HomeMy WebLinkAbout20. Storm Water Runoff MemorandumCIVIL ENGINIEERING
An Employee -Owned Company
LAND SURVEYING
MEMORANDUM
To: Olszewski, Massih & Maurer, P.C.
From: Tom Scott
Revised: June 18, 2012
Project: BNS Services, LLC
Subject: Storm Water Runoff
Per your request we reviewed Article VII, Section 7-207 of the Garfield County Unified Land
Use Resolution of 2008, as Amended. It appears that the proposed Land use application for the
project is exempt from the applicable land use regulations, as follows:
New development within 100 feet of a water body
According to the Garfield County Geographic Information System (GIS) aerial photographs
and the Improvement and Topographic Survey, prepared by High Country Engineering, Inc.
there are no existing water bodies within 100 feet of the proposed contractor's yard.
Development creating 10,000 square feet or more of impervious surface area
The proposed contractor's yard is to consist of pervious gravel equipment storage areas and a shop
building. The proposed building is to be 100 feet in length and 50 feet in length, having an
impervious roof area of 5,000 square feet.
Conclusion
Since the proposed contractor's yard is not located within 100 feet of a water body and the
proposed impervious areas are less than 10,000 square feet, the standards contained in Article
VII, Section 7-207 of the Garfield County Unified Land Use Resolution of 2008, are not
applicable.
1517 BLAKE AVENUE, SUITE 101
GLENWOOD SPRINGS, CO 81 601
970-945-8676 • PHONE
970-945-2555 • FAX
W W W.HCENG.COM