Loading...
HomeMy WebLinkAboutApplication- PermitJob Address U 2 �` GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8th, Street, Suite 303 Glenwood Springs, CO 81601(970) 94S-8212 Nature of Work 9 iilding Permit No. 8473 Amount of Permits , � Date Clerk GARFIELD COUNTY BUILDING PERMIT APPLICATION GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO TELEPHONE: (970) 943-8212 7 LNSPECrIONRLINE: (970)384-500 3 . PERM — IT NO. C / PARCEL/SCHEDULE NO. pH D1-- )..3- co -of S SOB ADDRESS: ' ✓ C R 3// ?ad- !Y/s-..) LOT NO. BLACK NO. 2 4/01111\ 37 f.Y' 3 L L 5k/ / Y � 4 Ani 5 MLI rr 011L14)12403. O S 6 7 8 SUBDIVISIOMEXEMFION Q 54-) RectSandsbre led lfcI ADDICO 35q4 Clka{t-1 Si tf- 816'8'5-4)57 n10)5 Slurp vain, ?IS7(�-a$ddR? q) 3,0-s3( °) liCrag7 170) )6-000/ aMa 4ISdL QAlCLtg1 nAL7ZIA110.1 9 SLR CAArceT. cEEKILII La' 10 Xeuvrwhrrglcr 013 4" '04 Aim an scirAQ culow . C10711C1 r nue VALCAMINEIVCILL 96L1AL COICILO0%1 4,25477.-18. u -o F ley LTC, 01,1.>54L:11r14 /,i6' c 4444114d✓ `�-� f NOTI A SEPARATE ELECIRKAL PERMIT 1S REQUIRED AND (MUST RE ISSUED WY THE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCION AUTHORIZED IS NOT CONLN(ENCED W rHIN 110 DAYS, OR IF CONSTRUCTION OR WORK LS SUSPENDED OR ABANDONED FOR A PERIOD OF ISO DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TPJ.B AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING TR]5 TYPE OF WORK WILL BE COMPLIED WTIIL WHETHER SPECIFIED HERELN OR NOT. THE CHRANTLNO OF A PERMIT DOES NOT PRESUME, TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW RE CONSTRUCTION OR THE PE RFOLMANCE OF r /' 1 CONSTRUCTION te4111/ !! acetliocized spat..� • .•.. db..' AllijartrAllikh. 4117 // Pim Da*- ApportallDsts 7-31-o =CT= .ALCAS10N,$ PLAN CHECK FEE: 1 PERMIT FEE: /2.17, 4z 1 /P72 .9•S TOTAL FEE 3240.37 DATE PERMIT ISSUED: OCC: GROUP: D.-3- CONST: TYPE: U ZONING SETBACKS: . HOME: PERM1SSION TS HEREBY GRANTED TO THE APPLICANT AS OWNER. CONTRACTOR A O AGREEMENT AGENT OF THE CONTRACTOR OR. OWNER TO CONSTRUCT THE STRUCTURE DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUI DL4G DEPARTMENT. DI CONSIDERATION OF TBE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUIIDING CODES AND LAND USE REGULATIONS ADOPTED I GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN DI 3011.2E1 CRS AS AMENDED. THE SICIN'ER FURTHER. AC EES TAAT IF THE ABOVE SAID ORDINANCES ARE NOT FULI COMPLIED wrn3 IN THE LOCATION, ERECTION. CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FR( THE COUNTY A) THAT THEN AIS THERE IT SHALL BECOME NULL AND VOID. TEE ISSUANCE OF A PERMIT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILD3*IO OFFICIAL FROM THEREAFTER REQUIRING T] CORRECTION OF ERRORS LN SAID PIANS, SPECIFICATIONS AND OTTER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER wuEsr VIOLATION OF THIS CODE OR ANY OILER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTIZ,TB AN ACCEPTANCE OF AI RESPONSIBILITIES OR L.IABILUIES BY GARFIELD COUNTY FOR FERnRS OMISSIONS OR DISCREPANCIES. THE RESPONS®ILITy FOR THESE ITEMS AND IMPIEMENFATR DURING CONSTRUCTION RESTS SPECIFICALLY WIT/1111E ARCHITECT, DESICENER. BUILDER AND OWNER. COMMENTS ARE INTENDED In BE CONSERVATIVE AND TN SUPPo' 0FIIE OWNERS INTEPEST. Cadann o03 !HEREBY ACiCIOWLFDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. ( TfALl - The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1997 UBC requirements; 6. Outside grading done to where .water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be trade upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupanc , use and the issuance of a Certificate of • cupancy for the dwelling under building permit # F7 3 . Signa bpcont Date VALUATION/FEE DETERMINATION Applicant ST R. Subdivision Address L1K3 11 5; pi- Lot/Block Date 7- 3l -0Z Contractor 0 '/Ve i u ow„ Finished Livable Area): 2� Main 2 Sa g Y 9 Upper Lower Other Total Square Feet Valuation Basement: Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: Crawl Space: Valuation '11e0 to Valuation 2888 Decks/Patios: Covered Valuation Open Valuation /45. /4)y 2' 111784 Total Valuation Building Permit Fee Plan Review Fee Total BP & PR Z,54748 /812..9" n.) -7.4z 3090. 3� / S-0.0 0 3240,3-7 Garfield County BUILDING & PLANING DEPARTMENT Agricultural Employee Affidavit 1, "� ri` ✓- ". f"- , state that the residential structure described below will be occupied solely as an agricultural employee dwelling unit provided to an individual and related family member who is/are employed in an agricultural use, including farms, garden, greenhouse, nursery, orchard, ranch, small animal farm for production of poultry, fish, furbearing or other small animals, as prescribed in Garfield County Zoning Resolution Section 3.02.01 and in Section 2.02.02 Agricultural Land, on the property at which the dwelling is located and further, pays no rent. It is agreed that proof of employment, in the form of Internal Revenue Service Forms W-2 or 1099 for each person employed as described above will be submitted to the Garfield County Building and Planning Department upon request by the county. It is agreed that this property will not be sold to another party without representing that the agricultural employee dwelling structure is for agricultural employees only and may not be used for any other purpose. Property and Building Description: Address q 3 ,5j/ rdvctck, f �n �rfj of Assessors Parcel Number a,L/ 0 ( lv1~ 00 - 15 � Building Description ho ?c/S, Building Square Feet Habitable c2,30c,51 Building Permit Numbe x4.T3 ISDS (Septic) Permit Number -7' Owner Owner Address 950 4-Q, 5i,,d ,,,���'jq ; % (`�j drA 0 Er/GS Date '7 - f a - a Witness 4.� 109 8th Street, Suite 303, Glenwood Springs, Colorado 81601 (970) 945-8212 (970) 285-7972 Fax: (970) 384-3470 (Signature) Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house - rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds per square foot, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Pro erties with slopes of 40% or greater must be shown on the site plan. Yes N 2. Does the site plan also include any other buildings on the property, setback easements and utilitx easements? Yes N 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? Yes N. 4. Does the site plan indicate the location and direction ofthe County or private road accessing the property? Yes NI 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered • 2 design? Yes \, 6. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes NI 7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces's and soffits? Yes NI 8. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Yes N 9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes N 10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof raters or joists or trusses? Yes \' 11. Does the building section drawing or other detail include the method ofpositive connection of all columns and beams? Yes 12. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing (undisturbed) grade contours? Yes \f 13. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase 11 certifications or phase 1I EPA certification? Yes No 14. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No \1 3 $ 15. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes —i No 16. Does the plan include a window schedule or other verification that windows provide natural lightd ventilation for all habitable rooms? Yes No 17. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for theareas? Yes No 18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No 19. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes No 20. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? If you do not have written permission from the association, do you understand that the plan check fee will not be refunded should the architectural committee deny or reject your building plans? Yes No N 21. Will this be the only residential structure on the parcel? Yes N No If no -Explain: 22. Have two (2) complete sets of construction drawings been submit -ted with the application? Yes 23. Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.? Yes \I No 24. Have you designed or had this plan designed while considering building and other construction code requirements? 4 Yes \i No 25. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes N No 26. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes Ni No 27. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building pe t? Yes No 28. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. Yes i No 29. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes \J No 30. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for the project complying with the Uniform Building Code? Yes j No 31. Are you aware that prior to issuance ofa building permit you are required to show proofofa driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes NI No 32. Do you understand that you will be required to hire a State of Colorado Licensed Electrician 5 and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes \I No 33. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance ofa building permit? Your attention in this is appreciated. Yes No I hereby acknowledge that I have read, understand and answered these questions to the best" y ability. Signa Pho Project Name: on, ,21 S (days); Date 01--6)-lco- S. y OS (evenings) Project Address: Notes: 3[ I kofV1 1- CO 01(9 50.. If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. bpminreq 04/02 6 Garfield County Road and Bridge Department 902 Taughenbaugh Blvd., Ste 305 Rifle, CO 81650 Phone -(970)625-8601 Fax- (970)625-8627 Invoice Invoice Date: 5/15/2002 Invoice Number. 22 Bill To: Kerry and Kim Oneil 9110 CR 311 Silt , CO 81652 Driveway Permit Number. 22 $15.00 per Driveway Permit. Driveway Permit Fee: $15.00 Total Due: $15.00 Thank You! T&I 6/4, oit/ Garfield County Application for Driveway Permit Application Date: 5/15/2002 Permit Number:22 Termination Date:5/23/2002 County Road Number: 311 District: 3 Sub -Contractor: Permitee: Kerry and Kim Oneil Inspector: Jake Mall Kerry and Kim Oneil hereby requests permission and authority from thc Board of County Commissioners to construct a driveway approach (cs) on the right-of-way off of County Road, 311, 9110 CR 311, adjacent to Applicant's property located on the South side of road for the purpose of obtaining access to property. Applicant submits herewith for the consideration and approval of the Board of County Commissioners, a sketch of the proposed installation showing all thc necessary specification detail including: 1. Frontage of lot along road. 2. Distance from centerline of road to property line. 3. Number of driveways requested 4. Width of proposed driveways and angle of approach. 5. Distance from driveway to road intersection, if any. 6. Size and shape of arca separating driveways if more than one approach. 7. Setback distance of building(s) and other structure improvements. 8. No unloading of equipment on county road, any damage caused to county road will be repaired at subdivision expense. 9. Responsible for two years from the date of completion. General Provisions 1) The applicant represents all parties in interest, and affirms that the driveway approach (es) is to be constructed by him for the bona fide purpose of securing access to his property and not for the purpose of doing business or servicing vehicles on the road right of way. 2) The applicant shall furnish all labor and materials, perform all work, and pay all costs in connection with the construction of the driveway(s). All work shall be completed within thirty (30) days of the permit date. 3) The type of construction shall be as designated and/or approved by the Board of County Commissioners or their representative and all materials used shall be of satisfactory quality and subject to inspection and approval of the Board of County Commissioners or their representative. 4) The traveling public shall be protected during the installation with proper warning signs and signals and the Board of County Commissioners and thcir duly appointed agents and employee shall be held harmless against any action for personal injury or property damage sustained by any reason of the exercise of the Permit. 5) The Applicant shall assume responsibility for thc removal or clearance of snow, ice, or sleet upon any portion of the driveway approach (es) even though deposited on the driveway(s) in the course of the County snow removal operations. • 6) In the event it becomes necessary to remove any right-of-way fence, the posts on either side of the entrance shall 'fie fe surely braced before the fence is cut to prevent any slacking of the remaining fence, and all posts and wire removed shall be turned over to the District Road Supervisor of the Board of County Commissioners. 7) No revisions or additions shall be made to the driveway(s) or its appurtenances on the right -of --way without written permission of the Board of County Commissioners. 8) Provisions and specifications outlined herein shall apply on all roads under the jurisdiction of the Board of County Commissioners of Garfield County, Colorado, and the Specifications, set forth on the attached hereof and incorporated herein as conditions hereof. Special Conditions: 1. 40' wide driveway. 2. No culvert is necessary. 3. Maintain 3% slope away from CR 311. 4. Clear brush on both sides of driveway to maintain visibility. In signing this application and upon receiving authorization and permission to install the driveway approach (es) described herein the Applicant signifies that he has read, understands and accepts the foregoing provisions and conditions and agrees to construct the driveway(s) in accordance with the accompanying specification plan reviewed and approved by' the Board of County Commissi ners. Ck./A1 s ON -4))/ Signed: Address: i Kerry and Kim Oneril Telephone Number: Permit granted 5/1512002, subject to the provisions, specifications and conditions stipulated herein. For Board of County Commissioners' of Garfield County, Colorado: Representative of Garfield County Road and Bridge Signature Special Provisions for Excavation of Road Surface and Installation 1) Any oversized material, (larger than 10 inches in diameter), that is not utilized in backfill will be hauled off by permitee. Further, any frozen material will be removed from site by permittee. 2) When a paved or chipped surface is cut, it is to be replaced with a minimum three-inch (3") hot mix asphalt patch. Temporary patch with cold mix asphalt would be allowed, which would be replaced with hot mix asphalt when the weather or availability of materials allow the work to be completed. An asphalt or chipped surface cut would require the road to be straight cut and squared by means of a pavement cutter or saw. A chipped surface cut will require a seal coat of the patch, which will be full width or half width of roadway when trenches run with the road. For trenches across the road, the edges of the seal coat will overlap the existing edge. All seal coats will overlap edges by a two of the roadway in the vicinity of the excavation. Asphalt hot mix or cold patches will be completed in a maximum of five (5) working Days. Weather permitting. 3) When possible all installations should avoid the top edge of a fill slope. 4) Installations in drainages subject to flash flooding will have a minimum bury of 4 feet deeper than normal flow line at nearest abutment, wing wall, or culvert. 5) Installations at culvert crossings will be buried beneath the culvert with a minimum separation of 18 inches between installation and the bottom of the culvert. 6) Open trenches adjacent to the traveled roadway shall be backfilled daily to within 100 fect of the working area of the trench, and shall be barricaded with warning devices after dark. A 3 foot high orange plastic fence will be installed daily to keep livestock out of the open trench after hours. 7) In areas being disturbed where vegetation is established, reseeding with a mixture either by broadcasting, drilling and mulching with seed mixtures suitable to the climatic conditions or existing vegetation will be performed. Use only certified weed -fret seed. Noxious weed control will be ongoing along with revegetation. 8) The permittee should check the R -O -W of surrounding landowners to see if other permits arc required, i.e., BLM, Forest Service. R esentative for Garfield County Road and Bridge ,)‘ CeLorJ el( -11 itit— ----C.-4'1'1J (9 I Kerry and Kim Oneil Specifications 1. A driveway approach is understood to be that portion of the county road right -of way between the pavement edge and the property line that is designed and used for the interchange of traffic between the roadway and abutting property. 2. At any intersection, a driveway shall be restricted for a sufficient distance from the intersection to preserve the normal and safe movement of traffic. (It is recommended for rural residence entrances that a minimum intersection clearance of 50 feet be provided and for rural commercial entrances a minimum of 100 feet be provided.) 3. All entrances and exits shall be so located and constructed that vehicles approaching or using them will be able to obtain adequate sight distance in both directions along the county road in order to maneuver safely and without interfering with county road traffic. 4. The Applicant shall not be permitted to erect any sign or display material, either fixed or movable, on or extending over any portion of the county road right-of-way. 5. Generally, no more than one approach shall be allowed any parcel or property thc frontage of which is less than one hundred (100) feet. Additional entrances or exits for parcels having a frontage in excess of one hundred 100) feet shall be permitted only after showing of actual convenience and necessity. 6. All driveways shall be so located that the flared portion adjacent to the traveled way will not encroach upon adjoining property. 7. No commercial driveway shall have a width greater than thirty (30) feet measured at right angles to the centerline of the driveway except as increased by permissible radii. No noncommercial driveway shall have a width greater than twenty (20) feet measured at right angles to the centerline of the driveway, except as increased by permissible radii. 8. The axis of an approach to the road may be at a right angle to the centerline of the county road and of any angle between ninety (90) degrees and sixty (60) degrees but shall not be less than sixty (60) degrees. Adjustment will be made according to the type of traffic to be served and other physical conditions. 9. The construction of parking or servicing areas on the county road right-of-way is specifically prohibited. Commercial establishments for customer vehicles should provide off -the -road parking facilities. 10. The grade of entrance and exit shall slope downward and away from thc road surface at the same rate as the normal shoulder slope and for a distance equal to the width of the shoulder but in no case less than twenty (20) feet from the pavement edge. Approach grades are restricted to not more than ten percent (10%). 11. All driveways and approaches shall be so constructed that they shall not interfere with the drainage system of the street or county road. The Applicant will be required to provide, at his own expense, drainage structures at entrances and exits, which will become an integral part of the existing drainage system. The Board of County Commissioners or their representative, prior to installation, must approve the dimensions of all drainage structures. Note: This permit shall be made available at the site where and when work is being done. A work sketch or drawing of the proposed driveway(s) must accompany application. No permit will be issued without drawing, blueprint, or sketch. r II • 1• Garfield County Road and Bridge Department 902 Taughenbaugh Blvd., Ste 305 Rifle, CO 81650 Phone -(970)625-8601 Fax- (970)625-8627 Invoice Invoice Date: 5/14/2002 Invoice Number. 23 Bill To: Kerry and Kim Oneil 9110 CR 311 Silt , CO 81652 Driveway Permit Number. 23 $15.00 per Driveway Permit. Driveway Permit Fee: $15.00 Total Due: $15.00 Thank You! Fe ---- Garfield County ADDtication for Driveway Permit Application Date: 5/14/2002 Permit Number:23 Termination Date:5/23/2002 County Road Number: 311 District: 3 Sub -Contractor: Permitee: Kerry and Kim Oneil Inspector: Jake Mall Kerry and Kim Oneil hereby requests permission and authority from the Board of County Commissioners to construct a driveway approach (es) on the right-of-way off of County Road, 311.9110 CR 311, adjacent to Applicant's property located on the South side of road for the purpose of obtaining access to property. Applicant submits herewith for the consideration and approval of the Board of County Commissioners, a sketch of the proposed installation showing all the necessary specification detail including: 1. Frontage of lot along road. 2. Distance from centerline of road to property line. 3. Number of driveways requested 4. Width of proposed driveways and angle of approach. 5. Distance from driveway to road intersection, if any. 6. Size and shape of arca separating driveways if more than one approach. 7. Setback distancc of building(s) and other structure improvements. 8. No unloading of equipment on county road, any damage caused to county road will be repaired at subdivision expense. 9. Responsible for two years from the date of completion. General Provisions 1) The applicant represents all parties in interest, and affirms that the driveway approach (es) is to be constructed by him for the bona fide purpose of securing access to his property and not for the purpose of doing business or servicing vehicles on the road right of way. 2) The applicant shall furnish all labor and materials, perform all work, and pay all costs in connection with the construction of the driveway(s). All work shall be completed within thirty (30) days of the permit date. 3) The type of construction shall be as designated and/or approved by the Board of County Commissioners or their representative and all materials used shall be of satisfactory quality and subject to inspection and approval of the Board of County Commissioners or their representative. 4) The traveling public shall be protected during the installation with proper warning signs and signals and the Board of County Commissioners and their duly appointed agents and employee shall be held harmless against any action for personal injury or property damage sustained by any reason of the exercise of the Permit. 5) The Applicant shall assume responsibility for the removal or clearance of snow, ice, or sleet upon any portion of the driveway approach (es) even though deposited on the driveway(s) in the course of the County snow removal operations. 6) In the event it becomes necessary to remove anyright-of-way fence, the �7' gh Yposts on either side of the entrance shall be surety braced before the fence is cut to prevent any slacking of the remaining fence, and all posts and wire removed shall be turned over to the District Road Supervisor of thc Board of County Commissioners. 7) No revisions or additions shall be made to the driveway(s) or its appurtenances on the right -of --way without written permission of the Board of County Commissioners. 8) Provisions and specifications outlined herein shall apply on all roads under the jurisdiction of the Board of County Commissioners of Garfield County, Colorado, and the Specifications, set forth on the attached hereof and incorporated herein as conditions hereof. Soecial Conditions: 1. lnstall 40' wide driveway. 2. Clear brush from both sides of drive for visibility. 3. No culvert is necessary. 4. Maintain a 3% slope away from CR 311. In signing this application and upon receiving authorization and permission to install the driveway approach (es) described herein the Applicant signifies that he has read, understands and accepts the foregoing provisions and conditions and agrecs to construct the liriveway(s) in accordance with the accompanying specification plan reviewed and approved by the Board of County Commissioners. Signed: Address: rry and m Oneil Telephone Number: Permit granted 5/1412002, subject to the provisions, specifications and conditions stipulated herein. For Board of County Commissioners' of Garfield County, Colorado: 1n, Representative of Garfield County Road and Bridge Signature Special Provisions for Excavation of Road Surface and Installation 1) Any oversized material, (larger than 10 inches in diameter), that is not utilized in backfill will be hauled off by permitee. Further, any frozen material will be removed from site by permittee. 2) When a paved or chipped surface is cut, it is to be replaced with a minimum three-inch (3") hot mix asphalt patch. Temporary patch with cold mix asphalt would be allowed, which would be replaced with hot mix asphalt when the weather or availability of materials allow thc work to be completed. An asphalt or chipped surface cut would require the road to be straight cut and squared by means of a pavement cutter or saw. A chipped surface cut will require a seal coat of the patch, which will be full width or half width of roadway when trenches run with the road. For trenches across the road, thc edges of thc seal coat will overlap the existing edge. All seal coats will overlap edges by a two of the roadway in the vicinity of the excavation. Asphalt hot mix or cold patches will be completed in a maximum of five (5) working Days. Weather permitting. 3) When possible all installations should avoid the top edge of a fill slope. 4) Installations in drainages subject to flash flooding will have a minimum bury of 4 feet deeper than normal flow line at nearest abutment, wing wall, or culvert. 5) Installations at culvert crossings will be buried beneath the culvert with a minimum separation of 18 inches between installation and the bottom of the culvert. 6) Open trenches adjacent to the traveled roadway shall be backfilled daily to within 100 feet of the working area of the trench, and shall be barricaded with warning devices after dark. A 3 foot high orange plastic fence will be installed daily to keep livestock out of the open trench after hours. 7) In areas being disturbed where vegetation is established, reseeding with a mixture either by broadcasting, drilling and mulching with seed mixtures suitable to the climatic conditions or existing vegetation will be performed. Usc only certified weed -free seed. Noxious weed control will be ongoing along with rcvegetation. 8) The permittee should check the R -O -W of surrounding landowners to see if other permits are required, i.e., BLM, Forest Service. Representative for Garfield County Road and Bridge Kerry and Kim Oncil a. • 4 Specifications 1. A driveway approach is understood to be that portion of the county road right -of way between the pavcment edge and the property line that is designed and used for the interchange of traffic between the roadway and abutting property. 2. At any intersection, a driveway shall be restricted for a sufficient distance from thc intersection to preserve the normal and safe movement of traffic. (It is recommended for rural residence entrances that a minimum intersection clearance of 50 feet be provided and for rural commercial entrances a minimum of 100 feet be provided.) 3. All entrances and exits shall be so located and constructed that vehicles approaching or using them will be able to obtain adequate sight distance in both directions along the county road in order to maneuver safely and without interfering with county road traffic. 4. The Applicant shall not be permitted to erect any sign or display material, either fixed or movable, on or extending over any portion of the county road right-of-way. 5. Generally, no more than one approach shall be allowed any parcel or property the frontage of which is less than one hundred (100) feet. Additional entrances or exits for parcels having a frontage in excess of one hundred 100) feet shall be permitted only after showing ()factual convenience and necessity. 6. All driveways shall be so located that the flared portion adjacent to the traveled way will not encroach upon adjoining property. 7. No commercial driveway shall have a width greater than thirty (30) feet measured at right angles to the centerline of the driveway except as increased by permissible radii. No noncommercial driveway shall have a width greater than twenty (20) feet measured at right angles to the centerline of the driveway, except as increased by permissible radii. 8. The axis of an approach to thc road may be at a right angle to thc centerline of the county road and of any angle between ninety (90) degrees and sixty (60) degrees but shall not be less than sixty (60) degrees. Adjustment will be made according to the type of traffic to be served and other physical conditions. 9. The construction of parking or servicing areas on the county road right-of-way is specifically prohibited. Commercial establishments for customer vehicles should provide off -the -road parking facilities. 10. The grade of entrance and exit shall slope downward and away from the road surface at the same rate as the normal shoulder slope and for a distance equal to thc width of the shoulder but in no case Icss than twenty (20) feet from the pavement edge. Approach grades arc restricted to not more than tcn percent (10%). 11. All driveways and approaches shall be so constructed that they shall not interfere with thc drainage system of the street or county road. The Applicant will be required to provide, at his own expense, drainage structures at entrances and exits, which will become an integral part of the existing drainage system. The Board of County Commissioners or their representative, prior to installation, must approve the dimensions of all drainage structures. Note: This permit shall be made available at the site where and when work is being done. A work sketch or drawing of the proposed driveway(s) must accompany application. No permit will be issued without drawing, blueprint, or sketch. 935-.? OK' 3// INSPECTION WILL NOT BE MADE UNLESS THIS CARD 15 POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING P� OPY G RFIELD COUNTY, COLORADO Date Issu .. .Srned Area Permit No 7 3 AGREEMENT In consideration of the issuance of this permit, the applicant hergby agrees to comply with all • laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Ins !i tor and IMM DIATELY t ECOME NULL AND VOID. Sstbat Front Side Sider Reaf This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing $-/-02... /9" � •V -+e,1 114 fl -2,z -"z ,em. Foundation fc�I5-_ _ p51_02, ,a A1v\ Underground Plumbing Rough Plumbing /A5-: ..ere.6 Chimney / -- Chimney & Vent ��_S-- -- Insulation /_/2 -02- Drywall lif. z- Gas Piping //_._ Electric Rough (By State inspector) d4c Electric Final (by State lus tor)1..' °4 Final �3 =dL Septic Final Framing //-c- azi Notes: (To inchede Rodin place and Windows and Doors installed). ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. 4THIS PERMIT IS NOT TRANSFERABLE Phone :384=5003. 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVEDDO NOT DESTROY THIS CARD IF PLA ED OUTSIDE C 1 r WITH CLEAR PLASTIC