Loading...
HomeMy WebLinkAbout1.06 PreAppCommunity Development Department 108 8`b Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com PRE -APPLICATION CONFERENCE SUMMARY TAX PARCEL NUMBER: 1919-224-00-009 PROJECT: VRM Group Telecommunication Tower (Comnet Wireless) PROPERTY OWNER: A. J. Woodward LLC REPRESENTATIVE: Mark Ray, VRM Group Inc. PRACTICAL LOCATION: 19294 Highway 13, Rifle Colorado TYPE OF APPLICATION: Limited Impact Review Land Use Change Permit DATE: 9125114 Updated 2/11/15 I. GENERAL PROJECT DESCRIPTION The Applicant proposes to construct a telecommunication tower on a site off of Hwy. 13 in an area generally referred to as Rio Blanco Hill. The site is zoned Rural and a Limited Impact Review Land Use Change Permit is required for the proposed use pursuant to the Land Use and Development Code The tower is proposed to be located within a fenced 40 ft. by 40 ft. parcel approximately 50 yds. or more off of the east side of Hwy. 13. The tower is planned to be approximately 150 ft. in height with a monopole self supporting design. A raised platform is anticipated with an outdoor cabinet for technical support equipment. No buildings are planned and the site will be fenced. Power will be supplied by White River Electric. Commnet Wireless will obtain all federal, state and local permits. II. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS Garfield County Comprehensive Plan 2030 Garfield County Land Use and Development Code, as amended (LUDC) • Limited Impact Review Section 4-104 • Section 4-101 Common Review Procedures • Table 4-102 Common Review Procedures and Required Notice • Section 4-203 Description of Submittal Requirements • Table 4-201 Application Submittal Requirements • Article 7 Standards - Sections 1, 2, and 3 as applicable • Section 7-1102 Standards for Telecommunication Facilities • Article 15, Definitions of Telecommunication Facility III. REVIEW PROCESS A. Pre -application Conference. B. Application Submittal (3 hard copies and 1 copy on a CD). C. Determination of Completeness. D. Schedule Public Hearing before the Board of County Commissioners. E. Completion of public notice (posting, mailing, publication) 30 days prior to the hearing. F. Additional Copies requested and sent to referral agencies. G. Evaluation by Director/Staff resulting in a Staff Report. H. Public Hearing before the BOCC, resulting in approval, approval with conditions or denial. 1. Preparation of a Resolution documenting the Board's action J. Issuance of a Land Use Change Permit if approved once all conditions of approval have been satisfied. IV. PUBLIC HEARINGS AND NOTICE Public Hearing notices shall be posted, mailed and published pursuant to Section 4-101.E. None Planning Commission X Board of County Commissioners Board of Adjustment Referrals will include but are not limited to the following agencies: ➢ Garfield County Consulting Engineer > Garfield County Road & Bridge • Garfield County Airport s Garfield County Environmental Health s Garfield County Vegetation Manager s Fire Protection District • City of Rifle V. SUBMITTAL REQUIREMENTS (per Table 4-201) A. General Application Material (includes application form, fees, agreement to pay form, proof of ownership and/or leases or authorizations to utilize the site, authorization to represent, statements of authority for corporations or LLC's, copy of the pre -application summary B. Vicinity Map C. Site Plan D. Grading and Drainage Plans E. Landscaping Plan F. Impact Analysis G. Traffic Study H. Water Supply Plan I. Wastewater Treatment Plan J. Narrative Description of the Project K. Sections addressing Article 7 Divisions 1, 2, and 3 including provision of utilities/infrastructure to serve the site and adequate access to serve the site. L. Sections addressing compliance with Section 7-1102 Standards for Telecommunication Facilities including all FCC and FAA forms (Le. FAA Form 7460-1). M. Waivers from submittal requirements can be requested pursuant to Section 4- 202 and the review criteria contained therein. It is recommended that you contact the Planning Staff regarding any anticipated submittal waivers. Some submittals may not be applicable based on a facility being unmanned. N. Waivers from standards can be requested pursuant to Section 4-118 and the review criteria contained therein. Requests need to contained detailed information on compliance with the review criteria. VI. APPLICATION REVIEW FEES This application will be subject to the following fees and deposit requirements: Planning Review Fees: $ 400 (additional Staff time charged at hourly rate of $40.50) Referral Agency Fees: $ tbd (includes County Consulting Engineer) Total Deposit: $ 400 General Application Processing Planner reviews case for completeness and sends to referral agencies for comments. Case planner contacts applicant and sets up a site visit. Staff reviews application to determine if it meets standards of review. Case planner makes a recommendation of approval, approval with conditions, or denial to the appropriate hearing body. Disclaimer The foregoing summary is advisory in nature only and is not binding on the County. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. This summary does not create a legal or vested right. Pre -application Summary Prepared by: Glenn Hartmann Senior Planner D to Garfield County Limited Impact Review Process (Section 4-104) Step 1: Pre -application Conference *Applicant has 6 months to submit application Step 3: Completeness Review .20 business days to review *If Incomplete. 60 days to remedy deficiencies •Published, posted, and mailed to adjacent property owners within 200 feetand mineral owners at least 30days but no more than 60 days prior to BOCC public hearing Step 5: Referral 021 daycomment period Step 6: Evalution by 1/fret-tor Step 7; BOCC Decision •Applicant has 1 year to meet any conditions of approval