HomeMy WebLinkAboutApplication- PermitGarfield County
Building & Sanitation Department
108 8h Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
Job Address
M /37 6ciS
LOEqui
Nature of Work Building Permit ala 2j 5j9 — �cy i
Use of B ilding eat / 9 pSt8-7 `a a
ltcd
Owner r 1 17,4' Al A1 V ll (� [rip l Q--
Contractor 06 l60l
Amount of Permit $ Cc� ID-
Clerk
•t"(o Date r D - cM-
Clerk
Permit No:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8'" Street, Suite 201, Glenwood Springs, CO 81601
Phone: 970-945-8212/ Fax: 970-384-3470 / Inspection Line: 970-384-5003
90771
Parcel/Schedule No: 9-1013' .2-5 A- oo'Iy�
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A FERMI BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER BUILDER, AND OWNER. COMMENTS ARE
INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Garfom.003
1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):2�
a ` rf/aa/o q
c e Sl r? E-7),2)
Job Address: I I 4 02, f 3 3' G-« Cot ( I -6e i
1
1 Lot No: Block No: Subd. / Exemption:
2
Owner: L: + safezaf -1-4.-4,
VVL:c he l -c, A [Faw(
Address
A L -t
Ph:
r -t S-e2Li SCJ
Wk Ph:
S/'fervc
3
Contractor:
519 •,f efo 11^AR,'v u'
Address:
Ph:
4 cc Fi- 6 b 2.1-
Lic. No.
4
Archiitect/Engineer:
Address:
Ph:
Lic. No.
5
Sq. Ft. of Building:
Sq. Ft. of Lot: C/
Height:
No. of Floors:
6
Use of Building:
01/20.2_10 a4-- f- .- 5Td, �, s mol
7
Describe Work: .Z «c a/t/r✓,t+ c✓,:%4 S'h„tprt,c f 1,-c a U^% s-Ccfc
8
Class of Work: — New o Alteration ❑ Remove
o Addition o Move
9
10
Garage: ❑ Single
nnuhle
Carport: o Single
-}E Double
) riveway Permit o On -Site Sewage Disposal o Site Plan
a,c- (Septic)
11
Valuation of Work:IS I.. a/�
Adjusted Valuations: % 7 7 s- O A
0
12
/
Special Conditions:
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
ISSUED BY THE STATE OF COLORADO.
THISPERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR, IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
OF CONSTRUCTION.
Lf d ZO ci
Plan Check Fee:
72 3/
Permit Fee:
///.25-
//2.C-THIS
Total Fee: Dated Permit Issued:
/OO-3-47p
0(`_�,i/�/oup: -iI�1 .onst.Type:
`/,'1{�
Zoning:
Setbacks:
Manu. Home: ISOS No. & Fee:
iiiir.l
li lk"
%s3t/:'�• /I DATE
6-7 Q
07
5 -
:LF ,E'
'APPROVAL/DATE
PLNG. DEP.'
APPROVAL
ATE
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A FERMI BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER BUILDER, AND OWNER. COMMENTS ARE
INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Garfom.003
1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):2�
a ` rf/aa/o q
c e Sl r? E-7),2)
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector
2. Permanent address assigned by Garfield County Building Department posted where
readily visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-
absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and
refrigerator, all necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running
water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on
balconies or decks over 30" high constructed to all 1997 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration
of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOTOCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISE UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit#
Signature
BpcontO82002
007V
Date
Applicant
PLAN REVIEW CHECKLIST
d4S-11.4vati Lick:FiXi9
Building
Olt Engineered Foundation
7.64. Driveway Permit
✓Surveyed Site Plan
41.4 Septic Permit and Setbacks
rade/Topography 30%
Attach Residential Plan Review List
Minimum Application Questionnaire
/, Q Subdivision Plat Notes
Atli Fire Department Review
✓Valuation Determination/Fees
✓Red Line Plans/Stamps/Sticker
/7(4. Attach Conditions
✓Application Signed
`-i Plan Reviewer To Sign Application
P i�re�ei lScl /
e No. *` ppiLA/ii
,q,1` 40# Snowload Letter- Manf. Hms.
GENERAL NOTES:
Date
Planning/Zoning
Property Line Setbacks
30ft Stream Setbacks
Flood Plain
Building Height
Zoning Sign -off
Road Impact Fees
HOA/DRC Approval
Grade/Topography 40%
Planning Issues
Subdivision Plat Notes
FEE ESTIMATE (DkC. kj'`
FINISHED LIVING SPACE:
UNFINISHED BASEMENT:
CRAWL SPACE: X 9.00 =
X 69.00 =
X 41.00 =
GARAGE: X18.00 =
UNCOVERED PATIO/DECK: X 12.00 =
COVERED PATIO/DECK: X 24.00 =
MISC.
MISC.
X30 43 A /a dD = ,77/�o
ozix /7
TOTAL VALUATION: '13 0)
i76g.
PLAN REVIEW FEE: a 3 r
PERMIT FEE: /1/ _ d 5
TOTAL:
MANUFACTURED HOME SET UP FEE;
SEPTIC — PERMIT:
PERK:
4
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. Adequate and complete
information will prevent delays in the plan review process. Reviewing a plan and the discovery that
required information has not been provided by the applicant may result in the delay of the permit
issuance and in proceeding with building construction. The owner or contractor may be required to
provide this information before the plan review may proceed. This causes delays because other plans
that are in line for review may be given attention before the new information may be reviewed after
it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. If you do not, it may be
helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code".
This book is available to you through this department at our cost. Also, please consider using
a design professional for assistance in your design and a construction professional for
construction of your project.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line.
A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square
foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds
per square foot, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC.
Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each comer of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 106.3.1
(7.) Any site plan for the placement of any portion of a structure within 50 ft. of a
property line and not within a previously surveyed building envelope on a subdivision
final plat shall be prepared by a licensed surveyor and have the surveyors signature and
professional stamp on the drawing. Any structure to be built within a building envelope
of a lot shown on a recorded subdivision plat, shall include a copy of the building
envelope as it is shown on the final plat with the proposed structure located within the
envelope.
Yes L�
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a corner lot. Special
setbacks do apply.
Yes ✓
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses?
Yes \/k
2
4. Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes !v,/
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes A Pr
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces's and soffits?
Yes (gym
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes APr
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes r
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes t/
11. Does the building section drawing or other detail include the method of positive connection
of all columns and beams?
Yes
12. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing (undisturbed) grade contours?
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase II EPA certification?
! '
Yes nNo
3
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes A AP No
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform
Building Code?
Yes !v /Y No
16. Does the plan include awindow schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes n /i No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these areas?
Yes /V 4-- No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes 7\ ,/>- No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural committee deny or reject your building plans?
Yes (\/i No
21. Will this be the only residential structure on the parcel?
Yes f\ A No If no -Explain:
22. Have two (2) complete sets of construction drawings been submitted with the application?
Yes
23. Do you understand that the minimum dimensions a home can be on a lot is 20ft.wide and
20ft. long?
Yes 7\j* No
24. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes ✓ No
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties zone district?
Yes No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes No
27. Do you understand that approval for design and/or construction changes are required jirior to
the application of these changes?
Yes No
28. Do you understand that the Building Department wilt collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building permit?
Yes No
29. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoons. All inspections must be
called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for
inspections will delay your inspection one (1) day. Inspections are to be called in to
384-5003.
Yes ✓/ No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a $47.00 re-inpsection fee?
Yes t/ No
31. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy and occupancy of the building?
Yes (-- y'Vlk No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the Uniform Building Code?
Yes L— No
33. Are you aware that prior to submittal issuance of a building permit application you are
required to show proof of a driveway access permit or obtain a statement from the Garfield
County Road & Bridge Department stating one is not necessary? You can contact the Road
& Bridge Department at 625-8601.
Yes ft /y No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes ✓/, No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building permit application? Your attention in this is appreciated.
Yes No
I hereby acknowledge that I have read, understand and answered these questions to the
best of my ability.
/2.---a t
Date
Phone: cl /-ci �C a (ays); ,p Cl /`T 5 C-_2 'I r3 (evenings)
Cha x L. 41% A" ti 1 / / S 4/L—',.i t ir�alir
Project Name: �/t est ti L "� y k
((Li C/1 (34
Project Address:
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
04/2003
No g07Ri
Job Ad;ress
Owner SS%•1e ! A ..1r
Contractor�I� ��R�► f Irkenk
Assessor's Parcel No cQ r2Sd O4%2
Date 370 9051
BUILDING PERMIT CARD
Address ti Tl
Address
RH
INSPECTIONS
Soils Test
Footing
Foundation/%lend/#nJ
Grout
Underground Plumbing
Rough Pluszbinyy_
Framing W +
Insulation
Roofing
Drywall
Gas Piping
NOTES
Phone #9 I<
Phone al -2-1,09,Q7
M,Q7
LH Zoning
Weatherproofing
Mechanical
Electrical Rough (State) t
Electrical Final ( tate) a ,5"--zocy
Final- ecklis Co pleted9
Certificate Occupancy #
Date
Septic System #
Date
Final
Other
(continue on back)
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
G RFIELD COUNTY, COLORADO
Date Issued.. . �ril Zoned Area Permit No cf0F
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
/�
Use 0 — 4
0049
Addres or Legal eription
Own
Setbacks
Contractor
Side Side
Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
',
Footing 404-0e/it-
-0 e%D'�d--
Foundation
Foundation
Underground Plumbing
Insulation
Rough Plumbing
Drywall
Chimney & Vent
Electric Final (by State Inspector)
Gas Piping
Final
9_, y'-ogp —
Electric Rough (By State Inspector)
Septic Final
Notes:
Framing 7- 29 aQ' —
(To include Roof in place and Windows
and Doors installed).
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVEDDO NOT DESTROY THIS CARD -- _.•
Date By
s jF PLACED OUTSIDE- CO WITH CLEAR PLAS