Loading...
HomeMy WebLinkAbout1.20 Water SupplyArticle 4-203.M Water Supply and Distribution Plan Ursa Operating Company and Battlement Mesa Partners Major Impact Review Application Battlement Mesa PUD Phase I BMC B OAProject No. 014-1829 +O LSSO N ASSOCIATES WATER SUPPLY AND DISTRIBUTION PLAN Ursa Operating Company Battlement Mesa PUD Phase I BMC B Section 4-203.M. Water Supply and Distribution Plan. The Ursa Operating Company's (Ursa) Battlement Mesa PUD Phase 1 BMC B well operations will be similar to other natural gas operations in Garfield County. During drilling and completion operations, potable water will be provided at this facility by Stallion Oilfield Services via their existing water agreement(s) with the Town of Silt. A will serve letter from Stallion is provided in this section. Letters from the Town of Silt confirming that the Town has adequate and legal physical water supply to meet these needs is included. Ursa has entered into a Water Service Agreement (WSA) with the Battlement Mesa Metropolitan District (BMMD) to obtain non -potable water for use in drilling and dust control. A copy of the contract is included in this section. A letter from the BMMC confirming that the District has adequate and legal physical water supply to meet these needs is included. During the production phase, the facility will be unmanned with personnel onsite only for short intervals. Potable water will not be required for daily operations. Personnel will provide their own potable water carried in their vehicles. Ursa makes potable water available at their field office to staff and contractors. Sanitary facilities will not require a source of water and will be provided by portable toilets. Per details imbedded in the SUA between Ursa and the landowner, no landscaping is proposed for this project location. Thus, there are no requirements for water for irrigation purposes. Water use for this proposed well pad is temporary in nature. Once all of the wells have been drilled and completed, there will be no additional need for water at the site. 760 Horizon Drive, Suite 102 TEL 970.263.7800 Grand Junction, CO 81506 FAX 970.263.7456 www.olssonassociates.com Ursa Operating Company Battlement Mesa PUD Phase I — BMC B THIS PAGE LEFT BLANK FOR TWO-SIDED DUPLICATION. Water Supply and Distribution Plan Page 2