Loading...
HomeMy WebLinkAbout5.02 List of conditions of approvalAugust 6, 2004 Jimmy Smith Wagon Wheel Consulting 111 E. Third Street, Suite 213 Rifle, CO 81650 Garfield County BUILDING & PLANNING DEPARTMENT RE: Encana 8" Waterline from Last Chance Ditch to the Hunter Mesa Water Treatment Facility Dear Jimmy, As you are aware, on Monday, August 2nd, 2004, the Board of County Commissioners approved the request for a Special Use Permit for "material handling" for an 8" water line from Buckhorn Drive in the City of Rifle that extends to the Hunter Mesa Water Treatment Facility in Garfield County with the following conditions: 1. That all representations made by the Applicant in the application and as testimony in the public hearing before the Board of County Commissioners shall be considered conditions of approval,. unless specifically altered by the Board of County Commissioners. 2. The Applicant shall provide surface use agreements that clearly show that the Applicant has obtained all necessary approvals to cross all subject private properties along the proposed waterline route prior to the issuance of a Special Use Permit from Garfield County. 3. Prior to the issuance of a Garfield County Special Use Permit, the Applicant shall provide all applicable approvals from the Bureau of Land Management (Form 299) and the Army Corps of 4. The Applicant shall obtain a Watershed District Permit from the City of Rifle for the construction of the pipeline as it falls within the City's jurisdiction under the Watershed Ordinance and regulated activities prior to the issuance of the Special Use Permit from Garfield County. 5. The subject pipeline shall be used to deliver water solely for the Applicants or their successors in interest for the use in the extraction of gas. Any secondary taps to the water line by third parties or secondary use by the applicant shall require an amendment to this special use permit and proof 108 8th Street, Suite 201, Glenwood Springs, Colorado 81601 /117111 11AC 0111 mint 10C 71171 L',.... mini 204 24711 that said third parties possess rights to water being distributed through the pipeline. 6. In order to comply with the requirements of the County Vegetation Manager, the Applicant or their successors in interest shall provide a written commitment to inspect, monitor, and be responsible for the management of any of Garfield County's Noxious Weeds that may emerge on private lands that are disturbed by the pipeline. This commitment shall be in effect for the life of the pipeline and shall include a commitment to respond to any complaints by landowners regarding pipeline noxious weeds in a timely manner. This commitment shall include cooperation with the Bureau of Land Management in developing a weed management plan for any noxious weed infestations that occur on the pipeline within BLM land, 7. The Applicant shall provide a revegetation security in the amount of $26,000.00 to cover the revegetation obligation of the Applicant for 26.13 acres of private (non-federal) lands along the pipeline route. The security shall be held by Garfield County until vegetation has been successfully reestablished according to the Reclamation Standards in the Garfield County Weed Management Plan. It shall be the responsibility of the Applicant to contact the County, upon successful revegetation establishment, to request an inspection for security release consideration. No Special Use Permit shall be issued until this security has been posted. 8. The Applicant shall provide a copy of the Storm Water Management Plan submitted to the Colorado Department of Public Health and Environment prior to the issuance of any Special Use Permit from Garfield County. 9. The Applicant shall adhere to the "Construction, Operation, and Maintenance Plan" which is included in the permit application for Storm Water Management Plan for all activity on private land as well as public lands. 10. The Applicant shall provide a construction schedule and indicate where staging areas are to be located to be used during construction to the Planning Department prior to the issuance of a Special Use Permit. 11. A draft agreement between the Loesch & Crann Ditch Company and the Applicant dated July 26, 2004 was submitted. This agreement contemplates a seven (7) year agreement with the right to extend the agreement another seven years. As a result, the Applicant shall be required to maintain a legal water supply and approval to use the Last CtianceTtch tor the proposed re of the water line of 30 years. 12. The Applicant shall prepare and submit a formal fire protection plan to the Rifle Fire Protection District which includes a phone list of supervisory personnel, as it relates to construction activities. This list should also contain phone numbers, office and cell. This plan shall also include measures that address the potential impacts of any fire bans that may be enacted by the County. As soon as the Applicant has demonstrated that all these conditions have been met, the County will issue the actual Special Use Permit. Please do not hesitate to contact this office in the event you have any questions. Very truly yours, Fred A. Jarman, AICP, Senior Planner 970.945.8212 Fred Jarman From: Dion Plsek [dionplsek©cordcomp.com] Sent: Monday, August 02, 2004 10:26 AM To: Fred Jarman Cc: Jimmy Smith (E-mail) Subject: FW: Water Line Importance: High Fred, L L1.15L, 1 vi Z. Please refer to the statement below for information on the water line valves. The alignment drawings show the vent valve locations in the second row (marked "Crossings") from the top of the page. I will forward the vent valve schematics to you in a subsequent message. Thanks, Dion Plsek, P.E. Associate Engineer Cordilleran Compliance Services, Inc. 826 21'/% Road Grand Junction, CO 81505 Phone = 970.263.7800 Fax = 970.263.7456 Mobile = 970.270.0278 www.cordcomp.com Original Message ----- From: Bronte Consulting [mailto:bronte_egr@msn.com] Sent: Monday, August 02, 2004 9:34 AM To: Dion Plsek Cc: Chuck Bucans; David Grisso - EnCana; Mike-Hayde-Encana ROW,; KristinF-Encana Subject: Re: Water Line Importance: High Dion: The line has 10 buried vent valve locations as indicated on the alignment sheets, the only other above ground valve set will be located on the Lazier property EnCana made an agreement with the landowner to supply water to the new development from the River Water Line. The only other valves will be located at the Pump House -- there no other above ground valve sets along this line. I will forward you a copy of the drawings for the vent valve installations. «<JC?» ETcre rent = Firesident Bronte Consulting, Inc. 10224 Loridan Lane Sandy, UT. 84092 801-942-8130 (0) phone/fax 801-673-5283 (M) This transmission & any accompanying documents contain information belonging to the sender which may be confidential and legally privileged. This information is intended only for the use of the individual or entity to whom this transmission was sent. If you are not the intended recipient, any disclosure, copying, distribution or discussion of these materials, or action taken 8/2/2004 f in reliance on the contents of the information contained in this transmission is strictly prohibited. If you have received this transmission in error, please delete the transmission from your files. Original Message From: Dion Plsek To: John E. Corrent (E-mail) Sent: Monday, August 02, 2004 9:24 AM Subject: FW: Water Line Do you have any information on this? The county hearing is today, so I need to know where & how many on the valve sets or get some drawings by this morning. Thanks, Dion -----Original Message From: Fred Jarman[mailto:fredjarman©garfield-county.com] Sent: Monday, July 26, 2004 10:17 AM To: Dion Plsek Subject: Water Line Hello again, I also need to know how to locate fhe above ground valves on the plans. Any ideas, thanks. Fred A. Jarman, AICP, Senior Planner Garfield County Building and Planning Department 108 8th Street, Suite 201 Glenwood Springs, Colorado 81601 970.945.8212 My Inbox is protected by SPAMfighter 715 spam mails have been blocked so far. Download free SPAMfighter today! 8/2/2004 GRADE C7 Fr) 8" ANCHOR FLANGE, STD. WT -- MATERIALS LIST ITEM QUAN. 01 01 02 01 03 01 04 01 05 01 06 01 07 01 08 09 01 DESCRIPTION 8" ANCHOR FLANGE, C , STD. 4" TO 2" CONC. RED, S D, GR B 8" ANCHOR FLANGE P. W/ CONCRETE THRUST BLOCK 2" THREADED BALL VA VE, BRONZE 2" VENT -O -MAT 050 RB 2521 BRONTE/TMC VALVE NCLOSURE 8"x4"RED. TEE, CS, S`D.,GR. B 4" PIPE, STD. GR. B 2" PIPE NIP., CS, SCH. 8a, TOE 41 0" I1. --111- 111 �! 111111II111. 1 E: :111-111'111 =111111=L1 111- I U 1=111=111=411=11 11r 11 REV. 07/19104 REVISED FOR RIVER PIPEINE INSULATION ALL SIDES AND LID GRADE 2" VENT -O -MAT 050 RBX 2521 * 2" THREADED BALL VALVE, BRONZE 2" NIP TOE, SCHD. 80, GR B 4" X 2" CONC. RED., STD., GR B 4" PIPE, CS, STD, BE, GR. B NOT TO SCALE 8" X 4" RED TEE, CS, STD., Y-52 1,_.. 8„ LINE PIPE, SEE ALIGNMENT SHEETS FOR SCHED. List Update Authorization here. Approved By: �•" SBW CB/FTM JC 0U1MMfYY 07/19104 07/19/04 07/20/04 RRONTE CONSULTING STAR VELL EY ENGINEERING TED MILLER CO„ ING- ENCANA OIL & GAS (USA), INC. RIVER WATER PIPELINE 2" HIGH POINT VENT VALVE RIFLE, COLORADO H. P. VENT VALVE 7-19-04 r" w xxfJOB NUMBER 9994-C SHEET 1 OF 1 GRADE Z0 8" ANCHOR FLANGE, STD. WT - MATERIALS LIST ITEM QUAN. 01 01 02 01 03 01 04 01 05 01 06 01 07 01 08 09 01 10 01 DESCRIPTION 8" ANCHOR FLANGE, C.., STD. 4" TO 2" CONC. RED, S D, GR B 8" ANCHOR FLANGE P. W/ CONCRETE THRUST BLOCK 2" THREADED BALL VA VE, BRONZE 2" VENT -O -MAT 050 RB 2521 BRONTE/TMC VALVE . NCLOSURE 8" x 4" RED. TEE, CS, S D., GR. B 4" PIPE, STD. GR. B 2" PIPE NIP., CS, SCH. , TOE 2" X 1" RED. BUSH, CS, HD. III+H +H—til- 11E111E111=111- 11111=111 1 1•1111 11-f11 VlI 1. f.11111=111--111- 111'111- 111-1- - =111-:= 11 I. 11 h 1-1_I 11111.11) 1= IVf=1.11= "i111iIIIF _11111F1 —III—III= I 11=11f=1 I- 1=111=1117- 11=111=111= 4' 0" Q a� ,_[1I =111== IIf =1II- I-1.1 I-1 1=1I 1P. 111-111- = 11=11 i111111i11EE-11=1 11P IH REV. 07!19/04 REVISED FOR RIVER PIPEINE INSULATION ALL SIDES AND LID GRADE 1" VENT -O -MAT 025 RBX 2521* 2" X 1" RED. BUSHING, CS, THD. 2" THREADED BALL VALVE, BRONZE 2" NIP TOE, SCHD. 80, GR B 4" X 2" CONC. RED., STD., GR B 4" PIPE, CS, STD, BE, GR. B 8" X 4" RED TEE, CS, STD., Y-52 NOT TO SCALE 8" UNE PIPE, SEE ALIGNMENT SHEETS FOR SCHED. List Update Aothonzeeon here. Approved By: om, SBW JC/CB/FTM Ream, JC RM.. 2 DD/MM1YY 07119/04 07/19104 07/20/04 RVArIm S: GRONTE CONSULTING STAR VELLEY ENGINEERING TEO MILLER CO., INC. ENCANA OIL & GAS (USA), INC. RIVER WATER PIPELINE 1" HIGH POINT VENT VALVE RIFLE, COLORADO H. P. VENT VALVE 7-19-04 Zoo o : xx JOB NUMBER 9994-C-1 SHEET 1 OF 1