HomeMy WebLinkAboutApplication- PermitINSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued..Z.I.it.t.Zoned Area Permit No $'94214
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use ao.4--c,�
S#77 %Cnt t tl t 6(..as 7isSel(01
Address or Legal Description
Setbacks _Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing //7 02_, i 4a
Foundation /`/1/4z— /92K. `
Underground Plumbing mi._
Insulation //1
Rough Plumbing v 4.
Drywall N
Chimney & Vent "AP
Electric Final (by State Inspector) 4 j e t 1
Gas Piping' i qt b y k)i.A,.
Final E 3-1D2....- Ant_
Electric Rough (By State Inspector) 3%4
Septic Final -� 4
Framing . q_ ,(f'— -
(To include Rooi m place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
Phone 384-5003
A
THIS PERMIT IS NOT TRANSFERABLE
109 8th Street County Courthouse Glenwood Springs, Colorado.
E D DO NOT DESTROY THIS CARD
Date 00114 By
F PLACED OUTSIDE - COVER WITH CLEAR PLASTIC
GARFIELD COUNTY
BUILDING, SANITATION,
and PLANNING DEPARTMENT
109 8th, Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
Job Address —] g7 -7 Nutrt
Nature of Work Budding Permit
No. 8234
(ockc:4 I1-7, CAWS s1Cp41
Use of Building G._ 0.-4-c._
Owner
2 rC1* Yl tom- � -1 C )
Contractor (YZ R A CL, -5
Amount of Permit; D 1 . Date
t
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
TELEPHONE: (970) 945-8212
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
INSPECTION LINE: (970)384-5003'
PERMIT NO. Foi 3
PARCEL/SCHEDULE NO.
JOE ADDRESS: Me(/:/// kfire,-,/1/1.117
713 / / c v %/ / / ' `12 ! / 7�h I2 1/&2
1
LOT NO.
SUBDIVISION/EXEMPT/ION ] /
2
�BLLOCKNyO.
°want J// " I' G CL ' . l` �i 7t
�JrJ�-'J %
ADDRESS / ! J / / (.70.,/,,,,,,„77-7 Y `��
�i
PR 9-L �� j
4
%
Weft 9A2 62 f
3
cONTEAcroRR ' /`` /'"' J`/../
,� 2-'6.&.4./.2/A?1
2S -
-'44''n-c0aI I
" 4
Apourscrnavamom 1/3/W/40/2-72,
SQ. Fr. °FBU11MM 175--612
Z�5%,�
. E/! • �VC/ J fig _j5
:3.31'253
�r• ���-�,� ��� �g
,J fi J"J
G`
MN°.
Nao /
5
6
USE OFBOnDIN°
favie
(.I & r v 4 7 v s z (D( 1. \J
A 6'291 ft,, 7 /5
°ALTERATION mOVE ORFi[OVE
7
_ .4%60-//1
CLASS OF WORK: °ADDITION
S
9
CIARACIn68ZIN 9 ODOUBLE.
CARPORT: tE
10
0 DRIVEWAY PEWIT
/
DON S/TR SEWAGE DISPOSAL (SEPTIC)
t
VALUATION OF WORM S /271/�52 7 6 '
•J
ATI]OSTI•DVALUAIIONS #31 !`•' T
1
(.....2oi ,,
`r_
v
/-,7
SPECIALCONIDrONS: 1 `rte
Or
A SEPARATE
COLORADO.
THIS PERMIT
AUTHORIZED
WORK IS
AFTER WORK
I HEREBY
KNOW THE
GOVERNING
HEREIN
AUTHORITY
LOCAL
CONSTRUO,
NOTICE
ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED
BECOMES NULL AND- VOID IF WORK
IS NOT COMMENCED WITHIN 180 DAYS, OR IF
SUSPENDED OR ABANDONED FOR A PERIOD OF ISO
IS COMMENCED.
CERTIFY THAT I HAVE READ AND EXAMINED THIS
SAME TO BE TRUE AND CORRECT. ALL PROVISIONS
THIS TYPE OF WORK WILL BE COMPLIED WITH
OR NOT. THE GRANTING OF A PERMIT DOES NOT
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY
LAW REGULAITNG CONSTRUCTION 011 THE
Oma. , i
Bagillifi
EY THE STATE OF
OR CONSTRUCTION
CONSTRUCTION OR
DAYS AT ANY TIME
APPLICATION AND
OF LAWS
WHETHER. SPECIFIED
PRESUME TO GIVE
OTHER STATE OR
PERFORMANCE OF
PLAN CHECK FEE. [yam
,gr"-�� n
9
PERMIT FEE: .X
�/� • ��
f
TOTAL FEE: f .0 DATE PERMIT ISSUED:
_!'
OCC: GROUP: CONST:TYPE: /
"3^ �,/
ZO. Cr
SETBACKS:
Signature
t 2
ofOwner, Contractor or Guth . ' ,-. agent . .: . • .
e.
/� / I ,
JI I /.
r' /
rifyi HaME:
ISM NO. & FEE:
po .i %�
l
% AL —A – /�M.
Building Dept. Fir rrte 1 .-P ,� :_
a . ApprovaI/Date /
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDINGDEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30/L201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL, AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS 1N SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
TI3E REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCIEU THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND 1N SUPPORT
OF THE OWNERS INTEREST.
Gad-°rm.003
t2[(
/11
I HEREBY ACKNOWI,EDCR THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL) /
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" highconstructedto all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # •
40/ V/ -Q
/(
Signature Date
bpcont
z53_10/ c41/7
alit -az?
- 11
January 1, 1999
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all a ides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A
section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to
7,000 F.O.S. and an 80 M.P.H. wind_
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
Is a site plan included that indicates the distances of the proposed building or addition to
property lines, other buildings, setback easements and utility easements?
Yes
2 Does the site plan include _the _location of the I.S.D.S. (Individual Sewage Disposal System)
and the distances to property lines, wells (on subject property and adjacent properties),
1;treams o ater courses?
Yes
3 Does the site plan indicate the location and direction of the Couiityor private road -accessing
the property? f,
Yes
4. Dothe plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes
5. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces�,1 the clearances required between wood and earth?
Yes 4
2
6. Do the plans indicate the size and location of ventilation openings for the attic, roofjoist
spaces's and soffits? -
Yes ,1/h _ -
7. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction?
Yes
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
10. Does the building section drawing or other detail include the method of positive connection of
all columns an beams? ---..----.---
Yes
11. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing grade contours?
Yes
12. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase I certifications or phase 11 EPA certification?
Yes No
13. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Buildin Code Chapter 37?
Yes No
14. Does the plan include a window schedule or other verification that egress/rescue windows
from -sleeping -rooms and/or basements comply with the requirements of the Uniform Building
Code?
Yes
No fir f -//M,2//.5
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes No
3
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safety glazing for these areas?
Yes No "Vel ni/,yao/I-7
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan? / 7 �/e
9-0
Yes No
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants
Yes No
19. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectur onunittee deny or reject your building plans?
Yes No
20. Will this be the onl; reside ': stcture on the parcel? ,1�f��� �1
Yes 1 o If no -Explain: ri Zf
21. Have two (,) complete sets of construction drawings been submitted with the application?
Yes
22. Do you un
Yes
and that the minimum size a home can be on a lot is a 20ft. x 20ft.?
23. Have you designed or had this plan designed while considering building and other
constructio code requirements?
Yes X No
24. - Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes No
25. Do you understand that approval for design and/or construction changes are required prior to
the applic , io of these changes?
Yes No
4
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at
the time of application and that you will be required to pay the "Permit Fee" as well as any
"School Impact" or "Septic System" fees required, at the time you pick up your building
permit?
Yes No
27. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will
delay yo , r inspection one (1) day. Inspections are to be called in to 384-5003.
Yes No
28. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspectionprior to receiving a Certificate of
Occupancy and occupancy of the building?
Yes � No
29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the proje co plying with the Uniform Building Code?
Yes e No
30. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes No
31. Do you -Understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number ofthe person performing the work will be required
at time of applica le inspection.
Yes No
32. Are you aware, that on the front ofthe Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance of a
building permit? our attention in this is appreciated.
Yes No
5
_I hereby acknowledge that I have read, understand and answered these questions to the
est of my ability.
Y %Z
7')71 "VYYZ71�
signature
Phone: �%- r% C�G�G days);
Project Name:
Project Address:
Notes:
date
7%GG�9
%'I`G G <�
(WI (evenings)
7g?77 Coc/myX00 //
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
8/00
6
Ri f 6iat : er,ga
1
(
4;NI /1
J)'T 70 5c./tyGr /-Am- j rr=ir4)
WHO
/
Sp
$ 1.94y>
6 )D :A 1)-
Ro WQ &M/Z-
&O, —'9U >( 5r-/, :
tCif/7.
; /y2Vf'2'
67e/177-5
r ,i. •• i, f.� t
I2
A
.y