HomeMy WebLinkAboutApplication- PermitGarfield County
Building, Sanitation,
& Planning Department
108 8`" Street, Suite #201
Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
Job Address / o
Nature of Work Building Permit Lot 8 b+ ,('Ac2.0" Ettd.Q
Use of Building C;111
Owner l j CADIP )
Contractor
Amount of Permit $ 79 5, 55 Date
Clerk
Permit No:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8' Street, Suite 201, Glenwood Springs, CO 81601
Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003
(� I J? Parcel/Schedule No: dial- 30a- O(-0(6
rz-4o3
PERMISS IS HEREB GRANTED TO THE APPL
AGREEMENT
AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28101 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED HY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A FERMI BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE
NTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
0L40,(Garfo'a.003
Z/ /I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):fb ((( I `✓
iced \\/
bole
Job Address: 1
%U'5 vtt .Dr'
1 '
1 Lot No: 1 Block No: Subd.1 Exem't _
2
Owner:.Address
.Tht3 e-- C-.4 (""fLL\
-1(TY—C, t
Ph:
4Li6—Y(.AVLI
Wk Ph:
��TCl�piaC
3
Contractor:
a. .
c -
Address:
Ph.
Lk. No. It
"cam
TMC
4
Architect/Enngine'e'''r�����r:
O'
Address:
'57\ i'-1 `G.
Pb:
Lic. No.
5
Sq. Ft. of isx'Id 2
inoll
Sq. Ft. ofo/2
(_
Height•.i ..t �- —
No. if Floors:
6
Use of Build
7
Describe.--
S11JC>LF £ li / J 1 IC IL c'.0i ca- (5l-.4427 O.) {_,t 2P0
8
Class of Work: R��. New ❑ Alteration o Remove
o Addition o Move
9
10
Garage: X Single
o Double
Carport: ❑ Single
o Double
�{ Driveway Permit ❑ On -Site Sewage Disposal ❑ Site Plan
` %(0K (Septic)
11
Valuation Work: S
Adjust Valuations: _S
3 G Y
12
Special Conditions: /
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED
ISSUED BY THE STATE OF COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK
AUTHORIZED IS NOT COMMENCED WITHIN 180
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED
PERIOD OF IS0 DAYS AT ANY TIME AFTER WORK
I HEREBY CERTIFY THAT I HAVE READ
APPLICATION AND KNOW THE SAME TO BE TRUE
PROVISIONS OF LAWS GOVERNING THIS TYPE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN
GRANTING OF A PERMIT DOES NOT PRESUME
TO VIOLATE OR CANCEL THE PROVISIONS OF
LOCAL LAW REGULATING CONSTRUCTION OR
OF CONSTRUCTION.
AND MUST BE
OR CONSTRUCTION
DAYS, OR, IF
FOR A
IS COMMENCED.
AND EXAMINED THIS
AND CORRECT. ALL
OF WORK WILL BE
OR NOT. THE
TO GIVE AUTHORITY
ANY OTHER STATE OR
THE PERFORMANCE
I i2- 53
Plan Check Fee:
13./10
Permit Fee:
482 IC
Total Fee: Dated Permit Issued:
�� ��
OCC Group: Const. Type:
1.).V Al
Zoning:
Setbacks:
anu. Home: 1SDS No. & Fee:
SI NATURE 0 OWNER
-D TE i
B D --saw . /r, ..P3
PPR'VM../'- .P.V•• DAJE
rz-4o3
PERMISS IS HEREB GRANTED TO THE APPL
AGREEMENT
AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28101 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED HY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A FERMI BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE
NTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
0L40,(Garfo'a.003
Z/ /I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):fb ((( I `✓
iced \\/
bole
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector
2. Permanent address assigned by Garfield County Building Department posted where
readily visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-
absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and
refrigerator, all necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running
water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on
balconies or decks over 30" high constructed to all 1997 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration
of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOTOCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISE UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy use and the issuance of a
Certificate of Occupanc dwelling under building permit# ("1 .
Li— I2,—b✓
BpcontO82002
Date
PLAN REVIEW CHECKLIST
Applicant Mo px,fe i
Building
N • 4 Engineered Foundation
Driveway Permit
d Site Plan 7 r
/41 •14•Septic Permit and Setbacks
,. - ade/ opography 30%
Xttach Residential Plan Review List
✓ Ivlmimum Application Questionnaire
J7 4 Subdivision Plat Notes
X<•A Fire Department Review
L aluation Determination/Fees
/ed Line Plans/Stamps/Sticker
/it A Attach Conditions
Ppb
tion Signed
`Plan Reviewer To Sign Application
/j • A 40# Snowload Letter- Matf. Hms.
GENERAL NOTES:
472 + /s = 33 694
Date 12-4-03
Planning/Zoning
Property Line Set
cks
30ft Stream Set•.acks
Flood Plain
Building ' eight
Zonin Sign -off
R
Impact Fees
A/DRC Approval
ade/Topography 40%
Planning Issues
Subdivision Plat Notes
J
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line.
A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square
foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds
per square foot, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 106.3.1
(7.) Any site plan for the placement of any portion of a structure within 50 ft. of a
property line and not within a previously surveyed building envelope on a subdivision
final plat shall be prepared by a licensed surveyor and have the surveyors signature and
professional stamp on the drawing. Any structure to be built within a building envelope
of a lot shown on a recorded subdivision plat, shall include a copy of the building
envelope as it is shown on the final plat with the proposed structure located within the
envelope. /
Yes
envelop/
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a corner lot. Special
setbacks do p ly.
Yes
3. Does the site plan include when applicable the location of the [.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent pro
pro rties), streams or water courses?
Yes te
i
4. Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes ,/
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design? t
Yes
6. Do the plans indicate the location
spaces and the clearances required
Yes rV
enings for under floor crawl
etween wood and earth
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces's and soffits?
Yes
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind 1 s?
Yes Pee" -
9.
,i
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafter r joists or trusses?
Yes
11. Does the building section drawing or other detail include the method of positive connection
d beams?
of all columns
Yes
12. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing (undisturbed) grade contours?
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase certifications or phase II EPA certification?
Yes No
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code apter 37?
Yes No
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform
Building Code?
Yes No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rums?
Yes No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors, fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these area 2
Yes No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural co ittee deny or reject your building plans?
Yes / No
21. Will this bet my residential structure n the parcel?
Yes ✓ No If no -Explain: ACC tC-c- r -tai= le -V---+:1;
22. Have two (2) complete sets of construction drawings been submitted with the applicatio
Yes
23. Do you understand that the minimum dimensions a home can be on a lot is 20ft.wide and
20ft.long?
Yes // No
4
i
24. Have you designed or had this plan designed while considering building and other
construction co requirements?
Yes No
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties zonedis ct?
Yes 7 No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by t Garfield County Building Department?
Yes No
27. Do you understand that approval for design and/or construction changes are required prior to
the applicati of these changes?
Yes No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building per
Yes No
29. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoons. All inspections must be
called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for
inspections will lay your inspection one (1) day. Inspections are to be called in to
384-5003.
Yes ✓ No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a $47.0-inpsection fee?
Yes r No
31. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy and/cupancy of the building?
Yes (V No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the Unifo Building Code?
Yes No
5
33. Are you aware that prior to submittal issuance of a building permit application you are
required to show proof of a driveway access permit or obtain a statement from the Garfield
County Road & Bridge Department stating one is not necessary? You can contact the Road
& Bridge Derrent at 625-8601.
Yes V No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes V No
35. Are you aware, that on the front of the Building Pciumit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building perms plication? Your attention in this is appreciated.
Yes No
I hereby acknowledge that I have read, understand and answered these questions to the
best of my ability.
1-17>07�
Signature of Owner Date
Phone: �t I� 3( -1 (days); (evenings)
Project Name:
Project Address: -7 (Deo NA s t J
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
04/2003
6
11.11 2003 12:11 TEL 9706253800 CHEROKEE EPDXY INC
RIFLE CREEK ESTATES
Home Owners Association
1000 Mesa Drive, Rifle, CO 81650
}' / r/z--
2001
Tp e. rr sr i��GA //
C'xr •�
i / J
-
_ o3
RIFLE CREEK ESTATES HOMEOWNERS ASSOCIATION
ARCHITECTURAL CONTROL COMMITTE
NOVEMBER 11TH, 2003
Don & Patty Mobley
Lot 18, Rifle Creek Estates
Rifle, Colorado 81650
Don:
Plans recieved November 11th.
The ACC recieved your plans for the improvements to be on your property, a new garage
The ACC will approve your plans for the project. Providing you follow the Rifle Creek Covents, and the
plans are followed according to the presentation of location and description.
Any changes or additions must be approved by the ACC before undertaken. We appreciate your
submitting your plans prior to constuction thanks.
Should you have any questions, please call one of the following members.
c 4 -29 -(20.4 -4, -Al
7/- /2
SHARON COLOROSO, CHAIRPERSON
� BZ 1
PATRICIA SHETLER, MEMBER
// " /2 - d3
/(-11 3
E HAMILTON, MEMBER
RICK KEISTER, MEMBER
KRIS SWALLOW, MEMBER
11/12/2003 03:20 6258627
ROAD AND BRIDGE PAGE 01
Garfield County
Road and Bridge Department
November 12, 2003
Slarineraillariaw
705 Mesa Drive
Silt, CO
948-8664
CC: Garfield County Building and Planning Department
Dear Mt. and Mn. Mobley
This driveway that you have in place meas with Garfield County Road and Bridge
standards, therefore no driveway permit it needed
if you have any questions or problems, please feel free to contact me.
Sincerely,
Kraig Kuberry
Foreman
Garfield County Road and Bridge Department
P.O. Box 426
Ride, CO 91650
float: 97642541601
Fat 970fit5 7
No 4 95c -
Assessor's Parcel No
BUILDING PERMIT CARD ,6± }$
Job Address * ,i • p� 16.. , )% `_
Owner V. _G!3IBR,.Y A 'A. 11:- b4 ess
Contractor (:) .. rtQA — Address
etbacks: Front
Rear
Soils Test
Footing Matta
Foundation /Z - ' D 3 .07Nt�
Grout
Underground Plumbing
Rough Plu bin• A/1r
Framing 3 ,
Insulatio _ .. ��__. ��• fi%r.
Roofing
Drywall �- 24%oci
Gas Piping 3-aq-)
Nrr\
Date Or il—i
Phone t`R-EUD4
Ph no e #9ko-'1c*(1-k
Zoning
RH
INSPECTIONS
NOTES
LH
Weatherproofing
Mechanical
Electrical Rough (State) 3-4-0c7( C*0
Electrical Fin State) 9-23--D54 C -4o
Final . ecklist Completed'✓
Certificate Occupancy #
Date
Septic System #
Date
Final
Other
(continue on back)
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
II GARFIELD COUNTY, COLORADO
Date Issuedi7�. s3...Zoned Area Permit No....Q..�..5Qr
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the abovf
described structure, the permit may then be revoked by notice from the County Building
Inspec ii r and IMMEDIATELY BECOME NULL AND VOID.
Use
Setbacks — Front Sn Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing I a•: �d - 0 5" CrVVI---
Foundation pin .° Si2.4.-ks
Underground Plumbing
Insulation 4t '.0 �j: —
Rough Plumbing Nm.
Drywall 4_0_g -toy 6-e"v,
Chimney & Vent 9s -6 /
Electric Final (by State Inspeetor)9 23 oyC4°
Gas Piping 5 -xi -O7
Final 9;1.0'q'th,t
Electric Rough (By State Inspector)3/45P4
Septic Final 4 91-
Framin 3
g o1�I-OS� �►1'L-
(To include Roof in place and Windows
and Doors installed).
Notes:
iALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
IN rtETHER INTERIOR OR EXTERIOR, UNDERGROUND QR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFER&BLE
bene -380`5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
'�"� DO NOT DESTROY THIS CARD
APPROVED
Oaf BY r
IF PLACED OUTSIDE COVER WITH CLEAR PLASTIC