Loading...
HomeMy WebLinkAbout2.2 Grading and Drainage DrawingsNV NV NV NV NV NV NV NV NV NV NV NV NV SEE GRADING PLOW UP ON SHEET C1.2A FOR DETAILED GRADING SURROUNDING RESIDENCE DECK TO BE MAXIMUM 30" ABOVE EXISTING GRADE NV NV NV RELOCATE EXISTI DITCH TO PAM WEST PROPER PROPOSED RELOCATED DITCH SEE DRAINAGE SWALE DETAIL ON SHEET C1.4 V FG:6261 FG:6261.53' / / A/ NV ` N NV '4, NV «V NV NV FLOOD PLAIN NV ZONE A3 NV 1V NL ® 1V NV EX:6259.3'±= • \ NV N �' NV NV ' L V \I/ w ` \V 4 NV / \V _ \L * / \ 1 1 N\ / A... <4., kt C, 2 \V *V Ik21/2% / N • EX:6259.9'i FL:6259 FG:6261.13' G:6260.57' V / 4:6260.80' / \" FG:6263.00 / PROPOSE?6 ADS N-12 TO CAIINECT TO ROOF D {(AGE TO DAYLIGHT FL:6261.29' / / / FG:6262 F6:62 FG:6261.77' FG:6261.54' PROPOSED RELOCATED DRAINAGE / IRRIGATION SWALE SEE DETAIL C11 SHEET C1.4 FG:626 .44' EX:6261.O't FG6239' FUTURE FF=6262.25' / / N / BUILT ORMATICT /ROM HIGH COUNTRY ENGINEERING \ NV NL NV \IFRE-4.4. AS BUIIJ JNMATI - FROM HIGH COUNWEL ENGINEERING NV : EX:660.9'±. • F6:6262.65' 6:6261.51' FL:6262.43' F6:6263.00' FG:6262.50' 4. FL:62 1.56' FL:6260.61' F FL:626R.67' TOW:6262.85' FG:6262.15' 63.10' (1) 7" STEP FS;626 50' TOW:6264, '0' / FG:6262.00' FG:6261.00' F6:6263.50' FG:6263.50' PROPOSED GARDEN 6263.5' TOW:6263.25 PROPOSED GARDEN TOW:6263.25' FF=6263.5' FG:6263.50' FG:6263.50' FG:626 . t FG:6262.5 ' GRADE TO BE FLAT @ GATE •67I61.80' TOW:6264.00' W:6266.28' 2.1% 'TTOW:626 • •' FG:6263.00' FG:62. ;,02' TOW:6264.00' FG:6262.46' FG:6262.37' FG:6262.46' FG:6263.03' NV \ I/ NV NV NV \fr \fr NV NV NV NV \fr NV NV N NV NV 'Mit, an `NV NV; N NV NV NV NV N NV • NV NV NV NV NV * NV NV • 1/ NV NV i •6261.00' FG:6263.08' 137 NV NV NV N NV NV NV NV NV NV NV NV NV N NV NV NV NV N N --'NI 4 NV FG:6262.33' TOW:6263.5 FINISHED GRADE BELOW DECK TO BE MIN 14" BELOW DECK ELEVATION 4/ 7:626 W:6263.50' TOW:6263.5 i �� •• FG:6263.00' FG:6263.00' FG:6262.99' 6.762 640 OW:6266.03' FG:6261.93' F6:626\ NV NV NV N NV FG:6261.57 Tao N NV NV DECK TO BE MAXIMUM 30' ABOVE EXISTING GRADE NV W 1' / \V yV / / NV NV NV NV \V NV NV NV NV NV NV w / FG:,777' N NV. N 1 rERI/NFo, '03Nibfr 2 \fr• .%CNV NV \ \ N 1, 0. NV NV GRADING & DRAINAGE NOTES: 1. THE EXISTING CONDITIONS BASED ON TUTTLE SURVEYING. THE CONTOUR INTERVAL IS ONE (1) FOOT. 2. ENSURE THAT DRAINAGE IS AWAY FROM ALL STRUCTURES IN ALL DIRECTIONS, MIN OF 6" IN THE FIRST 10' OR 3' IN THE FIRST 10' IN PAVED OR CONCRETE AREAS. 3. THE CONTRACTOR SHALL CONTAIN THEIR CONSTRUCTION OPERATIONS TO THE AREA WITHIN THE LIMITS OF THE PROPERTY, THE CONTRACTOR SHALL NOT OPERATE OUTSIDE THIS AREA WITHOUT THE PRIOR CONSENT OF THE PROPERTY OWNER INVOLVED. 4. ALL UTILITIES BOTH UNDERGROUND OR OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY DAMAGE TO, OR INTERRUPTION OF, SERVICES CAUSED BY THE CONSTRUCTION. 5. THESE UTILITIES AS SHOWN, MAY NOT REPRESENT ACTUAL FIELD CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF UTILITY COMPANIES FOR FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION. 6. ALL GEOTECHNICAL RECOMMENDATIONS SHOULD BE FOLLOWED. HATCH LEGEND: PROPOSED GRAVEL DRIVE PROPOSED CONCRETE DRIVE PROPOSED DECK DETAIL LOCATION: 20 DETAIL NUMBER SHEET DETAIL IS ON 0 10 GRAPHIC SCALE 20 40 (IN FEET) linch = 20 ft. Know what's below. Call before you dig. CALL 2 -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES W Z C9 In W ❑ >- ❑ U J J C7 z_ W LU z a W U) cc 0a N 0, z Q CO z z_ LL rn O J 0 w 0 0 J 0 0 0 0 W tL Q < 0 C/) z Q 0 z 0 100% CONSTRUCTION DOCUMENTS DATE: 04-28-2015 JOB NO. 14002 SHEET C1.2 6260-----1N. \ \ •-......... - - / // CONTINUE / DRAINAGE / / - WEST 6260 / E$:6259.9'±- PROPOSED / , \ \ \ / -FL:6259.28' \ „• FL:6259.40' \ \ SWALE ALONG / \' - - \ SIDE OF PROPERTY, / / \ \ �i \ \ \ _ - _ \ \ / / .. . 676 / FG:6260.6T \ \ - \ / / / // / /\ // \ \ \••••./ \ \ \ \. \ \ �� \ \ \ \ \ .. - \ - \ \ � - \ / \ \- / 7 / / / 6261\ \ \ INITIALS DATE / / / FG -6260.80' / / FG:6261.7T \ \\ - ' \ / FG:6261.44' _ \ \ \ \. -FG<6251.56' / -- = ��.: .� \ :• EX:6261.0'± -, m / 7 / / 7 2 STEPS 6" RISERS 1' TREADS o \ -.. \ \ \ "" ' - \ p } m ='�__ \ - Z Y , / \\ 2 /� \\ NSW _ - / / Z7jam/\ / FG:6263.00' / /77 3 STEPS 6" RISERS I' / / / TREADS / / F6:626 .50' FG:6262.92' �\ �� \ �j� \ tt w FG:626' FL:6260.46' ` .'�.•x A6 •. \ `\ 'a`i� \ `� \ -I J J C.9 Z_ (/) / _ oo / 7 ' \ FL:6260.61' cc z N / FG:6261.53' / FG:6262 9' / \ W Q to c, F- .- / �� _ / (1) 6" STEP @DOOR \ W W o0 r Pal ., 0.0% `��Y .. THRESHOLD \\ r // /� FG:6262.65' n 7 - / Z \ z J N CC L.) o or fn US a o^ Z Q // / 4.0% 1.9% Z Z O Q 2.0% \ W Oy_ // _ _ _ FG:6263.00' / L-6261.56' O o m v /�/ / �/ FL6261.29' / �� TW : 6263 _ //Jfl 75' G:6261.51' FL:6262.43'J PROPOSED CURB CUT 11 ASSUMED DO ELEVATION 6263 POUT 0' FG:6262.50' �^ $p ,.a \ _ /' \ / - N CC ; - U Q Q LL U - - WIDE 2" DEEP INV IN=6261.5 �,% 7- - t626VIEE 0.8% ,\ O / / v t m - TOW:6262.85' / / 3 STEPS 5.5" RISERS 7 6" DAYLIGHT=6260.3 16.5" TREADS F '6267 / FG:6262.15' / 7 7 FG:6262.I- GGG }� TOW:6262.85' PROPOSED CURB CUT 1' /7j / 7 J / / V / WIDE2"DEEP J / DATE •: - 63 41' i EL=6261.90' V 7 / / / I IUW:6263.1U TOW:6263.10' / ti 80 LF OF 6' ADS / l•-•.1: / FG:6262.00' N42 @ 1.5% FL: / FG:6261.80' 261.87' - _ TOW:6264.00' m \ FG:6262.50' / - / - - FG:6263.50' . 161.00 FG.6263.50 FG:6263.50' FG:6262.5 ' / FG:6262.2 To 6266.28' / SEE LANDSCAPE PLAN FOR ALL GARDEN FG:6263.50 DETAILS GARDEN TO BE SLOPED AT 2.0% (1) 74TEP - / D n% TOW:6264.00'.1116 A 2.1% OW:6266.28' TOWARDS CURB CUT. FINISHED GRADE TO BE j -Q- ' TOW:6263.25' - 1" BELOW TOP OF WALL EXCEPT AT CURB FG:i3263.50' �"' TOW:6264.00'- TOW:6264.00' 0.0% / 3.6% OW:6265.10' FG:6263.00' y CUT WHERE IT IS 3" BELOW TOP OF CURB TOW:6263.25' FG:6262.65 - FG:6262.46' FG:6262.46' FG:6265.02' / / NI SIN s • FG:6263.03' CONTRACTOR TO DAYUGHT- .�.---FG:6262.37' / 1 / ROOF DRAIN INTO PLANTER. PROPOSED CURB CUT I' a / / �5 Z / ..... SEE LANDSCAPE PLAN FOR ALL GARDEN .�./ ' e� / REVIS F .• 61.00' WIDE 2"DEEP • EL=6262.33 FG:6263.08' FG -6262.65' DETAILS. GARDEN TO BE SLOPED AT 2.0% Y TOWARDS CURB CUT. FINISHED GRADE TO BE / 1" BELOW TOP OF WALL EXCEPT AT CURB / / F6:6262.33' �� _,_ , TOW:6263.50' TOW:6263.50' N N. -'' 7/ CUT WHERE IT IS 3" BELOW TOP OF CURB / PROPOSED CURB CUT 1' / \OW:626 N N 2. N. TOW6263 .D' WIDE 2" DEEP / EL=6262.66 SEE LANDSCAPE PLAN FOR / GARDEN AND WALL DETAILS h / N FG:6262.66' N. N. FG:6263.00' / / N N N FG:6263.00' FG:6262.88' / /N / Z N. \\\ _%a N. \-"t\ (1) 6" STEP OF DECK N \ \ \ 6$? 4 / SEE LANDSCAPE PLAN FOR N ADDITIONAL DETAILS IN THIS \ N. N. / // bryb., / �� / / / 616ti / / UMA RESIDENCE LOT 9 FINNBAR RANCH GARFIELD COUNTY, COLORADO BLOW UP OF GRADING PLAN 100% CONSTRUCTION DOCUMENTS N ofAREA N. / /� ••• sit \ N N. N. N. 6760 N.nfOf N.N N. N. (1) 6" STEP OF LAND I NTO FINISHED GRADE FG=62.38' 6:6261. I '-• Ole/., / ✓/jt / ,� .� .. PaGY yf/ ;p 2 377 TOW:6266.03' r/ , / +a� OPaAI E ,r• / 2r • t A ..... GRAPHIC SCALE FG:6262.33' 10 0 5 10 20 a0 ` `C / (IN FEET) , , \ . f inch = to ft. FG:6261.57' / \ / ��� ,.., .._, / / v.:, ,, $ / / Know what's below. \ dig. `/ / Call before DATE: 04-28-2015 you \ \ ` / CALL 2 -BUSINESS DAYS IN ADVANCE ` JOB NO. 14002 / BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE UGROUND \ / MEMBER TIIUTI SHEET C1.2A CONTRACTOR TO INSTALL STRAW BALE CHECK DAM AT END OF SWALE WHILE VEGETATION IS BEING RE ESTABLISHED ® CONTRACTOR TO INSTALL SILT FENCE (TYP.) X FLOW PLAIN ZIONE A3 \ '1 \ 4' 4' / 4' N \fr • ** ` `� � \ *% 10004,11811. 4' \ \ \6260 6260 4' 4' N N N N / • BUILTORMATIC\ -ROM HIGFICOUNITRY ENGINEERING 62s / / / CONTRACTOR TOISNTALL VEHICLE.TI#ACKING DEVICE: ATSITEEP(I1(NCE/EXIT 111%�Tj� $'Re 4. \L J, i AS OM HfGH COUMANiB ATTI FR7j4'Fp) ENGINEERING ` - '0.3 L �` j\3 ��\4/1114 / / / / ye- / ELECTRI TRN. CABLE PHON N 1 / F is N is N N is is is N N N N N 6262 yf CONTRACTOR TO INSTALL ® SILT FENCE (TYP.) as is CONTRACTOR TO INSTALL SILT FENCE (TYP.) ® is. / N / 7 LOT 10 ST FINNBAR FARM SUB N \ N . N N STORM WATER MANAGEMENT NOTES: 1. IN GARFIELD COUNTY, ALL CONSTRUCTION PROJECTS WITH OVER 1/2 ACRE OF DISTURBANCE, REQUIRE A CONSTRUCTION STORMWATER DISCHARGE PERMIT FROM THE COLORADO DEPARTMENT OF PUBLIC HEALTH & ENVIRONMENT (CDPHE), WATER QUALITY CONTROL DIVISION (WQCD). THE PERMIT APPLICATION SHALL BE SUBMITTED AT LEAST 10 DAYS PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. 2. 3. 4. THE PERMIT APPLICANT (S) SHALL BE THE OWNER AND/OR THE SITE CONTRACTOR. THE APPLICATION SHALL BE SIGNED BY THE OWNER AND/OR THE SITE CONTRACTOR. STORMWATER MANAGEMENT PLANS (SWMPs) ARE REQUIRED FOR ALL PROJECTS REQUIRING A CONSTRUCTION STORMWATER DISCHARGE PERMIT AND SHALL BE MAINTAINED AND UPDATED ON SITE. THE PERMIT HOLDER MUST IMPLEMENT, MAINTAIN AND INSPECT STORMWATER AND EROSION CONTROLS DELINEATED ON THE SWMPs UNTIL THE SITE IS PERMANENTLY STABILIZED AND THE PERMIT IS INACTIVATED. THE PERMIT COVERS ALL WORK ON THE PROJECT INCLUDING WORK PERFORMED BY SUB- CONTRACTORS AND OTHER ENTITIES. IT IS RECOMMENDED BY THE WQCD THAT A SWMP ADMINISTRATOR BE DESIGNATED FOR THE PROJECT. THE SWMP MUST BE KEPT ON SITE FOR USE BY THE ADMINISTRATOR AND REVIEW BY WQCD PERSONNEL. 5. THE SWMP SHALL BE PREPARED IN ACCORDANCE WITH GOOD ENGINEERING, HYDROLOGIC AND POLLUTION CONTROL PRACTICES THE SWMP NEED NOT BE PREPARED BY A REGISTERED ENGINEER. THE OBJECTIVE OF THE PLAN SHALL BE TO IDENTIFY BEST MANAGEMENT PRACTICE'S (BMPS) WHICH WHEN IMPLEMENTED WILL MEET THE TERMS AND CONDITIONS OF THE GENERAL PERMIT. THE SWMP SHOULD BE AMENDED AS NEEDED TO REFLECT THE CHANGES/IMPROVEMENTS MADE. 6. THE PERMIT REQUIRES THAT INSPECTION OF THE STORMWATER MANAGEMENT SYSTEM BE PERFORMED AT LEAST EVERY 14 DAYS AND AFTER ANY PRECIPITATION OR SNOWMELT EVENT OCCURS. INSPECTION REPORTS MUST BE MAINTAINED ON SITE AND MADE AVAILABLE FOR REVIEW BY WQCD PERSONNEL. 7. THE OBJECTIVE OF THE STORM WATER MANAGEMENT PLAN INCLUDES BUT IS NOT LIMITED TO MINIMIZING THE AMOUNT OF DISTURBED SOIL, PREVENTING RUNOFF FROM OFF-SITE AREAS FROM FLOWING ACROSS DISTURBED AREAS, SLOWING DOWN THE RUNOFF FLOWING ACROSS THE SITE AND REMOVING SEDIMENT FROM ON-SITE RUNOFF BEFORE IT LEAVES THE SITE. 8. THE INSTALLATION OF BMPS AND SPECIFICATIONS FOR EROSION CONTROLS SHALL BE IN COMPLIANCE WITH THE COOT EROSION AND CONTROL STORMWATER QUALITY GUIDE. 9. THE CONTRACTOR WILL BE REQUIRED TO FURNISH AND APPLY A DUST PALLIATIVE ON THE SITE AS DIRECTED BY THE COUNTY. DUST PALLIATIVE MAY CONSIST OF WATER OR A NON-POLLUTING SOLUTION. SPREADING OF WATER OR WATER MIXTURE SHALL BE DONE WITH ACCEPTABLE SPRINKLING EQUIPMENT. ALL DUST CONTROL SHALL EXTEND BEYOND THE CONSTRUCTION AREA PROPER TO THE SIDE STREETS ENTERING AND EXISTING THE PROJECT, WHERE MUD AND DIRT FROM CONSTRUCTION EQUIPMENT, AS WELL AS LOCAL TRAFFIC, MAY GET ONTO THE SIDE STREETS. CLEANUP OF THESE AREAS WILL BE REQUIRED AS NECESSARY OR AS DIRECTED BY THE OWNER. EROSION CONTROL NOTES: 1. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH GARFIELD COUNTY UNIFIED LAND USE RESOLUTION. 2. CONTRACTOR TO UTILIZE "BEST MANAGEMENT PRACTICES" TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION. NO SEDIMENT SHALL LEAVE SITE DURING CONSTRUCTION. 3. CONTRACTOR RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF TEMPORARY EROSION CONTROL. 4. THE CONTRACTOR SHALL MAINTAIN SEDIMENT AND EROSION PROTECTION THROUGHOUT THE CONSTRUCTION OPERATION. SILT FENCES OR OTHER NECESSARY EROSION PROTECTION SHALL REMAIN IN PLACE UNTIL ALL DISTURBED AREAS HAVE BEEN REVEGETATED. 5. ENGINEER WILL FIELD VERIFY DURING CONSTRUCTION EROSION CONTROL METHODS AND EXTENT. 6. PERMANENT EROSION CONTROL TO BE PLACED AFTER CUT AND FILL SLOPES ARE IN PLACE, ENGINEER WILL DESIGNATE AREAS FOR EROSION CONTROL, AND DESIGNATE TYPE OF EROSION CONTROL. 7. ALL. DISTURBED AREAS SHALL BE SUCCESSFULLY REVEGETATED AND MAINTAINED IN A PREDOMINATLY WEED FREE CONDITION. 20 HATCH LEGEND: PROPOSED GRAVEL DRIVE PROPOSED CONCRETE DRIVE PROPOSED DECK DETAIL LOCATION: DETAIL NUMBER SHEET DETAIL IS ON GRAPHIC SCALE 0 10 20 40 60 (IN FEET) l inch = 20 ft. Know what's below. Call before you dig. CALL 2 -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTIUTIES H O DESIGNED BY CHECKED BY M N I- c"1 W °3 ,- cT WQr9 cc U co goo n zW�o Q n Z oma In a Li. U m 0 U) w O Z U coLL rn 0 J U z 0 Co LLE Q U) 0 0 0 0 U J W LL CL Q Q J CL J 0I- z 0 z 0 0 DC Lu 100% CONSTRUCTION DOCUMENTS DATE: 04-28-2015 JOB NO. 14002 SHEET C1.3