Loading...
HomeMy WebLinkAboutApplication- PermitNo. 8109 GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8th, Street, Suite 303 Glenwood Springs, CO 81601(970) 945-8212 Job Address Q `.t - ? Cd'e C i (L -d SiaU� a-uhL Nature of Work Building Permit Use of Building I 601,0 / aiza,OwnerEst * is Contractor / Amount of Permit$ F �% l • (v L! Date c2� ,261) so. % = a(° �v Clerk p GARFIELD COUNTY BUILDING PERMIT APPLICATION GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO 3LEPHONE: (970) 9.45-8212' INSPECTION LINE: (970)3$4-5003 PERMIT NO. PARCEL/SCHEDULE NO. OB ADDRESS: DO ya. C S eK. C+, SI (4- c . i IAT NO. q BLOCK NO. SUBDIVISION/EXEMPTION ( vJ j ie CS ij 2 owrmi �e bate_ Acres bou L(G Waff� ADDRESS 14-67 (flip -1- A -v. r 31>~ cod Ce i, N t pe gb4-IPA 4 wxra q4e, i57 3 comAcToR }Cipro..t tAidCe4.- ADDREss (+vo 4 S i—, � PR30(1` 60 —I- Vq6 4 OI ARL9ECdPNC�B�R J /A ADDRESS •Z✓l SQ. Ff.OPWT 4-2, I ,i5.2:2.. (02, 150.,c) (Al oida.c.,LJ PR: RTD r =NO: NO.°MOORS 1 5 SQ. Fr. OFBORDING 1 q 2 li OSEOFB[IDDWG tigiAA.1_ C 7 DESCRIBE WORK: 8 cIASs OFWORK: r.'1E l 6ADD ON nALiFRgF[ON oNOVE tlRP3fOVE ^ --)N 9 GARAUE: OeN®EUDOOSIE CAP -PORT: oSNGLE CDOVBIE 10 C DRIVEWAY PERMIToox SUE SEWAGE DISPOBAL(8lFft O ](STTEPWP • VALUATION OF WORK: S - ADJUSTED VALIIA IM 4 ?173 ' OD r A SEPARATE COLORADO. THIS PERMIT AUTHORIZED WORK IS NOTICE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF BECOMES NULL AND VOB) IF WORK OR CONSTRUCTION IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME IS COMMENCED. CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS THIS TYPE OF WORK WILL BE COMPLIED W1TH WHETHER SPECIFIED OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF N Due 6d t PLAN CHECK FEE: 2 `7 u. b'91h�� (((�/� PERMIT FEE: d I{ c� r S Ib TOTAL FEE: DATE PERMIT ISSUED: 371 • G f Al, 11 R WORK 1 HEREBY KNOW THE GOVERNING HEREIN AUTHORITY AUTHORIT'Y LOCAL CONSTRU OCC: (B OUP:/ j CONST: TYPE: — (7_ U –3 U—( V— (q ZONING SETBACKS: Signature a , Contractor or authorized agent having read and um njjjo ce above. P . 2, Y! f IvTALaLs. HOME:`, n 0.O 0 ISDS NO. &FEE: 6A&111 /e'ii jf�u "-10. 0 0 Building Dept. Approval/Date Planning Dept. • ... i • OAQI c.t ,.a . AGREEMENT PERMISSION IS 'HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSUCT THE STRUCTURE AS DETAILED ON PIANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WTI1T IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM 111E COUNTY AND THAT THEN AND THERE TT SHALL BECOME NUL.. AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OFTHIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS YURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH TITS ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BFB N,4ERVATIVE ANI) IN SUPPORT OF THE OWNERS INTEREST. l�/IYI/) Garfoim.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL) The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; • 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy use and the issuance of a Certificate of Occupancy for the dwelling under building permit # /O Signature Date bpcont tg-de*staa / 3c,Q 9 173P7( 57 4" = ` Io 36g : etv 41773 F. 374Q •�1 s asb-S So, co oo, co 87 /41( r.� Report Date: November 5, 2001 Client: Peter Waller Radon Test Address: 0042 Esther Court, Silt, CO Overall Average: 2.5 pCi/L This is the report of a radon gas screening measurement. The mea- surement was performed using a continuous radon monitor (CRM), and was performed in conformance with test protocols established by the US Environmental Protection Agency in the document entitled "Protocols for Radon and Radon Decay Product Measurements in Homes." The report in the adjacent column is a photocopy of the actual report that was obtained form the CRM upon completion of the measurement period. The measurement period was 48 hours. Test date Start: October 31, 2001 End: November 2, 2001 During the measurement period radon gas measurements were recorded once every hour. The serial number of the CRM deployed for this measurement is: 1515018 Explanation of Report Data: Tabular Data: This portion of the report provides a numerical listing of the radon gas measurements that were made throughout the measure- ment period. Average: This portion of the report gives the average radon gas concentration measured during the entire measurement period. This average is computed in two ways. The "Overall Average" is the simple average of all of the values listed in Tabular Data. The "EPA Average" is the simple average of all of the values listed in Tabular Data, except those values recorded during the first four hours of the measurement period. The "EPA Average" is computed in a manner consistent with the protocols cited above. 111P14 ibssi+onaI Radon Monitor Start Gate Start Time /©•'Gary, Serial # Lc, cation: i 2a( 7�/avv- Si9naturea aNCti Ga.ta in PGir1 Time Interval 1 lir 2.3 2.0 0.3 1.6 1.6 1,0 3.6 3.3 3.0 1.0 3.0 1.3 2.6 3.3 5.0 4.0 2.0 1.0 0.6 1.0 2.3 1.6 3.0 4.3 3.0 3.0 0.3 2.:3 3,0 1.3 6.0 1.0 0.3 1.3 1.6 1.0 3.6 1.3 4.0 3,6 3,3 4.0 2.3 4.3 4,3 2.3 5.3 Overall Avg. = 2.5 EPA Protocol Av•B.= 2.5 ' Other Information: In the printout, the letter "p" or "T" may appear next to a given value. The "p" indicates that, during this measurement interval, the power was disconnected from the CRM. The "T" indicates that, during this measurement interval, the CRM was disturbed or moved. The radon gas measurement was completed and there is no evidence that the CRM was tampered with any way. Therefore, the average values contained in this report reflect the radon gas concen- tration at the time of the test and should not be construed as either predictive or supportive of a similar measurement conducted at another time in the same structure. 0 The radon gas measurement was completed and there is evidence that the CRM may have been tampered with during the measurement period. Therefore, the measurement values are not consid- ered valid, and further testing is recommended. Please consult the attached EPA guidelines to interpret the results of this measurement Building Inspection Services, Inc. does not accept any responsibility for health, financial, or other issues that may arise form the disposition or interpretation of this measurement result. This result is confidential and will not be released to anyone else without you permission. If you have any questions on the results please contact Building Inspection Services, Inc. Interpretation of Radon Test Results There are two possible outcomes of a screening measurement: (1) if the result is at or above 4 pCi/L (picocurries per liter of air), mitigation of the radon concern is recommended; (2) if the result is below 4 pCi/L, no action is necessary. However, the EPA believes that any radon exposure carries some risk, therefore, follow-up testing four times in a year (once each season) is recommended to obtain a more accurate radon exposure picture of the home. The following recommendations are summarized from EPA's Home Buyer's and Seller's Guide to Radon: If your Screening Measurement Result is below 4 pCi/L: Follow-up measurements are probably not required if the screening measurement was made in the lowest livable area of your home under closed -house conditions. EPA estimates that the average indoor radon level is about 1.3 pCi/L. The U.S. Congress has set a long-term goal that indoor radon levels be no more than outdoor levels. EPA estimates that the average outdoor radon level is about 0.4 pCi/L. While this goal is not yet technologically achievable in all cases, most homes today can be reduced to less that 2 pCiIL. If your screening measurement results are 4 pCi/L or higher: The EPA recommends that a qualified radon mitigation company be contacted to make corrections. This test did not include a test for the amount of radon in the water supply. Note that federal standards may be imposed on public water supplies in the near future. Determination of the amount of radon in the water can only be determined by a separate testing methodology. This test was performed by Charles Lanci, Residential Measurement Provider ID#100321 RT KURTZ & ASSOCIATES, INC. 5012 County Road 154 Glenwood Springs, CO 81601 Date: November 16, 2001 RECEIVED N 0 V f 9 2001 STRUCTURAL CONSULTANTS Phone (970) 945 6305 Fax (970) 945 1093 MEMORANDUM TO WHOM IT MAY CONCERN Re: Foundation Design Ukele Acres Subdivision: Highway 6 and County Road 216, Garfield County, CO. Our office is the structural engineer of record for the foundation systems for modular homes to be placed on the following five lots: Lot 1, Lot 2, Lot 3, Lot 7, and Lot 9. Prior to commencing with design of the foundations we reviewed the following information provided by Hepworth-Pawlak Geotechnical, Inc.: 1. "Geologic Hazards Assessment, Proposed Smith Subdivision, Highway 6 and Road 216, Garfield County, Colorado" (October 25, 1999). 2. "Preliminary Geotechnical Study: Proposed Smith Subdivision, Highway 6 and County Road 216, Garfield County, Colorado" (November 11, 1999). The preliminary report included borings on four of the five subject tots: Lot 1, Lot 3, Lot 7, and Lot 9. Consequently, Hepworth-Pawlak provided our office with site specific soils information for those four lots. An allowable soil bearing pressure of 1200 PSF was provided, and utilized in the foundation design for Lot 1, Lot 3, and Lot 9. An allowable soil bearing pressure of 800 PSF was provided, and utilized in the foundation design for Lot 7. An assumed soil bearing pressure of 1200 PSF was provided and utilized in the foundation design for Lot 2. For this lot it is recommended that Hepworth-Pawlak examine the site to verify the assumed soil bearing pressure. RUG -03-2001 09:25 CHAMP I ON COLORADO M U APPROV .�etalireTivl c°noies *G misptC CO z 970 532 4352 '77 P.07/07 II -r 2 II :1 NEN ■11 mmi#: k illinu Jrimonmaromiiinnummw IR R, WRZING.DEPAR Mei I CO AZd I ;,roe,, • EigliON NITWIT Its GN of ssooci YdC�Pcr Ct? TOTAL P.07 41, r;i0 z § k "k4 Itiii III 111-114 i g it gLi .iiiilt 1g wieghigt;12 114 11 91 n g 6 z M Ba i.i xi 7 i M1 IES 4k / 1 - `1@ Y {/i 4124 ..!;1 / F f linoNil Mpg - fli g f• Lam"" z i 0.1V I ItII1 a iiii hug! g x c a - 7,1,vu CYU WALL Nag me STAWT LIM ECT10.14 4.1144TPM4 hoot 1461.4114 SW- 54 LMt 3t 1rgSLfat Lxurw H {x1FVR1f1t• o3;.444 d 5411 4444 wmwrw0a11Lr SA113W ltelxrPwAm ■t11W1F+b4 1 h 5 i if WA i Y_ n g 6 z M Ba Tit INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued.. j/.Pf...Zoned Area Permit No t..01. AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Use a f*' '''.. ' 5 s.om ti .. 4,, s-ilvi Owner 4ARio Ie. Dev IUwetatirContractor ritoOk ttesgo Address or Legal De cri Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing . CT/ — pl C r e 7- rz o1 , Foundation g - 4 -of �, .S_ Underground Plumbing Insulation Rough Plumbing Drywall Chimney & Vent Electric Finaj'(by State Inspector) A, ...//72/ Gas Piping Final `�////e9 Electric Rough (By State Inspector) Septic Final 'B 5 6/ .,,,..1 Framing A) 7/ (To include R6oflace an Windows and Doors installed). '" Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVED DO NOT DESTROY THIS CARD CE IF PLACED OUTSID - COVER WITH CLEAR PLASTIC