Loading...
HomeMy WebLinkAboutEnvelope Compliance Certificate 07.02.2015COMcheck Software Version 4.0.0 IA rill Envelope Compliance Certificate Section 1: Project Information Energy Code: 20091ECC Project Title: Project Type: New Construction Construction Site. Owner/Agent: Designer/Contractor: Building Location (for weather data): Glenwood Springs, Colorado Climate Zone 5b Vertical Glazing 1 Wall Area Pct : 11 Building Use: Activltv_Type(s) 1 -Warehouse Nonresidential EMMA= 26796 Section 2: Envelope Assemblies and Requirements Checklist Envelope PASSE57I]esign 6%t}etter,than code. Envelope Assemblies: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R -Value R -Value U•Factor U -Factorial Perimeter Roof 1: Metal Building, Screw Down, [Bldg. Use 1- Warehouse] 26796 19 0 110 0.047 0 055 Exterior Wall 1: Metal Building Wall, Double Layer Mineral Fiber, 11816 13 0 13.0 0.046 0.069 [Bldg. Use 1 - Warehouse] Window 1: Metal Frame with Thermal Break, Pert. Specs.' Product 128 --- — 0.500 0.550 ID PRODUCT LABEL, SHGC 0.25, PF 0,02, (Bldg. Use 1 - Warehousej (b) Door 1: Insulated Metal, Swinging, [Bldg. Use 1- Warehouse] 126 — — 0.037 0.700 Door 2: Insulated Metal, Non -Swinging, (Bldg. Use 1 - Warehouse] 34 — — 0.070 0.500 Floor 1: Slab-On•Gradellnheated, Vertical 4 ft., (Bldg. Use 1 - 694 — 10.0 — — Warehouse] la) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. lb) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation Air Leakage, Component Certification, and Vapor Retarder Requirements: • 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material Installed In accordance with the manufacturer's Installation Instructions, o 2. Windows, doors, and skylights certified as meeting leakage requirements. O 3. Component R -values & U -factors labeled as certified. O 4. No roof Insulation is installed on a suspended ceiling with removable ceiling panels. o 5. `Other components have supporting documentation for proposed U -Factors. O 6. Insulation installed according to manufacturer's Instructions, in substantial contact with the surface being Insulated, and in a manner that achieves the rated R -value without compressing the Insulation. O 7. Stair, elevator shaft vents, and other outdoor air Intake and exhaust openings In the building envelope are equipped with motorized dampers. O 8. Cargo doors and loading dock doors are weather sealed. O 9. Recessed lighting fixtures installed In the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. O 10.Buliding entrance doors have a vestibule equipped with self-closing devices. Exceptions: 0 Building entrances with revolving doors. Project Title: Data filename C:IUserstkimoehllDocumentstCOMcheck\GARFIELD COUNTY.cck Report date: 07102/15 Page 1 of 2 Doors not intended Io be used as a building entrance, CI Doors that open directly from a space less than 3000 sq ft In area ❑ Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. 0 Doors opening directly from a sleeping/dwelling unit. Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document Is consistent with the building plans. specifications and other calculations submitted with this permit application. The proposed envelope system has been designed 10 meet the 2009 IECC requirements in COMcheck Version 4.0.0 and to comply with the ; andatory : • remen • in the Requirements Checklist. Tito Gtoil-Ez-E3Rot.ki } g.1uCt�i4a'� Name - Title Signature i -Z Date Project Idle Report dates 07/02/15 Data filename C:lUserslkimoeh! Documents1COMchecklGARFIELD COUNTY.cck Page 2 of 2