HomeMy WebLinkAboutApplication- PermitJob Address
GARLFIELD COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 stk. Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
CrA
Nature of Work Building Permit a (-)67...- 3 j 1--' - /64,
Use of B 'din � � � en,,A ictil\f24011 /-rm•
Comer e-
t 11
r
No. 8695
Contractor
Amount of Perm t$
Date
k.Q
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION -
GARFIELQ COUNTY (GLENWOOD gpRINGS), COLORADO
• ,TELEPHONI (97O) 945-8212
KJ
PRR T NO (c)c)6'
pL
INSPECTION LINE: (970)384 5003
. RCEL SCBEDULB NO. I) 3/1 0I66
oBADDREss: a n9C v.+.)t' 0--40.40 8 -1:1 (-0
SI6S)_
LOT MO.
1
, BLOCK NO.
L2,../ 6'0 .43 44.) a T
-1 erg e)/Zadici
6WNIIt ADDRF54 Lace,i,vrfr,
R- 4.2
ADnllnss �C�II ii .5
45 x ):150,1 12..I JJft 2.D5o Aanmos f COe 8/6,0/
cwrsAC1UR 'T# f+ , §� ] �L(
u 1ii7 ,A:\\
SUBDIVISION/EXEMPTION
SQ.FT-OPRIAWRld 'Qr.7
11SE°"39" 1N(1
7
8
9
10
.DEriGIUP43 WORK:
SQ. pr. °SI.Or 4/ 75Z, B D
PEL �i �(fT• z733 wxp,
21J:
` a"!r 4`? '6% -cod -e)
inzattrog/
NO. OF=ORS
.CG144 OF WORE:
aN1m e>6aurax
AALTMAMMY
GARAGE:
CARPORT: o81NOfE
°POD. .
aDiFIVESPAr?MAW
001 alfa SE WAGE011F09AL (SE PTIO)
GETS PLAN
VALUATION °3r alk,
65,800
AEGIME:1 VALOATION S
I .o
SPECIALCOMITIONZS:
NOTICE
A SEPARAI'S ELECTRICAT, PERM 1s REQUIRED AND MELEE BE ISSUED BY IRS STAIR OP
CCHAPADO.
TIIIS PERMOL' BECOMES NULL AND VOID W WORK OR. CONSTRUCTION
ATTxE r-Rrr.EI) Rs NOT COMMENCED WUH N 150 DAYS, OR IF ,CONSTRUCTION OB.
WORK IS SRiSPENDEA OL ABANDONED FORA PERIOD OF 180 DAYS AT ANY TTM
AFTER:WORK IS COMMENCED.
113BUER V' CERTIFY THAT I HAVE READ AND EKAziENED'IIBS APPLICATION AND
KNOW THE SAME TO BE TRU AM CORRECT. ALL PROVISIONS OF LAWS
GOVRRNIN(QT IIS'IY9E OF WORK WII.LBE COMPLIED WTiHWHETFERSFEC:IKW.,1
HEREIN o. NOT THE GRANTING OF A PERM' DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGUTATINO • .:. ON OR THE PERFORMANCE OF
CO136TRUCTi*
BIuildingb
at $Jaritu rg
PLAN CREc KERS:
9.`• 3't
P irTTPEE: �-+
7c.7:?
TOTAL FEE:
is 1442,14
DATE PERMIT i58UED:
OCC: COUP:
IR -3
CONST: TYPE:
ZONING: -
SETBACKS:
ZL'N T.HOME:
PERMISSION I& HEREBY GRANTED TO DRE APPLICANT AS OWNER, CONTRACTAnaimEia
OR ANT7ACNT unix CON'TRACTOR OR OWNER TO CONSTRUCT IBE STRUCTURE AS
DErAIEIDONPLANS AND OPE CIFICAI'IONaE DMJrrEDTOANDREVIEWEDBYTHEHEIIE,DENGDEPARMeN1".
EN CONSIDERATION' OF TEE ISSUANCE OP TEES PERMTI, TUB SIONIER DEREBY ASSES TO COMPLY WITH ALL WRUNG UNG CODES AND LAID USE RECULATTONS ADOPTED BY
ARFIE „D COUN'TY PURSi3ANT TO AUTHORITY ,GWEN IN 30.25.201 CRS AS AMENEtED. TIM SIGNER. FSR AGREES TEAT IF THE 'ism SAID ORDINANCES ARE, NOT FULLY
COMPLIED wrm Isi 4THE LOCATION, ERECTION, CONSTRUCTION AND UTB
SE OF E ABOVE DESCRIBED STRUCTURE, TBE PERMIT MAY TIThN BE REVOKED BY NOTICE FROM
TBE COON ANDTFWAT 2BBN AND THERE yr mgt. BECQMLNE12.1. AI+FD VOID.
THE ISSUANCE OF A PERM' BASED UPON PLAWS, .SPECIFICATIONS AND MUER- DATA SHALL NOT PREVEEN-THE BUILDING OFFICIAL FROM THEREAFTER. REQUIRING TILE.
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIQL.ATIONOFTHIS CODE OR: ANY OTIBIR ORDINANCE OR BBGULATIONOETERS JURISDICTION.
THE REVIEW OF TIE SUET E PLAIN AND, SPEE:IPSCATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONST5TflE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR 1,IABi1.STIEE BY GAIRPIEL). COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE- RBSPON .reaITY FOR THESE QTS AND B4PLEMENTATTON
DURING COMMOTION' RESTS SP-Eu.1E1CA= NvIraTm ARCHITECT, DESIGNER, MILDER AND OWNER. COMMENTS ARE INTENDED TO IS /T+isE tvATIVE AND IN SWFFORT
INTER 04V1IFRS INTEREST.i �G-
Gufom� Gd3 I23ERRElY ACKNOWLEDGETHAT I HAVE READ AND t DERSTAND TU A4tEEMENIT ABOVE. STNII`IAL
]SDS NO. & FEE:. _ f pr
)•?-tt'3
The following items are required by Ga'rliield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector; -
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
•
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen withcabinets, a sink with hot & cold runningWater,°non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing; `
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hat and cold running water,
non-absorbent floors and walls finished and a privacy door;
5, All steps outside or inside over three (3) Steps must have handrails, guard rails on balconies or
decks over 30" high construcoed to all 1997 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and'a: final inspection made,
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL TRE•
ABOVE ITEMS HAVE BEEN`COMPLETED,
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupanc use and the issuance of a
Certificate of Occupancy for the dwelling under building permit #
Signature Date
Bpcont082002
44
VALUATION/FEE DETERMINATION
Applicant &)'J 01700 Subdivision
Address A ( 0, .22 g Lot/Block
Date 03 Contractor 're+
Finished (Livable Area):
R .- g-40.0 Main J 1 P }
Upper
Lower
Other
t
Total Square Feet
Valuation
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Crawl Space:
Valuation
Valuation
Decks/Patios:
Covered
Valuation
Open 224 !2
Valuation
3c 900
r5; g9
Total Valuation 5_24__
Building Permit Fee 70ep,7
Plan Review Fee 4 51 •3
Total BP & PR *0,
PLAN REVIEW CHECKLIST
Applicant 1,3743/,J 4Z)i37o%
Building
/1// Engineered Foundation
.,s Driveway Permit
�_. Surveyed Site Pian
k/ 4 ,Septic Permit and Setbacks
'Grade/Topography 30%
,---"Aliach Residential Plan Review List
Minimum Application Questionnaire
_Subdivision Plat Notes
A14 Fire Department Review
Valuation Determination/Fees
Reef Line Plans/Stamps/Sticker
AI, Attach Conditions
'-''application Signed
Plan Reviewer To Sign Application
/.4Parcel/Schedule No.
•J
,40# Snowload setter- Manf, Hms.
GENERAL NO i'ES:
C44.140.ti )1,4
Date -7-03
Planning/Zoning
Property Line Setbacks
30ft Stream Setbacks
Flood Plain
Building Height
Zoning Sign -off
Road hnpact Fees
HOA/DRC Approval
Grade/Topography 40%
Planning Issues
Subdivision Plat Notes
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, handrails and guard rails, windows and doors, including the finish grade line.
A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square
foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds
per square foot, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan.
Yes C
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements?
Yes °
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses?
Yes \C
4. Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes p kr
2
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces's and sots?
Yes
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes y�
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
11. Does the building section drawing or other detail include the method ofpositive connection
of all columns and beams?
Yes
12. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing (undisturbed) grade contours?
Yes y
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado ase II certifications or phase II EPA certification?
Yes No `
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes No
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform
Building Code?
Yes No
3
7
16. Does the plan include a window schedule or other verification that windows provide natural
Light and ventilation for all habitable rooms?
Yes ')' No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these areas?
Yes S' No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural committee deny or reject your building plans?
Yes It Ai// No
21. Will this be the only residential structure on the parcel?
Yes X" No If no -Explain:
22. Have two (2complete sets of construction drawings been submitted with the application?
Yes
23. Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.?
Yes No
24. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes No
25. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes 7 No
4
7
. a
26. Do you understand that approval for design and/or construction changes are required prior to
the application of these changes?
Yes )' No
27. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building permit?
Yes ,( No
0
28. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoons. All inspections must be
called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for
inspections will delay your inspection one (1) day. Inspections are to be called in to
384-5003.
Yes / No
29. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupanc3i and occupancy of the building?
Yes A No
30. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project complying with the Uniform Building Code?
Yes No
31. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes No
32. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes No
5
7
33. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance
of a building permit? Your attention in this is appreciated.
Yes No
I hereby acknowledge that I have read, understand and answered these questions to the
best of my ability.
Signature Date
Phone: ? (days); l 4 ? T41 -O (evenings)
Project Name: (4) (7 / t,Iert 1, Gc
Project Address: C5 `7-6.0 C oLrw4 1? -04L41 - f % y CQ
Notes: ��//
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
08/2002
6
FROM
FAX NO. : Apr. 1.? 2€ 03 09:51AM P1
—7 1r-teth t.,> , L3G.b', 3eira
F4, : Li— 3 7
momm
=y ►2 �=t ; 7'�- 4 13ULc, p
t..#�•4703
fiECEBTED
GARFIELLI UOUNPY
3URLD#i#G PLANNING
p Le. t s#16) t ! D g-4.. ¢t. 14, -Au
Ii W rto 4 4 4 i f iQ#) ■ 4c ^ f1 -/AI 4)414-.1
£ lxt k F cote 7'tf-e-
-Fk PaoS t..% fr..-06‘,1, C��.� � ,.,� - k� u pR,j
x G4
44714, - r."+ D t s c4540 , , .t1 ! P r4rt 5-4,-.4 !$
t44 F W =e..3 tr+u:. a FFA C -A ifs w E. S+
Ta to
e D4+7.-rg,0.
TWA- Or,"Lae ! S [r •v • g p, E
144,s•7 -el Pa -v rt— PQ& fal P,l, Z. _
i' .L ye F.0.- yer • tom- r[3, es-17yI,
7-4-4 n v e do x
77,9- 27 f r 9277
4
IT"iISPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD'COUNTY, COLORADO
Date Issued -040 5 Zoned Area Permit No.... ... .
AGREEMENT
In consideration of the issuance of this.permit, the. applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECO E NULL AND VOID.
Use r -PA
Address or.ega1 D. criptj�a
Owner
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing l./... 3,030
Foundation /I.2 3la ---
Underground Plumbing
Insulation (0.—/7-03,771___
Rough Plumbing 6)--/A0
. Drywall ,6 —S4 .0.3 AL_
Chimney & Vent
Electric Final (by State Inspector) ?-,/ro3'
Gas Piping a
Final 24/ .
Electric Rough (By State inspector) ) 0
Septic final
Framing %--j7- P 37/4Notes:
(To include goof in place and Windows
and Doors installed).
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
AP��o�EDDO NOT DESTROY THIS CARD
Date
IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC
FROM
•
FAX NO,
Apr. 17 2003 09:52AM P2
PC -e -P1 #...12611tC. Ar".1161)E.-e.
zuancr TO „Cy APA'S
11,qcs;---)r!ch3 livavzCrt::-
GARF1ZLD COINT-4 f
GUIL ING DEPARTI-Wn
4013 By
LZLD COPY
i,;19PEZCTOA
10:3:5:1'a3J13 thr
eN
0141,0 g,L0 F-1 (we -
_5 L
44
.75P
IT r.er
2
ecArr.
•7-"/P-
1-14‘4.
e;)(1-E...41b y "
E)o-r
Z Aes4t_
lct4it-frort&IN, Tist
LJ(
C-04-17•144-10t05 *g-
ttue-i4t.te.4r
Clasp -mg, Si -45 .a-rufre-,14
4.).e)u—=
5c,41,E. :
11,17-0:s
1._e,e4)
�?oz U/S/51,0 1)r ra
c-trmiti• ri--ter,st
-7743
r 135-23