HomeMy WebLinkAboutApplication- Permit.Garfield County
Building & Sanitation Department
108 8`h Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
NO. Cl��lo
Job Address (401515 ti,j (C) vay__ Q c ryTJ
Nature of Work BuiidinQ Permit t ) 3 - _ i 'V
Use of Building e- /tX)11
Owner OnLn�ht(DP ilet i c at
Contractor nk.,\ is Q
Amount of Permit $ AOC Date
Clerk
40,0
Permit No:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8h Street, Suite 201, Glenwood Springs, CO 81601
Phone: 970-9454212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003
ParceUSchedule No:
AGREEMENT
PERMISSION I5 HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3018201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WREN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECr, DESIGNER, BUILDER, AND OWNER COMMENTS ARE
INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Garfom.003
1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
Job Address:
\ tai
-�
1 Lot No: }r BI k No: Subd. /Exemption:
2
Owner: s I
Ad ess q
�(�
/Wk Ph•
3
Contractor:
n 1,.)
Address:
Pb:
Lit No.
4,
Archltect/Engineer:
Address:
Ph:
Lic. No.
5
Sq. Ft of Building: (L .7y
Sq. Ft. of Lot:
Height:
No. of Floors:
6
Use of Building:
v11�f � Gt�
i�GC3� LIL('e
y
7
Describe Work: -�
8
Class of Work: ❑ New i o Alterat' n ❑ Re
o Addition ❑ Move
• ove
9
Garage: o Single
o Double
Carport: o Single
❑ Double
10
o Driveway Permit ❑ On -Site Sewage Disposal 0 Site Plan
(Septic)
11
Valuation of Work: 5
Adjusted Valuations: $
12
Special Conditions:
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
ISSUED BY THE STATE OF COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR, IF
CONSTRUCTION OR WORK 1S SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
L LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
OF . i
L- l t is UCTION.�/
Z tr l` i' eF oy
Plan Check Fee:
Permit Fee:
�y�
/ s+ Cl , Lrt)
Total Fee: Dated Permit Issued:
rn
/V V , OD
OCC Group: Coust. Type:
Zoning: Setbacks:
Manu. Home: ISDS No. &Fee:
A s ER J� DATE
1 PI , 7 UUU
0, , i ' PLNG. DEPT.
'APPROVAL/DATE APPROVAL/DATE
AGREEMENT
PERMISSION I5 HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3018201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WREN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECr, DESIGNER, BUILDER, AND OWNER COMMENTS ARE
INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Garfom.003
1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1997 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit #
Signature
Bpcont03/2004
Date
No • \S3(r--,
Assessor's Parcel No
r O
Date
++,,'' __ II �\ ��yyBUILDING��``,PERMIT CARD
Job Ad&ess4b15B L* (US �`�}� 7 1-7
Owner]-�� -1 XJ r�("V Address
ContractorC5k
Setbacks: Front\
t2 -e rriTh
Rear
Soils Test
Footing
Foundation
Grout
Underground Plumbing
Rough Plumbing
Framing
Insulation
Roofing
Drywall
Gas Piping
35 bcti Au, 4-18-03"
Address Phone #
RH LH Zoning
INSPECTIONS
NOTES
Weatherproofing
Mechanical
Electrical Rough (State)
Electri al Final (State)
Final -2-1-0 hecklist Completed?
Certificate Occupancy #
Date
Septic System #
Date
Final
Other
(continue on back)