Loading...
HomeMy WebLinkAbout5.0 Water Pump Waiver-Letterarchitecture + interiors August 17, 2015 Glenn Hartmann Senior Planner: Community Development Department Garfield County 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Re: Supplemental Discussion to Pre -Application Water Pump and Quality Waiver Request at 24 St. Finnbar Farm Road, Carbondale Dear Mr. Hartmann: Studio 6 Architects is providing this letter to request a waiver on conducting additional water pump test done in the approved subdivision of St. Finnbar Farm for the proposed ADU. Per the attached document, the pump test previously done in February 28, 2015 in conjunction with the construction of the main house on the same lot shows a flow rate of 15 gallons per minute. After consulting with Samuelson Pump Company Inc., the company commissioned for the pump test, they have confirmed this flow rate is more than enough for the existing main house consisting of a full kitchen and 3.5 baths, and the proposed 470 sq. ft. ADU consisting of a kitchenette and 1 full bathroom. The proposed ADU water supply will be from the same approved well. Please do not hesitate to contact me via phone or e-mail if you have any additional questions or need further clarification. Thank you for your consideration. Regards, Eric Sechrist Assoc. AIA Studio B Architects 501 rio grande place suite 104 aspen co. 81611 970.920.9428 fax 970.920.7822 www.studiobarchitects.net