Loading...
HomeMy WebLinkAbout20. Storm Water Runoff MemorandumCIVIL ENGINIEERING An Employee -Owned Company LAND SURVEYING MEMORANDUM To: Olszewski, Massih & Maurer, P.C. From: Tom Scott Revised: June 18, 2012 Project: BNS Services, LLC Subject: Storm Water Runoff Per your request we reviewed Article VII, Section 7-207 of the Garfield County Unified Land Use Resolution of 2008, as Amended. It appears that the proposed Land use application for the project is exempt from the applicable land use regulations, as follows: New development within 100 feet of a water body According to the Garfield County Geographic Information System (GIS) aerial photographs and the Improvement and Topographic Survey, prepared by High Country Engineering, Inc. there are no existing water bodies within 100 feet of the proposed contractor's yard. Development creating 10,000 square feet or more of impervious surface area The proposed contractor's yard is to consist of pervious gravel equipment storage areas and a shop building. The proposed building is to be 100 feet in length and 50 feet in length, having an impervious roof area of 5,000 square feet. Conclusion Since the proposed contractor's yard is not located within 100 feet of a water body and the proposed impervious areas are less than 10,000 square feet, the standards contained in Article VII, Section 7-207 of the Garfield County Unified Land Use Resolution of 2008, are not applicable. 1517 BLAKE AVENUE, SUITE 101 GLENWOOD SPRINGS, CO 81 601 970-945-8676 • PHONE 970-945-2555 • FAX W W W.HCENG.COM