State of Colorado; and
WHEREAS, this Board is authorized by the provisions of
C.R.S. 1973, 30-28-109 through 30-28-116 to provide for the
approval of amendments to such Zoning Resolution; and
WHEREAS, pursuant to such authority, this Board
has proposed certain text amendments to the said Zoning
Resolution, which were on file for public inspection in the
Office of the Garfield County Clerk and Recorder for a period
of thirty days beginning the 14th day of September, 1979; and
WHEREAS, a public hearing was held on the 15th day of
October, 1979, upon the question of the adoption of the pro-
posed text amendments, pursuant to public notice required by
law; and
WHEREAS, the public was, at such public hearing, given
the opportunity to voice its opinions regarding the proposed
text amendments, which opinions have been given full consid-
eration by this Board; and
WHEREAS, this Board has determined that certain of the
proposed text amendments are necessary to make the aforementioned
Garfield County Zoning Resolution consistent with Colorado
statutes and to improve the efficiency and clarity of said
Zoning Resolution;
NOW THEREFORE, BE IT RESOLVED, by the Board of County
Commissioners of Garfield County, Colorado, that the Garfield
County Zoning Resolution, adopted by this Board on the 2nd
day of January, 1979, and identified as its Resolution No. 79-1,
shall be and hereby is amended as follows:
AMENDMENTS TO GARFIELD COUNTY ZONING RESOLUTION;'
Section 2.02.23 of the Garfield County Zoning Resolution shall
be amended by the deletion of the words "the Colorado Department
of Health and" and by the addition of the words "to review and/
or enforce health and safety provisions or requirements which
are included in this Resolution,"at end of said section.
Section 2.02.43 of the Garfield County Zoning Resolution shall
be amended by changing the words "one thousand" to "five .
hundred".
Section 2.02.47 of the Garfield County Zoning Resolution shall
be amended by changing the word "right" to "tight".
The Garfield County Zoning Resolution shall be amended by the
addition of a new section 2.02.56, which shall read as follows:
Salvage Yard: Any location which is maintained, used
or operated for storing, keeping, buying or selling
wrecked, scrapped, ruined, or dismantled motor vehicles
or motor vehicle parts, old or scrap copper, brass,
rope, rags, batteries, paper, trash, rubber or sythe-
tic petro -chemical debris, waste, appliances, or parts
thereof, iron, steel, and other old or scrap ferrous
or non-ferrous material.
Section 3.02.03 of the Garfield County Zoning Resolution shall
be amended by changing the word "events" to "gatherings".
Section 3.07.06 of the Garfield County Zoning Resolution shall
be amended by the addition of the following paragrpah:
(3) Side yard: 10 feet from side lot line or 1/2 the
height of the principal building, whichever is greater.
Section 3.09 of the Garfield County Zoning Resolution shall
be amended by changing the word "Special" to "Conditional".
Section 3.09.01 of the Garfield County Zoning Resolution shall
be amended by changing the word "special" to "conditional".
Section 4.08.03 of the Garfield County Zoning Resolution shall
be amended by the addition of the following, which shall be the
first sentence in said section.
Every Planned Unit Development Plan shall include a
detailed listing of districts within the PUD in which
specific uses shall be permitted, which listing shall
be in substantially the form contained in Section 3.00
hereof.
Section 4.08.05(7)(d) of the Garfield County Zoning Resolution
shall be amended to read as follows:
A list of the owners of properties located within 300
feet of the boundaries of the PUD and their addresses:
Section 5.02:01 shall be amended by the addition of the
following sentence:
Occupancy of an .existingt..mobile horhe =.park and individual
spaces of an existing mobile home park shall be
governed by the provisions of Section 6.11 and 7.00
of this Resolution.
Section 5.03(1) of the Garfield County Zoning Resolution shall
be amended to read as follows:
Utilities adequate to provide water and sanitation
service based on accepted engineering standards and
approved by the Environmental Health Officer shall
either be in place or shall be constructed in con-
junction with the proposed use;
Page 1
AMENDMENTS TO GARFIELD COUNTY ZONING RESOLUTION
The word and number "thirty (30)" found in Sections 5.03.01
(A)(4) and (A)(5) of the Garfield County Zoning Resolution shall
be amended to read "fifteen (15)".
The first sentence of Section 5.03.07(4) of the Garfield County
Zoning Resolution shall be amended to read as follows:
In the event the County Commissioners or Planning
Director determine that the impact of a proposed
industrial operation is such that information in
addition to the impact statement or other informa-
tion submitted is necessary for the informed evalu-
ation of such impact, such additional information
may be required.
Section 5.03.07 of the Garfield County zoning Resolution shall
be amended by the addition of a new subparagraph, which shall
read as follows:
(6) The Planning Director may, upon the preliminary
determination that an industrial operation related
solely to the extraction of oil and gas from the
ground through conventional use of drilling and pumping,
and the extraction of sand and gravel affecting not more
than ten.. acres has limited impact, waive the requirement
for the above-described impact statement, upon the
submittal of such information as the Planning Director
requires for the evaluation of the impact of such an
extractive operation. If the determination is later
made that additional information is required, subsection
(4) of this Section shall apply.
10°.Thection 8.01 of the Garfield County Zoning Resolution shall be
amended by the following words at the conclusion of the first
sentence thereof:
and all provisions of Building Code affecting the
subject property.
Section 9.02.01 of the Garfield County Zoning Resolution shall
be amended to read as follows:
Application: All conditional use permit applications
shall be filed by the owner or owners of the subject
lot with the Planning Director on a form provided by
the Planning Director for this purpose and shall consist
of all information required of an application for a
permit and subject to all administrative procedures
thereof plus the following:
Supporting information, plans, letters of approval from
responsible agencies and other information to satisfy
requirements listed under Conditional and Special Uses
in the Supplementary Regulations.
Section 9.02.02 of the Garfield County Zoning Resolution shall
be amended to read as follows:
Action by the Planning Director: The Planning Director
shall utilize services of the Environmental Health Officer,
the Building Official, and Planning Department and other
county and state officials or agencies to arrive at a
determination that the proposed buildings, structure and
use is in compliance with all applicable zoning, sub-
division, building,health and sanitation regulations;
and if the proposed building, structure and use are in
compliance, the Planning Director shall make a;
recommendation that the County -Commissioners consider the
application with or without a public hearing.
Page 2
AMENDMENTS T.O GARFIELD COUNTY ZONING RESOLUTION
The Garfield County Zoning Resolution shall be amended by the
addition of a Section 9.02.03, which shall read as follows:
Action by theiCounty Commissioners: Upon receiving
an application for conditional use permit and recom-
mendation regarding public hearing from the Planning
Director, the1County Commissioners shall either (1)
grant the conditional use permit without conditions,
(2) provide the applicant with an opportunity for hear-
ing, subsequent to which the County Commissioners may
grant or conditionally grant the conditional use permit
on such conditions as are deemed necessary to effect the
purposes of this Resolution, or (3) schedule a public
hearing upon the conditional use application, at which
the applicantand interested parties, including county
representatives, will be provided an opportunity to
express their!opinions regarding such application, sub-
sequent to which public hearing the County Commissioners
may grant, orconditionally grant the conditional use
permit on such conditions as are deemed necessary to
effect the purposes of this Resolution. A hearing
shall be heldno later than 30 days following the receipt
of the Conditional Use Permit application unless such
time is extended by the County Commissioners. The
County Commissioners may refer a request for conditional
use permit tothe County Planning Commission for its
review and recommendation.
Public Noticeshall be provided in accordance with the
provisions ofSections 9.03.03(1) and (2), if public
hearing held.;
The concurring vote of the majority of the County
Commissionersshall be necessary to decide that the
conditional use permit shall be conditionally granted
upon specific;conditions. The County Commissioners
shall take action on the conditional use permit appli-
cation and notify the applicant of their decision,
in writing, within fifteen (15) days following the
public hearing. The decision shall state specific
findings of fact relevant to all essential issues.
If the permitis conditionally granted, such decision
shall include:reasons for conditions imposed.
The first clause of Section 9.03.01 of the Garfield County Zoning
Resolution shall be amended to read as follows:
Application: ;All special use permit applications shall
be filed by the owner or owners of the subject lot with
the Planning Director on a form provided by the Planning
Director for this purpose and shall consist of all infor-
mation required of an application for a permit and sub-
ject to all administrative procedures thereof plus the
following:
The number "?.02.03" contained in Section 9.04.02 of the
Garfield County Zoning Resolution shall be amended to read
"9.05.03".
Section 10.04.01 of the Garfield County Zoning Resolution shall
be amended to read as follows:
Prior to final adoption of any amendment to this
Resolution, the County Commissioners shall hold a
public hearing thereon, at least thirty (30) days notice
of the time and place of which shall be given by at
least one publication in a newspaper of general circula-
tion in the County. Except for text amendments, notice
of such public hearing shall also be sent by mail at
least fifteen' (15) days prior to such hearing to all
owners of record of property adjacent to the lot or
lots subject to the proposed amendment.
Section 11:00 of the+Garfield County Zoning Resolution shall be
-3-
. AMENDMENTS TO GARFIELD COUNTY ZONING RESOLUTION
amended by the addition of a new paragraph, which shall read
as follows:
Unless otherwise specifically provided herein, time
limitations imposed upon the Board of County
Commissioners, the Planning Commission, or any other
County officer, or body by this Zoning Resolution shall
be interpretted as having no consequence other than
authorizing any interested party, upon the expiration
of such limitation, to request judicial relief in the
nature of mandamus, requiring the body or officer to
make the determinations or decisions required by this
Resolution. The expiration of any such time limitation
shall not in and of itself be considered the approval
or denial of any application, plan or question under
consideration.
The Garfield County Zoning Resolution shall be amended by the
addition of new sections 3.11 through 3.11.09, which shall
read as follows:
3.11 R-MH/G/UD -- RESIDENTIAL -MOBILE HOME/GENERAL/
URBAN DENSITY
3.11.01 Uses, by right: Single-family, two-family
and multiple -family dwelling, boarding and rooming
house, and customary accessory uses including building
for shelter or enclosure of animals or property acces-
sory to use of the lot for residential purposes and
fences, hedges, gardens, walls and similar landscape
features; park.
3.11.03 Uses, conditional: Mobile Home as principal
use of the lot; Row House; Studio for conduct of arts
and crafts;
Home occupation;
Church, community building, day nursery and school.
3.11.03 Uses, special: Mobile Home Park;
3.11.04 Minimum Lot Area: 7500 square feet and as
further provided under Supplementary Regulations.
3.11.05 Maximum Lot Coverage: 50 percent
3.11.06 Minimum Setback:
(1) Front yard; (a) arterial streets: 75 feet from
street centerline or 50 feet from front lot line,
whichever is greater;
(b) Local street: 50 feet from street centerline or
25 feet from lot line, whichever is greater;
(2) Rear Yard: 25 feet from rear lot line;
(3) Side Yard: 10 feet from side lot line or 1/2 the
height of the principal building, whichever is greater.
3.11.07 Maximum Height of Buildings: 25 feet
3.11.08 Maximum Floor Area Ratio: 0.50/1.0 and as
further provided under Supplementary Regulations.
3.11.09 Additional Requirements: All uses shall be
subject to the provisions under Section 5 (Supplementary
Regulations).
-4-
• AMENDMENTS TO GARFIELD COUNTY ZONING RESOLUTION
The first sentence of Section 5.03.01 of the Garfield County
Zoning Resolution shall be amended to read as follows:
A mobile home may be allowed as the principal use of
a lot as a special or conditional use, as provided
within the zone district provisions of this resolu-
tion, provided that each of the following conditions
is satisfied in the situation of a special use and that
the first three of the conditions are satisfied in
the situation of a conditional use:
The legend of zone district designations shall be amended by
the addition of the following:
N\N: R-MH/G/UD RESIDENTIAL -MOBILE HOME/GENERAL/URBAN DENSITY
BE IT FURTHER RESOLVED that the foregoing amendments
shall be effective immediately, that a copy of this amending
Resolution shall be filed and recorded with the Garfield
County and Recorder, and that all other provisions of the
said Garfield County Zoning Resolution shall remain in full
force and effect.
DATED this
ATTEST:
15th day of October, 1979.
N�elf 1 /l ,
ncy r'ck Page
Deputy lerk of theBoard
BOARD OF COUNTY COMMISSIONERS
GARFIELD COUNTY, COLORADO
By:_-
Flaven J. Ceri e, Chairman
-�C
-5-