Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application- Permit
Job Address GARI'IELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 8th. Street, Suite 303 Glenwood Springs, CD 81601(970) 945-8212 049a CR,Q1' Nature of Work Building Permit , 117 /I-- o Use of Building No. 8570 oo-35 Owner 7€11 , S an -t+ Contractor Amount of Permit$ D9L- . 1 Date ( /30 /e Clerk Telephone;` (970)945-8212 GARFIELD COUNTY BUILDING PERMIT APPLICATION Garfield County (Glenwood Springs) Colorado Permit # Inspection L 'ne: (970) 384-5003 Parcel f $chedule # .12161. cb Job Address: 7 g2 C ec2 f (-Fie Co 74/ 1. Lot #: Block #: Subdivision/Exemption: 2. r / /� Owner: do t. �`iG/IT Address: 04Veitz eg 2 1 o A.. Ph: 4/e"ixai,6, Wk Ph: big -//28 3. Contractor ✓COO e /0/4,../.1- Address: aiicja Gr J z,„ ,e,k Ph:4/0 _ f/28 Lie #: 4. ArchitecI/Englneer: 5:13 .71;14e / Address: 4/b;C 1 Meir. k Ph:J .p. g 7 --(1.it aO S Sq Ft of Building: .1# 161/0 ,0 Sq Ft of Lot: ,go, Adrz.5 Height: /g / / # of Floors: 6. Use of Building: % .P -74f j ,4,6",-,--`/) 7. Describe Work: rrl? / L. / 4 B Class of Work: iew ❑ Addition 0 Alteration ❑ Move ❑ Remove 8 Garage: ❑ Single ❑ Double Carport: ❑ Single ❑ Double 1U ❑ Driveway Permit El On Site Sewage Disposal (Septic) ❑ Site Plan y n(� Valuation of Work $: `Y©, 600 Adjusted Valuation $: 13,at, 7 1 a Special Conditions: NOTICE A SEPARATE ELECTRICAL PERMTF IS REQUIRED AND MUST BE ISSUED BY INC STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, ORIF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FORA PERIOD OF 180Tete/ DAYS AT ANY TIMEAFTERWORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPUCATIONAND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OFLAWSGOVERNING THIS TYPE OF WORK WIU. BE COMPLETED WmTH WHETHER SPECIFIED 11 REIN OR NOT. THE GRANTING OF THE PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE ORCANCEL TH PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING C ST , Tip / .; PERFORMANCE OF CONSTRUCTION. -- _. .1 Date: , pian Check Fee:J �b of P Permit Fee. f I J / /78 Fee: ,7 ,..6r ` Date Permit issued: OCC _L� V.. Construction Type: N 1 v /� Zoning: // /g,D Sit�;:• 1-.• + .r, Contactor orAulhorizedA.. understood Flake above./ 1�1l�P / 0 7/ y Ing read, rJ Setbacks: , Manufactured Home: Bacing ':'., = Approval/Vete PlemtAgD-,_•_.;. ..0 iSDS#�&Fee: J60 v� � . AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY DEPARTMENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.25.201 CRS AS AMENDED. FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION. AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE Chan TI-1Ki5P 11" el-IAI I PFf`1111.AO 1111111 elm Arnln THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE /IF T1 -1/C IEnelgnrf TrcnN THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION REST SPECIFICALLY WITH 01111 mmo Ahmr\ nbukICD r.n.,k,ChITe ADC IhITCkirven Tn Om r•rmoOCO1,ATIl/C Al -in 'hl do 1DDfcr nC tUC nlh,lICac IhITCDDOT Garrorrr1.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE, (INITIAL) OR OWNER TO THE BUILDING CODES AND LAND THE SIGNER ERECTION, CONSTRUCTION COUNTY AND THAT THEN BUILDING OFFICIAL FROM FROM PREVENTING OR REGULATION NOT CONSTITUTE AN DISCREPANCIES, THE THE ARCHITECT, DESIGNER, / L'vto/0 I 41-6'6 i VALUATION/FEE DETERMINATION Applicantk4:1O 2111 342_ gk,o5trk..Subdivision Address 2 t1,.. CttaAo Lot/Block Date 1c ' 2 - 07 Contractor n Finished (Livable Area): Main Upper Lower Other Total Square Feet Valuation 5400 Y 614/0 5? 18c,Co0 Basement: Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: Crawl Space: Valuation Valuation Decks/Patios: Covered Valuation Open Valuation 3240 Y' 2:5*, 3 Total Valuation Building Permit Fee Plan Review Fee Total BP & PR )24z3, 241, ?at) 11`°i. `7/01, an i941 i4 J ,E4 2O 4, , THE FOLLOWING ITEMS ARE REQUIRED BY GARFIELD COUNTY FOR A FINAL INSPECTION: 1.) A final Electrical Inspection from the Colorado State Electrical Inspector; 2.) Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3.) A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4.) A complete bathroom, with wash bowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5.) All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; 6.) Outside grading done to where water will detour away from the building; 7.) Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i,e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION OF PREMISES UNTIL ABOVE CONDITIONS ARE MET. I UNDERSTAND AND AGREE TO ABIDE BY THE ABOVE CONDITIONS FOR OCCUPANCY, USE AND THE ISSUANCE OF A CE TIFICATE OF OCCUPANCY FOR THE DWELLING UNDER BUILDING PERMIT # Signature: Date: 1/20--A Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot. up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds per square foot and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or moreor�.properties must be show on site plan. Yes V 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed s rveyor with their signature and professional stamp on the design. Yes No Not necessary for this project 3. Are the plans submitted for application construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approvalflrawings only", "For permit issuance only" or similar language? Yes �j// No Not necessary for this project 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No / Not necessary for this project . 2 5. Does the site plan indicate the location and direction of the State, County or private road accessing e property? Yes 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? /- Yes C/ No Not necessary for this project 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundati plan for this building? Yes No Not necessary for this project 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes No Not necessary for project �-✓ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes No Not necessary for this project 10. Do the plans include design loads as required under the Uniform Building Code for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes ✓ No Not necessary for this project 11. Do the plans include design loads as required for floor loads under the Uniform Building Code Chapter 16 and Tables 16A, 16B and 16C? Yes ✓ No Not necessary for this project 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes if No Not necessary for this project 13. Is the wi d speed and exposure design included in the plan? Yes ✓ No Not necessary for this project 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes No Not necessary for this project 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes ✓ No Not necessary for this project ' 3 16. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to sting grade contours? Yes ,./' No Not necessary for this project 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project 18. Does the plan include a masonry fireplace including a fireplace sec on indicating design to comply with the Uniform Building Code Chapter 31? Yes No Not necessary for this project 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building,Code? Yes ' No Not necessary for this project 20. Does the plan include a window schedule or other verification that windows provide natural lyght and ventilation for all habitable rooms? Yes '/ No Not necessary for this project 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No Not necessary for this project 3/ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? / Yes No Not necessary for this project ./ 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the Uniform Building Code Table 5-A) Yes ✓ No Not necessary for this project 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No Not necessary for this project 4 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes +, No Not necessary for this project 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes �/ No Not necessary for this project 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project 28. Have two (2) complete sets of construction drawings been submitted with the applicat}'on? Yes V No 29. Have you designed or had this plan designed while considering building and other construcflon code requirements? Yes Y� No Not necessary for this project 30. Does the plan accurately indicate what you intend to construct and what will receive a final insPction by the Garfield County Building Department? Yes V No 31. Do you understand that approval for design and/or construction changes are required prior to implementation of these changes? Yes No 32. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your buildingn it? Yes No 33. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes ✓ No 34. Are you aware that the person signing the Permit Application whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the applicat' n is the party responsible for the project complying with the Uniform Codes? Yes V� No 5 35. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale, in the afternoon. All inspections must be called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. 36. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Departmeyf at 625-8601. Yes No 37. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required,at time of inspection. Yes V No 38. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to issuance o the building permit? Your attention in this is appreciated. Yes No I hereby acknowledge that I have read, understand, and answered these questions to the ) est of my ability. Signatur. /v// Date Phone: Z //,26 (days); , /6i —//Z 8 (evenings) Project Name: ,g74 d --X' /�� ' r i /2i 6fe Project Address: t -M,2 „2/' Note: If you answered °No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application 6 October 14, 2002 Scott Fields 2492 CR 210 Rifle, CO 81650 Cell Phone -618-1128 Garfield County Road and Bridge Department CC: Garfield County Building and PIanning Department Dear Mr. Fields, There is already an existing driveway, therefore a driveway permit is not needed. If you have any questions or problems, please feel free to contact me. Sincerely, Kraig Kuberry Foreman Garfield County Road and Bridge Department 902 Taughenbaugh Blvd. Suite 305 Rifle, CO 81650 Phone: 970-625-8601 Fax: 970-625-8627 afield County Assessor 09 8th Street, Suite 207 ilenwood Springs, CO 81601 'hone: (970)-945-9134 Fax (970)-945-3953 )ffiee hours: 8:00 a.m. - 5:00 p.m. Monday- Friday R210879 P R 0 0 %V PN E E R R T Y SCHEDULE NUMBER TAX YEAR 2001 Z,UU I AR1C'.i#11. 217701300352 TAX AREA COBE FIELDS,492 COUNTY ROAD 21 ONE RIFLE, CO 816j5{{0-9[[705 jj FF jj ``j{ tt 1 I11Ii111IIiII111111Ei I11111IIuIII11Ii1111'III1IIIIEIIIIILIIll TYPE OF PROPERTY AGRICULTURAL LAN —AGRICULTURAL -IMP ----- AGRICULTURAL RES rlrry Or ire' I. • THS IS NO/ DATE: May 1, 2001 PROPERTY DESCRIPTION (MAY NOT BE COMPLETE) SECT,TWN,RNG:1-6-93 DESC: W2SESW BK:091 6 PG:0980 PRE:R210240 TOTALS PRIOR YEAR ACTUAL VALUE 140020 CURRENT YEAR ACTUAL VALUE 200680 BEST COPY + OR — CHANGE 60660 BIOLBIND #i CHARACTERISTICS DISPLAYED The the live data period to establishu a 3f property Data shouldrbe gathered in six-month nteriod irvals goinJune g ckfrom2000. If dJune 30, 2000, unis insufficient til sufficient datathis time pisrgathered. Your proAssessors perty wause s e is valued dha live -year existede P ones endingyof _ 30,20 as it The o January ceivthe current e next January wilt be basednon this avale Anuassessment percentageresents the lvalue will be appliedour p o the actual value as of the at yourEdate. The p property beforeppropearty taxes aca ul Ted taxTnotice you re 39-5-121(1}, C.R.S. are caleuiated. Th assessment dpercentage A hange inthe projectedaresidential assessment percentage isINOTlother grounds for protest oriabateme t vacant of taxes,nd and ersonal39-5-121(1), 9-5-12 property, is asse sset at 29%, 39-1-104(1) ( ),_ _ _ - ..- _ - - _FIE CK OF IC. FORM TO PROTEST YOUR PROPERTY.UULULATION OR THE CLASSIFICATION. YOU M- AY ELECT TO COMPLETE 217701300352 DATE: May 1, 2001 PROPERTY DESCRIPTION (MAY NOT BE COMPLETE) Amy J. Williams, Rautt County Assessor SCHEDULE NUMBER 8210879 FIELDS, 2 COUNTY RSCOTT OAD EUGENE1 RIFLE, CO 81650-9705 TYPE OP PROPERTY AGRICULTURAL LAN AGRICULTURAL IMP AGRICULTURAL RES TAX YEAR TAX AREA CODE 2001 021 SECT,TWN,RNG:1-6-93 DESC: W2SE 6 PG:0980 PRE:R210240 PRIOR YEAR ACTUAL VALUE 7070 28120 104830 SW BK:091 COMMIT YEAR ACTUAL VALUE 6970 26360 167350 +OR—CHANGE -100 -1760 62520 PLAN REVIEW CHECKLIST Applicant # Ei.. ' (44, , t1. i 0we Building Engineered Foundation )A 1 �, , Driveway Permit �''�urveyed Site Plan 'eptic Permit and Setbacks L.4rade/Topography 30% 4lan review -File Notes jU , 4 , Attach Residential Plan Review List G'' inimum Application Questionnaire A) , A Subdivision Plat Notes O(-, FireaDepartment Review Valuation Determination/Fees Red Line Plans/Stamps/Sticker Attach Conditions V Application Signed Pand Reviewer To Sign Application Vfarcel/Schedule No. GENERAL NO 1'ES: Date / 0.75, 02, Phi ning/Zoning Pro dly Line Setbacks 30ft Stream Setbacks Flo° Plain Bu' ‘Height Zoning Sign -off Subdivision Plat Notes Road Impact Fees HOA/DRC Approval �Grade/Topography 40% Planning Issues fi Garfield County Building and Planning Department 109 8th Street, Suite 303 Glenwood Springs, Colorado 81601 970.945.8212 Fax 970.384.3470 Plan analysis based on the 1997 Uniform Building Code Project Number: Project Name: Grand River Nursery Address: Occupancy: H4,B Construction: V -N Date: October 25, 2002 Contractor: Tally Ho Const. Architect: Engineer: Loyd/Boice Report By: Andy Schwaller NOTE: The code items listed in this report are not intended to be a complete listing of all possible code requirements in the 1997 UBC. It is a guide to selected sections of the code. Report created using Plan Analyst software by b w & a. (719) 599-5622 Portions of the material contained in this program are reproduced from the Uniform Building Code with the permission of the International Conference of Building Officials. DIRECTION NORTH EAST SOUTH WEST BOUNDARY Property line Property line Property line Building Allowable area increased 100.6 for open -- Sec. 505.1 SEPARATION AREA INCREASE 74.0 Feet 20.0 Feet 150.0 Feet 75.0 Feet FL NAME OCC FIRE PROTECTION 74.0 Feet 20.0 Feet 150.0 Feet 40.0 Feet area on 3 sides. MAX FLR AREA ALLOWED RATIO STATUS 1 Office 1 Repair Garage TOTAL FOR FLOOR BUILDING TOTAL -- Sec. 504 and Table 5-B B H4 ok 560 16000 0.04 ok 3840 10200 0.38 4400 10693 0.41 4400 10693 0.41 The actual height of this building is 18. feet. The maximum height of the building i5e+ele. feet. -- Table 5-B 21 R ok ok ok ok Page # 2 Code review for: Project Id.: Grand River Nursery Address: EXTERIOR WALL FIRE RATINGS AND OPENING PROTECTION Table 5-A NORTH For Bearing Non -Bearing , Opening Construction Parapet Occupancy Wall Wall Protection Material Required H4 0 hour 0 hour None Any No B 0 hour 0 hour None Any No EAST For Bearing Non -Bearing Opening Construction Parapet Occupancy Wall Wall Protection Material Required H4 0 hour 0 hour None Any No B 0 hour 0 hour None Any No SOUTH For Bearing Non -Bearing Opening Construction Parapet Occupancy Wall Wall Protection Material Required H4 0 hour 0 hour None Any No B 0 hour 0 hour None Any No WEST For Bearing Non -Bearing Opening Construction Parapet Occupancy Wall Wall Protection Material Required H4 0 hour 0 hour None Any No B 0 hour 0 hour None Any No None -- No fire protection requirements for openings. 3/4 hour -- Openings are to be protected with 3/4 hr fire assemblies. 50% of the area of the wall maximum. -- Table 5-A, Footnote 5 & Sec. 503.2.2 Maximum single window size"is 84 sq.ft. with no dimension greater than 12 feet. -- Sec. 713.8 Not Allowed -- Openings are not permitted in this wall. Page # 3 Code review for: Project Id.: Grand River Nursery Address: OTHER BUILDING ELEMENTS Table 6-A ELEMENT MATERIAL RATING NOTES Interior Bearing wall Any 0 hr Interior nonbrg wall Any 0 hr Structural Frame Any 0 hr Exterior Struct Frame Any 0 hr See footnote #1 Floor/Ceiling Assembly Any 0 hr See Footnote #18 Roof/Ceiling Assembly Any 0 hr Stairs Any None FOOTNOTES: 1) Elements in an exterior wall located where openings are not permitted or where protection of openings is required, shall be protected against external fire exposure as required for exterior bearing walls or the structural frame, whidhever is greater. -- Table 6-A, footnote 1 9) In areas with vehicles or airplanes, the floor shall be of noncombustible, nonabsorbent materials. -- Sec. 307.2.2 18) In areas containing hazaradous materials, the floor shall be of noncombustible, liquid -tight construction. -- Sec. 307.2.2 Page # 4 Code review for: Project Id.: Grand River Nursery Address:" 113PENETRATIONS OF FIRERESISTIVE ASSEMBLIES • 14. WALLS ASSEMBLIES -- Sec. 709.6 Through penetrations: 1) Penetrations shall be installed as tested in the rated assembly. -- Sec. 709.6.2 2) Penetrations shall be protected by an approved penetration firestop system and shall have an F rating of not less than the required rating of the wall penetrated. -- Sec. 709.6.3 Exception: When penetrating items are steel, ferrous or copper pipes or steel conduits and the wall is concrete or masonry, the annular space shall be permitted to be grout or mortar. The minimum thickness is the thickness required to maintain the fire rating. The maximum size of the penetrating items is equivalent to a 6 -inch diameter and the opening is a maximum of 144 square inches. -- Sec. 709.6.1 Membrane penetrations: The requirements are the same as for through penetrations. -- Sec. 709.7 Exceptions: 1. Steel electrical outlet boxes that do not exceed 16 square inches provided that the area of such openings does not exceed 100 square inches for any 100 square feet of wall area. Boxes on opposite sides of the assembly shall be separated by a horizontal distance of not less than 24 inches. 2. Sprinklers with metal escutcheon plates. Noncombustible penetrating items shall not be connected to combustible materials on both sides of the membrane unless it can be confirmed that the fire -resistive integrity of wall is maintained. -- Sec. 709.7 rA:0044001- Page # 5 Code review for: Project Id.: Grand River Nursery Address: FLOOR/CEILING AND ROOF/CEILING ASSEMBLIES -- Sec. 710.2 Through pentrations: Through penetrations of fire -resistive horizontal assemblies shall be enclosed in fire -resistive shaft enclosures. -- Sec. 710.2.1 Exceptions: 1. When penetrating items are steel, ferrous or copper conduits, pipes, tubes and vents through a single concrete floor, the annular space shall be permitted to be grout or mortar. The minimum thickness is the thickness required to maintain the fire rating. The maximum size of the penetrating items is equivalent to a 6 -inch diameter and the opening is a maximum of 144 square inches. 2. Electrical outlet boxes that have been tested for use in fire -assemblies. The system shall have an F rating and a T rating of not less than one hour but not less than the required rating of the floor system. Sec. 710.2.3 Exception: Floor penetrations contained and located within the cavity of a wall do not require a T rating. Membrane penetrations: The requirements are the same as for through penetrations. -- Sec. 710.3 Exceptions: 1. When penetrating items are steel, ferrous or copper conduits, electrical outlet boxes, pipes, tubes and vents through concrete or masonry and the annular space is protected by an approved penetration firestop assembly or protected to prevent the free passage of flame and products of combustion. Such penetrations shall not exceed an aggregate area of 100 square inches in any 100 square feet of ceiling area in assemblies without penetrations. 2. Electrical outlet boxes that have been tested for use in fire -assemblies. 3. Sprinklers with metal escutcheon plates. Fire -resistive roofs may have unprotected openings. -- Sec. 710.4 4 , Code review for: Project Id.: Grand River Nursery Address: Page # 6 SMOKE and FIRE. DAMPERS -- Sec. 713.10 and 713.11 Dampers shall be accessible for inspection and servicing: 1. Penetrations through area separation walls. Penetrations through occupancy separations. 2. Penetrations of the fire -resistive construction of horizontal exit walls or corridors serving as a means of egress. Exception: Openings for steel ducts penetrating the required fire -resistive construction of corridors are not required to have smoke dampers when such ducts are of not less than 0.019 -inch thickness (26 gage) and have no openings serving the corridor. 3. Penetrations of shaft enclosures. Exceptions: 1. Duct penetrations by steel exhaust air subducts extending vertically upward at least 22 inches above the top of the opening in a vented shaft where the airflow is upward. 2. Penetrations of a fire -resistive floor forming the base of a shaft enclosure may be protected by fire dampers listed for installation in the horizontal position. 3. Smoke dampers are not required when shaft is exhaust only, and is used for continuously operating fans. 4. Penetrations of the ceiling of fire -resistive floor -ceiling or roof -ceiling assemblies. Exception: Smoke dampers are not required. 5. Penetrations of an atrium enclosure element. Exception: Smoke dampers are not required. 6. Penetrations of exterior walls where protection of openings is required. Exception: Smoke dampers are not required. 7. Penetrations of areas of refuge. Exception: Ventilation system designed to supply outside air during an emergency. 8. Smoke dampers are required in smoke barriers and elevator lobbies. DRAFT STOPS: If there is combustible construction in the roof/ceiling assembly, draft stops shall be installed so that the area of concealed space does not exceed 3,000 square feet and so that the horizontal dimension between stops does not exceed 60 feet. -- Sec. 708.3.1.2.2 Page # 7 Code review for: Project Id.: Grand River Nursery Address: OCCUPANCY SEPARATIONS --- Table 3--B H4 -B 1hr Offices less than 25% of major use do not require a separation. -- Sec. 302.1 exc. 2.2 HEATING EQUIPMENT SEPARATION: FOR H4 OCCUPANCY: ionplA 2hr occupancy separation is required around rooms containing a boiler or central heating unit. -- Sec. 302.5 FOR B OCCUPANCY: A 1 hr. occupancy separation is required around rooms containing a boiler or central heating unit greater than 400,000 BTU input. -- Sec. 302.5 ADDITIONAL SEPARATIONS: A refrigeration machinery room shall be separated from the remainder of the building as required for an H7 occupancy regardless of area. A horizontal occupancy separation may be limited to the actual floor area of the machinery room. Structural supporting elements shall be protected for the type of construction only. -- Sec. 2802 -- Table 3-B EXIT REQUIREMENTS: FL NAME NUMB MIN MIN PANIC HALLWAY/ DOOR NOTES OCC EXITS WIDTH HDWR CORRIDOR SWING 1 Office 6 1 Repair Garage 19 TOTAL 25 1.2 No N/A N/R 3.8 No N/A Out 8 5.0 No N/A Out In areas where 2 exits are required, the minimum separation is 1/2 of the maximum diagonal of the area or floor. -- Sec. 1004.2.4 When 2 exits are required, exits must be arranged so that it is possible to go in either direction from any point in a corridor or hallway to a separate exit, except for dead ends not exceeding 20 feet in length. -- Sec. 1004.2.6 A Code review for: Project Id.: Grand River Nursery Address: Page # 8 Exit signs are required from all areas where 2 or exits are required. -- Sec. 1003.2.8.2, Exception 2 No point to be more than 100 feet from an exit sign. Main exterior exit doors which obviously and clearly are identifiable as exits need not be signed when approved. -- Sec. 1003.2.8.2, Exception 1 Door swing is based on Sec. 1003.3.1.5 except as noted. Occupant load factor is based on Table 10-A. Number of exits is based on Table 10-A except as noted. Exit width is in inches and based on Sec. 1003.2.3 and Table 10-B Exit width is to be divided approximately equally among exits. -- Sec. 1003.2.3.2 Width shown for all areas is based on other egress components. Width shown for 1st floor is based on other egress components. Width shown for other floors & basements is based on stairways. -- Table 10-B For the minimum width of doors, see Sec. 1003.3.1.3 For the minimum width of hallways, see Sec. 1004.3.3.2 For the minimum width of corridors, see Sec. 1004.3.4.2 For the minimum width of stairways, see Sec. 1003.3.3.2 FOOTNOTES: 8) The number of exits is based on Sec. 1007.4.1 FLUSH AND SURFACE BOLTS: Manually operated edge- or surface -mounted flush bolts and surface bolts or any other type of device that may be used to close or restrain the the door other than by operation of the locking device shall not be used. When automatic flush bolts are used, the door leaf having the automatic flush bolt shall not have a door knob or surface -mounted hardware. The unlatching of any leaf shall not require more than one operation. -- Sec. 1003,3.1.8 LOCKS AND LATCHES: Regardless of the occupant load served, exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. -- Sec. 1.003.3.1.8 #1 Zt Page # 9 Code review for: Project Id.: Grand River Nursery Address: LANDINGS AT DOORS: 1) A floor or landing shall be provided on each side of doors. When access for persons with disabilities is required. the floor or landing shall not be more than 1/2 inch lower than the threshold. When access is not required, the maximum is 1 inch. -- Sec. 1003.3.1.6 2) Landings shall have a width not less than the width of the stairway or width of the doorway, whichever is the greater. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing dimension to less than one half it required width. The minimum length in the direction of exit travel is 44 inches. -- Sec. 1003.3.1.7 TRAVEL DISTANCE: (distance to an exit) , The maximum travel distance in this building is 200 feet. --- Sec. 1004.2.5. Travel distance shall not be limited within an exit enclosure or exit passageway. -- Sec. 1005.2.2 BUILDING ACCESSIBILITY: ROOFING REQUIREMENTS: 1) The roofing on this building is required to be Class B or better. -- Table 15-A 2) See section 1504 and ICBO research reports for requirements. VENTILATION: All areas customarily occupied by humans shall be provided with natural ventilation by means of openable exterior openings with an area of not less than 1/20 of the total floor area or shall be provided with a mechanically operated ventilation system. Such system shall be capable of supplying a minimum of 15 cubic feet per minute of outside air per occupant. -- Sec. 1202.2.1 WALL AND CEILING FINISH: 1) Wall and ceiling finish materials are required to comply with Sec. 804.1 and Table 8-B. 2) Carpeting on the ceiling is required to have a Class I flame spread rating. -- Sec. 804.2 3) Textile wall coverings shall have Class I flame spread rating. and shall be protected by automatic sprinklers or meet the acceptance criteria of U.B.C. Standard N. 8-2 -- Sec. 805 4) Toilet room floors shall have a smooth, hard nonabsorbent surface that extends upward onto the walls at least 5 inches. -- Sec. 807.1.1 5) Walls within 2 feet of the front and sides of urinals and water closets shall have a smooth, hard nonabsorbent surface. -- Sec. 807.1.2 Page # 10 Code review for: Project Id.: Grand River Nursery Address: INSULATION NOTES: 1) All insulation material including facings are required to have a flame -spread rating of 25 or less and a maximum smoke density of 450 unless it is in a concealed space and the facing is in contact with a wall or ceiling. -- Sec. 707.3 exc.2 2) Foam plastic insulations are required to be protected. -- Sec. 2602 GLAZING REQUIREMENTS All glazing in hazardous locations is required to be of safety glazing material. -- Sec. 2406.3 & 2406.4 Locations: 1) Glazing in ingress and egress doors except jalousies. 2) Glazing in fixed and sliding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors. 3) Glazing in storm doors. 4) Glazing in all unframed swinging doors. 5) Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs and showers. Glazing in any portion of a building wall enclosing these compartments where the bottom exposed edge of the glazing is less than 60 inches above a standing surface and drain inlet. 6) Glazing in fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24 -inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. 7) Glazing in an individual fixed or operable panel, other than those locations described in items 5 and 6 above, than meets all of the following. conditions: A. Exposed area of an individual pane greater than 9 square feet. B. Exposed bottom edge less than 18 inches above the floor. C. Exposed top edge greater than 36 inches above the floor. D. One or more walking surfaces within 36 inches horizontally of the plane of the glazing. 8) Glazing in railings regardless of height above a walking surface. Included are structural baluster panels and nonstructural in -fill panels 9) Glazing in walls and fences used as the barrier for indoor and outdoor swimming pools and spas when the bottom edges is less than 60 inches above the pool side and the glazing is within 5 feet of the pool or spa water's edge. 10) Glazing in walls enclosing stairway landings or within 5 feet of then bottom and top of stairways where the bottom edge is less than 60 inches above the walking surface. INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued .02oned Area Permit No. 'q#'5.70 AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is gradted, and further agrees that if the above said regulations are not fully complied with in the z ning, Iocation, erection and construction of the above described structure, the permit ma then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Addres;s4Ler Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing // 7.. p 2- /4L,. Foundation ))-.. J D &4 Underground Plumbing if —Z1)--__,07_ 'Insulation / /' Eeci 6`" i< 7Z . 'r ei6j:,6 Rough Plumbing . 3 r ---c :>144e (..._ Drywall g-5-....0, �pyyu Chimney & Vent .A. 1 . C :5 ( /r.s., Electric Final (by State Inspector) 9 1. Gas Piping .� -.4 �{ '- Final 3 Electric Rough State I gect r Septic Final-;:. -. Framing •-• r- JUL_ (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVEDDO NOT DESTROY THIS CARD Date IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC