Loading...
HomeMy WebLinkAboutApplication- PermitNow 8225 GARFIELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 Stb. Street, Suite 303 Glenwood Spring, CO 81601(970) 945-8212 Job Address / a 3 a s- 414„,4, Q4 �` Nature of Work Wilding Permit o 8 Use of Building Q .. P 4cd.(,v Owner auk -WA ZGC.L c (2) ;?yL, Contractor0i.2*[ , Amount of PermtS,it$ S • rf e -k -c. 5 „4_,..p& (6-6 - n1//iF I 0 c)_ : tumuli- 74 67) 5 A Date fog , .69),0 Clerk GARFIELD COUNTY BUILDING PERMIT APPLICATION TELEPI-1ON1t: (970) 945-8212 GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO INSPECTION LINE: (910)384 5003 PARCEL/SCHEDULE NO. PERMIT NO. JOB ADDRESS: / a 32. .S 6 CPA.92, SFR/ ad S 72,pf'v, r7a-p____) 5 /4.-7, {moo U / IJ c2+ 1 LOT NO. BLOCK NO. SUBDIVISION/EXEMPTION (L _/c,� Sp�3 c Lk Su ate. (( t 2 EWNNAt P /9 .2?'wvap �.tac.� d- %'7AoIn ..v � oh.-,�0z., p ADDaEsa J 4 L'Y'' 7 � C,�r o.w�s� c &1 CQ / b 3 eJ7U) (I.P -adds wxPx: (r-7lJ� rl tl 3 -- ,2_2._Gx 3 CENSRACroa ADDRESS PH'. LIG130: 4 7»�i v ENGINEER �' �..1- ,,t. 80 3 5 ., /1 714 3" 7' App s/`1 v � ,s } 6C) 2 l'a r PH: (q,U) - 99 -- 9 S' 'ACNE: S2 b C J 9Q -Pr. OEMS::MN° - a� , �;,�� a74-3 SQ. Fr. OFLo'T s 0o eierS ��p�: lemur / /r /7 �/� `f�i:./.. F 7" / In I I(J I/0—%%O.`j .. 6 C 179E OF BUILDING J/ yt�. iD G^" Ce t V i �s 6-A. I - y -E/o llL �x' s AESCtuBEWO1EC Co IZ/s J_V'"v�.:.%J it �a7'✓.al-✓f 4 ���(�1»�,���,,yggen oGLA. �� ]y, / J % [//wCJ-, t7 7 �J�+`1 /�-��j 8 CLASS Or 'NOM. )(KEW DAEJIImON oAL'1FRAT10N DMOVE sEPAIOVE 9 GARAGE; o31NGLE a DOUBLE del 0 ...6.7.11 PS CIL. eD077&LE l0 AV )DRIVEWAY PFAIM<r , 6511E AGE DISPOSAL (SEPTIC) ATE PLAN �/vr ,,--16.3 � Tc -R. 0T r )&._ 1,0 y2 �- 23 Sib/� VALUATION OF WORK: 1 �� V� " 71 (� ��y','ryt/� % ADJUSTED VALUATION:5 `y %' Iog1 • l / ,i0-1.7 f/,�1 l% I Ir'� SPECIAL Cg1DmON1: NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OP COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRU�IQ. / / 1 te /7 a/ PLAN CHECK FEB: 605 .9 tv PERMIAFEE: 4r3 a .r x5 — TOTAL FEE: DATE PERMIT ISSUED: - e 8 , 11 "1 1 . zziA4/4/se p 611.611.I d` OCC: GROUP: CONST: TYPE: ZONING: -..-• SETBACKS: , Signature of Owner, .n.•ctororauthorized agent having read and understoodnotice above. r j�I!aff 4'D f MANU. HOME: ISDS NO. & FEE: Building Dept. ' 1 . 1 g Planning Dept. p roval/Date AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OFT/ E CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDINGDEPARTMENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28,201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT" MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILIIIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILTTY FOR THESE IuEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONS n' VATTVE AND IN SUPPORT OFTHE OWNERS IN�IERL., t sarfotmoE3 I HEREBY ACKNOWLEDGE 'THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. flNi,) 4 VALUATION/FEE DETERMINATION Applicant 1\u13b/ b9 ,11 F. SubdivisionCEW 5fipANG5 RA.4\1GH Address 12.52 6aVa 916,MMM R Lot/Block Leg" 2 Date /247.01 Contractor f)h4F `Finished (Livable Area): Main (32o Upper — Lower Other Total Square Feet 120 )( 69 � De0 Valuationits s 6E0e8. 'asement: Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: 'Crawl Space: Valuation Valuation 'VDecks/Patios: Covered Valuation Open Valuation 132-9, NVA Z4 227 z 433‘2,4a2-1 4272412 Total Valuation Building Permit Fee Plan Review Fee Total BP & PR 9110€0- January 1, 1999 Plans to be included for a Building Permit, must be on drafting Eger at least 18"x24" and drawn to scale. Plans must include ,a. floor plan, a co� ncrete foting and foundation pian, elevations all sides with ,ticks, balcon steps hand rails and guard rails, windows and doors, including the finish grade line. A section showin in detail, from the bottom of the footing to the top of the roof including re -bar, anchor bolts, pressure treated pla s, floor joists, wall studs and spacing, insulation, sheating, house- ra , (which is required), siding or any approved building material. 1 ��' rc9 A window schedule. A door schedule. _A floor framing Man. a roof framing plan, roof must be designed to withstand a 40# per ft. up to 7OO�Q.I.Q.S. and S0 M.P.H. wind. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. 1. Is a site plan included that indicates the distances of the proposed building or addition to property lines, other buildings, setback easements and utility easements? Yes l/ 2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties), streams or water courses? Yes yds Does the site plan indicate the location and direction of the County or private road accessing the property? Yes y(42 4. Do.. the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes 1/�5 5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes /5 A /or- Do the plans indicate the size and location of ventilation openings for the attic, roofjoist spaces's and softs? Yes 1/0 7. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Yes 75 8. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes 9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes i.`�� �2. Does the building section drawing or other detail include the method ofpositive connection of all columns and beams? Yes /f0 Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes Does the plan include any stove or zero clearance fireplace planned for installation including make and mode and Colorado Phase I certifications or phase II EPA certification? Yes , / No Does the plan include a masonry fireplace including a fireplace section indicating design to comply with t e Uniform Building Code Chapter 37? Yes {/` No A 14. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes Y v No 15. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes y& No 3 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes y5 No 17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes � No 18. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes : , No 19. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? If you do not have written permission from the association, do you understand that the plan check fee will not be refunded should the architectural committee deny or reject your building plans? Yes y No Will this be the only residential structure on the parcel? Yes 11P' No If no -Explain: .. : Have two (2) complete sets of construction drawings been submitted with the application? Yes , /�5 22. Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.? Yes \ /et No l 23. Have you designed or had this plan designed while considering building and other construction code requirements? Yes \/P`> No 24. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes \// No 25. Do you understand that approval for design and/or construction changes are required prior to the applicatio y,of these changes? Yes \16—'No 4 26. Do you understand that the Building Department will collect a "Plan Review" fee from you at 'the time of application and that you will be required to pay the "Permit Fee" as well as any "School Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes ')/ice No 27. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay yourjnspection one (1) day. Inspections are to be called in to 384-5003. Yes �/ �7 No 28. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of 'Occupancy and occupancy of the building? Yes \/c/; No 29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for the project complying with the Uniform Building Code? Yes V1-5 No 30. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes P t No 31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes No 32. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance of a building permit? Your attention in this is appreciated. Yes 1/615 No 5 'I hereby acknowledge that I have read, understand and answered these questions to the best ate ny ability. signature (97.6) 944 3---z-s 6 (days); Phone: h/2._‘,//0 / date ('r 5 -(evenings) Project Name: IL-3%pc [?�✓ Wiz /12eA c c Project Address: ) 2-- 3 2 S • C -s --j Go V sz Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and pians to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. bpminreq 8/00 6 No Job Add ss�� l�3l 5' fi Owner -77t,(A°� Contractor t43y4. cE skrIti -i As$e�ss�or's Parcel No. BUILDING PERMIT CARD Wd1V1 ddress R0.5g7)-C'dJ.iC i hone #910'i -l$ o6AS'S Addresses 04-x. Phone # Setbacks: Front Rear RH LH .qFAitetd-Lr aVt (Aztkvegre.tc_ic Soils Test Footing / Foundation 11-1,210k_LIVA Grout Underground Plumbiryg Rough Plumbi g . Framing "O Insulation ,03 Roofing Drywall Gas Piping INSPECTIONS `i/8/oa: 64414.04w.. u.�' Asa U2-#4" 13/4"— 6,60 -ed 67:5//63 Zoning Weatherproofing Mechanical //,, Electrical Rough (State) 44 a3 Electrical Final State) /O �2g^D3 Final 0'0 hecklist Completed? Certificate Occupancy # Date Septic System # Date 1 mil �1 FJ l Final )-g-Dz. Other C. NOTE &air AjZmewd c r syrial 40103 03 (continue on back) INS ICT1 LL ,s1T E ADE UNLESS THIS RD IS PST ; ON T E J 24 IIOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issue/... .. Zoned Area Permit AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Use '; AddreLor Legal Description Owner. i+ Contractor Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing /02,— O—CV 5-4JA___ Foundation J9-,bal,0 J9 -,b 1 I 1011\ - Underground Plumbing Ai* Insulation ice- ,Q Rough Plumbing tL„3 ...63 DrywallG-3- D3 /O?VL-� Chimney & Vent E 1 --ID -o3� Electric Final (by State Inspector) /d",7-211'� Gas Piping2________ Final / 2., -10 - cy ke7VL-, Electric Rough (By State Inspector) 4/12.:(pN. Septic Final ziLcc; . 4 .,'-� Framing L - t- 03 0-141Notes: (To include Roof in place and Windows and Doors installed). ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. t THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVED DO NOT DESTROY THIS CARD IF ' LACED OUTSID - CO R WITH CLEAR PLASTIC • 6 8 tC O P- 0 0 cr CD lar )11 0 12112 UNI p } • tj far Cr O � 0 P 0 CD CD CD O r-1-) orn -i O CD • h' pp o 0 m P3 CD v' �• CD C/3 r Pfit) t-9 g O 0 o o0 CD 03 'lli33 • C) E.a :a O cn CM?1< Cr. 0 VD y ;; u, 0 P 0 O cn Iul ILI CD 0 moil risoM altu2IsaG LAO O p op0 b�- t f too' L WV, e. >C 00 has WO t x'600° 'Q 1.4 N O 17d cic9i' .. A 0 o '