HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-11-15-3995
Atlantic Aviation Services
Alteration/Addition @ GarCo Airport
375 CR 352 Hanger Bldg. # 2070
Rifle, Colorado
1) STRUCTURE REVIEWED AS A FULLY SPRINKLERED, TYPE VB CONSTRUCTION, B AND S-1
OCCUPANCIES.
2) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IECC, IFC CHAPTER 11,
NFPA 409, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS.
3) APPROVED FOR THE STORAGE OF TRANSIENT AIRCRAFT ONLY PER NFPA 409.
4) LOCAL FIRE DISTRICT SHALL INSPECT THE FIRE SUPPRESSION SYSTEM, EXTINGUISHERS,
ALARMS, AND OTHER PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL
REPORT IS REQUIRED FOR CERTIFICATE OF OCCUPANCY.
5) ENGINEER ON RECORD SHALL INSPECT ALL EXTERIOR CONSTRUCTION RELATED TO
INFRASTRUCTURE/CIVIL IMPROVEMENTS. A FINAL APPROVAL REPORT IS REQUIRED FOR
CERTIFICATE OF OCCUPANCY.
6) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 2000 PSF.
7) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR.
APPROVAL REPORT IS REQUIRED AT FRAMING INSPECTION.
8) STORAGE OF HAZARDOUS MATERIALS PER 2009 IBC AND IFC REQUIREMENTS.
9) HEATING EQUIPMENT ROOMS MUST COMPLY WITH IBC, SECTION 412.4.4.
10) ONE (1) HOUR FIRE -RATED SEPARATION REQUIRED PER NFPA 409, SECTION 5.2.4.
11) ACCESSIBILTY REQUIREMENTS PER 2009 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003.
12) ELECTRICAL PERMITTING AND INSPECTIONS THROUGH THE COLORADO STATE
ELECTRICAL BOARD. (303-869-3458)
13) VERIFY EXIT DIRECTIONAL SIGNAGE PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.
14) ELECTRICAL ROUGH APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION.
15) ELECTRICAL FINAL APPROVAL 15 REQUIRED FOR CERTIFICATE OF OCCUPANCY.
16) IECC, CH. 5 COMPLIANCE REPORT REQUIRED PRIOR TO FINAL MECHANICAL INSPECTION.
17) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
18) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.