Loading...
HomeMy WebLinkAbout1.0 ApplicationIndex Hunter Ridge Energy Services LLC 003 Story Booster Limited Impact Review General Application Materials Preapplication Conference Summary Project Description Impact Analysis Standards Deeds & Easements Vicinity Map Site Plan Erosion and Sediment Control Plan Traffic Analysis Waiver Requests Supplemental Information Adjacent Property Owner and Mineral Rights Information Access Documents Class I Cultural Resources Report Wildlife & Vegetative Impact Analysis Reclamation Plan Nontributarty Groundwater Formation Details NRCS Soils Report Geological and Soil Hazards Report Emergency Response Plan SPCC Plan Stormwater Management Plan Noxious Weed Management Plan Pipeline Map General Application Materials ■ HUNTER RIDGE ENERGY SERVICES LLC _c Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com L. USE CHANGE PERMIT APPLICATION FORM TYPE OF APPLICATION O Administrative Review 8 Limited Impact Review O Major Impact Review ❑ Amendments to an Approved LUCP ❑ LIR ❑MIR ❑ SUP O Location and Extent Review O Development in 100 -Year Floodplain O Designation of Flood Fringe/Floodway ❑ Rezoning ❑ Zone District❑ PUD 0 PUD Amendment O Minor Temporary Housing Facility O ULUR Text Amendment O Vacation of a County Road/Public ROW O Appeal of Administrative Interpretation O Pipeline Development O 1041 Regulations O Comprehensive Plan Amendment 0 Major 0 Minor O Variance INVOLVED PARTIES Owner/Applicant Name: Hunter Ridge Energy Services LLC Phone: ( Mailing Address: 370 17th Street, Suite 1700 City: Denver E-mail: State: C0 Zip Code: 80202 Representative (Authorization Required) Name: Chris Putnam Phone: ( 970 ) 285-2757 Mailing Address: 143 Diamond Ave City: Parachute E-mail: christopher.putnam©encana.com State: C0 Zip Code: 81635 ROJECT NAME AND LOCATION Project Name: (003) Story Booster Assessor's Parcel Number: 2135 Physical/Street Address: None Assigned Legal Description: 273 00 015 Zone District: RL - Plateau Property Size (acres): 26,441 • PROJECT DESCRIPTION Existing Use: Natural gas extraction and production Proposed Use (From Use Table 3-503): Material Handling Description of Project: See Attached Project Description Tab REQUEST FOR WAIVERS Submission Requirements lI The Applicant requesting a Waiver of Submission Requirements per Section 4-202. List: Section: 4-203.F Landscape Plan Section: Section: 4-203.M Water Supply Plan Section: Waiver of Standards El The Applicant is requesting a Waiver of Standards per Section 4-117. List: Section: 7-305 Landscaping Standards Section: Section: Section: I have read the statements above and have provided the required attached information which is correct and accurate to the best of my knowledge. 03/21/2013 Signature of Property Owner Date OFFICIAL USE ONLY File Number: _ _ _ _ - _ _ _ _ Fee Paid: $ 1:116u.T-littKovi ri T5S R 104' T63 R105k10 "F3 R 105W T03 F:10401 TTS R 104W T83 T83 R 10M R 104? /01rarn Smi T5S R la3W T55 R102W T.53 R 101W T5.3 R 100W' T63 T6S R 103W R. 102W T6S 1153 R 10 -FA' R100W T73 1)1173 R 103W !. 11. 2•4! T7S R1 -01W T-73 R 100W Ta3 T8S R103\ ( R 102W T8S T83 R101W — • — R 100W T43 R 99W T5S R99110 T6:3 T7S R99•0 TOS R 99W 2CE27300015 T43 R981.10 T53 R 98'W 1153 R 98W 173 R 98W T83 R 961/e Iga..W0e(A T4S R07V T53 R 97W T63 R9TW 173 R 97W T83 1133 R 94W T3 3 R (53W T33 R 92W T7 • T73 R 9- R R971W TF:3 1135 T83 F.: or.:0 F49', W R 94W° — — 173 R 9.3•W T83 R9:3•W TOS R9 za T73 R 92W T83 R 92W T-33 R 01W T43 R 91W T65 T6S R 91W T73 R 91W R 91110 T1S T13 R 861A' R 87W F:3. 411:2123ww, Owner Information ENCANA OIL & GAS (USA) INC 3615 5 HURON STREET, SUITE 200 ENGLEWOOD, CO 80110 T 3 Parcel Number: 213527300015 R900: ji Site Informat[on :Acres: 26441.91 Account Number: R46131365 Links T43 R9OW Garfield County .Assessor Data Garfield County Treasurer Data 173 R 90V T53 R S9.50 T5S R 89W 6'. A - SIN! LIS ;25. MS 1133 R96Nrii R89W T53 T53 R 884' R 87W T7S R 996' T8S R 90W "FS R 89V 1133 T73_ rill T83 1133 - R 891/0 R 88'W TOS R8 TW T73 R 87W T83 R 87•W 1,12,1LIM (!1,-'37ffordi-7 151954.997, 4418549.725 a Garfield County Assessor Data Site Jim Yellico, 109 8th Street, Glenwood Springs, CO, 81601 (P) 970.945.9134 1 (F) 970.945.3953 1 (E) jyellico@garfield-county.com Account Information Account: R460005 Parcel: 213527300015 Owner Name: ENCANA OIL & GAS (USA) INC Owner Address: 3615 S HURON STREET, SUITE 200, ENGLEWOOD, CO, 80110 Property Address: , PARACHUTE Legal: Section: 27 Township: 5 Range: 96 SEC 2 LOT 4(NET 27.16A) ALSO A TR IN SEC 2&11 CONT 341.07A SEC 3 S2NE, S2NW, S2 LOT 1(40.82A) 2(40.69A) 3(40.57A) 4(40.44A) SEC 4 S2NE, S2NW, S2, LOT 1(40.33A) 2(40.21A) 3(40.11A) 4 (39.99A) SEC 5 S2NE, S2NW, S2 LOT 1(39.80A) 2(39.52A) 3(39.24A) 4(38.96A) SEC'S 8,9,10 ALL SEC 14 W2NE, NW, S2 SEC 15 W2NE, NENE, NW, S2 SEC 16 ALL SEC 17 E2 SEC'S 21,22,23,24 ALL SEC 25 TR 37(107.06A) LOTS 1(37.84A) 2 (37.42A) 6(6.55A) 7(11.27A) N2NE, W2, SWSE SEC'S 26,27,28 ALL SEC 33 N2NE, NENW, E2NWNW SEC 34 NE, N2NW, SENW SEC 35 N2 SEC 36 N2, & PT OF THE SE(NET 116.68A) EXCEPT A PT ALONG THE C/L OF PARA. CRK. TO POB CONT 43.32A SEC 15- 5-95 A PT OF SEC 15 CONT 467.62A SEC 16 ALL THAT PT LYING S OF SOUTHERN MOST MAHOGANY MARKER CONT 386A SEC 17 S2S2, THAT PT OF THE N2S2 LYING S OF THE SOUTHERN MOST MAHOGANY MARKER CONT 41A SEC 19 E2, LOTS 1(40A) 2(40A) 3(21.41A) 4(21.42A) 5 (40A) 6(40A) 7(40A) 8(40A) 9 (21.44A) 10(21.45A) 11(40A) 12(40A) SEC'S 20,21,22,27,28,29 ALL SEC 30 Tax Area: 026 Subdivision: Sales Information Date Deed Type Doc Number Grantor Grantee Amount 06/11/2004 SWD 655347 UNION ENERGY MINING DIVIS... TOM BROWN, INC 26,445,000 Taxable Values History Year Land Actual Imp Actual Total Actual Land Assessed Imp Assessed Total Assessed 2012 466,070 1,230,340 1,696,410 135,160 356,800 491,960 2011 466,070 1,230,340 1,696,410 135,160 356,800 491,960 2010 451,230 1,368,140 1,819,370 130,850 396,760 527,610 Property Details Garfield County PAYMENT AGREEMENT FORM GARFIELD COUNTY ("COUNTY") and Property Owner ("APPLICANT") Hunter Ridge Energy Services LLC agree as follows: 1. The Applicant has submitted to the County an application for the following Project: Story Booster (003) Limited Impact Review for LUCP 2. The Applicant understands and agrees that Garfield County Resolution No. 98-09, as amended, establishes a fee schedule for each type application, and the guidelines for the administration of the fee structure. 3. The Applicant and the County agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. The Applicant agrees to make payment of the Base Fee, established for the Project, and to thereafter permit additional costs to be billed to the Applicant. The Applicant agrees to make additional payments upon notification by the County, when they are necessary, as costs are incurred. 4. The Base Fee shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board of County Commissioners for the consideration of an application or additional County staff time or expense not covered by the Base Fee. If actual recorded costs exceed the initial Base Fee, the Applicant shall pay additional billings to the County to reimburse the County for the processing of the Project. The Applicant acknowledges that all billing shall be paid prior to the final consideration by the County of any Land Use Change or Division of Land. I hereby agree to pay all fees related to this application: Billing Contact Person: Chris Putnam Phone: ( 970 ) 285-2757 Billing Contact Address: 143 Diamond Avenue City: DenverState: CO Zip Code: 80202 Billing Contact Email: christopher.putnam@encana.com Printed Name of Person Authorized to Sign: Chris Putnam 03/21/2013 (Signature) (Date) 1111 ri:111 IYI iNOIA NCILITRWItlinn10.11iii 11111 Reception#: 831595 02120/2013 11:36:41 AM Jan Alberich 1 of 1 Rec Fee:S11.00 Doc Fee:O D0 GRRFIELD COUNTY CO FicGarfield County STATEMENT OF AUTHORITY Pursuant to C.R.S. §38-30-172, the undersigned executes this Statement of Authority on behalf of Hunter Ridge Energy Services LLC , a limited liability company (corporation, limited liability company, general partnership, registered limited liability partnership, registered limited liability limited partnership, limited partnership association, government agency, trust or other), an entity other than an individual, capable of holding title to real property (the "Entity"), and states as follows: The name of the Entity is Hunter Ridge Energy Services LLC and is formed under the laws of The State of Delaware The mailing address for the Entity is 370 17th Street Suite 1700 Denver, CO 80202 The name and/or position of the person authorized to execute instruments conveying, encumbering, or otherwise affecting title to real property on behalf of the Entity is Renata Busch, Chris Putnam, Jason Oates. Julia Carter, Jennifer Lind The limitations upon the authority of the person named above or holding the position described above to bind the Entity are as follows (if no limitations, insert "None"): permit applications submitted to or issued by Garfield County Other matters concerning the manner in which the Entity deals with any interest in real property are (if no other matter, leave this section blank): EXECUTED this ? day of 1)6t(Ll '_y., , 20 Signature: Name (printed): Darrin Henke Title (if any): Manager STATE OF ) )SS. COUNTY OF c The foregoing instrument was acknowledged before me this+- day of j f ��_� j , 20 by Oce. r • H e,, _ , on behalf of R es Z r Ef ✓�t� a P j e. 1L L C. L Oar Witness my hand and official seal. My commission expires: (Date) [SE My Comm salon Expires 03/171201@ Notary Public) 1111 h'ir.6 RN 11 III Reception#: 821766 07/24/2012 03:04:12 PM Jean Rlberico 1 of 1 Rec Fee:$11.00 Doc Fee:0.00 GARFIELD COUNTY CO STATEMENT OF AUTHORITY CONFORMED COPY Pursuant to C.R.S. §38-30-172, the undersigned executes this Statement of Authority on behalf of Encana Oil d Gas (USA) Inc. a corporation (corporation, limited liability company, general partnership, registered limited liability partnership, registered limited liability limited partnership, limited partnership association, government agency, trust or other), an entity other than an individual, capable of holding title to real property (the "Entity"), and states as follows: The name of the Entity is Encana Oil di Gas (USA) IDG and is formed under the laws of the State of belaware The mailing address for the Ent i fly i s 37017th Street, Suite 1700 Denver, CO 80202 The name and/or position of the person authorized to execute instruments conveying, encumbering, or otherwise affecting title to real property on behalf of the Entity is Renata Busch, Jason Eckman, Mike Herndon and Chris Putnam The limitations upon the authority of the person named above or holding the position described above to bind the Entity are as fol lows : sign permit applications and permits issued by Garfield County (if no limitations, insert "None") Other matters concerning the manner in which the Entity deals with any interest in real property are: (if no other matter, leave this section blank) EXECUTED this r.:3day of JLLl` , 20nn,. STATE OF Colorado COUNTY OF Denver Signature: Name(typed or printed: barrinj. Henke Title (if any) : _.vice -President ) )SS. ) The foregoing instrument was acknowledged before me this J day of r :June + , 2042. by barrin J. Henke , on -behalf of Encana Oil Gas (USA) Inc. , a Delaware Corporation 11/08 Witness my hand and official seal. My commission expires: i DITH B SISNEROS NOTARY PUBLIC STATE OF COLORADO MY mmissian Expires 03/17/2018 != 11 y..-:�.. (Notary Public) Preapplication Conference Summary ■ HUNTER RIDGE ENERGY SERVICES LLC GARFIELD COUNTY Building & Planning Department 108 8th Street, Suite 401, Glenwood Springs, Colorado 81601 Telephone: 970.945.8212 Facsimile: 970.384.3470 0375 CR 352, Bldg #2060, Rifle, CO 81650 Telephone: 970.625.5903 Facsimile: 625.5939 www.garfield-county.com PRE -APPLICATION CONFERENCE SUMMARY PLANNER: Glenn Hartmann DATE: 12/6/12 PROJECT: 003 596 Booster/Compressor Station PARCEL: 2135-273-00-015 APPLICANT/OWNER: Hunter Ridge Energy Services LLC in Conjunction with Encana Oil & Gas (USA) Inc. REPRESENTATIVES: Chris Putnam, Encana Oil & Gas (USA) Inc. and Craig Richardson, Olsson Associates PRACTICAL LOCATION: Located approximately 20 miles northwest of Parachute in Section 3, T5S, R96W. ZONING: Resource Lands - Plateau TYPE OF APPLICATION: Limited Impact Review — Compressor Station/Pipeline Pump Station (not subject to Article 9) and Material Handling GENERAL DESCRIPTION & DISCUSSION Hunter Ridge Energy Services LLC in Conjunction with Encana Oil and Gas (USA) Inc. propose to request a Land Use Change Permit — Limited Impact Review for this existing facility. It is a compressor station and includes some material handling functions such as separation. The Applicant has indicated that the facility initially operated as a booster compressor and has been expanded over time to include three compressor units. All required facilities are existing and in place including access roads and storm water management improvements including best management practices such as berms and sediment ponds. The site is approximately 6.49 acres in size and is located on a well pad. Facilities include a small office building (14'x9'), a power building, various tanks, separator facilities, coolant tanks, pipelines, and the three compressor units. Approximately 364 sq. ft. of buildings exist on the site. Based on the Applicant's representations the Compressor Station and Material Handling designations are appropriate and require a Limited Impact Review Land Use Change Permit in the Resource Lands — Plateau Zone District. In addition to standard requirements of the ULUR the Applicant will need to address the conveyance network (pipelines) serving the facility, general location, County permitting information if applicable, and easement information if pipeline alignments extend off of Encana Property. ikrA ENCANA OIL & OAS (LISA) INC PARCEL. NiO. 213527300013 The Application will need to provide information on any hazards (including mitigation), stormwater drainage plans and improvements, CDPHE Permits including air and stormwater, and SPCC Plans. Staff anticipates the Application will be supported by actual permits and as -built documentation as the facility is existing. Confirmation that the facility is currently in compliance with all applicable permitting requirements (State and Federal) will be required. The Applicant has indicated that the submittals will include additional documentation of access agreements and easements for the existing access road. The Applicant has also indicated that the application will be for the existing three compressor units and may include expanded separation facilities. Other submittal requirements include impact analysis reports such as wildlife impacts. Information on reclamation and bonding/security will be required. Where waivers to submittal requirements may be requested compliance with the waiver provisions of the ULUR found in Section 4-202 will be required. The site plan inserted below identifies the existing facilities in place that the Applicant is anticipating permitting with the current request. aRTIMS7T SUIver'1t Cmir, w ra .v ua: Ain. rs. II. COMPREHENSIVE PLAN The site is designated in the Garfield County Comprehensive Plan 2030 as Resource Production/Natural (RPN). The Comprehensive Plan description of this use includes support buildings and facilities needed for the natural resource extraction industry. This description is consistent with the current proposal. The plan also notes that this designation includes areas that may have significant environmental constraints including slopes. III. REGULATORY PROVISIONS APPLICANT IS REQURED TO ADDRESS • Garfield County Comprehensive Plan 2030 • Garfield County Unified Land Use Resolution of 2008, as amended (effective 8/13/12) o Article III, Zoning & Use Tables — Resource Lands Plateau Zone District o Article IV, Application and Review Procedures including Sections 4404 (Limited Impact Review), Section 4-117 (Waiver of Standards), Section 4-202 (Waiver of Submittal Requirements, and Section 4-203 Submittal Requirements o Article VII, Standards — Divisions 1 and 2 and 3 as applicable o Article VII, Section 7-1101, Industrial Use Standards o Article XVI, Definitions • Colorado Department of Public Health and Environment Regulations Pertaining to Storm Water and Air Quality • Safety Regulations pertaining to emergency procedures and Spill Prevention Plans • Colorado Revised Statutes Regulations on Noise • Verification that any Garfield County Building Permits and building code requirements have been satisfied. IV. REVIEW PROCESS — LIMITED IMPACT REVIEW 1. Pre -application Conference 2. Application Submittal 3. Determination of Completeness by Planning Staff 4. Submittal of Additional Application Copies 5. Scheduling of the Public Hearing and Referrals are sent out 6. Public Notice Completed by the Applicant. 7. Evaluation by Direct and Staff Review -- Report Preparation 8. Review and Action by the Board of County Commissioners at the Public Hearing. V. ADDITIONAL SUBMITTAL REQUIREMENTS An Application for a Limited Impact Review will also need to provide a listing of all property owners (with addresses) within 200 ft., an excerpt from the Assessor's Office mapping showing the ownerships, a listing of any mineral rights owners on the property (with addresses), authorization to represent statements/letters, evidence of ownership and/or lease agreements for the site. VI. APPLICATION REVIEW a. Review by: Staff for completeness recommendation and referral agencies for additional technical review b. Public Hearing: c. Referral Agencies: Planning Commission _X_ Board of County Commissioners Board of Adjustment May include but is not limited to: Colorado Department of Public Health and Environment, County Road and Bridge Department, County Environmental Health Manager, County Vegetation Manager, County Consulting Engineer, local Fire Protection District, and adjacent Towns. VII. APPLICATION REVIEW FEES a. Planning Review Deposit Fees: Limited Impact Review ($400) b. Referral Agency Fees: TBD c. Total Deposit (GarCoj: $400 (additional hours billed at hourly rate) Disclaimer The foregoing summary is advisory in nature only and is not binding on the County. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. This summary does not create a legal or vested right. Pre -application Summary Prepared by: Glenn Hartmann, Senior Planner Date Garfield County Building & Planning Department Project Description ■ HUNTER RIDGE ENERGY SERVICES LLC Hunter Ridge Energy Services LLC (003) Story Booster - Project Description The facility is located in the SW 1/4, SE '/a of section 03, Township 5 South, Range 96 West of the 6th Principal Meridian on the WF 003-596 well pad. The Facility was constructed as part of the Conoco Philips joint venture to reduce well pad size and minimize truck traffic needed to make round trips daily to haul produced water and condensate. The proposed Facility is located approximately 18 miles north-northeast of Parachute, Colorado situated on Encana's North Parachute Ranch property. Processed natural gas is transported to the facility via pipelines from surrounding central delivery facilities that have separated and measured the gas and liquids. The gas enters a vessel where it is again separated to remove any free liquid. The gas then flows to 3 compressors where it is boosted to the main compression facility through existing pipelines. The free liquid is sent to a liquids pipeline where it combines with the liquid from the central delivery points and flows to the main processing facility through existing pipelines. The goal of this facility is to increase capacities at our central delivery facilities and increase production from our well sites by reducing pressures. Processed produced water and condensate enter the site via an existing liquid pipeline where it enters a vessel to separate the condensate and water to be measured. Condensate is measured with a LACT system and the produced water is measured and routed back to well pads or to the existing Middle Fork Compressor Station and the Middle Fork Water Storage Recycling Facility located in Section 30, Township 5 South, Range 96 West. The Facility will consist of the following equipment: - 3 Compressors - 1 Generator - 1 Slug Catcher - 1 3 -Phase Separator - 1 Receiver - 1 Gas Meter Building - 1 400 bbl Tank - 1 Future Measurement Building - 1 Future Custody Meter - 2 Future Compressors