Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application- Permit
j GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8th, Street, Suite 303 Glenwood Springs, CO 81601(970) 945-8212 Job Address 3 744:(22.1,--fiertAk Nature of Work Bui ld inq Permit Use of Building No. 8 362 ._.<4(2a vt4eit.Liz eass own„ tfittre&L-ctza-,,c_, Contractor %1' . Amount of Permits r%Q 7 • cj Date % / O� Clerk RECEIVED APR 2 9 20112 GARFIELD COUNTY BUILDING PERMIT APPLICATION 11 1EPHONE: (970) 94$-8212 �-1 A ‘AiS OA/AFIELD COUNTY (GLENWOOD SPRINGS), COLORADO PERMIT NO .36-2 INSPECTION LINE: (970)384-5003 PARCEJSCH DUI.E NO. 2 3 4 LDTN°. sca.• *rim' w)(-4.)f+rnS''.-' 70b(CCTIOr. c" �n..ztS7fi .1»nc.. 5 C�((COn5TYucT10t7, IC . lig PT. D.uec.a. la30 AMAMI 1LEDIVEIOIy'AOTHO$ 58 Cove,1/44,4>_.9.6.2> so+6.2> ..1)519wr h a.ic/ 5S) Apaal.a 1 Syr L,tidep to �e.t,:3 ' Py1 So5 1(Z9 �[ G •�. . 14TTc.4 aT Sof 3/it Pcra aDY67 37'7 W 1Y3yc,(i . )O(.7 u`"M5.3�a 1 6 D SO IMMO 7 8 9 mol mSA W. CO LOBS owa CxmP 55 YE. +Ad 0(0 `' PA (-0C1'- DA.taArAIII 10 G a /MAY muff imam. camessa 00 OnT sin MEADE MOO/AL Pz NOTICE A SEPASATE ElScISICAL MAW IS RGQM 0 AND MUST BE 1aiL'ED BY 0111 flATE OF coos UO THIS PERMIT BECOMES FRILL AND VOID IF WORK 01 CONSTRUCTION AUTHORIZED I1 NOT COMMENCED WEIGH 110 DAYS. OR IF CONSTRUCTION OR woRK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 1S0 DAYS AT ANY TIME AFTER WORK If COMMENCED. 1 11S1IDY CERTIFY THAT 1 HAVE READ AND EXAMINED YIDS APPLICATION AND ILNO"N MIB SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF taws OOVGRNDU'OTIDS TYPE OF WORK WILL BE MAPLE WTTHIVIETHER SPECIFIED HEREIN OR NOT. net GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLAS S Ca CANCEL TIE PROVISIONS OF ANY OTHER STATE OR LOCAL, LAW REGULATING CONSTRUCTION OR TRE PERFORMANCE OF COI` sebx{a.I wet having awn- 000116 rieriP411. H4 094 Duo. AprovaliDsto aril .A. ®t,�A 2/1. d PLAN CHECKF E:30c1a �1 »F: • 41 73 TOTAL EEL 7 cf DATE PERMIT ISSUED-.. 7 OCC: CROUP: CCBJSI1 TYPE: s�z vu ZOlNC SETBACKS: G3o . • - • la1: i EDS NO. & FTE: AGREEMENT PERMIS 110N 13 HEREBY GRANTED TO THE APPLICANT AS OWNER. CONTRACTOR AMUR THE AGENT OF THE CONTRACTOR OR OWNFA TO CONSTRUCT TIE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTIAENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, TIE SIONER HEREBY AGREES TO COMPLY WEB AUL BLUI DINO CODES AND LAND USE REGULATIONS ADOYTED BY GARFTE D COUNTY PURSUANT TO AUTHORITY GIVEN 1)13031.201 CAS AS AMENDED THE EIMER EUPSHER ASS TUHAT 1F TIE ASOVF. SAID ORDINANCES ARE NOT FULLY COMPLIED WITH LN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF TIE ABOVE DESCRIBED STRUCTURE, TIE PER.MTI MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT TIEN AND THEE IT SHALL BECOME. NULL. AND VOID. TIE ISSUANCE OF A PoNff BASED MON PLANS, SPECIFICATIONS AND OTHER DATA MAIL NUT PREVENT THE BUILDING OFFICIAL FROM TIIfJ.EAPTTJl =Nam) THE COR .ECTTON CF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OTR FRO PIREVBNTD70 BUILDING OPERATION BEANO CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR. REGULATION OF T113 1URLu0ICl P Ni TEE REVIEW OF TIE SUBMITTED PLANS AND 1PPXPIC:ATLON3 AND D PBCTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBIUDE3 OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS. OIDESIONS OR DISCREPANCIES. THE RESPONSIBILITY M* 's ICESE T1TIMS AND IMPLEMENTATION DURING CONSTRUCTION 1EsT1 sPBCELGLLY WITH -IRE ARCHITECT, DESIGNED. Duman AND OWNiISI COMMENTS ARE MENDED ED TO 13E CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. //' �� (�{ I HEREBY ACICT 0WIEDCE THAT 1 HAVE REAP AND UNDERSTAND THE *c lT ABOVE. (INITIAL) cA f 3°� ((OrD • The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; 6. Outside grading done to whcre water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL &LL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupan use and the issuance of a Certificate of Occupancy for the dwelling under building permit # Signature bpcont 7/1r by . Date As of January f, 1999: Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof', including re -bar, anchor bops, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40# per ft. up to 7,000 F.O.S. and an 80 M.P.H. wind. All sheets to be identified by number and indexed. All of the above requirements must be met or - your plans wilt be returned. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1 Is a site plan included that indicates the distance of the proposed building or addition to Property lines, other buildings, set back easements and utility easements? Yes No Not necessary for project 2 Are the plans submitted for application construction drawings and not drawings that are stamped or marked identifying them as Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes No Not necessary for this project 3. Does the site plan include the location, including the distances to property lines, wells, (on subject property and adjacent properties), streams or water courses of the I.SD S (Individual Sewage Disposal System) and has the system been designed, stamped and signed by a Colorado registered engineer? Yes A No Not necessary for this project 4 Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes )c No Not necessary for this project S Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes X, No Not necessary for this project 6. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes Pc No Not necessary for this project 7. Do the plans indicate the location and size of ventilation openings for under floor c, itwl spaces and the clearances required between wood and earth? Yes No Not necessary for project t B. Do the plans indicate the size and location of the ventilation openings for the attic, . oof joist spaces and soffits? Yes No Not necessary for this project A 9. Do the plans include design loads as required under the Uniform Building Code fo' oof snow s, (a minimum of 40 pounds per square foot in Garfield County)? Yes J No Not necessary for this project 10. Do the plans include design loads as required for floor loads under the Uniform Bi. ding Code ection 2304 and Tables 23-A and 23-B? Yes No Not necessary for this project 11. Does the plan include a building section drawing indicating foundation, wall, floor id roof • , ' ruction? Yes 4 No Not necessary for this project 12. Is the wind speed and exposure design included in the plan? Yes ,% No Not necessary for this project 13 Does the building section drawing include size and spacing of floor joists, wall stu ceiling ists, roof rafters or joists or trusses? Yes No Not necessary for this project 14. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes Pc No .... Not necessary for this project 15. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down t existing grade contours? Yes j No Not necessary for this project 16. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project 17. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No Not necessary for this project �( 18. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes. No Not necessary for this project 19. Does the plan include a window schedule or other verification that windows provide natu li t and ventilation for all habitable rooms? Yes '� No Not necessary for this project_ 20. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No Not necesstuy for this project 21. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes No Not necessary for this proj 22. Have all areas in the building been accurately identified for the intended use? (Occupancy as id fled in the Uniform Building Code Table 5-A) Yes No Not necessary for this project 23 . Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? I� Yes No Not necessary for this project 24. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No Not necessary for this project 25. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for sexes? Yes No Not necessary for this project 26. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project 27. Havew,o (2) complete sets of construction drawings been submitted with the application? Yes IX _ No Not necessary for this project 28. 1 -lave you designed or had this plan designed while considering building and other constrystion code requirements? Yes . No Not necessary for this project 29. Does the plan accurately indicate what you intend to construct and what will receive a finalsection by the Garfield County Building Department? Yes j No 30. Do you understand that approval for design and/or construction changes are required prior totthe implementation of these changes? Yes No 31. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" fees required, at the time you pick up your building permit? Yes No 32. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes No 33. Are you aware that the person signing the Permit Application whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the applic4i9n is the party responsible for the project complying with the Uniform Codes? Yes Pc No 5 34. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale, in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. 35. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes 9i No 36. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes. No £fr 37. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to issuance of the building permit? Your attention in this is appreciated. Yes 'x No I hereby acknowledge that 1 have read, understand, and answered these questions to the best of my ability, Signature date Phone:970- 13-146047-, (days), 6/ (evenings) Project Name: /id y ‘xpa. nSr o n Project Address: . ,H, /c5 .ocae - rt tiepts G .14-, A pug 6 Garfield County Building Department 109 8th Street Suite 303 Glenwood Springs, CO 81601 970-945-8212 Plan analysis based on the 1994 Uniform Building Code Project Number. Date: Mai 9, 2002 Project Name: Compressor Station Address: Occupancy: S2 Construction: V -N Contractor: Architect: Engineer. Report By: Andy Schwaller NOTE: The code items listed in this report are not intended to be a complete listing of all possible code requirements in the 1994 UBC. It is a guide to selected sections of the code. Report created using Plan Analyst software by b w & a. (719) 599-5622 Portions of the material contained in this program are reproduced from the Uniform Building Code with the permission of the International Conference of Building Officials. SEPARATION DIRECTION BOUNDARY AREA INCREASE FIRE PROTECTION NORTH Property line 80,0 Feet 80,0 Feet EAST Property line 90,0 Feet 90,0 Feet SOUTH Property line 80,0 Feet 80,0 Feet WEST Property line 80,0 Feet 60,0 Feet Allowable area increased 300,% for open area on 4 sides. -- Sec. 505.1 a FL NAME OCC MAX FLR AREA ALLOWED RATIO STATUS 1 Mechanical Room S2 ok 1250 48000 0,03 ok TOTAL FOR FLOOR 1250 48000 0,03 ok BUILDING TOTAL 1250 48000 0,03 ok The actual height of this building is 28, feet. The maximum height of the building is 40, feet. -- Table 5-B Page # 2 Code review for: Project Id.: Compressor Station Address: EXTERIOR WALL FIRE RATINGS AND OPENING PROTECTION Table 5-A NORTH For Bearing Non -Bearing Opening Construction Parapet Occupancy Wall Wall Protection Material Required S2 0 hour 0 hour None Any No EAST For Bearing Non -Bearing Opening Construction Parapet Occupancy Wall Wall Protection Material Required S2 0 hour 0 hour None Any No SOUTH For Bearing Non -Bearing Opening Construction Parapet Occupancy Wall Wall Protection Material Required S2 0 hour 0 hour None Any No WEST For Bearing Non -Bearing Opening Construction Parapet Occupancy Wall Wall Protection Material Required S2 0 hour 0 hour None Any No None — No fire protection requirements for openings. 3/4 hour — Openings are to be protected with 3/4 hr fire assemblies. 50% of the area of the wall maximum. — Table 5-A, Footnote 5 8. Sec. 503.2.2 Maximum single window size is 84 sq.ft. with no dimension greater than 12 feet. — Sec. 713.8 Not Allowed — Openings are not permitted in this wall. OTHER BUILDING ELEMENTS Table 6-A ELEMENT MATERIAL RATING NOTES Interior Bearing wall Any 0 hr Interior nonbrg wall Any 0 hr Structural Frame Any 0 hr Exterior Struct Frame Any 0 hr See footnote #1 Floor/Ceiling Assembly Any 0 hr Roof/Ceiling Assembly Any 0 hr Stairs Any None FOOTNOTES: 1) Elements in an exterior wall located where openings are not permitted or where protection of openings is required, shall be protected against external fire exposure as required for exterior bearing walls or the structural frame, whichever is greater. — Table 6-A, footnote 1 Page # 3 Code review for: Project Id.: Compressor Station Address: DRAFT STOPS: If there is combustible construction in the roof/ceiling assembly, draft stops shall be installed so that the area of concealed space does not exceed 3,000 square feet and so that the horizontal dimension between stops does not exceed 60 feet. — Sec. 708.3.1.2.2 EXIT REQUIREMENTS: FL NAME NUMB MIN MIN PANIC RATED DOOR NOTES OCC EXITS WIDTH HDWR CORRIDOR SWING 1 Mechanical Room 4 1 0,1 No N/A AUR TOTAL 4 1 0,1 No N/A NIR Door swing is based on Sec. 1004.2 except as noted. Occupant Toad factor is based on Table 10-A. Number of exits is based on Table 10-A except as noted. Exit width is in feet and based on Sec. 1003.2. Exit width is to be divided approximately equally among exits. Width shown for all areas is based on other exits. (0.2) Width shown for 1st floor is based on other exits. (0.2) Width shown for other floors & basements is based on stairways. (0.3) For the minimum width of doors. see Sec. 1004.6 For the minimum width of corridors, see Sec. 1005.2 For the minimum width of stairways, see Sec. 1006.2 FOOTNOTES: FLUSH AND SURFACE BOLTS: Manually operated edge or surface -mounted flush bolts and surface bolts are prohibited. When automatic flush bolts are used, the door leaf having the automatic flush bolt shall not have a door knob or surface -mounted hardware. The unlatching of any leaf shall not require more than one operation. — Sec. 1004.3 LOCKS AND LATCHES: All means of egress doors shall be readily openable from the side from which egress is to be made without the use of a key or special knowledge or effort. -- Sec. 1004.3 Key -locking hardware may be used on the main exit when the main exit consists of a single door or pair of doors if there is a sign stating THIS DOOR MUST REMAIN UNLOCKED DURING BUSINESS HOURS. When unlocked, door(s) must swing without operation of any latching device. — exc. Page # 4 Code review for. Project Id.: Compressor Station Address: LANDINGS AT DOORS: 1) A floor or landing shall be provided on each side of doors. When access for persons with disabilities is required. the floor or landing shall not be more than 1R inch lower than the threshold. When access is not required, the maximum is 1 inch. -- Sec. 1004.9 2) Landings shall have a width not less than the width of the stairway or width of the doorway, whichever is the greater. The minimum length in the direction of exit travel is 44 inches. — Sec. 1004.10 TRAVEL DISTANCE: The maximum travel distance in this building is 150 feet. — Sec. 1003.4 BUILDING ACCESSIBILITY: ROOFING REQUIREMENTS: 1) The roofing on this building is required to be Class C. -- Table 15-A Cedar or redwood shake shingles and #1 shingles constructed in accordance with Section 1504.5, Special-purpose Roofs may be used. -- Exception 1 2) See section 1504 and ICBO research reports for requirements. WALL AND CEILING FINISH: 1) Wall and ceiling finish materials are required to comply with Sec. 804.1 and Table 8-8. 2) Carpeting on the ceiling is required to have a Class I flame spread rating. — Sec. 804.2 3) Textile wall coverings shall have Class I flame spread rating. and shall be protected by automatic sprinklers or meet the acceptance criteria of U.B.C. Standard No. 8-2 -- Sec. 805 ADDITIONAL REQUIREMENTS: For S2 occupancy Page # 5 Code review for. Project Id.: Compressor Station Address: GLAZING REQUIREMENTS All glazing in hazardous locations is required to be of safety glazing material. -- Sec. 2406.3 & 2406.4 Locations: 1) Glazing in ingress and egress doors except jalousies. 2) Glazing in fixed and sliding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors. 3) Glazing in storm doors. 4) Glazing in all unframed swinging doors. 5) Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs and showers. Glazing in any portion of a building wall enclosing these compartments where the bottom exposed edge of the glazing is less than 60 inches above a standing surface and drain inlet. 6) Glazing In fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24 -inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing Is less than 60 inches above the walking surface. 7) Glazing in an individual fixed or operable panel, other than those locations described in items 5 and 6 above, than meets all of the following conditions: A. Exposed area of an individual pane greater than 9 square feet. B. Exposed bottom edge less than 18 inches above the floor. C. Exposed top edge greater than 36 inches above the floor. D. One or more walking surfaces within 36 inches horizontally of the plane of the glazing. 8) Glazing in railings regardless of height above a walking surface. Included are structural baluster panels and nonstructural in -fill panels. 9) Glazing in walls and fences used as the barrier for indoor and outdoor swimming pools and spas when the bottom edges is less than 60 inches above the pool side and the glazing is within 5 feet of the pool or spa deck area. 10) Glazing in walls enclosing stairway landings or within 5 feet of then bottom and top of stairways where the bottom edge is less than 60 inches above the walking surface. Ited HAYES GULCH COMPRESSOR FACILITY SITE' PLAN ON UNOCAL PROPERTY, SECTION 1, TOWNSHIP 7 SOUTH, RANGE 96 WEST, 6T11 P.M., GARFIELD COUNTY, COLORADO 80' 80' \ 90'c o, 41'X 75' PROPOSED COMPRESSOR BUILDING 7X \ 90 i CONSTRUCTION UURVEY6, INC. 0012 SUNRISE eLYO. SILT, CO 81652 WILLIAMS ODLJCT I ON RMT 910-876-5153 [ SCALE: 1' - 60' _ DATE: 09/19/01 •it oI Gi vl t r• 0 CO !I.l3S O li y D 0 O 73 O m L 2 A 7 X CZYJ�YI SCYJI iFl Q 0 m 0 i U 2 C to INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS ©,s3 $ BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued VI 16t Zoned Area Permit No..le AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning,location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building I9spec and IMMEDIATELY BECOAND VOID. C Use 1 sur /' Address or D�cnp n C1� c ft �LI Owne�) t CAS contractor ` aN44 i a1 1 Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing S- zZ-6Z AAA_ Foundation (_1/0-L -- Underground Plumbing 4/4- Insulation ,J Rough Plumbing Drywall AM - Chimney & Vent 4)4- Electric Final (by State Inspector) A.4 Gas Piping N19' Final 7/r. Toa. 4,10L, Electric Rough (By State Inspector) NA-- Septic Final Framing S`Bum 1/61.4,k), -Notes: (To include Roof in plifce and Window and Doors installed). v NI ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. Phone 384-5003 THIS PERMIT IS NOT TRANSFERABLE 09 8th Street County Courthouse Glenwood Springs, Colorado. VEDDO NOT DESTROY THIS CARD By b9cc IF PLACED OUTSIDE - COV R WITH CLEAR PLASTIC