400%
200%
100%
75%
50%
25%
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application- Permit
Job Address Nature of Work No, GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8tb, Street, Suite 303 Glenwood Springs, CO 81601(970) 9454212 AL 11 Building Permit Use of Building(le-orbr/rikr Otrlirlo413 Owner fl Contractor Amount ofPermitS Clerk GARFIELD COUNTY BUILDING PERMIT APPLICATION GadT !d County (Glenwood Springs) Cokitedo ti Telephone: (97O)945-8212 "THunter Mesa,'ComAir DryePrfmt# +G' d Parcel ►BchedTl inspection fine; (970) $845003 � �2177-362-00-345 Jobaddress• SE1 /4SE1/4 Sect. 1 _ T7S Range 93 W of 6th P.M. ,. Lot is Stock Nk Sobt1biaFoNsurnpI on EnCana Mdrns : 792 Bockhorn Rif fie w!Ph: 625--4209 conttasto: ek1 Vaughan mimosa: 1038 t R323Rifle Fire LWt 625-5350 4. '+^ch'teOddo En:. AAJd710 Coo ser GiS'r ftc 9, -1000 LIc 2808 s. s totouldTng: 320 Sq Ft of Lou Lease 6 .94-itigght 10 T -4n 4ofFlows: 1 theotn3uildinT (Oomp ,e$sor/aLr dryer building 7 uasetibeWatt Foundation -and preengineered steel building Cross of Word; 0 Now 0 Addition 0 A14et ion 0 Move © Remove g Gorogo: 0 Sin& 0 Ocubia Carport 0 Single 0 Dot 10. 0 VtNYWay Frxma EI On Ste S (Sepik) © Sita Plan Valilatkm of via* $: 1 4 , 300.00 A.. ted V 1i n $: 1 • Spacial Conthl ons: Group F, Dion 1 ASEPARATEIRECTMALPERNITISREQMEDNIDIAISTOBissUEOPIYTIESTATE Ii CmLURADG. DoSpETINDOEcOmEstimAttniODIFINORHORCOMDRUCTIONAIITHORIDEO IS NOT SUSPENDED IS COMMENCED. IF THE TYPE imamate° VIOIATECRCANCELTIR l'S NOTICE COMMENCED WITHIN WO DAYS, ORIFCOH9TRlUClltN ORWOfKIB ORl N ONEDFORAPERIODOFelDAYSATANYIPAEAFTEiWORt YCERWYMATIHAVEREADANDEXA TPISAFFIXCATIONAM KNOW SAMTOBETRUEANDCORRECT. ALL PRORI QU8OFLAMGOVERIRJGTiIS OFWORKWIL.BEGOMPLETEOWI iiWITEDISI vEamo Hem o NOT. OP THEFERMITDOESNOTPRESINETOGIVEAUTHORITYTO PROVISICNSOF ANT OTHERSTATEORLOCALLAW PlanChe'CkFee: Iog.7/ Total Fee: /`yam►x+.91 Date mit issue* . OCC F70-/ OXIShild011 Type: 6-w r' !�I TING GRIM 11 � �t tie, or � � Zoning: -4' , • ofeo w, Coe ttadoror Eridlntie3ndt�oIttl 400 31 o-o5Jm - ` . rot '- Setbacks: '‚ 0fi %i®Frl ISMS #$ Fee: itonausiesr PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER. CONTRACTOR MOTOR THE AGENT OF THE CONTRACTOR CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS MD SPECWiCATlONS 3 UBUITTED TO AND REVEWED DY DEPARTMENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING USE REGUTATIONS ADOPTED SY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30313.203 CRS AB AMENDED. FURTHER AGREES THAT W THE ABOVE SAID ORDINANCFR ARE NOT FULLY COMPLIED WITH IN THE LOCATION, AND U$E OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE awn Twurar IT QHA11 Pre.r111= In 11 i ARif7 utut► THE ISSUANCE OFA PERMIT BASED UPON RAM SPECIFICATIONS AND OThER DATA SHALL NOT PREVENT THE THEREAFTER REQUIRING THE CORRECTION OF ERRORS RI SAID PLAN, SPECIFICATIONS AND OTHER DATA OR BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY4TER ORDINANCE SIP TH1a IilfaIatlil; Ina THE REVIEW OF THE SUBMITTED PLANS MD SPECWICATiO NS AND INSPECTIONS CONNOTED THEREM TER DOES ACCEPTANCE OF MY RESP0liSIBBIRES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR RESPONSIBILITY FOR TFIESE ITEMS AND 1MPLELOENTATION DURING CONSTRUCTION REST SPECIFICALLY 'WITH 41111 ,.rr. weir. n143.41 1 P%1111CaITO VI= Arrr-MINetf VA OC rfaxt121t/ATft1C Mal Ht 47.181240 '1e7T AIC'ra1C f wliCOU .arrcaeer GaybotIXO I HEREBY ACBE THAT I HAVE READ AND UNDERSTAND TOE AGREEMENT ABOVE oNmAL)e OR OWNER TO THE BUILDING CODES AND LAND THE SIGNER ERECTION, CONSTRUCTION COUNTY AND THAT THEN BUILDING OFFICIAL FROM FROM PREVENTING OR REGULATION NOT CONSTITUTE AN DISCREPANCIES. THE THE ARCHITECT, DESIGNER, gN Cty. Rd. 319 Rifle The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to alt 1997 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL al THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CER iPICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupanA74 use and the issuance of a Certificate of Occupancy for the dwelling under building permit # Signature Date Bpcont0S2002 PLAN REVIEW CHECKLIST Applicant -4,:t 1 Date 3 -i .0,3 As4 4 Building Engineered Foundation. % ir. Driveway Permit ✓ Surveyed Site Plan A . Septic Permit and Setbacks1iId' eight '—'Grade/Topography 30% oning Sign -off tan review -File Notes Subdivision Plat No ia 4. Attach Residential Plan Review List Road Impa ees Platug/Zoning erty Line Setbacks 30ft Stream Setbacks lood Plain �. lY'Fimmum Application Questionnaire A/,A. Subdivision Plat Notes ' M.4. Fire Department Review Valuation Determination/Fees . Red Line Plans/Stamps/Sticker Attach. Conditions HO RC Approval ade/Topography 40% / Planning Issues Application Signed ' Plan Reviewer To Sign Application Parcel/Schedule No. 40# Snowload Letter- Manf. Hms. GENERAL NOTES: 3 K) w 24.3 -- 869Ce Pir—,�acar 47 -25- /o8. 7( 27'5.94 anchor bolts, pressure treated plates, floor joists, wall studs and spacing, Insulation, sheeting, house -rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roofing framing pian, roof must be designed to withstand a 40 pound per square foot. up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windioad of 15 pounds per square foot and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements roust be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. Applicants aro required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that Identifies the Location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 40% or more on props es must be show on site plan. Yes 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stampon the design. Yes No Not necessary for this project ,. 3. Are the plans submitted for application construction drawings and not drawings that are stamped or marked identifying them as Not for construction, for permit Issuance only", "Appy val drawings only"', "Por permit issuance only" or similar language? Yes - No Not necessary for this project 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No Not necessary for this project j 5. Does the site plan indicate the location and direction of the State, County or private road acce sing the property? Yes 6. Do the plans Include a foundation plan indicating the size, lotion and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes �% No , Not necessary for this project_._,__ 7. tf the building is a pre-engineered structure, is there a stamped, signed engineered 2 founation plan for this building? Ye No_ Not necessary for this project_ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and a rth? Yes, No Not necessary for project `/ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes .1 No Not necessary for this project 10. Do the plans include design loads as required under the Uniform Building Code for roof snowlqads, (a minimum of 40 pounds per square foot In Garfield County)? Yes No Not necessary for this project 11. Do the plans include design loads as required for floor loads under the Uniform Building Code Chapter 16 and Tables 16A, 16B and 16C? Yes No Not necessary for this project.,/ 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof ctruotion? Yes ,I No Not necessary for this project,____ 13. Is the wind speed and exposure design included In the plan? Ye&J No Not necessary for this project. 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling;9ists, roof rafters or joists or trusses? Yes,. JJ . No Not necessary for this project 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes/ No Not necessary for this project 16. Does the pian indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the save down tq existing grade contours? Yes o/ No Not necessary for this project 17. Does the pian include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase 11 certitcations or Phase NEPA certification? Yes No Not necessary for this project 18. Does the pian include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 31? Yes No Not necessary for this projeck.._� 3 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? p Yes No_ Not necessary for this project) 20. Does the plan include a window schedule or ether verification that windows provide natural light and ventilation for all habitable rooms? Yes No _ Not necessary for this project , 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No Not necessaryfor this project) 22. Do the plans include a complete design for all mechanical systems planned for install tion in this building? YesNo -- _- -- Not necessary for this project 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the Uniform Building Code Table 5-A) Yes - No Not necessary for this project 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? j Yes No Not necessary for this project! 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters Indicated on the plan? Yes_..,_ No Not necessary for this project 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes No Not necessary for this project t,/ 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes - No Not necessary for this project, 28. Have two (2) complete sets of construction drawings been submitted with the appli tion? Yes J No 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes. ._ No. .. Not necessary for this project 4 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes J No 31. Do you understand that approval for design and/or construction changes are required prior t the implementation of these changes? Yes No 32. Do you understand that the Building Department will collect a "Plan Revieve fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes J No 33. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval an a final inspection Elm to receiving a Certificate of Occupancy and occupancy of the building? YesJ No_____.� 34. Are you aware that the person signing the Permit Application whether the "Owner, "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the application is the party responsible for the project complying with the Uniform Codes? Yes4 Na 35. Are you aware that twenty-four (24) hour notice is required for all inspections? inspections will be made from Battlement Mesa to West Glenwood In the mornings and from Glenwood Springs to Carbondale, in the afternoon. Morning inspections must be called In by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. inspections are to be called in to 384-5003. -1 36. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes No 37. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installat#ons and hookups? The license number will be required at time of inspection. Yes , _ No 38. Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this permit on prior to issuance of the bunging permit? Your attention in this is appreciated. Yes J No 5 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Signature Phone: C -� 3 Cb (days);-� `�\U1 Z (evenings) Project Name:CA)sti,f'1.z)\- �C�.x.�.--� r�m� �i,. �evivr Project Address:S E I \,,5 E' I Qac P If you answered Na""on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected, Work may not proceed without the issuance of the permit. *if you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. O. Delay in proceeding with construction. if you answered No to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm 04102 Date 6 Corporate Office 18933 Aldine Westfield Houston, Texas 77073 Tel (281) 443-9065 Fax (281) 443-9064 Toll Free (888) 467-4443 February 19, 2003 RIGID S.O. NO.: CUSTOMER: ADDRESS: END-USER: JOBSITE: COUNTY: BUILDING END-USE: RIGID 111.11t DING SYSTEMS 22271 BLDG A .Aer°@3°., PHIL VAUGHAN CONSTRUCTION MANAGEMENT 1038 CR 323 RIFLE, CO 81650 ENCANA SE 1/4 OF SECTION 10, T7S, R93W, 6TH P.M. RIFLE, CO 81650 GARFIELD TANK COVER BUILDING: "A" Rigid Frame (Fully Enclosed) Western Sales Office 10 Inverness Drive East, Suite 101 Englewood, CO 80111 Tel (303) 799-4579 Fax (303) 799-4803 Toll Free (800) 658-2885 Span Length Low Side Eave Height Roof Slope Bay Spacing 16'-0" 20'-0" ,10'-0" Gentlemen: 1:12 20'-0" This is to certify that the above structures were designed in accordance with the A.I.S.C. Specification for Structural Steel Buildings — Allowable Stress Design, 9th Edition, 1989, the A.I.S.1. Specification for the Design of Cold -Formed Steel Structural Members, 1996 Edition, 1st Printing June 1997, A.W.S. 01.1-02 Structural Welding Code -Steel and A.W.S. D1.3-98 Structural Welding Code — Sheet Steel and generally accepted engineering practices. Loads applied to design the buildingls are no Tess than the requirements prescribed in the order document and the design satisfies the requirements of the UBC 1997 Building Code. Dead Load metal building structure only as furnished by RIGID Wind Load 80 mph, UBC '97, Exp. "B", imp. Factor = 1.15 Live Load 40 psf (Primary Framing) Live Load 40 psf (Secondary Framing) Ground Snow Load 40 psf, Exp. Factor = 1.0, Imp. Factor = 1.0 Seismic Load Zone= 1, Ca=0.19, Imp. Factor =1.25 Accessories provided by others are to sustain the design wind load. Likewise, the customer is to ensure that the above loads comply with the requirements of local regulatory authorities. This Letter of Certification covers only the steel building and its components furnished and fabricated by Rigid Building Systems facility in Houston, Texas and specifically exclude accessories, anchor bolts, foundation, masonry, or general contract work including erection certification. Sincerely, Professional Engineer Garfield County Building and Planning Department 109 8th Street, Suite 303 Glenwood Springs, Colorado 81601 970.945.8212 Fax 970.384.3470 Plan analysis based on the 1997 Uniform Building Code Project Number: Project Name: EnCana Air dryer,Chem,MMC Address: Occupancy: F1 Construction: V -N Date: March 10, 2003 Contractor: Vaughan Architect: Engineer: Oddo/Campana Report By: Andy Schwaller NOTE: The code items listed in this report are not intended to be a complete listing of all possible code requirements in the 1997 UBC. It is a guide to selected sections of the code. EXIT REQUIREMENTS: FL NAME NUMB MIN MIN PANIC HALLWAY/ DOOR NOTES OCC EXITS WIDTH HDWR CORRIDOR SWING 1 Multi Bldg. TOTAL 8 1 1.6 No N/A N/R 8 1 1.6 No N/A N/R Door swing is based on Sec. 1003.3.1.5 except as noted. Occupant load factor is based on Table 10-A. Number of exits is based on Table 10-A except as noted. Exit width is in inches and based on Sec. 1003.2.3 and Table 10-B Exit width is to be divided approximately equally among exits. ---- Sec. 1003.2.3.2 Width shown for all areas is based on other egress components. Width shown for 1st floor is based on other egress components. Width shown for other floors & basements is based on stairways. -- Table 10-B For the minimum width of doors, see Sec. 1003.3.1.3 For the minimum width of hallways, see Sec. 1004.3.3.2 For the minimum width of corridors, see Sec. 1004.3.4.2 For the minimum width of stairways, see Sec. 1003.3.3.2 Page # 2 Code review for: Project Id.: EnCana Air dryer,Chem,MMC Address: FOOTNOTES: FLUSH AND SURFACE BOLTS: Manually operated edge- or surface -mounted flush bolts and surface ,bolts or any other type of device that may be used to close or restrain the the door other than by operation of the locking device shall not be used. When automatic flush bolts are used, the door leaf having the automatic flush bolt shall not have a door knob or surface -mounted hardware. The unlatching of any leaf shall not require more than one operation. -- Sec. 1003.3.1.8 LOCKS AND LATCHES: Regardless of the occupant load served, exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. -- Sec. 1003.3.1.8 Key -locking hardware may be used on the main exit when the main exit consists of a single door or pair of doors if there is a sign stating THIS DOOR MUST REMAIN UNLOCKED DURING BUSINESS HOURS. When unlocked, door(s) must swing without operation of any latching device. -- exc. LANDINGS AT DOORS: 1) A floor or landing shall be provided on each side of doors. When access for persons with disabilities is required. the floor or landing shall not be more than 1/2 inch lower than the threshold. When access is not required, the maximum is 1 inch. -- Sec. 1003.3.1.6 2) Landings shall have a width not less than the width of the stairway or width of the doorway, whichever is the greater. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing dimension to less than one half it required width. The minimum length in the direction of exit travel is 44 inches. -- Sec. 1003.3.1.7 TRAVEL DISTANCE: (distance to an exit) The maximum travel distance in this building is 200 feet. -- Sec. 1004.2.5. The travel distance for the major occupancy may be 30.0 feet. -- Sec. 1004.2.5.2.5 Travel distance shall not be limited within an exit enclosure or exit passageway. -- Sec. 1005.2.2 BUILDING ACCESSIBILITY: ROOFING REQUIREMENTS: 1) The roofing on this building is required to be Class C. ---- Table 15-A 2) See section 1504 and ICBO research reports for requirements. Page # 3 Code review for: Project Id.: EnCana Air dryer,Chem,MMC Address: VENTILATION: All'areas customarily occupied by humans shall be provided with natural ventilation by means of openable exterior openings with an area of not less than 1/20 of the total floor area or shall be provided with a mechanically operated ventilation system. Such system shall be capable of supplying a minimum. of 15 cubic feet per minute of outside air per occupant. -- Sec. 1202.2.1 INSULATION NOTES: 1) All insulation material including facings are required to have a flame -spread rating of 25 or less and a maximum smoke density of 450 unless it is in a concealed space and the facing is in contact with a wall or ceiling. -- Sec. 707.3 exc.2 2) Foam plastic insulations are required to be protected. -- Sec. 2602 Page # 4 Code review for: Project Id.: EnCana Air dryer,Chem,MMC Address: GLAZING REQUIREMENTS All glazing in hazardous locations is required to be of safety glazing material. -- Sec. 2406.3 & 2406.4 Locations: 1) Glazing in ingress and egress doors except jalousies. 2) Glazing in fixed and sliding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors. 3) Glazing in storm doors. 4) Glazing in all unframed swinging doors. 5) Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs and showers. Glazing in any portion of a building wall enclosing these compartments where the bottom exposed edge of the glazing is less than 60 inches above a standing surface and drain inlet. 6) Glazing in fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24 -inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. 7) Glazing in an individual fixed or operable panel, other than those locations described in items 5 and 6 above, than meets all of the following conditions: A. Exposed area of an individual pane greater than 9 square feet. B. Exposed bottom edge less than 18 inches above the floor. C. Exposed top edge greater than 36 inches above the floor. D. One or more walking surfaces within 36 inches horizontally of the plane of the glazing. 8) Glazing in railings regardless of height• above a walking surface. Included are structural baluster panels and nonstructural in -fill panels 9) Glazing in walls and fences used as the barrier for indoor and outdoor swimming pools and spas when the bottom edges is less than 60 inches above the pool side and the glazing is within 5 feet of the pool or spa water's edge. 10) Glazing in walls enclosing stairway landings or within 5 feet of then bottom and top of stairways where the bottom edge is less than 60 inches above the walking surface. .w. y°�^ i'[7�y; ��1 � a, :i 2 -did : E S �L" �1 f I ADZ � z Al Y �° tri ' 2. 777 Ai qA i. �" 24 11.OURS NOTICE. Qli1R :i) FOR INSPECTIONS BUILDING PERMIT C RF1ELD COUNTY, COLORADO Date Issued . . ? Zoned Area Permit No...7.A, AGREEMENT In consideration of the issuance of this permit, the. applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. uPts C7StSf- Address o Legal Description r Owner .' i ,,rcs`+: Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing Foundation - z,, ` 0 Underground Plumbing A Insulation Rough Plumbing A 4- Drywall Chimney & Vent j'y9- Electric Final (by State Inspector) go :4,i '" Gas Piping 4. ¢ Final 114{2 -05 _ Electric Rough (By State Inspector) Septic Final Framing -(co-rO3 p Mit ua , (To include Roof in place and Windows i and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED WHETHER INTERIOR OR EXTERIOR, AND APPROVED BEFORE COVERING - UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APP. ` • VEDDO NOT DESTROY THIS CARD Dai f By IF PLACED OUTSIDEt COVER WITH CLEAR PLASTIC