HomeMy WebLinkAboutApplication- PermitGARFIELD COUNTY
BUILDING, SANITATION,
and PLANNING DEPARTMENT
109 8th, Street, Suite 303
Gknwood Springs, CO 81601(970) 945-8212
Job Address 3 % S 00\-x-(\--`\- 15 1
Nature of. Work --- ... ,Building . Permit
No. 8192
31
Use of Building .- L`2Ar\ n o pn ,0et ,Q)
Owner Com,
Contractor s Cyc, (5, A A
Amount of Permit$ 5 (c) Date , j
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
•
TELEPHONE: (970) 945-8212
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
PERMIT NO.
not
PARCEL/
INSPECTION LINE: (970)384-5003
JOB ADDRESS: 35-16 ri 1 5 CO 1 (3 1
I
LOT NO, BLOCK NO. SUBDIVISION/EXEMPTION
2
owNl;tt C i Ul / /gbl
ADDRESS s 30 J Meserve- t/Gr ek W� St.,
(.�Qaer,s/Ce/T✓-ri�y_�I]l� li:i _L I Coro
ADDRESS 5C3 ).r.... (1-1. .3\ _u+.•✓. -
PH: 703 SO r la
Q , IJ
l7et S�`1 -
wK eB:. ��� d ASO
LIC NO:
3
CONTRACTOR =oHy) �pQ.l. _
4
ARCEIL ECIIEN A+
ADDRESS
PTI:
LIC NO:
5
Q. FI.OFBUDDNG 000 0.1.?4,
("�
Q. FT. OF LOT V ,jJj� !
HEIc J� ��
NO. OFFLOORS +!
6•
719E OF BUDDING i } �� T to v� p 2.,,,_ �y W o Wl--'C. 6 f 4+ ft 1 { . �4/
15\l
l ` 111..
7
AES[RmE WORK: •taitoU ) �+ !
1.
8
CLASS OF WORK: r 73EW oADDrnON DALTERATION DMOVE °REMOVE
9
/A a WHOLE 0130t1 .E CARPORT: ,v „ osv.up.g oDOVeLE
GARAGE; Ali/A.
o DRIVEWAY PERMIT oON SITE SEWAGE DISPOSAL (SETYfIC) oSIIE PLAN
10
O
VALUATION OF WORK: S
li !VO (:) O QoADJUSTED VALUATICRS /(65 4251.0D
SPECIAL CONDIONS:
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE FSSUED BY THE STATE OF
COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME
AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOLA CEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW RE cCONSTRUCTION OR THE PERFORMANCE OF
dr, l /
Date �f ��! ��
r�..
PLAN CHECK FIN
�ij/
,
PERMIT FEE: /
!
(111 t
TOTAL FEE: DATE PERMIT ISSUED:
`� ( E e * i
l
OCC: GROUP: CONST: TYPE:
f t 3 V - f1
ZONING:SETBACKS:
Signature
of Owner,
CDD .: ctor or authorized agent having read and understood notice above.
r ,N I
i l actk
MANU. HOME:
ISDS NO. & :
OD
Building Dept. A ... a ate Planning Dept. A I/Date
AGREEMENTS
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUJLDINGDEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OFTHIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS IURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT
OF THE OWNERS INTEREST.
Garfwntoo 1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. ()NITIAL/
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit #
9=/
Signature Date
bpcont
35?Scr-(5f
d l t,31
tSt FLLolk-fO:9- = 7( Cb,o�
69 : .'sl(407.(a
s- (4 8
mr:
Coy- 1Pos'C,-+ 1o6
Ot o o e
41 - 42?(,40.00
{Ly 414)92,o0
prL t p )Woo,J
z r7,2
76/f. rt
January 1, 1999
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A
section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to
7,000 F.O.S. and an 80 M.P.H. wind.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
Is a site plan included that indicates the distances of the proposed building or addition to
property line other buildings, setback easements and utility easements?
Yes (/
2. Does the site plan include the location of the I.S.D. S. (Individual Sewage Disposal System)
and the distances to property lines, wells (on subject property and adjacent properties),
streams or water courses?
Yes v
3. Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes [�
4. Dothe plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes
5. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces andthe clearances required between wood and earth?
Yes
2
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safety glazing for these areas?
Yes No
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes v No
19. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural co ttee deny or reject your building plans?
Yes ( No
20.
21.
22.
1 this be the only residential structure on
No
Have two (2) complete sets of construction
Yes
the parcel?
If no -Explain: (````-'k t'ana- 4k\
drawings been submitted with the application?
Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.?
Yes 1/ No
23. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes No
24. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes No
25. Do you understand that approval for design and/or construction changes are required prior to
the application of these changes?
Yes l/ No
4
6. Do the plans indicate the size and location of ventilation openings for the attic, roofloist
spaces's and soffits?
Yes !/
7. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes I/
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction? i
Yes �/
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
10. Does the building section drawing or other detail include the method ofpositive connection of
all columns and beams?
Yes (/
11. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing grade contours?
Yes (/
12. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase 11 certifications or phase H EPA certification?
Yes No
13. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes No
14. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform Building
Code?
Yes No
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes C/ No
3
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at
the time of application and that you will be required to pay the "Permit Fee" as well as any
"School Impact" or "Septic System" fees required, at the time you pick up your building
permit?
Yes No
27. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will
delay your ins ection one (1) day. Inspections are to be called in to 384-5003.
Yes No
28. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy and occupancy of the building?
Yes c/ No
29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project complying with the Uniform Building Code?
Yes r/ No
30. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes No
31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be required
at time of applicable inspection.
Yes No
32. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance of a
building permit? Your attention in this is appreciated.
Yes No
5
I hereby acknowledge that I have read, understand and answered these questions to the
ability.
c.rue-A/-2-41444
signatu
Phone: 5153 7 0 d co 5 (days); 3e 3? 4 aS�Q (evenings)
Project Name:
Project Address:
eV() /
date
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
8/00
6
CofL(
Garfield County
Road and Bridge Department
902 Taughenbaugh Blvd., Ste 305
Rifle, CO 81650
Phone -(970)625-8601 Fax- (970)625-8627
Invoice
Invoice Date: 10/15/01 Invoice Number: 81
Bill To: John Jodrie
P.O. Box 157
Gypsum , CO 81637
Driveway Permit Number: 81
$15.00 per Driveway Permit.
Driveway Permit Fee:
$15.00
Total Due: $15.00
Thank You!
Garfield County
Application for Driveway Permit
Application Date: 10/15/2001 Permit Number: 81 Permitee: John Jodrie
Termination Date: 11/03/01 County Road Number: 151 Inspector: Doug Thoe
District: 1 Sub -Contractor:
John Jodrie hereby requests permission and authority from the Board of County Commissioners to construct a driveway
approach (es) on the right-of-way off of County Road,l51 Beyond the starting point of 151, adjacent to Applicant's
property located on the North Side side of road for the purpose of obtaining access to property.
Applicant submits herewith for the consideration and approval of the Board of County Commissioners, a sketch of the
proposed installation showing all the necessary specification detail including:
1. Frontage of lot along road.
2. Distance from centerline of road to property line.
3. Number of driveways requested
4. Width of proposed driveways and angle of approach.
5. Distance from driveway to road intersection, if any.
6. Size and shape of area separating driveways if more than one approach.
7. Setback distance of building(s) and other structure improvements.
8. No unloading of equipment on county road, any damage caused to county road will be repaired at subdivision
expense.
9. Responsible for two years from the date of completion.
General Provisions
1) The applicant represents all parties in interest, and affirms that the driveway approach (es) is to be constructed by
him for the bona fide purpose of securing access to his property and not for the purpose of doing business or
servicing vehicles on the road right of way.
2) The applicant shall furnish all labor and materials, perform all work, and pay all costs in connection with the
construction of the driveway(s). AlI work shall be completed within thirty (30) days of the permit date.
3) The type of construction shall be as designated and/or approved by the Board of County Commissioners or their
representative and all materials used shall be of satisfactory quality and subject to inspection and approval of the
Board of County Commissioners or their representative.
4) The traveling public shall be protected during the installation with proper warning signs and signals and the Board
of County Commissioners and their duly appointed agents and employee shall be held harmless against any action
for personal injury or property damage sustained by any reason of the exercise of the Permit.
5) The Applicant shall assume responsibility for the removal or clearance of snow, ice, or sleet upon any portion of
the driveway approach (es) even though deposited on the driveway(s) in the course of the County snow removal
operations.
6) In the event it becomes necessary to remove any right-of-way fence, the posts on either side of the entrance shall
be surely braced before the fence is cut to prevent any slacking of the remaining fence, and all posts and wire
removed shall be turned over to the District Road Supervisor of the Board of County Commissioners.
7) No revisions or additions shall be made to the driveway(s) or its appurtenances on the right-of-way without written
permission of the Board of County Commissioners.
8) Provisions and specifications outlined herein shall apply on all roads under the jurisdiction of the Board of County
Commissioners of Garfield County, Colorado, and the Specifications, set forth on the attached hereof and
incorporated herein as conditions hereof.
Special Conditions:
1. Has to intersect county road at 90 degree angle and continue 30' before continuing.
2. Approach grade cannot exceed 4 % up or down for 30'.
3. Construct the driveway in such a way as to shed water within the property.
In signing this application and upon receiving authorization and permission to install the driveway approach (es)
described herein the Applicant signifies that he has read, understands and accepts the foregoing provisions and conditions
and agrees to construct the driveway(s) in accordance with the accompanying specification plan reviewed and approved
by the Board of County Commissioners.
Signed:
Address:
`John Jodrie
23& f5- lW`114-44,.. ,- a.
Telephone Number:
17a— 3 75
Permit granted 10/15/2001, subject to the provisions, specifications and conditions stipulated herein.
For Board of County Commissioners' of Garfield County, Colorado:
�d,llPu/6
Representative of Garfield County Road and Bridge Signature
Special Provisions for Excavation of Road Surface and Installation
1) Any oversized material, (larger than 10 inches in diameter), that is not utilized in backfill will be hauled off by
permitee. Further, any frozen material will be removed from site by permittee.
2) When a paved or chipped surface is cut, it is to be replaced with a minimum three-inch (3") hot mix asphalt patch.
Temporary patch with cold mix asphalt would be allowed, which would be replaced with hot mix asphalt when
the weather or availability of materials allow the work to be completed. An asphalt or chipped surface cut would
require the road to be straight cut and squared by means of a pavement cutter or saw. A chipped surface cut will
require a seal coat of the patch, which will be full width or half width of roadway when trenches run with the
road. For trenches across the road, the edges of the seal coat will overlap the existing edge. All seal coats will
overlap edges by a two of the roadway in the vicinity of the excavation. Asphalt hot mix or cold patches will be
completed in a maximum of five (5) working Days. Weather permitting.
3) When possible all installations should avoid the top edge of a fill slope.
4) Installations in drainages subject to flash flooding will have a minimum bury of 4 feet deeper than normal flow
line at nearest abutment, wing wall, or culvert.
5) Installations at culvert crossings will be buried beneath the culvert with a minimum separation of 18 inches
between installation and the bottom of the culvert.
6) Open trenches adjacent to the traveled roadway shall be backfilled daily to within 100 feet of the working area of
the trench, and shall be barricaded with warning devices after dark. A 3 foot high orange plastic fence will be
installed daily to keep livestock out of the open trench after hours.
7) In areas being disturbed where vegetation is established, reseeding with a mixture either by broadcasting, drilling
and mulching with seed mixtures suitable to the climatic conditions or existing vegetation will be performed. Use
only certified weed -free seed. Noxious weed control will be ongoing along with revegetation.
8) The permittee should check the R -O -W of surrounding landowners to see if other permits are required, i.e., BLM,
Forest Service.
Representative for Gar field County Road and Bridge
John Jodrie
Specifications
1. A driveway approach is understood to be that portion of the county road right -of way between the pavement edge
and the property line that is designed and used for the interchange of traffic between the roadway and abutting
property.
2. At any intersection, a driveway shall be restricted for a sufficient distance from the intersection to preserve the
normal and safe movement of traffic. (It is recommended for rural residence entrances that a minimum
intersection clearance of 50 feet be provided and for rural commercial entrances a minimum of 100 feet be
provided.)
3. All entrances and exits shall be so located and constructed that vehicles approaching or using them will be able to
obtain adequate sight distance in both directions along the county road in order to maneuver safely and without
interfering with county road traffic.
4. The Applicant shall not be permitted to erect any sign or display material, either fixed or movable, on or
extending over any portion of the county road right-of-way.
5. Generally, no more than one approach shall be allowed any parcel or property the frontage of which is less than
one hundred (100) feet. Additional entrances or exits for parcels having a frontage in excess of one hundred 100)
feet shall be permitted only after showing of actual convenience and necessity.
6. All driveways shall be so located that the flared portion adjacent to the traveled way will not encroach upon
adjoining property.
7. No commercial driveway shall have a width greater than thirty (30) feet measured at right angles to the centerline
of the driveway except as increased by permissible radii. No noncommercial driveway shall have a width greater
than twenty (20) feet measured at right angles to the centerline of the driveway, except as increased by
permissible radii.
8. The axis of an approach to the road may be at a right angle to the centerline of the county road and of any angle
between ninety (90) degrees and sixty (60) degrees but shall not be less than sixty (60) degrees. Adjustment will
be made according to the type of traffic to be served and other physical conditions.
9. The construction of parking or servicing areas on the county road right-of-way is specifically prohibited.
Commercial establishments for customer vehicles should provide off -the -road parking facilities.
10. The grade of entrance and exit shall slope downward and away from the road surface at the same rate as the
normal shoulder slope and for a distance equal to the width of the shoulder but in no case less than twenty (20)
feet from the pavement edge. Approach grades are restricted to not more than ten percent (10%).
11. All driveways and approaches shall be so constructed that they shall not interfere with the drainage system of the
street or county road. The Applicant will be required to provide, at his own expense, drainage structures at
entrances and exits, which will become an integral part of the existing drainage system. The Board of County
Commissioners or their representative, prior to installation, must approve the dimensions of all drainage
structures.
Note: This permit shall be made available at the site where and when work is being done. A work sketch or
drawing of the proposed driveway(s) must accompany application. No permit will be issued without drawing,
blueprint, or sketch.
•
INSPECTION WILL .INOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB.
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued..1. ...Zoned Area Permit.No. t �►
AGREEMENT ,
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use Fi£ 1.1,JE .19tryii..-'
Address or Legal Description 0 124.. IS.' 1 ea.
Owner ft ze+ .‘, tetek1 Chei( ikS Contractor k„,j00.tirt odt.,t
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing i r �.-O E 'L .
Foundation /I ,.2. o / -.S.
Underground Plumbing r 2,3-01 ... S.
Insulation 4 -4 -oz , S
Rough Plumbing 3-04.:, a
Drywall pm. 4 S
Chimney & Vent 3- Z9-cs,.., , 4,› ,
Electric Final (by State Inspector) a�J
Gas Piping i. i yi_z 1., 4.,s
Final ?— _ v
Electric Rough (By State Inspector)4h
Septic Final 12,-, ,-o i 1L.
Framing -34/42. �Pcko„Ar re ,. (
(Tb include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse . Glenwood Springs, Colorado.
APPROVED DO NOT DESTROY THIS CARD
By m tkiaan °%511'
F PLACED OUTSIDE - COVER WITH CLEAR PLASTIC