Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-10-15-3978 American Soda/Solvay Chemicals Equipment Shelter/Canopy 1821 CR 215 Parachute, CO 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IECC, IFC, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) BUILDING IS APPROVED AS TYPE V -B CONSTRUCTION, S-1 OCCUPANCY. 4) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT 1FC REQUIREMENTS. 5) ALL HIGH STRNGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. APPROVAL REPORT IS REQUIRED AT FRAME INSPECTION. 6) ELECTRICAL ROUGH APPROVAL IS REQUIRED AT FRAME INSPECTION. 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION. 8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR FINAL/COMPLETION APPROVAL..