HomeMy WebLinkAboutApplication- PermitGARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (GLENWOOD SPRINGS). COLORADO •
TELEPHONE (970) 945-8212 GG INSPECTION LINE: (970)384-5003
PERMIT NO. O 'L PARC}1JSCI :DIJLE NO
1011 ADDRESS
; )t( VZ;cty_ Dr. 6 $'(,o
SUBDIVISION/EKE—MERTON Q•
1
,. L.cl ,,,,,,,t-___
1
2
C—
°WNr' Wcdi ei A- J iQ �-e
rr./'f r'/�^
{/./(fir //({� (. /�/}
AX)1i46 19 f 11%Cr 1\i, le j/
.9--,),,,,-- `1
p.y� •/�e�
.. / �/ ' 1
3
coyTTA[YOR s',1 S
ADV IP9 Wl. +
P11,
IX' NO
ADDRESS
PN
LIC NO
4
AALVITICTINGINEMIL
5
1Q FT OF IUDDL‘O g Q a o f
(� /} / �/�
SQ FT (SLOT �• OH
7 K `r ' `-
76XCirt
NO LS FLOORS
6
1ID
LIE °tBDCKf gtz._.5 ii? V9 54 c-1- Q uA‹KiSie01 1206ecKcMf tb 1ZS4
2
DERI]mEIPWJC rl. +RA 16 e Xi 541 K5 eKt
8
CLASS OF PTARS ONFW MON r.ALTDAitOH =MOVE ORFMO�'E
9
IADAM
0.0....m. �IRNL! 1l1X(6lF CARPORT -JAMB nacx.m,F
10
V
^ DRPAAPAY ROOM T/Ile RITE SEWAGE DmIriAL (SUM) : 4IP r1AN
vALUAiIDN OF WALK S AD PFTin VALUATIONS `1 J i Y 9 D , V �/
`J� O
PONTW•a
aAL CD.
NOTICE
A SEPARATE ELECTRICAL PFRMI T IS REWIRED AND MUST BE ISSUED) BY THE STATE OF
COLORADO
THUS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 110 DAYS. OR TF CONSTRUCTION OR
WORD: LS SUSPENDED OR ABANDONED FOR A PERIOI) OF ISO DAYS AT ANY TIME
AFTER WORK 1S COMMENCED.
1 HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND
KNOW THE SAME TO 1) CO. ' CT. AIT, PROVISIONS OF LAWS
GOVERNING THIS P 'WORK i OMPI_TED WITH WHETHER SPECIFIED
HEREIN OR NOT T. ''. AN '0 OF , .RMIT DOES NOT PRESUME. TO GIVE
(R.
AUI1EORITY'TO R )R i .'ITIE. ROVISION'OF ANY OTHER STATE OR
LOCAL LAW •. r P •'.'S TR R Rel ON OR IIS. PERFORMAN OF
CONSTRUCT ., +
PLAN CHECK FEE: i
( O O o O
_
PERMIT FEE: ....9-y9 l/
S!'► S `)
TOTAL FEE' Xf` DATE. PERMIT' ISSUED:
ED
OCC: (BEUl1P: aCONST: TYPE:/ — c f
V 1'
ZONING
SETBACKS
.,te ..e.
S'. .•ofOwaah4,.w,:., wig • ! r4 r ,.,.
J`1 ir / 4' • �' I
ff I 7
—
!.L . HOME:ISDS
NO, &FEB:
-.2.0:4016,11! , a 23?
P . -
IItLildiaE Dept. Approval/Due PIRDDiDg . � al
AC CEMENT
PERMISSION 15 HEREBY GRANTED TO TETE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF'I14E CONTR1C1'OR OR OWNER TO CONSTRUCT THE STRLiCTLRE AS
DETAILED ON PLANS AND SPECIFICATIONS SLI3MTTTF.D TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WITH AXI BUILDING CODS ANI) IANND USE R&R LATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO ALTHORITY GIVEN TN 30 21.201 CRS AS AMENDED. THE SIC'NER FURTHER ACREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECITON, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
TILE COUNTY AND THAT TIIF-N AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED LYPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL. FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OF TT ITS. CODE OR ANY OTHER ORDINANCE OR RECR.. AT ION OF THIS JURISDICTION.
THE REVIEW OF THE SUBMITTED PIANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THERFAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY OARFLEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. TED: RESPONSIBEI.TTY FOR THESE ITEMS ANI) IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT. DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND LK SUPPORT
OF THE OWNERS T OEERES
Gufatmoo3 6
315\°-14
1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ ANI) UNDERSTAND THE AGREEMENT ABOVE. (TNT11AL)
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County l3uilding Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand
Certificate
*de by J• above conditions for occupancy, use and the issuance of a
elling under building permit #•
Signature
bpcont
Date
eib
No. 8286
GARFIELD COUNTY
BUILDING, SANITATION,
and PLANNING DEPARTMENT
109 8th, Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
Job Address161a eL;Lx,,-- Pay t .y L C" 2 u-35 s t (4 (l j
Nature of Work Building Permit
Use of Building r1 A i S k gX S` �� �.t,►r. ' f g�Yr. P
Owner i vl� DQ
f
Contractor LJJ�,Ci�
Amount of Permits lR 9 3 ' Date 1 / 0
Cleric
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT Permit
2-1'39
BEST COPY
109 8th Street Suite 303
Glenwood Springs, Colorado 81601
Phone (303) 945-8212
INDIVIDUAL SEWAGE DISPOSAL PERMIT
Assessor's Parcel No.
This does not constitute
a building or use permit.
PROPERTY
Owners Name Oa1t Stowe Present Address P. 0. Box 276 , Glenwood Phone 945-5366
System Location
R River Ridge Drive. Glenwood Brings
Legal Description of Assessor's Parcel No
SYSTEM DESIGN
940 Septic Tank Capacity (gallon) Other
fi'N 2.3 dw'Vercolation,Ratee (�Y-nutes/inch) Number of Bedrooms (or other) 5
10109#
�% A 1 pct stay bort g44
$dt4 /6;:i°49701
Required Absorption Area - See Attached t, 173 s /t/c�� u NITS
•
Special Setback Requirements: 7� f i0 - L/6fi)ssoIP3 - A.)17S
Date 3 S' 9 7 Inspectorc:7,T%y,(q�,.�,�
FINAL SYSTEM INSPECTION AND APPROVAL (as installed)
Call for Inspection (24 hours notice) Before Covering Installation
System Installer
/SO CI
Septic Tank Capacity I /JO 6
Septic Tank Manufacturer or Trade Name G•21-4/uot
Septic Tank Access within 8" of surface 17)ES
Absorption Area � 3
Absorption Area Type and/or Manufacturer or Trade Name 2 %� NClc- u IU/73 j L A
Adequate compliance with County and State regulations/requirements 5.)f 5
Other
Date`11-97
•
InspectorI 'i..i '- r'
RETAIN WITH RECEIPT RECORDS AT CONSTRUCTION SITE
*CONDITIONS:
1. All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter
25, Article 10 C.R.S. 1973, Revised 1984.
2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con-
nection to or use with any dwelling or structures not proved grille Building and Zpniffice shall automatically be a violation or a
requirement 01 the permit and cause for both leg tiq{i ardLrevocatlorlbf'M&'perih t.
3. Any person who constructs, alters, or installs an individual sewage disposal system in a manner which involvesa knowing and material
variation from the terms or specifications contained in. the application -of -permit commits a Class I, Petty Offense (5500.00 fine — 6
months in jail or both).
White - APPLICANT Yellow - DEPARTMENT
f INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS •
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued.4..5J... ned Area Permit No....1.1
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use Ft 111, k Q�QY'y.4. .
Address or Legal Description 14.4.2..Rai Rvntyd 6 6.3.S ¶11
Ownersl Contractor Q
Setbacks Front Side Side Bear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing c - , 44Foundation
Underground Plumbing 5 7 X01071,--
Insulation wow FS-rhgep
Rough Plumbing _51,7/02_. A9-yr.Drywall
.4 o �rn�
Chimney & Vent
4,
Electric Final (by State Inspector}S•�4�
G4
?.�.,s,,
Gas Piping A 4-
Final F/40 -03
Electric Rough (By State Inspector) ;,
Septic Final
Framing 3 -zq- o. �.5.
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
DO NOT DESTROY THIS CARD
AP -PROVED
DateI5)p,_-y'I
IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC
1
GARFIE:ta COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 8111. Street, Suite 303
Gkelrood Springs, CO 81601(470) 4454212
No. 8285
Job Address q d» c a� P
Building Permit r Cm f 167-3
Nature of Work
se of Buildin
Owner,
Contractor
Amount of Permits
44-610
b,„0„,„
0 A"
Date —7/4CZAZIL a'a
Clerk
1
GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
TELEPHONE: (970) 945-8212
10B ADDRESS:
INSPECTION LINE: (970) 3 8 450'3
PERMIT NO. U c; -O ,, PARCEUSCHEDULE NO,
Ct'o Q -v00 A Hb(1O
LOT NO.
BLOCK NO.
Lv‘ • C'r ,cictie._ cog/.„3
SUBDIVISION/EXEMFFION 6.,,t-rtivziet F
2
3
cTropi1=IN H (N 1[ -i
cormkAciria
ADDma90 Ce7-T rr FSG Ott £-'j 60AL(
u
4
AlClotEcTANCOOMI
Lk Mk
5
6
7
8
9
114 FT. OF SOLDINO
101.1)010
DOCILIZE WOOL f 0 h
CLAIR Of MILL
°NNW
=MOLL
.Q. IT Of LUT
WO aPLOOL1
oALTD.ATION
CARPcor.
10
o01. WAT PULPIT
obi aTf[EEWA01 DOPO AL W7T1LT
corn RAN
YALZ:Al1ON Cr .MAL
ADIRITID VALCATYA13 Qj 3UIV/ / h M . _ /73
IYw [f t/
=sou ccommaatSUIP th64 L , 6 c44,6,1...0GLIeR4 /419 )vb/- Ys.'
NOTICE
A SEPARATE ELECTRICAL PERMIT 1S REQUB.ED AND MESE BE ISSUED BY THE STATE OF
COLORADO
THIS PERMIT BECOMES NULL AND VOlT) IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 110 DAYS, OR IF CONSTRUCTION OR
WORK 15 SUSPENDED OR ABANDONED FOR A PERIOD OF 110 DAYS AT ANY TIME
AFTER WORK 1S COMMENCED.
I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING THIS TYPE OF WORK WILL, BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT. THE/GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOL OR CANCEL. THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LA>,4 RE r^' TING CONSTRUCTION OR THE PERFORMANCE OF
OONSTR ON.
-Oz
PLAN CHECK FEE:
PER'"" f/
TOTAL FEEa.
:
BGG.{
DATE PERMIT ISSUED:
OCC: Giga -P:
ZONING
Kf
Boil Dept.
111,aswor Vie .#14491
A
PERMISSION IS HEREBY (RANTED TO THE APPLICANT AS OWNER. CONTRACTOR AND/OR T1E AGENT OF THIS CONTRACTOR OR OWNER TO CONSTRUCT T}E STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
CONST: TYPE:
v1v
SETBACKS:
ISDS NO. & FEE: ,
DI CONSIDERATION OF THE ISSUANCE, OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3011.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE TT STALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PIANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRED ON THEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY OT}ER ORDINANCE OR REGULATION OF TDB JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY POR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND LMP E.MENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE. ARCHITECT DES/GNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT
OF THE OWNERS INTEREST.
Grfom .003 1 liEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL)
�L-'7g
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to whcre water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancx, use and the issuance of a
Certificate,of Occupancy for the dwelling under building permit # �'� .
Signature
bpcont
Date
9a colt�ktetm., � C)d,-.
StIkLiA, 4q,c4cAj,
SfOrkAGc 7-0 UVrw(,5i°AC£
Sr X boo = -?::0)6 00
P LIo3.7a
—LG cict
at
FJVE D DEC 2 7 2001
December 17, 2001
Stephen Heinig
Heinig Residence
0090 Cotton Hollow, Lane
Carbondale, CO 8123
RE: Heinig Residence — Existing ISDS System, 0090 Cotton Hollow Lane, Carbondale,
Garfield County, CO
SE Job No. 21183.01
. Dear Mr. tieing:
Pursuant to your request, attached herewith is a letter/report presenting our findings in regard to our
evaluation of the adequate size and design of an existing Individual Sewage Disposal System (ISDS) at the
above referenced Site. Our opinion is based on our evaluation of the site conditions with information
provided by you for use in supporting your application to the Garfield County. This evaluation is pursuant
to Condition 4, listed in Garfield County Resolution 2001-48, concerning the approval of the Heinig
Special Use Permit Application. Our opinions and recommendations are in accordance with Garfield
County and the State of Colorado ISDS Regulations. The Garfield County must permit any proposed
improvement to the site. We have reviewed the information forwarded to us, evaluated the existing ISDS
design and have presented recommendations for the upgrade of the system to accommodate a total of 5
bedrooms as a part of our scope of work.
Conclusions:
Based on our findings we believe that the design of the existing approved ISDS system is adequate to serve
the needs of a total of 4 bedrooms in accordance with the Regulations of Garfield County and the State of
Colorado. In addition we believe that the design and installation of a proposed upgrade/retrofit to the
existing approved ISDS system, to serve the needs of a total of 5 bedrooms, is feasible in accordance with
the Regulations of Garfield County and the State of Colorado. The existing septic system is currently in
use and adequately functioning to serve the needs of a total of 4 bedrooms. Therefore we recommend that
its use continue to accept wastewater from the existing 3-bedr000m single-family unit and that it be
utilized to accept wastewater from the second dwelling unit. The second dwelling unit would need to be
limited to a single bedroom with no more than 2 persons in residence. We recommend the installation of
an Orenco System Effluent Filter at the outlet in the secondary chamber of the existing Septic tank.
The future addition of a second bedroom in the second dwelling unit will require a sizing upgrade/retrofit
to the existing system. We recommend that an additional concrete tank with a minimum volume of 250
gallons be installed in series with the existing septic tank. The tanks will discharge effluent to an
approximate 420 square foot expanded soil absorption system to serve a future second bedroom, if
proposed, along with the current proposed new 1 -bedroom addition and the existing 3 -bedroom house.
The addition soil absorption leaching chambers can be installed in natural soils. The addition soil
absorption area will meet all required setbacks and be installed adjacent to the existing absorption field in a
separate trench configuration. Approximately 6 new chambers will be required for the additional area.
Our Evaluation/Design calculations are outlined below.
502 Main Street • Suite A3 • Carbondale, CO 81623 • (970) 704-0311 • Fax (970) 704-0313 1
SOPRIS ENGINEERING • LLC
civil consultants
• •
Site Location:
Stephen Heinig
SE Job No. 21183.01
December 17, 2001
Page 2
The subject site is located at 0090 Cotton Hollow Lane, Lot 2 in the Cottonwood Hollow Subdivision,
adjacent to the south side of County Road 113, in Garfield County, Colorado. The site is situated in
Section 14, T 7 S, R 88 W of the 6th P.M. The Site comprises approximately 5 acres.
Existing Site Conditions:
The site includes a 3 -bedroom house with an attached garage structure. An existing permitted ISDS system
designed to serve a total of 4 bedrooms was constructed in June, 1993. The ISDS includes a 1250 gallon
septic tank and approximately 325 SF (21 leaching chambers) of absorption area in an assumed bed
configuration. The site has a general slope toward the South. Domestic water is supplied by an existing
registered well in excess of 100 feet from the closest point of the absorption field.
Proposed Site Conditions:
It is our understanding that you intend to construct a second residential dwelling unit up to 1000 S.F.,
above the existing garage. The wastewater drainage from this new facility will be discharged to the
existing ISDS. Current development plans propose that the second dwelling unit shall be limited to a
single bedroom with no more than 2 persons in residence. The tank and field size is adequate for this
usage without an upgrade to the system. See attached floor plan currently proposed.
The addition of a second bedroom in the second dwelling unit will require a sizing upgrade/retrofit to the
existing system. The proposed improvements will include a additional concrete tank, with a minimum
volume of 250 gallons, to be installed in series with the existing septic tank and additional soil absorption
leaching chambers to serve the needs of an equivalent 5 -bedroom house. We recommend that any new
additional absorption area, if proposed in the future be installed in a trench configuration. We recommend
the installation of an Orenco System Effluent Filter at the outlet in the secondary chamber of the existing
Septic tank or in the additional tank if required.
Subsurface Conditions:
A subsurface investigation and percolation test was conducted on May 28, 1993 by Don Owens of Garfield
County. The results are including in the existing ISDS permit. Groundwater was not encountered to a
depth of 10 feet in the profile boring. Percolation testing utilized three test holes, which yielded similar
absorption rates. The average percolation rate is 7 minutes per inch and is suitable for a conventional
absorption system.
Existing ISDS,
The site includes an existing 3 -bedroom house with an existing ISDS system utilizing a 1250 -gallon septic
tank and a leaching chamber absorption bed consisting of 21 chamber in 4 rows of 5 and 1 row of 1. The
existing system was permitted by Garfield County on June 14,1993 (Permit No. 2075). The system is
reported to be adequately functioning.
Stephen Heinig
SE Job No. 21183.01
December 17, 2001
Page 3
The absorption system was sized based on 167 sq. ft of absorption area per bedroom, per documentation on
the permit. A gravelless absorption bed with 21 leaching chambers was permitted.
Therefore the absorption field is calculated as follows:
A = 4 bedrooms x 167 sa. ft. = 687 sq. ft absorption area with reduction to use 21 chambers.
Bedroom
Existing ISDS Analysis
The design flow for the existing system is based on a four-bedroom house.
From the State of Colorado I. S. D. S. Regulations;
Average daily flow (Q) = # of people x gal/person/day (avg. flow)
Existing Design flow (Qd) = # of people x gal/person/day x 1.5 (peaking factor) = gal/day
Maximum number of people is assumed to be 8 people.
Gallons per day for residential = 75 gal/person/day
Qd=4x2x75x 1.5 = 900gal/day
The existing absorption field system is adequate to serve the needs of a 4 -bedroom flow equivalent.
Based upon the previous percolation test rates, the standard absorption area equation yields:
A (SF) = 0 *(t) : where A = Area; Q = flow (gal/day)
5 t = time in minutes
For a bedconfiguration assume a 30.% area reduction.
Assume 15.5 S.F. per leaching chamber.
This equation will give a recommended minimum absorption area:
A = = 900 *(7) 1 = 476 S.F. 476 sq. ft (0.70) = 333 S.F = 21 OK existing area has 21 chambers.
5 153 S.F/chamber
Proposed ISDS Analysis
The design flow for the upgraded/retrofitted system is based on an equivalent five -bedroom house.
From the State of Colorado I. S. D. S. Regulations;
Average daily flow (Q) = # of people x gallperson/day (avg. flow)
Max. Design flow (Qmax) = # of people x gal/person/day x 1.5 (peaking factor) = gaVday
Maximum number of people is assumed to be 10 people.
Gallons per day for residential = 75 gal/person/day
Qmax=5x2x75x1.5= 1125gallday
The Proposed absorption field system will serve the needs of the five -bedroom flow equivalent from the 2
dwelling units. Based upon the previous percolation test rates, the standard absorption area equation is:
A(SF)=Q*(t).1 :where A=Area; Q=flow(gal/day)
5 t = time in minutes
For a bed configuration assume a 30% area reduction.
Assume 15.5 S.F. per leaching chamber.
This equation will give a recommended minimum absorption area:
A = = 1125 *(7) = 595 S.F. 595 sq. ft (0.70) = 416 S.F = 27
5 15.5 S.F/chamber
Stephen Heinig
SE Job No. 21183.01
December 17, 2001
Page 4
Install a minimum of 6 additional leaching chambers in a separate trench configuration and 250 gallon of
additional septic tank storage.
Svstem Recommendations
An effluent filter should be installed in the secondary compartment of the septic tank or in the additional
septic tank to reduce the biological loading to the absorption trenches and extend the life of the treatment
media in the absorption field. The effluent will be distributed from a new distribution box if an upgrade is
desired to the system. No garbage disposal systems are currently installed and we discourage there use
with the existing ISDS.
Our evaluation and recommendations are based upon data you supplied to us. If subsurface or site
conditions are found to be different from those presented in this report, we should be notified to evaluate
the effect it may have on the existing and/or proposed upgrade ISDS. If the County Environmental Health
Department requests changes or modifications to the system, we should be contacted to evaluate the effect
on our evaluation.
If you have any question or need any additional information, please call.
Sincerely,
SOPRIS ENGINEERING, LLC
Paul E. Rutledge
January 1, 1999
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A
section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to
7,000 F.O.S. and an 80 M.P.H. wind.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
1 Is a site plan included that indicates the distances of the proposed building or addition to
property lines, other buildings, setback easements and utility easements?
Yes
Does the.site plan include the location of the I.S.D.S. (Individual Sewage Disposal System)
and the distances to property lines, wells (on subject property and adjacent properties),
streams or water courses?
Yes
3. Does -the site plan indicate the location and direction of the County or private road accessing
the property?
Yes 7'`4, •
4. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?,
Yes
5. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes
2
6. Do the plans indicate the size and location of ventilation openings for the attic, roofjoist
spaces's and soffits? _ _ —. _ ..
Yes ,/ h E✓Auc& l�2•u�
7. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
.
Yes ,; r ''
Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction?
Yes �
T_-
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
10. Does the building section drawing or other detail include the method ofpositive connection of
all columns and beams?_-- —
Yes V
11. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing grade contours?
Yes12. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase II EPA certification?
— — -- Yes-- --- No— - -
13. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
•
Yes No
14. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform Building
Code?
Yes f/ No
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes ` No
3
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safety glazing for these areas?
Yes ^ No
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes /Z No
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes
No
19. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural committee deny or reject your building plans?
Yes t.. No
20. Will this be the only residential structure on the parcel?
Yes No If no -Explain:
21. Have two (2)_complete sets of construction drawings been submitted with the application?
Yes
22. Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.?
23. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes No
24. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the.Garfield County Building Department?
Yes t/ No
25. Do you understand that approval for design and/or construction changes are required ;prior to
the application of these changes? i; {
Yes No
4
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at
the time of application and that you will be required to pay the "Permit Fee" as well as any
"School impact" or "Septic System" fees required, at the time you pick up your building
permit?..,
Yes No
27. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will
delay your inspection one (1) day. Inspections are to be called in to 384-5003.
Yes No
28. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy and occupancy of the building?
Yes . 4, No
29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project complying with the Uniform Building Code?
Yes j_ " No
30. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes
No
31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be required
at time of applicable inspection.
Yes No
32. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance of a
building permit? Your attention in this is appreciated.
Yes —. No
5
._ 1 hereby acknowledge that 1 have read, understand and answered these questions to the
best of y ability.
signa C date
Phone: q g _YiL 6 (days); 1. = ,; 4 'c 6 ci (evenings)
Project Name:
Project Address: T () Ca -f" ; z N 11'0Gc akJ JM
Notes:
Car" fpA sl - Gr
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
8/00
6
0
0
w
0
0z
✓
O
H al
O --s
— 0—
i
O .a
O
al ES,
3 -'
,? TT,,��1.
• O h
133 U
4 cd
CO
3 E
• o y =
• -o .0
-o 92
73
co E
U -0 U
Liz 0
C y U
o
• H
at)
usattg
= O
,4. a) 0
in in
tr
• 0
a.)
G) _
m
0
0 11
yE z
L v
O 'e27z~
- ,
a - (4'_
o ��v
County Road (Note the Road Number and N
d.
-74
•
/
7.9'35/8'
-
•
I
C D I \
• I' \
I
m
I D-
ri
I � I
/
m •I.I I. ti l I O
I :\ z
m
days anoge a8
•
—I\
• CI
\ ��I 1•\ •�
\•
,i •
rn
12''9 5/8"
„Z/i. 1 a7an-dAD
\
r cr.
O•
. n
1.11 Ili,,•;, I
1 i'; ; I
��11_', x..111 !
I:I1 ,l,
3-,•;-r 11I,i:-
I I I ; j I 'i
• 1• I'IF }I
I. =„9/i 31VJS
c D
Z n
n
m
cnO
C
m
G7
m
D
0 z
_ •
• - • 10'4"
•••■•111..•
Ia
I 2
I.
• i
:1_,
r
A '4 -.-.-..o.• x
r" • • • • : • • -:•_•‘:
I "...0
A-
L
:
•
:••
1
12.5 5/8"
•
/
I
'
I.= „8/ 1 31V3S
.-•-•-•• . -. . ' .....
• ' . .... '..."
...................
.. ,
-ri C > ......... .
0•Z C")
.
O : I r) ....... .. -.
, m ....... .
-13 > VI • .: . . . . . . . . .
CU 00 0 .: . . . . . . . .....
• 0 = I !
<
••••• ••-••••• •• .
Pr,
m
. • . • .. •
r—
• 0 2 , ............
m G.)
„....„.
..........
• • . . • . . •
• • • • • •
• • • . . • •
• • . • • • • . - •
• • 1 • . • • .•
1 :_•J . • .. • . • • ..
. • • • • • • . • •..
, . • • . • • • •
. • • • • .. •
• • • • • • •
j: 1...; 1: ! '* •
• !. I•j • .
Trr
=•
CL)
•
a , a
J
L
F
a
a
•weaq a6pu leinpmis
29* -3 5/8"
—11–
1----
-
,.
. • 1 g
a : 2-
-1
N1
I 01
. I i
, _!. _ i ' • . f: i
IT V
) m
• /
ill 11 1 2
.1 z
. .I:
m 1—‘'' i5 g
m
P
.t.
Fi S
,,-. ...
• c CO
O 0
Q :Hg•r uirm-113.0-- E CfI:. g* ,L* -F, "‘..",,"iij1., iI :' jl8r- Xt \
111.1
'3 \;5.'
5.
ea
11 .• 1._
I ....1,-.rrepli_'L.- 1 I\J
=1.1-7. 1
— — • :I lit' II._ li I 1—: Atm. illi - - • . —.
['1ri. Ti n r.,ifl i r :o-
,cn
•
rr
1 . k
- A. '4' - I
el ...,
I 2 111 1 I
: c -,
cr;,
7 : I
'llg . c' ''
g , ..,...
E:.
c.,
I. r,
0 13
. S
• • - -
16; 1
I I 0 Er
' Ji
ni,„1:1--i\L- ,r,..-- -----.'-•.
12%9 5/8. .111 II. 1=.7
. i . 1 I
• -.,71 ••-•• -••
WI. "ri
i t • ill — — —A
• mu. • L
limier
—I I? XI
.4 4 rai
g
a
. s, .. .
a
1 1 g Ri 1 16-6.
v.
O — 8 ii E.) —.
i a
1
• • . • . • .... •
• • • • • • .....
1
..... •J
.. 0
ri
P
12.-5 5/8"
r
0
39VeDISII3NMO
l =.,8/ I. 31VJS
• • • • • • • .
. . . . . . . . . .
• • • • • • • • •
- • . - • -
...........*.........
as \
\ . ...................
... . . . . . . . . •
. • •
L.
•
•
BOISE CASCADE - BC CALC"" 2001 DESIGN REPORT - US
F de
N a. -n e
Double -1 314" x 14" V -L DF 2800
Job Marne •
Address
C'iy. Stale. by •
Code Reports • ICBG 5663. NER 442
CAtoms r
Spec+rrer
Desgrer
C-.3mpany
Mrac
lnursaai rreb*Lar- 14. 2.102 L.2,51
• Eloise Csacade Cc::orat.cn
- Base Ca. ad! C_:»ratcr
•
.-3-17-
B^
:5e0 7,.)S LL
1292 los OL
StanEtrc L^ -J7 46 P46 ; 24 aSr Tr Ou J } 36.0.30
T�ul Hora0•nta! Lsng:h • 15.06-C-0
3.1+7" '
rJ 1
• 980 Ibs LL
1i92 Os LL
Grmeral Data
Verson US Imperial
Member Type Floor Bsar.
N•:''+ber o' Spans 1
Lett Can.rtevr No
Runt Canlrevr No
Sb-oe 0112
Tnbuta:r 06-13`00
Reore tvs rt'a
;,on37ucbor Troe 1118
L+.'• Loan 40 0SF
Deas Load 24 FSF
Part Load 0 PSF
D,-aticr 100
Disclosure
1 he oornpte;er.esa and a:.curaCy of
the v pui'rust be -,snfAK1 b r anyone
who w0vtb ret} 0111.111 snout as
evidence of '0- a
oanatar applicator The ,r'p.1
above is aasee Von bt:r:G'+nq
:ode-aacentec assign properties
310 ar.eysis methods Installation
Dr Gorse CSs330s °Nineteren woc1
p•oducta mus! be r, accordanCe
,rith the cLrant Pleiarteti4.1 Gude
snJ the eppicable buJcing Colas
To otter ar. Insta!ration Gude or r+
have any greslrona. pleas ca
1800}2.32-3'88 before beginning
aradvCt instg0a!ior.
Paye 1 of
Load Summary
ID Description
S Standard
Load Type Rst.
Unf Area Load Left
Controls Summary
Control Type Value
Moment 134116!1-i
End Shear 2809 lbs
T71a' Def L.47_ LC 413' )
Lv9De!1eper _'?91/0,25'1
Mak Ceti. 41.1- 1"1
S)an:Depth 14 1
Bearuia Supporta
Hams Type
3C Wall//Plate
B1 WadlPlate
'4 A'.towable
51.5'x.
30.2Y.
50 11
45.5%
4•.3 ••
SUR
uO 0C-00
Duration
100%
l{JO°,:
End Live Dead Trib. Dur.
le.oe.cc 40 PCG 24 PSF D6-00-.)) °00
Loaddere
2
2
2
2
Dlm. (L : W) Value `b Arrowed Gass
3•-,2' x -1'Y• 3272 las 62 97v, 2
3 •f2' x S.1,2" 3272:3s 62 8% 2
NOTES:
Cosign -reel; C'uJe;n,1 m,tm 1L/24j; Tote' Oar; Jo'.wCGOn = :v
Dssi;n --.eels Code m•i;rnurr (L:6L; Lee Ioid deflection criteria
r'esrir meets aro.t:ary (1"; L'Iax.mu!'t CaJ:dele troy. craerra.
BCH and Versa•LrmGG aE regrbte•eC :raier'r ants c' Erise cacao Corp
. ••• ••••
Span Location
1 . Ince nit'
- Ler!
Morena!
Spr.rce•Ping•F it
Spruce-Prte•Fir
COT TONWOOD ROLL
-1
•cs /
0 .
i
•,
\ (
1 .0) -S'
, ,
-,
...- .•-i I
....•) .,•-
1 ..-4 •-i• I
r I
.1 3z, ct,
1 ...
yl C•\ •,,,,4;
1\1 -- .
7 , 4...k o.7..„
IA \ d
..0 \
1
mo• .
0 Cr ri i
0 , \
\( 6r -i -t i:,
CO --
CO
✓ i
13 it
1
Td ...Q
- _
0 ,
• I \., \
D I y
CC CD \ \
4 0 C. I ..1 • ..N.
7-3-r
5oi
.9\
. J
--
• -
op i E. ...,
o , '
1 7 - '.-,t4E. Ir • ‘.1-1 Qv.,
O 1 •-: '
•
O 1 i :::,, , ,• ,...,...c.: , „ ,,,-.1-.E.-
I r;
z
0
oi
C.1
3
6
INSPECTION WILL NOT BE MADE UNEEtS
THIS CARD IS POSTED ON THE JOB
_A IIUL•I2S Ntr11(-£ REQUIRED FOR INSPECTIONS
Th
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued .. .Zoned Area Permit No
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector an�I.
dd IMMEDIATELY BECOME NULL AND VOID.
UseCD M f :54Ork - ,. l 4 uDIAttki
Contractor Q l r
Address Legal Descripti
�rner/ ; 1
Setbacks Front
Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
P.
INSPECTION RECORD
Footing 04/07..., u
Foundation
Underground Plumbing 1402.-
Insulation . 1-z# -020
Rough Plumbing i,f 9sit /
Drywall 1-7.oyp-
Chimney & Vent I. 1.,0v Mr-
I� Ic•rt:•ic Filial tb► State ln�peciorl OI 4tz.
Gas Piping .. *6ca. kt
Final g./5-01-- l ,-
Electric Ruttih It, State Inspector}Wer.
r
Septic Final
Framing 7- -- »--t2(
(To include Roo[ in place and Windows •
and Doors installed).
—
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVED DO NOT DESTROY THIS CARD
Date.51 By
IF PLACED OUTSID - CER WITH CLEAR PLASTIC
.4