BLCO-10-15-3978
American Soda/Solvay Chemicals
Equipment Shelter/Canopy
1821 CR 215 Parachute, CO
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IECC, IFC, AND THE
MANUFACTURERS INSTALLATION SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
3) BUILDING IS APPROVED AS TYPE V -B CONSTRUCTION, S-1 OCCUPANCY.
4) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT 1FC
REQUIREMENTS.
5) ALL HIGH STRNGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR.
APPROVAL REPORT IS REQUIRED AT FRAME INSPECTION.
6) ELECTRICAL ROUGH APPROVAL IS REQUIRED AT FRAME INSPECTION.
7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION.
8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR FINAL/COMPLETION APPROVAL..