HomeMy WebLinkAboutApplication- PermitNow 8225
GARFIELD COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 Stb. Street, Suite 303
Glenwood Spring, CO 81601(970) 945-8212
Job Address / a 3 a s- 414„,4, Q4
�`
Nature of Work Wilding Permit o 8
Use of Building Q .. P 4cd.(,v
Owner auk -WA ZGC.L c (2) ;?yL,
Contractor0i.2*[ ,
Amount of PermtS,it$ S • rf
e -k -c. 5
„4_,..p& (6-6 -
n1//iF I 0 c)_ : tumuli- 74 67) 5
A
Date fog ,
.69),0
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
TELEPI-1ON1t: (970) 945-8212
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
INSPECTION LINE: (910)384 5003
PARCEL/SCHEDULE NO.
PERMIT NO.
JOB ADDRESS: / a 32. .S 6 CPA.92, SFR/ ad S 72,pf'v, r7a-p____) 5 /4.-7, {moo U / IJ c2+
1
LOT NO. BLOCK NO.
SUBDIVISION/EXEMPTION (L _/c,� Sp�3 c Lk Su
ate. ((
t
2
EWNNAt P /9 .2?'wvap
�.tac.� d- %'7AoIn ..v � oh.-,�0z.,
p
ADDaEsa J 4 L'Y'' 7 �
C,�r o.w�s� c &1 CQ / b 3
eJ7U)
(I.P -adds
wxPx: (r-7lJ�
rl tl 3 -- ,2_2._Gx
3
CENSRACroa
ADDRESS
PH'.
LIG130:
4
7»�i v ENGINEER �' �..1- ,,t.
80 3 5 ., /1 714 3" 7'
App s/`1 v � ,s } 6C) 2 l'a r
PH: (q,U)
- 99 -- 9 S'
'ACNE:
S2 b
C
J
9Q -Pr. OEMS::MN°
- a� , �;,��
a74-3
SQ. Fr. OFLo'T
s 0o eierS ��p�:
lemur / /r
/7
�/�
`f�i:./..
F 7" /
In
I
I(J I/0—%%O.`j ..
6
C
179E OF BUILDING J/ yt�. iD G^" Ce t V i �s 6-A.
I - y -E/o llL �x' s
AESCtuBEWO1EC Co IZ/s J_V'"v�.:.%J it �a7'✓.al-✓f
4 ���(�1»�,���,,yggen
oGLA.
�� ]y, / J %
[//wCJ-, t7
7
�J�+`1 /�-��j
8
CLASS Or 'NOM. )(KEW DAEJIImON oAL'1FRAT10N DMOVE sEPAIOVE
9
GARAGE; o31NGLE a DOUBLE del 0 ...6.7.11 PS CIL. eD077&LE
l0
AV
)DRIVEWAY PFAIM<r , 6511E AGE DISPOSAL (SEPTIC) ATE PLAN
�/vr ,,--16.3 � Tc -R. 0T r )&._ 1,0 y2 �- 23 Sib/�
VALUATION OF WORK: 1 �� V� "
71
(� ��y','ryt/� %
ADJUSTED VALUATION:5 `y %' Iog1 • l / ,i0-1.7
f/,�1 l% I Ir'�
SPECIAL Cg1DmON1:
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OP
COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME
AFTER WORK IS COMMENCED.
HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF
CONSTRU�IQ. / /
1 te /7 a/
PLAN CHECK FEB:
605 .9 tv
PERMIAFEE:
4r3 a .r x5
—
TOTAL FEE: DATE PERMIT ISSUED:
- e 8 , 11 "1 1 . zziA4/4/se p 611.611.I
d`
OCC: GROUP: CONST: TYPE:
ZONING: -..-•
SETBACKS:
,
Signature of Owner, .n.•ctororauthorized agent having read and understoodnotice above.
r j�I!aff 4'D
f
MANU. HOME:
ISDS NO. & FEE:
Building Dept. ' 1 . 1 g Planning Dept. p roval/Date
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OFT/ E CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDINGDEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28,201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT" MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILIIIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILTTY FOR THESE IuEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONS n' VATTVE AND IN SUPPORT
OFTHE OWNERS IN�IERL.,
t sarfotmoE3 I HEREBY ACKNOWLEDGE 'THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. flNi,)
4
VALUATION/FEE DETERMINATION
Applicant 1\u13b/ b9 ,11 F. SubdivisionCEW 5fipANG5 RA.4\1GH
Address 12.52 6aVa 916,MMM R Lot/Block Leg" 2
Date /247.01 Contractor f)h4F
`Finished (Livable Area):
Main (32o
Upper —
Lower
Other
Total Square Feet 120 )( 69 � De0
Valuationits
s 6E0e8.
'asement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
'Crawl Space:
Valuation
Valuation
'VDecks/Patios:
Covered
Valuation
Open
Valuation
132-9,
NVA
Z4
227 z
433‘2,4a2-1
4272412
Total Valuation
Building Permit Fee
Plan Review Fee
Total BP & PR
9110€0-
January 1, 1999
Plans to be included for a Building Permit, must be on drafting Eger at least 18"x24" and drawn to
scale.
Plans must include ,a. floor plan, a co� ncrete foting and foundation pian, elevations all sides with
,ticks, balcon steps hand rails and guard rails, windows and doors, including the finish grade line. A
section showin in detail, from the bottom of the footing to the top of the roof including re -bar,
anchor bolts, pressure treated pla s, floor joists, wall studs and spacing, insulation, sheating, house-
ra , (which is required), siding or any approved building material. 1 ��'
rc9
A window schedule. A door schedule.
_A floor framing Man. a roof framing plan, roof must be designed to withstand a 40# per ft. up to
7OO�Q.I.Q.S. and S0 M.P.H. wind.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
1. Is a site plan included that indicates the distances of the proposed building or addition to
property lines, other buildings, setback easements and utility easements?
Yes l/
2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System)
and the distances to property lines, wells (on subject property and adjacent properties),
streams or water courses?
Yes yds
Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes y(42
4. Do.. the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes 1/�5
5. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes /5
A /or-
Do the plans indicate the size and location of ventilation openings for the attic, roofjoist
spaces's and softs?
Yes 1/0
7. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes 75
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction?
Yes
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes i.`��
�2.
Does the building section drawing or other detail include the method ofpositive connection of
all columns and beams?
Yes /f0
Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing grade contours?
Yes
Does the plan include any stove or zero clearance fireplace planned for installation including
make and mode and Colorado Phase I certifications or phase II EPA certification?
Yes , / No
Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with t e Uniform Building Code Chapter 37?
Yes {/` No A
14. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform Building
Code?
Yes Y v No
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes y& No
3
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safety glazing for these areas?
Yes y5 No
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes � No
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes : , No
19. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural committee deny or reject your building plans?
Yes y No
Will this be the only residential structure on the parcel?
Yes 11P' No If no -Explain:
.. : Have two (2) complete sets of construction drawings been submitted with the application?
Yes , /�5
22. Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.?
Yes \ /et No
l
23. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes \/P`> No
24. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes \// No
25. Do you understand that approval for design and/or construction changes are required prior to
the applicatio y,of these changes?
Yes \16—'No
4
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at
'the time of application and that you will be required to pay the "Permit Fee" as well as any
"School Impact" or "Septic System" fees required, at the time you pick up your building
permit?
Yes ')/ice No
27. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will
delay yourjnspection one (1) day. Inspections are to be called in to 384-5003.
Yes �/ �7 No
28. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
'Occupancy and occupancy of the building?
Yes \/c/; No
29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project complying with the Uniform Building Code?
Yes V1-5 No
30. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes P t No
31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be required
at time of applicable inspection.
Yes
No
32. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance of a
building permit? Your attention in this is appreciated.
Yes 1/615 No
5
'I hereby acknowledge that I have read, understand and answered these questions to the
best ate ny ability.
signature
(97.6) 944 3---z-s 6 (days);
Phone:
h/2._‘,//0 /
date
('r 5 -(evenings)
Project Name: IL-3%pc [?�✓ Wiz /12eA c c
Project Address: ) 2-- 3 2 S • C -s
--j Go V sz
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and pians to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
8/00
6
No
Job Add ss�� l�3l 5'
fi
Owner -77t,(A°�
Contractor t43y4.
cE
skrIti
-i
As$e�ss�or's Parcel No.
BUILDING PERMIT CARD
Wd1V1 ddress R0.5g7)-C'dJ.iC i hone #910'i -l$ o6AS'S
Addresses 04-x.
Phone #
Setbacks: Front Rear RH LH
.qFAitetd-Lr aVt (Aztkvegre.tc_ic
Soils Test
Footing /
Foundation 11-1,210k_LIVA
Grout
Underground Plumbiryg
Rough Plumbi g
. Framing "O
Insulation ,03
Roofing
Drywall
Gas Piping
INSPECTIONS
`i/8/oa: 64414.04w.. u.�' Asa
U2-#4" 13/4"— 6,60 -ed
67:5//63
Zoning
Weatherproofing
Mechanical //,,
Electrical Rough (State) 44 a3
Electrical Final State) /O �2g^D3
Final 0'0 hecklist Completed?
Certificate Occupancy #
Date
Septic System #
Date 1 mil �1 FJ l
Final )-g-Dz.
Other
C. NOTE &air
AjZmewd c r syrial 40103
03
(continue on back)
INS ICT1 LL ,s1T E
ADE UNLESS
THIS RD IS PST ; ON T E J
24 IIOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issue/... .. Zoned Area Permit
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use ';
AddreLor Legal Description
Owner.
i+
Contractor
Setbacks Front Side Side
Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing /02,— O—CV 5-4JA___
Foundation J9-,bal,0 J9 -,b 1 I 1011\ -
Underground Plumbing Ai*
Insulation ice- ,Q
Rough Plumbing tL„3 ...63
DrywallG-3- D3 /O?VL-�
Chimney & Vent E 1 --ID -o3�
Electric Final (by State Inspector) /d",7-211'�
Gas Piping2________
Final / 2., -10 - cy ke7VL-,
Electric Rough (By State Inspector) 4/12.:(pN.
Septic Final ziLcc; . 4 .,'-�
Framing L - t- 03 0-141Notes:
(To include Roof in place and Windows
and Doors installed).
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
t
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVED DO NOT DESTROY THIS CARD
IF ' LACED OUTSID
- CO R WITH CLEAR PLASTIC
•
6
8
tC
O
P-
0
0
cr
CD
lar
)11
0
12112
UNI
p }
•
tj far Cr
O
�
0
P
0 CD
CD
CD
O
r-1-)
orn
-i
O CD
• h' pp
o
0 m
P3 CD v' �•
CD C/3 r
Pfit) t-9 g
O
0
o
o0 CD 03
'lli33 • C)
E.a :a
O cn CM?1<
Cr.
0 VD y ;;
u, 0 P 0
O cn
Iul ILI
CD 0
moil risoM altu2IsaG
LAO
O
p
op0
b�-
t
f
too'
L WV, e. >C 00
has WO t x'600°
'Q 1.4 N O
17d cic9i'
.. A 0 o
'