Loading...
HomeMy WebLinkAbout7.0 PlansENCANA OIL & GAS (USA) INC Parcel No. 217133100020 5outk rork Water reaciiii:y South Middle Fork Water Treatment Facility Project Location X3.6 Miles To Parachute (Vicinity Map Information Compiled From Garfield County GIS Data) Vicinity Map (1" = 2,000') Vicinity Map Legend Parcel Line Road Drainage Section Line Township Line No. SHEET CO SHEET C1 A SHEET C1 B SHEET C2 SHEET C3 SHEET C4 SHEET C5 SHEET C6 SHEET C7 SHEET C8 SHEET C9 REVISIS N DATE D PTION BY ri7 t_f Cover Sheet Site Plan Sheet 1 Site Plan Sheet 2 County Road 215 Plan & Profile County Road 215 Striping & Signing Plan Grading Plan Surface Type Plan Cross Section Views Pre—Construction Erosion Control Plan Construction Erosion Control Plan Post—Construction Erosion Control Plan encanan. natural RIVER CITY 744 Horizon Court, Suite 110 Grand Junction Co 81506 L TAN TS Phone: 970.241.4722 Far 970 241 8841 Encana Oil & Gas (USA) Inc. PROJECT 0086-042 DRAWN BY: nmr CHECKED BY: mjk South Middle Fork Water Facility Cover Sheet SCALE HORIZ: VERT: DATE ISSUED: 12.12.12 SHEET N0. OF SHEETS CO ENCANA OIL & GAS (USA) INC Parcel No. 21 71 331 00020 Vicinity Map Legend Parcel Line Road Drainage Section Line Township Line PARCEL N 2171 1000 0 FGAL DESCRIPTION (TAKEN FROM GARFIELD COUNTY GIS WEBSITE) SECTION: 33 TOWNSHIP: 6 RANGE: 96 LOT 5, SEC 34 PT OF LOTS 3 & 10 South Middle Fork Water Facility Project Description A parcel of fond situated 91 the NE 1/4 of Section 33 and the NW 1/4 of Section 34, Township 6 South, Range 96 West of the 6th Principal Meridian, County of Garfield, State of Colorado, being more particularly described as follows: commencing at a stone monument at the Northeast corner of said section 33, whence a found spike for the East 1/4 corner of said section 33 bears South 00'31'49 -East, a distance of 2664.21 feet, with all bearings herein relative thereto; thence South 00'31'49" East a distance: 1332.12 feet to the point of begining; thence North 89'37'47" West a distance of 1322.04 feet; thence South 00'49'34" East a distance of 1339.82 feet; thence South 89'57'40" East a distance of 1315.01 feet; thence South 00'31'36" East a distance of 1293.90 feet; thence South 89'27'49" East a distance of 209.60 feet; thence North 00'32'11" East a distance of 559.70 feet; thence South 89'27'49" East a distance of 714.70 feet; thence North 00'34111" East o distance of 634.10 feet; thence South 89'24'49" East a distance of 380.13 feet; thence North 00'05'34" East a distance of 115.01 feet; thence North 00'03132" East a distance of 106.42 feet; to the cusp of a curve concave to the northeast with a radius of 1550.00 feet, with a chord bof 205earing.89 of Northfeet, 38'16'14" West, with a chord length of 205.74 feet, along the arc for a length thence North 34'27'55" West a distance of 1287.99 feet; thence South 89'58'39" West a distance of 484.12 feet; which is the point of beginning, the above parcel description having an area of 3863320.01 square feet, 88.690 acres South Middle Fork Water Treatment Facility Project Location r-3.6 Miles To Parachute Reye etation Bond Legal Descriotiom A Parcel of land situated in the SE 1/4 of the NE 1/4 of Section 33 and the SW 1/4 of the NW 1/4 of Section 34, Township 6 South, Range 96 West of the 6th Principal Meridian, County of Garfield, State of Colorado, said parcel having an area of 2.9 acres SEC 33, T6S, R96W SEC 4, T7S, R96W SEC 3, T7S, R96W 1000 . 500 1000 I IN FEET I 1 INCH = 1000 FT. 2000 NOTES: 1. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE RESPECTIVE UTILITY COMPANIES AND/OR THEIR LOCATOR SERVICES, AND DRAWINGS PROVIDED BY THE UTILITY COMPANIES. NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO DETERMINE THE EXACT LOCATIONS AND DEPTHS OF THE UNDERGROUND UTILITIES AND STRUCTURES. ACTUAL LOCATION MAY VARY SLIGHTLY FROM THOSE SHOWN HEREON AND ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. EXISTENCE AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHOULD BE VERIFIED PRIOR TO ANY CONSTRUCTION ON THIS PROPERTY. 2. EXISTING SURVEY INFORMATION (INCLUDING EXISTING UTILITIES) PROVIDED BY WASATCH SURVEYING. 3. PARCEL INFORMATION IS TAKEN FROM THE GARFIELD COUNTY GIS WEBSITE. 4. THE PROJECT IS LOCATED WITHIN A 88.7 ACRE PARCEL, # 217133100020, WHICH IS OWNED BY ENCANA OIL AND GAS (USA). IN MORE LEGAL TERMS, IT IS LOCATED IN THE SOUTHWEST Y4 OF THE NORTHWEST 14 OF SECTION 34 AND THE SOUTHEAST Y4 OF THE NORTHEAST OF SECTION 33, TOWNSHIP 6 SOUTH, RANGE_ 96 WEST OF THE 6TH PRINCIPAL MERIDIAN, GARFIELD COUNTY, COLORADO. THE PROJECT AREA IS EQUAL TO THE ESTIMATED TOTAL AREA OF DISTURBANCE WHICH IS 31.2 ACRES. THE TOTAL AREA TO BL RE -VEGETATED IS APPROXIMATELY 2.9 ACRES. 5. ACCORDING TO THE NRCS WEB SITE, THE UPPER LAYER OF SOIL PRESENT AT THE PROJECT SITE CONSISTS OF ARVADA LOAM (1 TO 6% SLOPES), HALAQUEPTS (NEARLY LEVEL), AND OLNEY LOAM (3 TO 6% SLOPES). THESE SOILS HAVE A HYDROLOGIC SOIL CLASSIFICATION OF B TO D (MODERATE TO HIGH RUNOFF POTENTIAL), THE WHOLE SOIL EROSION K FACTOR FOR THESE SOILS IS BETWEEN 0.24 AND 0.37, MEANING THIS SOIL IS MILD TO MODERATELY EROSIVE. 6. EXISTING VEGETATION ON THE SITE INCLUDES VARIOUS GRASSES AND HIGH DESERT VEGETATION (SAGE, RABBIT BRUSH, ETC.). UNDISTURBED PORTIONS OF THE SITE ARE APPROXIMATELY 75% VEGETATED. 7. THIS SITE IS LOCATED WITHIN "RESOURCE LAND" ZONING. 8. BASIS OF BEARING IS S 00' 31' 49" E 2664.21 FEET BETWEEN FOUND MONUMENT AT NORTHEAST CORNER AND EAST Y4 CORNER OF SECTION 33 (ASSUMED). 9. POND LINER SYSTEM, BUILDINGS, TANKS, SECONDARY CONTAINMENTS, PIPING, ETC. DESIGN BY OTHERS. 10. NO BUILDINGS WITHIN 250' OF PROPERTY LINE. 11. THE ORIGINAL DRAWING SIZE IS 24" X 36". 12. THE CONTROL BUILDING TO BE SERVICED WITH VAULT & HAUL POTABLE WATER AND SEPTIC SERVICE. FINAL LAYOUT TO BE DETERMINED & DESIGNED DURING THE BUILDING AND SEPTIC PERMIT PROCESS. (Vicinity Map Information npiled From Garfield County GIS Data) e_° encanan. - �^ ria 1`uta, ga� Revised - per Garfield Coeirn ited Impact Review Comments do Encana Oil & Gas (USA) Inc. RIVER CITY 744 Horizon Court, Suite 110 Gr .I Ji air C.. '506 ULTANTS PROJECT #1086-042 Phone: 70.722 DRAWN BY: nmr F=x 9 970.241241487.7 CHECKED BY: mk South Middle Fork Water Facility Site Plan Sheet 1 - Vicinity Map SCALE HORIZ: 1000' VERT: N/A SHEET N0. 1 OF 2 SHEETS CIA FLOODPLAIN DISCLAIMER: THE FLOODPLAIN SHOWN IS BASED ON THE 100 YEAR FLOODPLAIN SHOWN IN THE 1985 USDA REPORT DONE BY THE SOIL CONSERVATION SERVICE TITLED "PARACHUTE CREEK IN THE VICINITY OF PARACHUTE, CO AND ROAN CREEK IN THE VICINITY OF DEBEQUE, CO". SHEET 7 OF 14 OF THIS REPORT SHOWS THE 100 YEAR FLOODPLAIN FOR PARACHUTE CREEK IN THE VICINITY OF THE SOUTH MIDDLE FORK WATER FACILITY PROJECT. THIS FIGURE WAS IMPORTED INTO CAD VIA A PDF AND WAS SCALED AND ALIGNED USING SECTION LINES. THE COURSE OF THE RIVER HAS CHANGED SINCE 1985, AND WE HAVE NOT EVALUATED THE IMPACT, IF ANY, OF THESE CHANGES TO THE FLOODPLAIN ANALYSIS. HOWEVER. IT IS UNLIKELY THESE CHANGES TO THE CHANNEL IMPACT THE 100 YEAR FLOODPLAIN LIMITS. THE BASE FLOOD ELEVATIONS (BFE) SHOWN BELOW WERE TAKEN FROM THE 1A9N8A5LYUSSAORETPHORTFLFOIOURAIANNDCATNRABNESFFORUNMEDD NFOHME NFOOD29HATOARDAVLDEER ( THE ELEVATION DATUM OF THESE DRAWINGS). MORE DETAIL ON THE PREPARED FOR THIS PROJECT BY RIVER CITY CONSULTANTS, INC.. Northeast Corner Section 33 Original Stone BFE = BASE FLOOD ELEVATION (NAVD88) GENERAL ELEVATION VIEW (To Demonstrate Maximum Structure Height) s.r.s _Property Corner 2002 Alum. Cap PLS 27925 B -- 1 Install (W12-56) "Trucks Turning" Sign Install (W16-2aP) "500 FT" Sign v\ Replace Existing Sign With (W2-1) ,» "Cross Road Intersection" PARCEL y 217133100020 LEGAL DESCRIPTION (TAKEN FROM GARFIELD COUNTY GIS WEBSLLE) SECTION: 33 TOWNSHIP: 6 RANGE: 96 LOT 5, SEC 34 PT OF LOTS 3 & 10 South Middle Fork Water Facility Project Description - A parcel of land situated in the NE 1/4 of Section 33 and the NW 1/4 of Section 34, Township 6 South, Range 96 West of the 6th Principal Meridian, County of Garfield, State of Colorado, being more particularly described as follows: commencing at a stone monument at the Northeast corner of said section 33, whence a found spike for the East 1/4 corner of said section 33 bears South 00'31149"East, a distance of 2664.21 feet, with all bearings herein relative thereto; thence South 00'31149" East a distance: 1332.12 feet to the point of begining; thence North 89'37'47" West a distance of 1322.04 feet; thence South 00'49'34" East a distance of 1339.82 feet; thence South 89'57'40" East a distance of 1315.01 feet; thence South 00'31'36" East a distance of 1293.90 feet; thence South 89'27'49" East a distance of 209.60 feet; thence North 00'32'11" East a distance of 559,70 feet; thence South 89'27'49" East a distance of 714.70 feet; thence North 00'34111" East a distance of 634,10 feet; thence South 89'24'49" East a distance of 380.13 feet; thence North 00'05'34" East a distance of 115.01 feet; thence North 00'03'32" East a distance of 106.42 feet; to the cusp of a curve concave to the northeast with a radius of 1550.00 feet, with a chord bof 205earing,89 of Northfeet, 38'16'14" West, with a chord length of 205.74 feet, along the arc for a length thence North 34'27'55" West a distance of 1287.99 feet; thence South 89'58'39" West a distance of 484.12 feet; which is the point of beginning, the above parcel description having an area of 3863320.01 square feet, 88.690 acres DOW / ENCANA_ -- WILDLIFE MITIGATION AREA (ENCANA,OWNED LAND),, Remove 111.6' Of Fence Revegetation Bond Legal Description: A Parcel of land situated in the SE 1/4 of the NE 1/4 of Section 33 and the SW 1/4 of the NW 1/4 of Section 34, Township 6 South, Range 96 West of the 6th Principal Meridian, County of Garfield, State of Colorado, said parcel having an area of 2.9 acres Diversion Ditch DAF Treatment Bldg 123' x 78' 1 Secondary Containmen 195'x 101' \ , 1 \\ (2) 9,800 BBL Off-load Tanks (10) 500 BBL Freshwater &Sludge Tanks `\\ (2) 400 BBL Condensate Tanks t� \ Encana Owned Power Lines � energized) ener 9 ) Proposed Site Relocated � Existing Sign I s. Control Room (see Note 13) 30' x 16' own§II �� 1 MIME II I � ERIE! LI � _stlaitillt* ttilk Install (R1-1) "Stop" Sign \ Relocated Existing \ Speed Limit Slgn 174 LF O 1.1% 18" RCP Invert In: 5406.00 Invert Out: 5404.00 Off-load Pads 106' x 64' t a -Property Corner 2.5" Alum. Cap PLS 27925 .S89' 57' 40"E 966.17 Property Corner / East 1/4 Corner Section 33 Found Spike End Of Road Markers / i 6' Chain -Link Fence Install (W12-56) "Trucks Turning' Sign Install (W16-2aP) "500 FT" Sign 0 n 1985 Floodplain Limit See Disclaimer Note Above RPP �ropery Corner � ` ` \ � � X14 Rebar With \ I Red Plastic Cop PLS 27925 EnC ono \042 NOTES: 1. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE RESPECTIVE UTILITY COMPANIES AND/OR THEIR LOCATOR SERVICES, AND DRAWINGS PROVIDED BY THE UTILITY COMPANIES. NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO DETERMINE THE EXACT LOCATIONS AND DEPTHS OF THE UNDERGROUND UTILITIES AND STRUCTURES. ACTUAL LOCATION MAY VARY SLIGHTLY FROM THOSE SHOWN HEREON AND ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. EXISTENCE AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHOULD BE VERIFIED PRIOR TO ANY CONSTRUCTION ON THIS PROPERTY. 2. EXISTING SURVEY INFORMATION (INCLUDING EXISTING UTILITIES) PROVIDED BY WASATCH SURVEYING. 3. PARCEL INFORMATION IS TAKEN FROM THE GARFIELD COUNTY GIS WEBSITE. 4. THE PROJECT IS LOCATED WITHIN A 88.7 ACRE PARCEL, N 217133100020, WHICH IS OWNED BY ENCANA OIL AND GAS (USA). IN MORE LEGAL TERMS, IT IS LOCATED IN THE SOUTHWEST Y4 OF THE NORTHWEST 14 OF SECTION 34 AND THE SOUTHEAST Y4 OF THE NORTHEAST Y4 OF SECTION 33, TOWNSHIP 6 SOUTH, RANGE 96 WEST OF THE 6TH PRINCIPAL MERIDIAN, GARFIELD COUNTY, COLORADO. THE PROJECT AREA IS EQUAL TO THE ESTIMATED TOTAL AREA OF DISTURBANCE WHICH IS 31.2 ACRES. THE TOTAL AREA TO BE RE -VEGETATED IS APPROXIMATELY 2.9 ACRES. 5. ACCORDING TO THE NRCS WEB SITE, THE UPPER LAYER OF SOIL PRESENT AT THE PROJECT SITE CONSISTS OF ARVADA LOAM (1 TO 6% SLOPES), HALAQUEPTS (NEARLY LEVEL), AND OLNEY LOAM (3 TO 6% SLOPES). THESE SOILS HAVE A HYDROLOGIC SOIL CLASSIFICATION OF B TO D (MODERATE TO HIGH RUNOFF POTENTIAL). THE WHOLE SOIL EROSION K FACTOR FOR THESE SOILS IS BETWEEN 0.24 AND 0.37, MEANING THIS SOIL IS MILD TO MODERATELY EROSIVE. 6. EXISTING VEGETATION ON THE SITE INCLUDES VARIOUS GRASSES AND HIGH DESERT VEGETATION (SAGE, RABBIT BRUSH, ETC.). UNDISTURBED PORTIONS OF THE SITE ARE APPROXIMATELY 75% VEGETATED. 7. THIS SITE IS LOCATED WITHIN "RESOURCE LAND" ZONING. 8. BASIS OF BEARING IS S 00' 31' 49" E 2664.21 FEET BETWEEN FOUND MONUMENT AT NORTHEAST CORNER AND EAST Y4 CORNER OF SECTION 33 (ASSUMED). 9. POND LINER SYSTEM, BUILDINGS, TANKS, SECONDARY CONTAINMENTS, PIPING, ETC. DESIGN BY OTHERS. 10. NO BUILDINGS WITHIN 250' OF PROPERTY UNE. 11. THE ORIGINAL DRAWING SIZE IS 24" X 36". 12. THE CONTROL BUILDING TO BE SERVICED WITH VAULT & HAUL POTABLE WATER AND SEPTIC SERVICE. FINAL LAYOUT TO BE DETERMINED & DESIGNED DURING THE BUILDING AND SEPTIC PERMIT PROCESS. DATE 04.23.12 05.02.12 06.07.12 11.12.12 REVISIONS DESCRIPTION Added General levation View Revised as per EncaraEmail on 05/02/12 Revised as per Ecana s direction I IN FEET 1 I INCH = 100 FT. CONTOUR INTERVAL = I FOOT Encana Oil & Gas (USA) Inc. Revised as per Garfield County Lim itrd Inpact Review Comments dated 09.10.12 BY nmr nmr mjk mjk 744 Horizon Court, Suite 110 Grand.b:action Cn 61506 PROJECT $1086-042 DRAWN BY: nmr CHECKED BY: milt South Middle Fork Water Facility Site Plan Sheet 2 - Site Plan SCALE HORIZ: 1" = 100' VERT: N/A DATE ISSUED: 12.12.12 SHEET N0. 2 OF 2 SHEETS 1119 LI.I Iilllh'8HIVIIIIRIII'�I;IIIIIIIIIIIIIIII�!I'I MOBIL OIL CORP Parcel # 217112300003 Existing 24" Culvert' \l \ ,�i \ )\\ \ `RA\ C.) is 3__ I CD -1�1 \t 4- � 8 1 24" Existing CMPBe Re(Bmoveduried) To I N Esting_ Signs (Typ.) \ - 7t,50.0, Sawcut Existing Surface A Minimum Of 1 Foot To Create Smooth Edge Apply Tack & Join To Match Existing 113 LF ® 0.9% 18" RCP Invert In: 5423.30 nvert Out: 5422.30 PUCKF TT LAND COMPANY Parcel # 21713420001 See Culvert Trench Section Detail This Sheet Sawcut Existing Surface A Minimum Of 1 Foot To Create SfnOath Edge Apply Tack &Join To Match Existing B New Pavement Section Overlay Section Overlay Asphalt Class 5 Aggregate Base Course Class B (Modifed) Bedding As Per CDOT M-603-2 Dry, Stable, Compacted Subgrade CULVERT TRENCH SECTION n+m 40 40 80 I IN FEET I I INCH = 40 FT. CONTOUR INTERVAL = I FOOT Sawcut Existing Surface A Minimum Of 1 Foot To Create Smooth Edge Apply Tack & Join To Match Existing Fxisting OT o r�3 M`1es P oCodc'u to 22 County Road 215 orrsat=o.00 Northing=108318. Easting�fi]146.t6 - _ --- ----- �.., `- - _. ._.g=66854.90 '-' Nath ng=108645 _ -. I= - WL- X.. PO' I tJ F 1, # LNC,i,11`'' \ OI -.f. PROPOSED PAVEMENT SECTIONS GARFIELD COUNTY RIGHT OF WAY (THICKNESSES PER GARFIELD COUNTY) 4" Asphalt Overlay 111111111111111MI Existing Asphalt (Width Varies) OVERLAY SECTION Ong s " in0 6 NEW PAVEMFNT SECTION Omi 5" Asphalt 6" Class 5 Aggregate Base Course 24" Class 2 Aggregate Base Course ROADBASE VOLUMES TOTAL CLASS 5 AGGREGATE BASE COURSE = 9,023 CY TOTAL CLASS 2 AGGREGATE BASE COURSE = 3,485 CY 543 542 542 541 9 -14.7' -. 8.0' Shoulder Sediment Basin Existing (-Ground 12.0' Northbound Lane 100.0' Right Of Way Striped Median Width Varies Finished Grade dor tAcireSee Sheet C4 - 7acll ty Z7`raang-pari -_ Varies 12.0' Southbound Lane Design Point Varies clieziSractatiseelr: rt. yttrA's ,d it A tie* New Pavement Section (Match Existing Slope) See Detail This Sheet Overlay Pavement Section (Match Existing Slope) See Detail This Sheet SECTION A -A (1" = 10') 8.0' Shoulder 3, 28.9' m/` --1I 8.0' Shoulder 12.0' Northbound Lane 100.0' Right Of Way Varies 12.0' 4.0' 12.0' Northbound -1 Striped k-Southbou nd Turn Lane Median I Lane I Finished I Design Grade Point Varies 8.0' Shoulder 29.6' New Paveent Section (blotch Exmisting Slope) See Detail This Sheet I i Overlay Pavement Section (Match Existing Slope) See Detail This Sheet SECTION (1" = 1o') 3 I-15.4' 8.0' Shoulder _Existing 12.0' Northbound Lane 100.0' Right Of Way Striped Median Width Varies Finished Grade ✓\---! wthbound 8'0 28.6' Lane �FShoulder�~-'V Design Point i 12.0' Vanes Varies Jf 3, PVI STA=105+30.06 PVI KEL=5423.039 =97.1 New Pavement Section (Match Existing Slope) See Detail This Sheet SECTION C -C (1" = 10') Overlay Pavement Section (Match Existing Slope) See Detail This Sheet NOTES: 1. ALL CONSTRUCTION ACTIVITIES AND MATERIAL INSTALLATION FOR THIS PROJECT SHALL BE AS PER GARFIELD COUNTY AND CDOT SPECIFICATIONS. 2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE RESPECTIVE Ui1LITY COMPANIES AND/OR THEIR LOCATOR SERVICES, AND DRAWINGS PROVIDED BY THE UTILITY COMPANIES. NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO DETERMINE THE E%ACT LOCATIONS AND DEPTHS OF THE UNDERGROUND UTILITIES AND STRUCTURES ACTUAL LOCATION MAY VARY SLIGHTLY FROM THOSE SHOWN HEREON AND ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. EXISTENCE AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHOULD BE VERIFlED PRIOR TO ANY CONSTRUCTION ON THIS PROPERTY. 3. EXISTING SURVEY INFORMATION (INCLUDING EXISTING UTILITIES) PROVIDED BY WASATCH SURVEYING. 4. SEE SHEET C3 FOR STRIPING AND SIGNING DETAILS. 5. POND LINER SYSTEM, BUILDINGS, TANKS, SECONDARY CONTAINMENTS, PIPING, ETC. DESIGN BY OTHERS. 6. THE ORIGINAL DRAWING SIZE IS 24" X 36". 430 425 420 415 0 N0. DATE REVISIONS DESCRIPTION BY •�y :; a rx' Ir.i. s tt " 4 UVi1 %' E41215 s 14set-----at„t� <: 4 %I/11Pa-- '' •'� - - #�f'" ca.i1,c'� ,. � ` RIVER CITY c o N s u L r A N T s 744 Hodzon Court, Suite 110 Phone: 970.241.4722 d n Co a150s Fax-97n2aie641 Match Existing Ga 57" .00 EL=5426958 6.58 South Middle Fork Water Facility County Road 215 Plan & Profile C O U \ TY P O A D 215 P O F I L E �io -0.4% L=300.00' HP STA:103+80.06 HP EL:5423.63 PROJECT 0086-042 SCALE DATE ISSUED: 12.12.12 I -3.5X Match Ezisting EL=5416.g+OS.q DRAWN BY: nmr HORIZ: 1" = 40' 1 C2 CHECKED BY: mjt VERT: 1" 8' SHEET N0. OF SHEETS _� i Finished Grade (Typ.) -- - c,d or Y:4: s `8 c �sc3 8 Y a�- tS ; -3.49z ; - - _ -0.40X 1 I I I I - - - - - - - _ _ _ - � - - I I I I I I I I I I I I I I LxTeting�,round (TypJ I I I I I - - 5+00 I I 96-00 97-00 98-00 99+00 100+00 101+00 102+00 103+00 I 104+00 I I in9+nn I I I 1r1R_i_nn I I I 1r,l1r,r, NOTES: 1. ALL CONSTRUCTION ACTIVITIES AND MATERIAL INSTALLATION FOR THIS PROJECT SHALL BE AS PER GARFIELD COUNTY AND CDOT SPECIFICATIONS. 2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE RESPECTIVE Ui1LITY COMPANIES AND/OR THEIR LOCATOR SERVICES, AND DRAWINGS PROVIDED BY THE UTILITY COMPANIES. NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO DETERMINE THE E%ACT LOCATIONS AND DEPTHS OF THE UNDERGROUND UTILITIES AND STRUCTURES ACTUAL LOCATION MAY VARY SLIGHTLY FROM THOSE SHOWN HEREON AND ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. EXISTENCE AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHOULD BE VERIFlED PRIOR TO ANY CONSTRUCTION ON THIS PROPERTY. 3. EXISTING SURVEY INFORMATION (INCLUDING EXISTING UTILITIES) PROVIDED BY WASATCH SURVEYING. 4. SEE SHEET C3 FOR STRIPING AND SIGNING DETAILS. 5. POND LINER SYSTEM, BUILDINGS, TANKS, SECONDARY CONTAINMENTS, PIPING, ETC. DESIGN BY OTHERS. 6. THE ORIGINAL DRAWING SIZE IS 24" X 36". 430 425 420 415 0 N0. DATE REVISIONS DESCRIPTION BY •�y :; a rx' Ir.i. s tt " 4 UVi1 %' E41215 s 14set-----at„t� <: 4 %I/11Pa-- '' •'� - - #�f'" ca.i1,c'� ,. � ` RIVER CITY c o N s u L r A N T s 744 Hodzon Court, Suite 110 Phone: 970.241.4722 d n Co a150s Fax-97n2aie641 Encana Oil & Gas (USA) Inc. South Middle Fork Water Facility County Road 215 Plan & Profile PROJECT 0086-042 SCALE DATE ISSUED: 12.12.12 I DRAWN BY: nmr HORIZ: 1" = 40' 1 C2 CHECKED BY: mjt VERT: 1" 8' SHEET N0. OF SHEETS _� � =11' I I F8 ,sr.,,ro,FILL _ _- --19,648o, CUT 'o'^L oL^ss o ^ooREo^rc B^sc oouRsE — 9.023 o' TOTAL CLASS„.2 -AGGREGATE BASE COURSE = 3,485 CY LEGEND DDVv / ENCANA \/V'|L'[}L'|F'E k/|lr|G/\l'|[]N /\FpE/\ (ENC/\NA OWNED LAND) ' '° """` ' � ' '°"" ' "" '` ""°`°~" '~`"°`^^ ' ' '""` FgregifiliffilieSSMIPM m 7^'--" __ S: \ PROJEC TS \ 1086 1. ALL CONS1RUCTION AC11V1TIES AND MATERIAL INSTALLATION FOR THIS PROJECT SHALL BE AS PER GARFIELD COUNTY AND CDOT SPECIFICAllONS. 2. 11 -IE LOCATIONS OF UNDERGROUND UTIUTIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE SLIGHTLY FROM THOSE SHOWN HEREON AND ADDITIONAL UNDERGROUND UTIUTIES MAY EXIST. EXISTENCE ..............LL.................... STRUCTURES SHOULD BE Y CONSTRUCTION ON THIS PROPERTY. , .........^.''....^....~.^...~^~,^... :� ;z�:.��:��/'�|���^X::��':y'.I^^�'�.,r^^^~^^`^^^`~~~^^'^' ~~^^' ^-^. ^^^'^~ ^`^`^`^^. naz"ma,cyaa RIVER CITY DATE ISSUED: 12.12.12 5425 laza 5415 5410 5400 5105 5385 5385 5385 5380 5 5 SECTION S1 -S1 5415 5410 5385 5375 5370 saes 5380 5425 54x0 5 5380 5385 5385 0 5 SECTION T1 -T1 (TREATMENT AREA) 1 POND 1 I 1 1 1 I 1 POf)D 2 1 I I I 1 I I F'UNU 3 I 1 1 1 I F'UNU 41 1 1 1 I KtA IMEN I.-. AKEA Y 1 I 1 I - 1 CR 215 1 1 1 ( - - - -_. -- Existing Ground T _ I `. t ',. - 21.7' - .... •_-. ...- _ ,.,. .40.0' ...,,. 40.0' I _ ..182.5' -inn 60.0' 67.0' 0 -- - 1 �--�� _.. 182.51 _._ '_. 300 40.0' 38.9' ---. -- 400 500 600 700 J _.. _� _. __.. 20.0' 1 _ _!- - L I'.....-...�.-__-_._�_.. _ I 'ter m 1 1 4Y00 6Y00 i 8+00 10-00 tt 00 t 1200 73-00 14-00 i 15-00 I 1 18-00 I ts- 1 --_.14441 1 1 z L_ I 1 1� Finished Grade(Typ.)-7." SY00 7+']0 BY'00 SECTION S1 -S1 5415 5410 5385 5375 5370 saes 5380 5425 54x0 5 5380 5385 5385 0 5 SECTION T1 -T1 (TREATMENT AREA) 5425 54x0 5415 5400 5410 5405 5385 5390 5380 5375 5370 53m meo ss 53sa5000 SECTION P4 -P4 (POND 4) Finished Grade (Typ.) Existing Ground (Typ.) 2.0' Ditch, 4 I-2.0' Berm T 3% 40.0' 40.0' -..._.1 ..187.5' _, 60.0' 60.0' 187.5' 40.0'.. - 40.0' 56.8' saes s4zo 5415 =5405 c) = saes 5380 5380 5375 5370 saes s3ea sass 5350 5425 54zo 54,5 s4to 5405 5400 5395 5390 53857R°5 5375 5370 sass s3eo 5355 5350 - 200 -100 200 300 400 540 600 700 SECTION P3 -P3 (POND 3) 1 I 1 5425 15 541 5400 5390 s3:s 5385 sass 40:0' 40.0' 187.5' - 2200 -100 60.0' 1C0 SECTION P2 -P2 (POND 2) 200 300 400 2.0' Ditch- 1% itch- 56.8' 510 5350700 40,0' 1 1% 40.0'. ( ..110.0'- - 2200 I 1 -100 i PC \� 60.0' I 110.0' 1 1C0 SECTION P1 -P1 (POND 1) 3A� A� -A C 40.0' 5415 sato 5105 I-- 5400 5395 51eo -5380 5375 5370 5385 5425 5420 5415 5410 5385 5380 5375 5370 200 300 400 BOSS SECTIO\S NOTES: 1. ALL CONSTRUCTION ACTIVITIES AND MATERIAL INSTALLATION FOR THIS PROJECT SHALL BE AS PER GARFIELD COUNTY AND COOT SPECIFICATIONS. 2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE RESPECTIVE UTILITY COMPANIES AND/OR THEIR LOCATOR SERVICES, AND DRAWINGS PROVIDED BY THE UTILITY COMPANIES. NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO DETERMINE THE EXACT LOCATIONS AND DEPTHS OF THE UNDERGROUND UTILITIES AND STRUCTURES. ACTUAL LOCATION MAY VARY SLIGHTLY FROM THOSE SHOWN HEREON AND ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. EXISTENCE AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHOULD BE VERIFIED PRIOR TO ANY CONSTRUCTION ON THIS PROPERTY. 3. EXISTING SURVEY INFORMATION (INCLUDING EXISTING UTILITIES) PROVIDED BY WASATCH SURVEYING. 4. POND DNER SYSTEM, BUILDINGS, TANKS, SECONDARY CONTAINMENTS, PIPING, ETC. DESIGN BY OTHERS. 5. THE ORIGINAL DRAWING SIZE IS 24" X 36". N0. DATE REVISIONS s3eo 5355 5350 DESCRPTON BY 5425 5420 sats S540ato 5405 0 533806 9 5 53:5 5380 5375 5370 5385 s3ea sass 5350 +encana,~ 744 Horizon Court, Suite 110 ural gas RIVER CITY L TANTS Phone: 970.241.4722 Building Existing Ground i Max Structure Height 42.0' Tank 5425 54 541155 5410 55395405 5400 5380 53:5 s3eo 3537570 5 538538 50 p535..c, f Finished Grade 50 n 25 IN FEET I I INCH = 50 FT. CONTOUR INTERVAL = I FOOT Encana Oil & Gas (USA) Inc. South Middle Fork Water Facility Cross Section Views PROJECT 0086-042 SCALE DRAWN BY: nmr CHECKED BY: mk HORIZ: 1" = 50' VERT: 1" = 50' DATE ISSUED: 12.12.12 SHEET N0. OF SHEETS C6 - `-. --+ - - - - -_. -- -- - _ _-- I `. ',. - 21.7' - .... •_-. ...- _ ,.,. .40.0' ...,,. 40.0' I _ ..182.5' -inn 60.0' 67.0' 0 -- - 1 0 200 _.. 182.51 _._ '_. 300 40.0' 38.9' ---. -- 400 500 600 700 5425 54x0 5415 5400 5410 5405 5385 5390 5380 5375 5370 53m meo ss 53sa5000 SECTION P4 -P4 (POND 4) Finished Grade (Typ.) Existing Ground (Typ.) 2.0' Ditch, 4 I-2.0' Berm T 3% 40.0' 40.0' -..._.1 ..187.5' _, 60.0' 60.0' 187.5' 40.0'.. - 40.0' 56.8' saes s4zo 5415 =5405 c) = saes 5380 5380 5375 5370 saes s3ea sass 5350 5425 54zo 54,5 s4to 5405 5400 5395 5390 53857R°5 5375 5370 sass s3eo 5355 5350 - 200 -100 200 300 400 540 600 700 SECTION P3 -P3 (POND 3) 1 I 1 5425 15 541 5400 5390 s3:s 5385 sass 40:0' 40.0' 187.5' - 2200 -100 60.0' 1C0 SECTION P2 -P2 (POND 2) 200 300 400 2.0' Ditch- 1% itch- 56.8' 510 5350700 40,0' 1 1% 40.0'. ( ..110.0'- - 2200 I 1 -100 i PC \� 60.0' I 110.0' 1 1C0 SECTION P1 -P1 (POND 1) 3A� A� -A C 40.0' 5415 sato 5105 I-- 5400 5395 51eo -5380 5375 5370 5385 5425 5420 5415 5410 5385 5380 5375 5370 200 300 400 BOSS SECTIO\S NOTES: 1. ALL CONSTRUCTION ACTIVITIES AND MATERIAL INSTALLATION FOR THIS PROJECT SHALL BE AS PER GARFIELD COUNTY AND COOT SPECIFICATIONS. 2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE RESPECTIVE UTILITY COMPANIES AND/OR THEIR LOCATOR SERVICES, AND DRAWINGS PROVIDED BY THE UTILITY COMPANIES. NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO DETERMINE THE EXACT LOCATIONS AND DEPTHS OF THE UNDERGROUND UTILITIES AND STRUCTURES. ACTUAL LOCATION MAY VARY SLIGHTLY FROM THOSE SHOWN HEREON AND ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. EXISTENCE AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHOULD BE VERIFIED PRIOR TO ANY CONSTRUCTION ON THIS PROPERTY. 3. EXISTING SURVEY INFORMATION (INCLUDING EXISTING UTILITIES) PROVIDED BY WASATCH SURVEYING. 4. POND DNER SYSTEM, BUILDINGS, TANKS, SECONDARY CONTAINMENTS, PIPING, ETC. DESIGN BY OTHERS. 5. THE ORIGINAL DRAWING SIZE IS 24" X 36". N0. DATE REVISIONS s3eo 5355 5350 DESCRPTON BY 5425 5420 sats S540ato 5405 0 533806 9 5 53:5 5380 5375 5370 5385 s3ea sass 5350 +encana,~ 744 Horizon Court, Suite 110 ural gas RIVER CITY L TANTS Phone: 970.241.4722 Building Existing Ground i Max Structure Height 42.0' Tank 5425 54 541155 5410 55395405 5400 5380 53:5 s3eo 3537570 5 538538 50 p535..c, f Finished Grade 50 n 25 IN FEET I I INCH = 50 FT. CONTOUR INTERVAL = I FOOT Encana Oil & Gas (USA) Inc. South Middle Fork Water Facility Cross Section Views PROJECT 0086-042 SCALE DRAWN BY: nmr CHECKED BY: mk HORIZ: 1" = 50' VERT: 1" = 50' DATE ISSUED: 12.12.12 SHEET N0. OF SHEETS C6 BNP LEGE\D Installation details and maintenance guidelines for the above erosion control measures con be found in Appendix E of the Encana Master Stormwoter Management Plan North Parachute Unit, CDOT standards, on Denver's Urban Drainage and Flood Control District website, and various manufacture's websites. Variations from these standards shall be approved by the CSWMP Administrator prior to installation. This list is not considered complete or absolute, additional methods con and should be added to this plan if required. This CSWMP should be kept current and modified appropriately by the CSWMP Administrator based on actual field conditions and the Contractor's means and methods. ile -ASB-ASB- DOW / ENCANA WILDLIFE MITIGATION AREA (ENCANA OWNED LAND) 100 100 200 I IN FEET I I INCH = 100 FT. CONTOUR INTERVAL = I FOOT COP t -cai xe {typi_ DW DD \ �/ .._ __ - -.. �._ -. __ _r_sees �. -0- 1//////, /// G I//,///, -pEV- RCD 18'4 18Lr� Invert In: 5406.00 Invert Out: 5404.00 ROD ?te Eccer`t QO Ga��i.o `r L0 ANCHORED STRAW BALE CHECK DAM' COMPOST BLANKET CONSTRUCTION FENCE COMPOST FILTER BERM CULVER INLET PROTECTION CONSTRUCTION MARKER CULVERT OUTLET PROTECTION CONSTRUCTION SITE BOUNDARY CONCRETE WASHOUT AREA DEWATERING DIVERSION DITCH EROSION CONTROL BLANKET EXISTING VEGETATIVE BUFFER EXISTING VEGETATIVE SWALE FILTER BERM HYDRAULIC MULCH LAND GRADING LEVEL SPREADER MATERIALS STORAGE AREA PROTECT EXISTING VEGETATION REINFORCED CHECK DAM ROPE FENCE RUN ON DIVERSION DITCH RETENTION POND RIPRAP / ROCK REINFORCED ROCK BERM RPROEINFORCEDCTION TEROCK BERM FOR CULVERT RSD -WI-Se- 1 TSD %R NE LN !r eeeE Lr reeA n1s- �4P WD - WIL- - ROAD SIDE DITCH REVEGETATON" SLASH SEDIMENT BASIN SEDIMENT CONTROL LOG / WATTLE SILT FENCE SURFACE HARDENING SEEDING AND MULCHING SNOW STORAGE AREA SOIL SILT BERM SEDIMENT TRAP SUBSOIL STOCKPILE TERRACING TOILETS (PORTABLE) TOPSOIL STOCKPILE TEMPORARY SLOPE DRAIN TEMPORARY STREAM CROSSING TOPSOIL WINDROW WATH TEMPORARY HYDRAULIC EROSION CONTROL MULCH VEGETATIVE BUFFER VEHICLE TRACKING CONTROL VEHICLE EQUIPMENT & MAINTENANCE WATER BAR WING DITCH WASTE MANAGEMENT STRAW WATTLE WITH VEHICLEWHIEEL TRACWASHKING CONTROL Level Spreader EI: 5382.5 d 966.T7, Corner," 4 Corner 33 Spike BMPS should not actually extenci the adjacent property. onto \ ,�c \ , 4� \ Propery Corner, #5 Rebar With \ Red Plastic Cap PLS`27925 t, 4 Check Dams To Be Placed In Ditches A Minimum Of Every Two Feet Of Vertical Relief (i.e., At Every 2' Contour) A Fred 111111111111111 SLOPES 3:1 OR GREATER: SURFACE ROUGHENING, TOPSOIL SPREADING, BROADCAST SEEDING AMENDMENTS, AND HYDRAULIC EROSION CONTROL MULCH SLOPES LESS THAN 3:1: SURFACE ROUGHENING, TOPSOIL SPREADING, DRILL SEEDING, AND CRIMPED STRAW MULCH GENERAL NOTES 1. SWMP ADMINISTRATOR (LOCAL CONTACT): KATHY KILOH (970) 285-2626. 2. THE CONSTRUCTION SITE BOUNDARY IS EQUAL TO THE ESTIMATED TOTAL AREA OF DISTURBANCE WHICH IS 31.2 ACRES. THE TOTAL AREA TO BE RE -VEGETATED IS APPROXIMATELY 2.9 ACRES. 3. AT ALL TIMES DURING CONSTRUCTION, EROSION AND SEDIMENT CONTROL SHALL BE MAINTAINED BY THE CONTRACTOR. 4. EROSION CONTROL MEASURES SHALL BE INSTALLED AS THE WORK (GRADING) PROGRESSES. 5. DETAILS SHOWN ARE SCHEMATIC ONLY. ADJUSTMENTS MAY BE NECESSARY TO FIT ACTUAL FIELD CONDITIONS. 6. NEGATIVE IMPACTS TO DOWNSTREAM AREAS (OR RECEIVING WATERS) CAUSED B, THE O2,LOT GRADING AND/OR CONSTRUCTION TO BE MONITORED AND CORRECTED BY THE CONTRACTOR. 7. TIE FIRST BMP TO BE INSTALLED ON THE SITE SHALL BE CONSTRUCTION FENCE, MARKERS, OR OTHER APPROVED MEANS OF DEFINING THE LIMITS OF CONSTRUCTION. 8. NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED WHEREVER POSSIBLE. EXPOSURE OF SOIL TO EROSION BY REMOVAL OR DISTURBANCE OF VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS. 9. ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE THROUGH THE SWMP-APPROVED ACCESS POINT. 10. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE EVIDENCE FROM ABOVE GROUND STRUCTURES, MARKINGS BY THE RESPECTIVE UTILITY COMPANIES AND/OR THEIR LOCATOR SERVICES, AND DRAWINGS PROVIDED BY THE UTILITY COMPANIES. NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO DETERMINE EXACT LOCATIONS AND DEPTHS OF UNDERGROUND UTILITIES AND STRUCTURES. ACTUAL LOCATIONS MAY VARY SLIGHTLY FROM THOSE AS SHOWN HEREON AND ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. EXISTENCE AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHOULD BE VERIFIED PRIOR TO ANY CONSTRUCTION ON THIS PROPERTY. 11. EXISTING SURVEY INFORMATION (INCLUDING EXISTING UTILITIES) PROVIDED BY WASATCH SURVEYING, INC.. 12. ORIGINAL DRAWING SIZE IS 24'x36". 13. STAKING INFORMATION TO BE PROVIDED TO SURVEYOR/CONTRACTOR BY RIVER CITY CONSULTANTS. PLEASE CONTACT RIVER CITY CONSULTANTS TO OBTAIN THE INFORMATION. SITE DESCRIPTION THE PROJECT IS WHOLLY WITHIN PARCEL # 217133100020, WHICH IS OWNED BY ENCANA OIL AND GAS (USA) INC. IN MORE LEGAL TERMS, IT IS LOCATED IN THE SOUTHWEST Y4 OF THE NORTHWEST g OF SECTION 34 AND THE SOUTHEAST Y4 OF THE NORTHEAST Y4 OF SECTION 33, TOWNSHIP 6 SOUTH, RANGE 96 WEST OF THE 6TH PRINCIPAL MERIDIAN, GARFIELD COUNTY, COLORADO. ACCORDING TO THE NRCS WEB SITE, THE UPPER LAYER OF SOIL PRESENT AT THE PROJECT SITE CONSISTS OF ARVADA LOAM (1 TO 6% SLOPES), HALAQUEPTS (NEARLY LEVEL). AND OLNEY LOAM (3 TO 6% SLOPES). THESE SOILS HAVE A HYDROLOGIC SOIL CLASSIFICATION OF B TO D (MODERATE TO HIGH RUNOFF POTENTIAL). THE WHOLE SOIL EROSION K FACTOR FOR THESE SOILS IS BETWEEN 0.24 AND 0.37, MEANING THIS SOIL IS MILD TO MODERATELY EROSIVE. 3. STORMWATER FROM THIS SITE WILL BE DISCHARGED FROM THE SITE THROUGH A SERIES OF EXISTING AND PROPOSED DITCHES, CULVERTS, AND SEDIMENT BASINS. DRAINAGE FOR THIS AREA IS FROM THE NORTHEAST TO THE SOUTHWEST. 4. THE RECEIVING BODY OF WATER IS PARACHUTE CREEK, WHICH ULTIMATELY DRAINS TO THE COLORADO RIVER (-5.4 MILES DOWNSTREAM OF THE SITE). 5. CONSTRUCTION ACTIVITY WILL CONSIST OF, IN THE FOLLOWING ORDER: ESTABLISHMENT OF PERIMETER STORMWATER BMPS, SITE CLEARING, TOPSOIL REMOVAL AND STOCKPILING, OVERALL GRADING OF THE PONDS, ROADS, AND PADS, INSTALLATION OF BUILDINGS, PIPING, UTILITIES, LINING OF PONDS, ETC., AND FINAL SEEDING. INTERMEDIATE STORMWATER BMPS WILL BE INSTALLED AND MAINTAINED THROUGHOUT CONSTRUCTION AS REQUIRED BY THE CONTRACTOR'S MEANS AND METHODS. 6. THE PRIMARY CONTAMINANT OF CONCERN FOR THIS SITE IS SEDIMENT. THE PROPOSED EROSION CONTROLS HAVE BEEN SELECTED AND PLACED TO MITIGATE THE POTENTIAL FOR SEDIMENT TRANSPORT FROM THE 7. EXISTING VEGETATION ON THE SITE CONSISTS PRIMARILY OF VARIOUS GRASES AND HIGH DESERT VEGETATION (SAGE, RABBIT BRUSH, ETC.). UNDISTURBED PORTIONS OF THE SITE ARE APPROXIMATELY SITE. 1. 2. . THE SCS CURVE NUMBERS FOR THIS SITE ARE: 61 FOR UNDEVELOPED AREAS AND 85 FOR DEVELOPED CONDITIONS. _ DURING CONSTRUCTION (TEMPORARY MEASURES) 1. MATERIAL STOCKPILES SHALL BE BERMED AROUND THEIR PERIMETER TO PREVYT RUNOFF POLLUTION. 2. PLACE WATTLES, SILT FENCE, AND/OR BERM DOWNGRADIENT OF DISTURBED AF.AS AND STOCKPILES. 3. COMPACT SOIL AND TOPSOIL TO THE REQUIREMENTS AS STATED IN THE GEOTEHNICAL RECOMMENDATIONS AND FINISH GRADE TO ELEVATIONS SHOWN ON THE SITE PLAN. ELIMINATE ANY LOW SPOTS PRIOR TO FINAL STABILIZATION. 4. CONTRACTOR SHALL HAVE A WATER TRUCK MADE AVAILABLE TO ASSIST IN CONTROLLING MOISTURE CONTENT AND DUST AND WIND EROSION. 5. SOILS THAT WALL BE STOCKPILED FOR MORE THAN THIRTY (30) DAYS SHALL 'E SEEDED AND MULCHED WITHIN FOURTEEN (14) DAYS OF STOCKPILE CONSTRUCTION. NO STOCKPILES SHALL BE PLACED WITHIN ONE HUNDRED (10) FEET OF A DRAINAGE WAY UNLESS APPROVED BY THE CSWMP ADMINISTRATOR. 6. THE CLEANING OF CONCRETE DELIVERY TRUCK CHUTES IS RESTRICTED TO APROVED CONCRETE WASH OUT LOCATIONS ON THE JOB SITE. TIE DISCHARGE OF WATER CONTAINING WASTE CONCRETE TO THE STORM SYSTEM IS PROHIBITED. \a CONCRETE WASTE SHALL BE PROPERLY CLEANED UP AND DISPOSED AT AN APPROPRIATE LOCATION. AFTER CONSTRUCTION (PERMANENT MEASURES) 1. ALL ACROENADSITIDOTSURTBHEEDSEBYARCEOANSSTSRHUACLTLIOBE AMCAITTAINDSHABEA RVEEVGEEGATTAVEEOTVEHR A RCEAT EEADSTW%-OEPE RNATCIOSSEUD IMIOXN ACPOPNRDOIPOINAEXSSIITFE SOILS ANEDESSARY, ADDTONAL SEED, MULCH, AND/OR FERTILIZER SHOULD BE APLIED TO ESTABLISH SAID VEGETATIVE COVER. MAINTENANCE 1. ALLEROSION CONTROL MEASURES SHOULD BE INSPECTED TO DETERAINE IF (€PAIRS OR SEDIMENT REMOVAL IS NECESSARY. THE MAXIMUM 11ME BETWEEN INSPECTIONS SHALL BE 14 DAYS. 2. EROSION CONTROL MEASURES ARE ALSO TO BE INSPECTED WITHIN 24 HOURS OF A STORM THAT PRODUCES RUNOFF, OR MODERATE SNOW MELT. 3. REPAIRS OR MODIFICATIONS TO THE EROSION CONTROL MEASURES SHALL BE COMPLETED IMMEDIATELY. REPAIRS AND MODIFICATIONS SHALL BE DOCUMENTED (WHAT, WHY, & WHEN). 4. SILT AND SEDIMENT SHALL BE REMOVED IF THERE IS A RISK OF SEDIMENT BYPASSING THE EROSION CONTROL FEATURE. SPECIFICALLY, SEDIMENT BUILDUP SHALL NOT EXCEED 6 INCHES ON SILT FENCE, 1/3 THE HEIGHT CF ANY CHECK DAM OR BERM (INCLUDING INLET PROTECTION), OR WHEN SEDIMENT WITHIN A SEDIMENT BASIN GETS WITHIN 6 INCHES OF THE BMBO T INVERT. 5. WHEN THE TEMPORARY MEASURES ARE TO BE REMOVED, ANY SILT AND SEDIMINT DEPOSITS SHALL BE REMOVED AND SPREAD EVENLY IN OPEN AREAS AND SEEDED AS NECESSARY. REVISION; EROSION CONTROL MEASURES (PERFORMANCE STANDARDS) BMP DETAILS PROVIDED IN APPENDIX E OF THE ENCANA MASTER STORMWATER MANAGEMENT PLAN PICEANCE CREEK/EUREKA/STORY GULCH UNIT COR -039167 (REVISED MAY 2008). THE REQUIREMENTS STATED IN THE ENCANA MASTER PLAN SHALL OVERRULE ANY CONFLICTING REQUIREMENTS STATED BELOW. THE GENERAL REQUIREMENTS FOR EROSION CONTROL WORK SHALL BE AS FOLLOWS: 1. ANY GRADING SHALL BE CONDUCTED IN SUCH A MANNER TO EFFECTIVELY REDUCE ACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION. 2. ALL GRADING SHALL BE DESIGNED, CONSTRUCTED, AND COMPLETED TO MINIMIZE THE SIZE AND DURATION OF EXPOSED (UNVEGETATED) AREA. SEDIMENT CAUSED ig ACCELERATED SOIL EROSION SHALL BE CAPTURED AND REMOVED FROM RUNOFF WATER PRIOR TO LEAVING THE SITE. 4. ANY TEMPORARY OR PERMANENT FACILITY DESIGNED AND 3. COVER WITH HYDRAULIC MULCH TOPSOIL TOPSOIL WINDROW DURING CONSTRUCTION SEED AND MULCH WINDROW CONSTRUCTED FOR THE CONVEYANCE OF WATER AROUND, THROUGH, OR FROM THE GRADED AREA SHALL BE DESIGNED TO LIMIT THE WATER FLOW TO A NON-EROSIVE VELOCITY. 5. TEMPORARY SOIL EROSION CONTROL FACILITIES SHALL BE REMOVED AND AREAS GRADED AND STABILIZED WATH PERMANENT SOIL EROSION CONTROL MEASURES. 6. ALL BMPS WILL BE IN PLACE PRIOR TO ANY MAJOR EARTHWORK. TOOPN SOIL OOPBEE SUSED NEW TSL TOPSOIL (-N) TOPSOIL WINDROW DURING RECLAMATION DESCR I FION Encana Oil & Gas (USA) Inc. RIVER CITY C O N S ULTANTS 744 Horizon Court, Suite 110 Phone: 970.241.4722 PROJECT #9086-042 DRAWN BY: nmr CHECKED BY: rnic South Middle Fork Water Facility Construction Erosion Control Plan SCALE HORIZ: 1' = 100' VERT: n/a DATE ISSUED: 04.13.12 SHEET N0. 2 OF 3 SHEETS