Loading...
HomeMy WebLinkAboutEngineer Report 01.08.16~:~~~~~~~~~~~~~~- January 8, 20 16 TO: Jeff and Janet Kirkpatrick 228 Mesa Drive Rifle, CO 81650 jeffckpr@gmail.com Gary R. Reeder, P.E. Regisuml Profmional Engineer 2937 Four Corners Drive, Grand Junction, CO 81503 cell: 970/250·9242 e-mail: garyreeder34@gmail.com RE: Underpinning {Piering) Project-Final Report 228 Mesa Drive Rifle, CO 81650 The above underpinning project has been successfully completed unitizing six push piers as were shown on the Proposed Piering Plan that was submitted on October 3, 2015, and a copy of which is included herein. There is no need to prepare a layout showing the final location of the piers since the piers were installed within a few inches of the original plan. The SW comer was lifted about 1-3/4" and the SW comer bedroom is essentially level after the lift. The lift area, including the SW comer bedroom, the adjacent bathroom and the other bedroom, are now within ±1/4" in elevation. The windows operate properly. The doors to these three rooms close but the two bedroom doors do not latch. These latch plates will need to be adjusted. The pre-lift and post-lift elevation surveys are attached. The post-lift elevation survey can be used as a benchmark for future reference. The push piers were installed in accordance with the manufacturer's recommendations and specifications. The lift was successfully accomplished in a proper manner by personnel from Foundation Repair of Western Colorado (FRWC). The SW comer is deemed to be stable. Keep in mind that proper drainage away from the house is extremely important for stabilization of foundation structures. Please call me if you have any questions. Respectfully submitted, G~.~~ co #19404 attachments (3) cc: FRWC • Residential Structural Inspections • Foundation Design and Piering \~~#i!~~-----------Gary R. Reeder, P.E. Registered Professional Engineer 2937 Four Corners Drive, Grand Junction, CO 81503 cell: 970/250-9242 TO: Jeff and Janet Kirkpatrick 228 Mesa Drive Rifle, CO 8165 0 jeffckpr@gmail.com e-mail: garyreeder34@gmail.com INVOICE RE; Underpinning (Piering) Project-Final Report 228 Mesa Drive Rifle, CO 81650 TOTAL PROJECT FEE *This fee includes: • Confirmation of data • Engineering and calculations for piering • Preparation of initial drawings and piering plan • Initial Report • Consultation with FRWC • On-site visit during progress ( 1) • On-site during lift • Final elevation survey • Preparation of final drawings • Final Report 01 /08 11 6 • Residential Structural Inspections • Foundation Design and Piering $ I .400* G~ f -0-~ \ (3...'il, -o· t ....-;...--- 8~ -LR. .. o--o--Cl- (Jan. 11 2.01'") J,.:?..S Mesa. Drive ~ ~ - -'Ii -o- -o- . -o· SW CPn::c q f Hc.o1.: ~a'( 17:.. Rt·eder, Pti. 'jflry red:!f 311@.:J..,,41'{. Urn. 97o~:J..~C-~"-'f2.. C3R -1f r \ 13c.,4, -o-I t ----- s~ -L.R -r., _,,,., -t (*"I , I 1,0lc.) Qi-Fl-e (a 8{{.(o ~ -o- -* -1.0 -I\ ~ -I~ SW G:m::c " t H-r-& !<: <:iary 1~. R~dr.f", Pr:. 'j"rt r~e.d:er 3"1-@..J~aJ·(. c.:i1>1. 'f 7o-]..$c -'7 -,.-1;z.. L..~~~~1-......,.-1.~~,~.~~-m~~-;:,.~~-m--:;~r·--.I 2. 3 ).28 &esa. Da've s 1' .. SW~r o~ Hams: m, p.,,b PCc ~ary R. Ruder-,P~ ~4ry ret:.r.IY 3¥@.'j.,v·f. ~,.,._ 'f 7o-:i..>o ~tp .. '{'2..