Loading...
HomeMy WebLinkAbout11. Traffic Analysis ReportTRAFFIC ANALYSIS REPORT FOR BNS SERVICES, LLC 2456 COUNTY ROAD 301 GARFIELD COUNTY, CO. PREPARED FOR: Olszewski, Massih & Maurer, P.C. 214 8th Street, Suite 210 P.O. Box 916 Glenwood Springs, CO 81602 PREPARED BY: HIGH COUNTRY ENGINEERING, INC. 1517 Blake Avenue, Suite. 101 Glenwood Springs, CO 81601 (970),,945-8676 ('•g`i -'gyp. �, 51 '11-1 Aprin1 '2012 HCE Job No. 2111017.00 TABLE OF CONTENTS SECTION PAGE INTRODUCTION 1 EXISTING AND PROPOSED LAND USES 1 SITE ACCESS 1 SURROUNDING LAND USE 1 CRITERIA 1 CURENT DAILY TRIP GENERATION 1 CURRENT AVERAGE DAILY TRAFFIC 2 PROPOSED DAILY TRIP GENERATION DURING CONSTRUCTION 2 PROPOSED AVERAGE DAILY TRAFFIC DURING CONSTRUCTION 2 PROPOSED DAILY TRIP GENERATION AFTER CONSTRUCTION 3 PROPOSED AVERAGE DAILY TRAFFIC AFTER CONSTRUCTION 3 CONCLUSION 3 REFERENCES 3 MAPS: FIGURE 1 - VICINITY MAP FIGURE 2 - ACCESS MAP FIGURE 3 - ADJACENT COUNTY ROADWAY MAP FIGURE 4 - ADJACENT STATE HIGHWAY MAP FIGURE 5 - CONSTRUCTION ACTIVITY MAP FIGURE 6 - CURRENT TRAFFIC VOLUME MAP FIGURE 7 - DURING CONSTRUCTION TRAFFIC VOLUME MAP FIGURE 8 - AFTER CONSTUCTION TRAFFIC VOLUME MAP INTRODUCTION This traffic analysis report addresses both the existing and proposed traffic as well as the capacity requirements associated with a proposed contractor's yard. The BNS Services property is situated approximately 3 miles east of Parachute, Colorado, and is located at 2456, County Road 301. The nearest intersections to the site are: County Road 309 approximately 1 -mile to the west, and County Road 310 1/4 -mile to the east. Refer to Figure 1 for the vicinity map. EXISTING AND PROPOSED LAND USES The site is currently vacant, and is zoned Rural. The owners are proposing construction of a contractor yard on the site. SITE ACCESS The site has an existing single driveway at the center of the property which accesses County Road 301. This road is posted as a designated truck route. Interstate 70, is approximately 3 -miles west of the site at Parachute CO, and is accessed via exit 75. The intersection of County Road 309 is approximately 1 -mile to the west of the site, and intersection of County Road 310 is 1/4 -mile to the east of the site.. SURROUNDING LAND USE The surrounding land use is zoned Rural and Planned Unit Development. CRITERIA This basic traffic analysis conforms to the submittal requirements set forth in Article IV, Section 4-502 (J) (3) of the Garfield County Unified Land Use Resolution of 2008 as Amended. CURRENT DAILY TRIP GENERATION The site is currently utilized for equipment and material storage. BNS Services currently has two (2) employees. Most employees report directly to the job site. There is no office at the site. The owners of the property have quantified the current daily trip generation of the site. The following is a summary of the owner's current daily trip generation: Vehicles Currently Accessing The Site Weekday Vehicle Trips Daily Trips AM Peak Hour PM Peak Hour In Out Total In Out Total Heavy trucks 2 1 0 1 0 1 1 All Other Vehicles 4 1 1 2 1 1 2 Total Vehicles 6 2 1 3 1 2 3 CURRENT AVERAGE DAILY TRAFFIC The existing average daily traffic (ADT) on County Road 301 is 600 vehicles, according to the Garfield County Road System 2002 Transportation Study. PROPOSED CONSTRUCTION ACTIVITIES Proposed construction activities are to include; construction of a proposed shop building, extension of utilities to the building site, grading of parking and equipment storage areas, and landscaping to screen the developed areas. The existing driveway is to remain unchanged. Construction staging is to be contained entirely within the property, at proposed parking and equipment storage areas adjacent to the building site. The existing driveway is adequate to accommodate the anticipated construction traffic. The expected duration of the construction is to be approximately 4 to 6 months. During construction, the anticipated frequency of heavy truck trips will be approximately 1 trip per hour. No construction within the County Road 301 Right -Of -Way is proposed. All construction is to be within the property limits. Therefore no lane closures or traffic interruptions of County Road 301 are anticipated. No County or State access permits should be needed. PROPOSED DAILY TRIP GENERATION DURING CONSTRUCTION Anticipated construction at the site is to include a shop building and additional areas for equipment and material storage. BNS Services anticipates having two (2) employees during construction. These employees will normally report directly to the job site. There will be no office at the site during construction. The owners of the property have quantified the daily trip generation of the site during construction. The following is a summary of the owner's anticipated daily trip generation during construction: Vehicles During Construction Weekday Vehicle Trips Daily Trips AM Peak Hour PM Peak Hour In Out Total In Out Total Heavy trucks 8 4 0 4 0 4 4 All Other Vehicles 4 1 1 2 1 1 2 Total Vehicles 12 5 1 6 1 5 6 PROPOSED AVERAGE DAILY TRAFFIC DURING CONSTRUCTION During construction, the anticipated increase in average daily traffic of County Road 301 will be approximately 6 additional vehicles per day. The resulting average daily traffic (ADT) will be 606 vehicles, which equates to a temporary increase in ADT of 1.00 - percent. PROPOSED DAILY TRIP GENERATION AFTER CONSTRUCTION BNS Services anticipates having two (2) employees after construction. These employees will normally report directly to the job site. There will be no office at the site after construction. The owners of the property have quantified the daily trip generation of the site after construction. The following is a summary of the owner's anticipated daily trip generation after construction: Vehicles after Construction Weekday Vehicle Trips Daily Trips AM Peak Hour PM Peak Hour In Out Total In Out Total Heavy trucks 2 1 0 1 0 1 1 All Other Vehicles 8 2 2 4 2 2 4 Total Vehicles 10 3 2 5 2 3 5 PROPOSED AVERAGE DAILY TRAFFIC AFTER CONSTRUCTION After construction, the anticipated increase in average daily traffic of County Road 301 will be approximately 4 additional vehicles per day. The resulting average daily traffic (ADT) will be 604 vehicles, which equates to a permanent increase in ADT of 0.67 -percent. CONCLUSION Based on the trip generation forecasts, the described operations at the site are not anticipated to have negative impacts on County Road 301 or the surrounding roadways. The noted increase in traffic during and after construction represents a negligible net increase of approximately 1 -percent above the average daily traffic. REFERENCES 2002 Average Daily Traffic County Road System Transportation Study, Garfield County Colorado. • }b men, : I .11. � 1A1R }�. • J I 1 2 1 • 1 �\ HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F-120, EINGLEWOOD, CO 80112 PHONE (809) 9280544 FAX (908) 9250547 181 7 BLAKE AVENUE, STE 101, GLENWOOD SPRINGS, CO 81601 PHONE (970) 945.8876 FAX (970) 9452555 W W W.HCENO.COM BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC VICINITY MAP DRAWN BY: TJS SCALE: 1" = 4000' CHECKED BY: RDN PROJECT No: 2111017.00 DATE'.: PAGE: 4-11-12 1 FILE: VICINITY.owG COUNTY RC)AC) NO. 301 tj XISTING DRIVEWAY DEPARTURE SIGHT DISTANCE TRIANGLES BASED ON AASHTO A POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS STOP CONTROLLED INTERSECTION DESIGN VEHICLE: PASSENGER CAR APPROACH GRADE ADJUSTMENT FACTOR: 1.0 DESIGN SPEED: 35 MPH CASE 81: LEFT TURN INTERSECTION SIGHT DISTANCE: 386' CASE B2: RIGHT TURN INTERSECTION SIGHT DISTANCE: 334' HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F•120, ENIGLEWOOD, CO 80112 PHONE (3031925-0544 FAX (303) 9250547 1517 BLAKE AVENUE, STE 101, GLENWOOD SPRINGS, CO 81801 PHONE (97019458878 FAX (970) 9462555 W W W.HCENG.COM BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC ACCESS MAP DRAWN BY: TJS SCALE: 1"=200' CHECKED BY: RDN PROJECT No: 2111017.00 DATE: PAGE: 411-12 2 FILE: ACCESS MAP SCALE: 1"=2000' � � l IGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F.120, ENGLEWOOD, CO 80112 PHONE 303) 9250544 FAX (3033) 9250547 1817 BLAKE AVENUE, STE 101, GLENWOOD SPRINGS, CO 81601 PHONE (970) 94843676 FAX (970) 9452558 W W W.HCENO.COM BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC ADJACENT COUNTY ROADWAY MAP min DRAWN BY: TJS SCALE: 1" = 2000' CHECKED BY: RDN PROJECT NO: 2111017.00 DATE: 4-1 1-12 PAGE: 3 FILE: ADJACENT ROADWAY MAP SCALE: 1"=-3000' (302) HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F•120, ENGLEWOOD, CO 80112 PHONE (303) 928.0544 FAX (303) 92.50547 1517 BLAKE AVENUE, STE 101, GLENWOOD SPRINGS, CO 81801 PHONE (970) 9458878 FAX (970) 9452555 W W W.HCENO.COM BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC ADJACENT STATE HIGHWAY MAP DRAWN BY: TJS SCALE: 1" = 3000' CHECKED BY: RDN PROJECT No: 2111017.00 DATE:: PAGE: 411-12 4 FILE. ADJACENT STATE HIGHWAY MAP SCALE: 1"=200' COUNTY ROAD NO. 301 OE 'a, OE OE_ OE m EXISTING DRIVEWAY (6) PROPOSED SPRUCE TREES HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F-120, EENGLEEWOOD, CO 80112 PHONE: (303) 9250544 FAX (303) 9250547 1517 BLAKE AVENUE:, )UE, STE 101, GLEN WOOD SPRINGS, CO 81601 PHONE (970) 9458676 FAX (970) 9452555 W W W.HCENG.COMI BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC CONSTRUCTION ACTIVITY MAP DRAWN BY: TJS SCALE: 1"=200' CHECKED BY: RDN PROJECT NO: 2111017.00 DATE: 411-12 PAGE: 5 FILE: CONSTRUCTION ACTIVITY MAP SCALE: 1"=200' CR 301 ADT:600 1- 0 COUNTY ROAD NO. 301 LEGEND XX(XX) AM(PM) PEAK HOUR TRAFFIC VOLUME ADT AVERAGE DAILY TRAFFIC EXISTING DRIVEWAY HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F-120, E:NGLE:WOOD, CO 80112 PHONE (303) 9250544 FAX (303) 9250547 1517 BLAKE AVENUE, STE 101, GLENWOOD SPRINGS, CO 81801 PHONE (970) 9458878 FAX (970) 945-2555 W W W.HCENG.COM BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC CURRENT TRAFFIC VOLUME MAP DRAWN BY: TJS SCALE: 1"=200' CHECKED BY: RDN PROJECT No: 2111017.00 DATE:: 411-12 PAGE: 6 FILE: CURRENT TRAFFIC VOLUME MAP SCALE: 1"=200' ri Il 4(1) 1 1 (0) CR 301 ADT:606 EXIST. DRIVEWAY N 1- 0 0 1 COUNTY ROAD NO. 301 LEGEND XX(XX) AM(PM) PEAK HOUR TRAFFIC VOLUME ADT AVERAGE DAILY TRAFFIC EXISTING DRIVEWAY II II II I I ---_.:�;.- • HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F-120, ENGLEWOOD, CO 80112 PHONE (303) 9250544 FAX (303) 9250547 1517 BLAKE AVENUE, STE 101, GLEN WOOD SPRINGS, CO 81601 PHONE (970) 9458678 FAX (970) 945-2555 W W W.HCENG.COM BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC DURING CONSTRUCTION TRAFFIC VOLUME MAP DRAWN BY: TJS SCALE: 1" = 200' CHECKED BY: RDN PROJECT NO: 2111017.00 DATE: PAGE: 411-12 7 FILE. DURING CONST TRAFFIC VOLUME MAP SCALE: 1"=200' CR ( 01� ADT: 604 N EXIST. DRIVEWAY O 0 COUNTY ROAD NO. 301 LEGEND XX(XX) AM(PM) PEAK HOUR TRAFFIC VOLUME ADT AVERAGE DAILY TRAFFIC EXISTING DRIVEWAY HIGH COUNTRY ENGINEERING, INC. 14 INVERNESS DRIVE EAST, STE F-120, ENGLEWOOD, CO 801 12 PHONE (303) 925-0544 FAX (303)9280547 1517 BLAKE AVENIUE, STE 101, GLENWOOD SPRINGS, C0 81601 PHONE (970) 945.8676 FAX (970) 945-2555 W W W.HCENO.COM BNS SERVICES, LLC GARFIELD COUNTY, CO BNS SERVICES, LLC AFTER CONSTRUCTION TRAFFIC VOLUME MAP DRAWN BY: TJS SCALE: II II II II 1"=200' CHECKED BY: RDN PROJECT NO: 2111017.00 DATE: PAGE: 411-12 8 FILE: AFTER CONST TRAFFIC VOLUME MAP