Loading...
HomeMy WebLinkAboutApplication-PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Offlce:970·945·8212 Fax: 970-384-3470 Inspection Line: 970-384-5003 Building Permit No. Parcel No: 2395-014-29-290 Locality: ___ ---~---·-/ron!)_ridg~~PUD Ph. S_!c>t 290~---~---~----------- Job Address: 1315 River Bend Way GWS Contractor: Hansen Construction Fees: Plan Check: $ 908.02 Septic: ----w~--··--~•··---~ Bldg Permit: RFTA: 750.00 Clerk: :lb~-~-----Date: I n GARFIELD COUNTY BUILDING PERMIT APPLICATION I 08 811 l Street. Suite 40 I, Glenwood Springs. Co 8160 I Phone: 970-945-82 I 2 I Fax: 970-384-3470 I Inspection Line: 970-384-5003 Ww\y.garfield~counly .com : (this information is avflilable at the assessors office 970-945-9134) All <f.!!l!!ru:i!r· This ~pplication for a 13uilding. Pen11it must be signed by the Owner of the property. described above. or an authorized agent If the signMurc below is not that of the Owner. n scpnrmc letter of authority. signed by the Owner. must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal ~nd adequate access to the property for purposes of inspections by tl1c Building l)epmtment Other Permits. Multiple scpllralc permits may be required: (I) State Electrical Permit. (2) County ISDS Pem1it. {3) another permit required for use on the propeny identified above. e.g. Swtc 01 Cotmty 1-fighw~y/ Road Access or a State Wastewater Discharge Permit. Void Permit. A 8uilding Permi! becomes nttll and void if the work authorized is not commenced within ISO days of the date of issuance at\d if work is suspended or aband(med for a period or !SO days ufler eomllleJlCCment. Cl~RTIFICATION I hereby certify that I have read this Application and thm the infornmtion contained above is true and correct. I understand that the Building. Dcpal'lment accepts the Appl ic(ltion. along. with the plans and spccificmions and other data submitted by me or on my bchalf(submittals). based upon my certification as to accuracy, Assuming completeness of the StlbmiHals and approval of this Application. a Building Permit will be issued graming permission to me. as Ow11cr. to construct the ~tructurc{s) and fhcilitics detailed \lll the submittals revic,~cd by the Building Depa11ment. In consideration of the issuance of the Guilding Permit. I agree that I and my agents will comply with provisions of any federal. state or local law regulating the work and the Garfield (\:llmty f3t!ilding · ISDS rcgulmioHs and applicable hmd use regulations (County Regulation(s)). I acknowledge thm the Building Permit may be suspended or revoked. upon notice fl·omthe Cmmty. if the location. \~ic'""<n'cl;;, """' '''"of the structurc(s) and facility(ies), described above, are not in compliance with County Rcg.ulation(s) or any other applicable law. I hereby gmnt permission to the Building Department to enter the property, described above. to inspect the work. I fimhcr acknowledge that the issuance of the Building Permit docs not prcvcmthc Building Official fi·om: (I) requiring the correction of c1rors in the submittals. if any. discovered after issuance: or (2) stopping construction or usc of the struc!urc(s) or facility{ics) if ~uch is in 'iol;t!ion i 1 I law, ! and inspections of the work by the Building Departll1Cnt do not cons!ilute an acceptance of responsibility or liability by 1he Coun!y of errors. omissions t !CSponsJbrluy for comphance w1th tcdcta! slate and local la11 sand ( ounty Rcgulauons tesl "'11h me a11d Ill\ atlthmt..:cd a gems inc!udill!' without ~~~~~1 1\ND UNDERSl AND! I!E NOTICl•:& ( F:RliFIC?f ON ABOVE __ j_p l_z,o,( 0 -- J)A r~ \ STAFF USE ONLY Special Conditions: Adjust·ed Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees: rr -~7S'D. 171,908.'2!:1-CJo8. !2Z I, '31b. 'Y KJ:fr ISI>S Fcc: Total Fees: 9.1-~~:gfs~ Balance Ouc: UP No & Issue Oatc: IS OS No & Issued Hate: 30f54. ~.:> .• 2!1 1 l Dv?:> Setbacks: OCC G•·oup: Const Type: Zoning: PUD /!/::J/4--;y'z:e/ot' 2);::~ :/ZBJO% APJ>H.OVAL OATE APPROVAL !)ATE The following items are required by Garfield County for a final Inspection: 1) A final Electrical Inspection from the Colorado State Electrical! nspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to alllBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS I-lA VE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. VALUATION FEE DETERMINATION Applicant Address Date ..;:D:,;:a:;:n;.:ie;;-1 ;:::Sa::rt.::a~in,_,.o;Mc;e~g'-'ha::n:.;R~e;:;i~lly,_ ____ Subdivision 1315 River Bend Way, GWS Lot/Block .,:7;;,/2;;,8:.;/2;0:,;0.;::8==="'-'.==-,.---,..---Contractor Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Valuation Crawl Space Valuation Decks/ Patios Valuation Covered Open Type of Construction: Occupancy: Valuation Total Valuation 1198 sf 905 sf sf sf X $74.68 2103 sf sf X $41.00 sf X $33.68 556 sf X $18.00 sf X $9.00 202 sf X $24.00 sf X $12.00 Commercial sf X sf X sf X sf X sf X sf X Ironbridge PUD 2 Lot290 Hansen Construction 157,052.04 0.00 10,008.00 0.00 4,848.00 0.00 171,908.04 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE SUBMITTED FOR ALL APPLICATIONS. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. I. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located withixe envelope. Yes 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do apply.\t Y es. _ _p:_J_::::c___ 3. Does the site plan include when applicable the location of the !.S.O.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? Yes f· 4. Does the site plan indicate the location and direction of the County or private road accessing the property\/ Yes·---A:A---/ 2 5. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; A County Road and Bridge permit; a Colorado Dept. of Highway Permit, including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-860 I. See phone book for other agencies Yes ){ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the IRC or per stamped engineered design? Yes "'f-- 7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes :>C No ________ __ 8. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and soffits? Yes~ No ________ _ 9. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? V Yes __ p,.P'---- I 0. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes 'j. II. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafte(s pr joists or trusses? Yes __ Jy-P''----- 12. Does the building section drawing or other detail include the method of positive connection of all columns ~nr beams? Yes_-c;&P'------ 13. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a fl_zt foof? (Building height measurement usually not to exceed 25 feet) Y es~-,)5,..,_ ___ _ 14. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No __ ...,'f"'------- 3 I 5. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the JRC? Yes _____ No __ )cf...._ ___ _ I 6. Does the plan include a window schedule or other verification that egress/rescue windows from sleepifl.&.j:DOms and/or basements comply with the requirements of the IRC? Yes _ __L::__..L._ ___ _ I 7. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes "[ 18. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes 'f. No ______ _ I 9. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes "f.,. 20. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes } 21. Do you understand that if you belong to a Homeowners Association (1-IOA), it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will be accepted without it, but you run the risk of the 1-IOA bringing action to enforce the covenants, which can result in revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans have been reviewed by the Building Department prior to any action by the 1-IOA that requires either revocati\fo or substantial modification of the plans. Yes --1---- 22. Will this be t~y only residential structure on the parcel? Yes 1::: lfno-Explain: ______ _ 23. Have two (2)() omplete sets of construction drawings been submitted with the application? Yes ·-~'---- 24. Do you unQ;rstand that the minimum dimension a home can be on a Jot is 20ft. wide and 20ft. long? Yes._-1~-"'---- 4 25. Have you designed or had this plan designed while considering building and other construction code requirem~tJ<s? Yes __ _&~-- 26. Do your plans comply with all zoning rules and regulations in the County related to your properties zone dis)<.t? Yes , 27. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes fv 28. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes ~ 29. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes )-. 30. Are you aware that you must call iu for au inspection by 3:30 the business day before the req nested inspection in order to receive it the following business day? Inspections will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes p No _____ _ 31. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes "{y 32. Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes 'f 33. Are you aware that the Permit Application must be signed by the Owner or a written authority being given for an Agent and that the party responsible for the project must comply with the I RC? Yes "j:. 5 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes ). 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building permit application? Your attention in this is appreciated. Yes )< 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes )( (please check with the building department about this requirement) 37. Do you understand that if you are planning on doing any excavating or grading to the property prior to issua~ofa building permit that you will be required to obtain a grading permit? Yes --1-/':c::-'-=--- 38. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certific~~ of Occupancy? Yes --)~'--"---- I hereby acknowledge that I have read, understand and answered these questions to the best of my abili . ' , Phone:_:) <t)Lt-399D (days); (evenings) PwjoctNom• ~rDnbr'~~~d le~ S'ario..in Project Address: IJ5 B.\ \JWa:t; C:Jti;'§; ~ tei (( l 6 Notes: If any required information is missing delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. BpminreqDec2007 7 PLAN REVIEW CHECKLIST Building ~ngineered Foundation tJjlt Driveway Permit ~Surveyed Site Plan tJjA Septic Permit and Setbacks _..'!__Grade/Topography 30% _£Attach Residential Plan Review List ~um Application Questionnaire. Lsubdivision Plat Notes tJj A Fire Department Review ~Valuation Determination/Fees ~ed Line Plans/Stamps/Sticker V Attach Conditions ~pplication Signed ~Plan Reviewer To Sign Application / __ Parcel/Schedule No. iII 40# Snowload Letter-Manf. Hms. Soils Report GENERAL NOTES: Date 7/ze/oB 7 Planning/Zoning ~Property Line Setbacks _£_3oft Stream Setbacks JJ/ A Flood Plain / Building Height ~Zoning Sign-off tJ/.4 Road Impact Fees / HOAIDRC Approval ~Grade/Topography 40% +Planning Issues __ Subdivision Plat Notes N 11063 0. ----------~~~----Assessor's Parcel No. 2395-014-29-290 Date 8/12/2008 BUILDING PERMIT CARD Job Address ----~1~3~1~5~R~iv~e~r~B~e~n~d~W~a~y~G~W~S~-~Iro~n~b~r~id~g~e~P~U~D~,~P~h~·~22,~1o~t~2~9~0 ______________________ __ Owner Sartain, Daniel & Reilly, Meg Address 4102 Elk ln. Basalt Phone # ____ _ Contractor ______ H_a_n_s_en __ C_o_n_st_. --~-------Address 410 lronbridge Dr. GWS Phone # 970-384-3990 Setbacks: Front Rear RH, _________ LH _________ Zoning--------- s/f on foundation w/ cov. Patios & att. Garage INSPECTIONS Soils Test ----------------------- Footing ------------------------ Foundation ___________________ _ Grout _____________ ~~~=-~~ Underground Plumbing 9-z.~o!3',@..J, Rough Plumbing 4-Z -"'.;; 9 9.£vl Framing o/-to-CI"l~ Insulation Aj-f5?-o9~ Roofing Z-/-c f:_:;Z?_q..-J Drywall f-c:-1 -o}t ~ Gas Piping Lf -<:. -c:J Z · 7~ / NOTES Weatherproofing 7-/-0 L ~ Mechanical 7-/ -C? ? ptt-t,_/ Electrical Rough (State) 4 -/ ·-d? W--1 Electrical Final (State) 7-L-o? ~-, Final 7-/-t:Yf /Checkli§it.,Compjeted? '%N Certificate Occupancy # -=W,__.,Z:_q-~--~+---------- Date !S&VLED I· W· DCJ Septic System # ---------------------- Date ----------------------- Final·-----------------------Other ___________________________ __ C,t£? p;e-ncro;e /#s/!.iU/Cp (continue on back) I BUlL lNG PERMIT GARFIELD COUNTY, COLORADO !NSP'ECTtON W!U .. NOT BE MADE UNlESS TE-HS CARD IS POSTE!J. ON THE JOB Date Issued t·/2 ·O<f..__ __ _ Permit No.__,_/_,__.,/ 0"-'"'{p"-""'3"------ AGREEMENT In consideration of the:-..:suance of the permit, the applicant hereby agrees to comply with all laws anl;:l regulations related to ~h~ zoning, location; construction and erection of the proposed structured for which this permit is -~;·a~~.~d, and further agrees that if the above said regUlations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NUll AND VOID. usesJfro_famd~_COV. 'fXt_ho_~d-a+l-. 0~~------ Address or legal ~escription ~ \S .ruvet::.__&.od_~-'i awsL_ ___ _ Owner ~dntn~!~ 'RtJ !I~ I Mlf1bmcontractor ~UnS.t,____ Building PermitType 12.eS\dt""'-nfi"-'-''-'t{~[~-------------------- This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD Footing Driveway Foundation I Grouting Insulation Lj~Jt:=o'l /7 Underground Plumbing <-)1-<..5""-oS "(Zc-v' 'Drywall 1---z-1-& 7 Rough Plumbing 4--;2.-o"( '/!J Elect'ic Final(by State Inspect:~ / (P>io,toQJ,:--/x zf/r 6f Rough Mechanical 1--_ z -to>;? 7'"'« Septic Final Gas Piping 1--Z-o'f pur FINAL 7-/-o? c;?~ E!ect 1:fi( Rouah {by State Inspector) 4f/61 {You Must Call For Final Inspection) ol(.-!bY Notes c..o. p,e:)Zclo!C / ,1/s/??C (__,£P (Prior to Framing) Framing /(-lo-o?'~~~~~~ cJ3_., (to include Roof in place & Windows & Doors installed & Firestopping in place) THIS PERMIT IS NOT TRANSFERABLE Fo' Inspection Call970-384-5003 1 08 8th Street, Suite 401 Glenwood Springs, Colorado 81601 DO NOT DESTROY THIS CARD ~::.ROVED £·12"Ck Byr:. hr~iHhoM{MlL PROTECTPER~~~AMAGE (DO NOT LAMINATE) COUNTY OF GARFIELD -BUILDING DEPARTMENT CORRECTION NOTICE 108 8th St., Suite 401 Glenwood Springs, Colorado Phone (970) 945-8212 9~?-?5'7~ Job located at 13/5"" ~ . ~~ PermitNo.~/t~C?~6~·=3~--------------------------- I have this day inspected this structure and these premises and found the following corrections needed: cg'call for Re-lnspection 0 $50.00 Re-lnspection Fee must be paid prior to Re-lnspection You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date 7'-2-CJ1' 20,__----r~:-- Building Inspector -;?;??~~ · Phone(970)945~212 ) C~tech HEPWORTH· PAWLAK GEOTECHNICAL: Hepworth-Pawlak Georechnical, Inc. 5020 County Road !54 Glenwood Springs, Colorado 81601 Phon" 970-945-7988 Fax: 970-945-8454 email: hpgeo@hpgeotech.com C>FPICG COf?tj A-~ f11 kdrDt) ~\)~+-' PRELUMINARYGEOTEC~CALSTUDY PROPOSED IRONBRIDGE VILLAS JRONBRIDGE DRIVE GARFIELD COUNTY, COLORAJ)O JOB NO. 105115-6 SEPTEMBER 14, 2005 PREPARED FOR: L.B. ROSE RANCH, LLC ATTN: AARON BEVJNGTON 410 JRONBRIDGE DRIVE GLENWOOD SPRINGS, COLORAJ)O 81601 Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY ............................................................................ -1 - PROPOSED CONSTRUCTION ..................................................................................... -l - SITE CONDITIONS ....................................................................................................... -2 - FIELD EXPLORATION ...................................................................... : .......... ~ ............... -2- SUBSURFACE COJ\1DITIONS ................................................................................•..... -3- ENGINEERING ANALYSIS ......................................................................................... -4 - DESIGN RECOMlv.lENDATIONS ................................................................................. -5 - FOUNDATIONS ........................... : ............................................................................. -5 - FOUNDATION AND RETAINING WALLS ............................................................ -6- FLOOR SLABS .......................................................................................................... -8 - UNDERDRAlN SYSTEM .................................... ~ ..................................................... -8- SITE GRADING ......................................................................................................... -9- SURFACEDRAINAGE ................................................................. : ......................... -10- PAVEMENT SECTION ........................................................................................... -11 - LIMITATIONS .................................................... ; ........................................................ -11 - FIGURES 1 AND 2-LOCATION OF EXPLORATORY BORINGS FIGURES 3 TilROUGH 8-LOGS OFEXPLORATORYBORINGS . FIGURE 9-LEGEND AND NOTES FIGURES l 0 THROUGH 16 -SWELL-CONSOLIDATION TEST RESULTS FIGURES 17 AND 18-GRADATION TEST RESULTS TABLE 1-SUMMARY OF LABORATORY TEST RESULTS PURPOSE AND SCOPE OF STUDY This report presents the results of a preliminary geotechnical study for the proposed Ironbridge Villas to be located along Jronbridge Drive, Garfield County, Colorado. The project site is shown on Fignres 1 and 2. The purpose of the study was to develop recommendations for the foundation and grading designs. The study was conducted in accordance with our agreement for professional engineering services to L.B. Rose Ranch, LLC dated June 30, 2005. We previously conducted geotechnical studies for planning and . preliminary design of the Rose Ranch Development (now known as Ironbridge) and presented our findings in reports dated October 29, 1997 and September 10, 1998, Job No. 197 327. A field exploration program consisting of exploratory borings was conducted to obtain information on the subsurface conditions within the depth of expected foundation loading. The potential for future ground subsidence due to deeper geologic conditions was to be evaluated by others. Samples of the subsoils obtmned during the field expli:mition were tested in the laboratory to detennine their classification and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation and for the subdivision grading. This report summarizes the data obtained during this study and presents our conclusions, design reco=endations and other geotechnical engineering considerations based on the proposed construction and the subsurface conditions encountered. PROPOSED CONSTRUCTION The proposed Villas development is located in the central part of Ironbridge near the main ·club and other common facilities and will consist of tightly spaced, single family residences in two development areas as shown on Fignres 1 and 2. The access roads and drives will connect to the existing and proposed Ironbridge Drive. The residences will be 2 story, wood :frame structures constructed typically 8 to 1 0 feet apart. Ground floors will Job No. 105 115-6 -2- be structural above crawlspace in the residences and slab-on-grade in the garages. The entire development area will be elevated typically up to about 15 feet. The fill sections will grade into the existing Ironbridge Drive, the golf course 18th Hole and the Robertson Ditch. The fill material will be obtained on the project site, likely from <:he Phase 2 development The Robertson Ditch will remain open but be improved by lining to reduce leakage. After the subdivision grading, the excavation for the individual residences will be relatively minor. We assume the residences wiil be relatively lightly loaded, typical of the proposed type of construction. Ifbuilding loadings, location or development plans change siguificantly from those described above, we should be notified to re-evaluate the recommendations contained in This report. SITE CONDITIONS The Villas development is located downhill to the east and southofthe existing pro shop and other commons area, see Figures 1 and 2. The north Villas site was ruainly vacant and covered with field grass and weeds. The south Villas site is partly disturbed and covered with grass and weeds with miscellaneous fill piles. The ground surface slope is about 5 to 7% with 20 feet of elevation difference across the north Villas site, and about 6 to 8% with 30 feet of elevation difference across the south Villas site. The entire project site is covered with debris fan deposits that generally increase in depth with increase in ground surface elevation to the west Bedrock of the Eagle Valley Evaporite outcrops to the west of County Road 109 in the golf course fairway and the steep valley side. FillLD EXPLORATION The field exploration for the project was conducted between July 6 and 8, 2005. Twenty~ five exploratory borings were drilled at the locations shown on Figures 1 and 2 to evaluate the subsurface conditions. The borings were advanced with 4 inch diameter continuous flight auger powered by a truck-mounted CME-55 drill rig. The borings were logged by a representative of Hepworth-Pawlak Geotechnical, Inc .. Job No. 105 115·6 Samples of the subsoils were taken with a 1% inch and 2 inch LD. spoon samplers. The samplers were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency ofthe subsoils and hardness of the bedrock. Depths at which the samples were taken and the penetration resista."lce values are shown on the Logs of Exploratory Bonngs, Figures 3 through 8. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Figures 3 through 8. The subsoils, below a thin topsoil root zone, consist of a variable depth of stratified silt, sand and gravel debris fan deposits overlying dense, river gravel alluvium. About 3 to 4 feet of existing fill was encountered above the n!ltu.ral soils in. Borings 5, 6, 7 and 15, located just east of the Robertson Ditch. The debris fan soils were typically encountered between depths of 7 to 19 feet in the north parcel and between depths of 16 to 32 feet in the south parcel. in Borings 6 through 9 and 15 at the north parcel, the debris fan soils were deeper than the adjacent area to the north, with depths of22 to 38 feet before the gravel alluvium was encountered. Siltstone and gypsum bedrock of the Eagle Valley Evaporite was encountered below the gravel alluvium at a depth of 42 feet in Boring 6. The bedrock quality appeared poor to fair and included gypsum, but did not appear to be a void or cavity. Drilling in the dense gravel alluvium with auger equipment was difficult due to the cobbles and boulders and practical drilling refusal was typically encountered in the deposit. Laboratory testing pe1formed on samples obtained from the borings included natural moisture content and density, liquid and plastic limits and gradation analyses. Results of swell-consolidation testing, presented on Figures 10 through 16, indicate the debris fan soils are typically hydrocompressive and moderately to highly compressible under load after wetting. Some of the clay soils showed a low expansion potential when wetted but Job No. 105 115·6 . -4- the resulting heave potential is not expected to be significant compared to the collapse potential. Results of gradation analyses performed on small diameter drive samples (minus 1 Y, inch fraction) of the debris fan soils are shown on Figures 17 and 18. The laboratory testing is summarized in Table 1. Free water was typically not encountered in the borings and the subsoils were relatively dry. In Borings 6 through 9 and 15, the subsoils became moist with depth and free water was encountered at depths between 26 and 3 6 feet in Borings 6 and 15. ENGINEERING ANALYSIS Development of the Villas project as proposed should be feasible based on geotechnical conditions. The upper 7 to 38 feet of soils encountered in the borings consist of debris fan deposits that tend to collapse (settle under constant load) when wetted. The amount of settlement will depend on the depth of the compressible soils and the wetted depth below the foundation. The settlement potential and risk of excessive building distress can be reduced by compaction of the soils to a certain depth below the foundation bearing level and by heavily reinforcing the foundation to resist differential settlements. The compaction should also extend to below driveway and utility areas. The soil compaction can consist of 1he structural fill proposed to elevate the project site but relatively deep structural fills will also have some potential fur long term settlement. Proper grading and compaction as presented below in Site Grading will help reduce the settlement risks. In areas underlain by less 1han 10 to 15 feet of debris fan soils, maiuly the northern part of the north parcel, additional compaction below the building foundation should not.be needed. A heavily reinforced mat foundation designed for large differential settlements or a deep foundation that extends down to the underlying, dense river gravel alluvium could also be used to reduce the settlement risk. Eagle Valley Evaporite that underlies 1he project area is known to be associated with · sinkholes and localized ground subsidence in the Roaring Fork River valley. A siulchole opened in the parking lot of the Pro Shop to the northwest of the project site in January 2005 and other inegular bedrock conditions have been identified in the affordable JobN<> 1051!5-6 -5 - housing site to the west of the Villas north parcel. Indications of ground subsidence were not observed in the Villas development area that could indicate a risk of future ground subsidence but the variable depth of debris fan soils in Borings 6 through 9 and 15 in the north parcel could be the result of past subsidence. In our opinion, the risk of future ground subsidence in the Villas project area is low and similar to other areas of the Roaring Fork River valley where there have not been indications of ground subsidence. We understand that the potential for future ground subsidence in the project area is being evaluated by others. The southern part of the northern parcel should be further evaluated for potential sinkhole development considering the variable subsurface profile encountered in that area. Recommendations for preliminary design of the proposed development are presented below. When the building plans have been developed, we should review the information for compliance with our recommendations. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory borings and the nature of the proposed construction, we recommend the buildings· be founded with spread footings bearing on at least 5 feet of compacted on-site debris fun soils or compacted structural fill. The feasibility of footings placed on the natural soils in the north parcel where the debris fan soils are Jess than about 10 to 15 feet deep should be evaluated prior to construction. lf a mat foundation or deep foUJidation system is considered for building support, we should be contacted for additional recommendations. The design and construction criteria presented below should be observed for a spread footing foundation system. 1) Footings placed on at least 5 feet of compacted fill in deeper debris fan areas or on natural soils where there is less than 1 0 to 15 feet of the natural debris fan soils should be designed for an allowable bearing pressure of Job No. 105115-6 -6- 1,500 psf. Based on experience, we expect initial settlement of footings designed and constructed as discussed in this section will be about 1 inch or less. Additional differential settlement between about J to 2 inches could occur in deeper fill areas or if the undistnrbed debris fan soils are wetted. 2) The footings should have a minimum width of20 inches for continuous walls and 2 feet for isolated pads. 3) EJcterior footings and footings beneath unheated areas should be provided with adequate soil c0ver above their bearing elevation for frost protection. Placement offoundations at least 36 inches below exterior grade is t)'pically used in this area. 4) The foundation should be constructed in a "box-like" configuration rather 1han with isolated footings. The foundation walls should be heavily reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 14 feet. Foundation walls acting as retaining structures should also be designed to resist lateral earth pressures as discussed in the "Foundation and Retaining Walls" section of this report. 5) The topsoil, existing undocumented fill and any loose or disturbed soils should be removed. The soils should be subexcavated as needed to JlTOVide at least 5 feet of structmal fill below the footing bearing level compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content. 'Where footings are placed on the natural soils, the exposed soils in footing area should be moistened and compacted. 6) A representaiive of the geotechnical engineer should evaluate the compaction of the fill materials and observe all footing excavations prior to concrete placement for bearing conditions. FOUNDATION AND RETAINING WALLS Foundation walls and retaining structures which are laterally supported and can be expected to Ulldergo only a slight amount of deflection should be designed for a lateral Job No. 105115-6 . 7. earth pressure computed on the basis of an equivalent fluid unit weight of at least 55 pcf for backfill consisting of the on-site frne-grained soils. Cantilevered retaining structures which are separate from the builclings and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcffor backfill consisting of the on-site frne-grained soils. All foundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The pressures recommended above assrnne drained conclitions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain should be provided to prevent hydrostatic pressure buildup behind walls. Site walls with a :rnax:irnrnn backslope of 2 horizontal to 1 vertical should be designed for an active earth pressure of at least 60 pcf equivalent fluid unit weight. Backfill should be placed in uniform lifts and compacted to at least 90% of the maxirnrnn standard Proctor density at a moisture content near optimum. Backfill in pavement and walkway areas should be compacted to at least 95% of the maxirnrnn standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall, since this could cause excessive lateral pressure on the wall. Some settlement of deep foundation wall backfill should be expected, even if the material is placed correctly, and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side ofthe footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of 0.35. Passive pressure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 300 pcf. The coefficient of friction and ·passive pressure values recommended above assume ultimate soil strength. Suitable factors of safety should be included in the Job No. !05115·6 -8 - design to limit the strain which will occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against the sides of the footings to resist lateral loads should be compacted to at least 95% of the maximum standard Proctor density at a moisture content near optimum. FLOOR SLABS The natural on-site soils, exclusive of topsoil, and compacted structural fill can be used to support lightly loaded slab-on-grade construction. The natural soils are compressible when wetted and there could be some post-construction settlement To reduce the effects of some differential movement, nonstructural floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free-draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2 inch aggregate with at least 50% retained on the No.4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs above footing bearing level should be compacted to at least 95% of maximum standard Proctor deru;ity at a moisture content near optimum. Required fill can coru;ist of the on-site soils devoid of vegetation, topsoil and oversized rock. UNDERDRAJNSYSTEM Although free water was typically not encountered during our exploration, it has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below-grade construction, such as retaining walls and basement areas, be protected from wetting and hydrostatic pressure buildup by an lob No. 105 115-6 . 9. underdrain system. An underdrain should not be provided around crawlspace and slab-on- grade areas. If installed, the drains should consist of drainpipe placed in the bottom of the wall backiill surrounded above the invert level with free-draining granular material. The drain should be placed at each level of excavation and at least 1 fuot below lowest adjacent ftnish grade and sloped at a minimum 1% to a suitable gravity outlet. Free-draini.11.g granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 1 Y, feet deep. An impervious membrane, such as a 20 mil PVC liner, should be placed beneath the drain gravel in a trough shape and attached to the foundation wall with mastic to prevent wetting of the bearing soils. SITE GRADING Extensive grading of the Villas area is proposed as part of the development plan. In addition, removal and replacement of the debris fan soils compacted is recommended in shallow fill areas to reduce the risk of excessive differential settlements and building distress. The structural fill should extend to at least 8 feet below design surface grade and to at least 2 feet below the water and sewer pipe invert levels. In addition, the water and sewer pipe joints should be mechanically restrained to reduce the·risk of joint separation in the event of excessive settlement. Excavation and compaction below footing bearing level may not be needed where the debris fan soils are less than 10 to 15 feet thick. The structural flll materials below footing bearing level should be compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content. Prior to fill placement, the sub grade should be carefully prepared by removing the existing fill, all vegetation and topsoil and compacting to at least 95% of the maximum standard Proctor density at near optimum moisture content. The ftll should be benched into slopes that exceed 20% grade. Based on our experience with the Phase 1 development, shrinkage of the debris fan soils due to compaction is expected to be about 15%to 20%. Job No. 105 115-6 -10- PemJanent unretained cut and fill slopes should be graded at 2 horizontal to 1 vertical or flatter and protected against erosion by revegetation or other means. This office should review site grading plans for the project prior to construction SURF ACE DRA1NAGE Precautions to prevent wetting of the bearing soils such as proper backfill construction, positive backfill slopes, restricting landscape irrigation and use of roof gutters need to be taken to help limit settlement and building distress. The following drainage precautions should be observed during construction and maintained at all times after each residences have been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. The slope should be at least 6 inches in the first 5 feet in unpaved areas and at least 3 inches in the first 10 feet in paved areas. Drain gravel of retaining walls should be capped with at least 2 feet of the on-site soils to reduce surface water infiltration. 4) Roof gutters should be provided with downspouts that discharge beyond the limits ofthe foundation wall backfJ.ll. 5) Landscaping which requires regular heavy irrigation, slli'h as sod, should be located at least 5 feet from foundation walls. Consideration should be given to use of xeriscape to reduce the potential for wetting of soils below the building caused by irrigation. JobNo.105 115·6 • 11 - PAVEMENT SECTION The upper soils encountered at the site consist of low plasticity sand, silt and clay that are considered a poor support of pavement sections. A Hveem stabilometer 'R' value of 15 was assumed for the native soils and required imported soils. The traffic loadings for the Villas development have not been provided but are assumed to be relatively light for the service traffic loading condition, after the construction phase. Based on these conditions, a preliminary pavement section consisting of 3 inches of asphalt on 8 inches of CDOT Class 6 base course for the main drives and 3 inches of asphalt on 6 inches of CDOT Class 6 base course for automobile only parking is recommended. We can review the pavement section design when the roadway subgrade has been graded and the traffic loadings have been detennined. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at thls time. We make no warranty either express or implied. The conclusions and recommendations submitted in thls report are based upon the data obtained from the exploratory borings drilled at the locations indicated on Figures 1 and 2, the proposed type of construction and our experience in the area Our services do not include detennining the presence, prevention or possibility of mold or other biological contaminants (MOB C) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our fmdings include interpolation and extrapolation of the subsurface conditions identified at the exploratory borings and variations in the subsurface conditions may not become evident uotil excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for teclmical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during Job No. 105 115·6 ( -12- construction to review and monitor the implementation of our reco=endations, and to verifY that the reco=endations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We reco=end on-site observation of excavations and foundation bearing strata and testing of structural fill on a regular basis by a representative of the geotechnical engineer. Respectfully Submitted, HEPWORTH-PAWLAK GEOTECHNICAL, INC. Steven L. Pawlak, P.E. Reviewed by: Daniel E. Hardin, P .E. . SLP/ksw cc; High Country Engineering-Attn: Scott Gregory S.K. Peightal Engineers -Attn: Jack Albright Job No. !05115-6 \ } ~ HEPWORTI+PAwt.AKGEO'l"£CH"f:{ICAL \ \ '\ \ LOCATION OF EXPLORATORY BORINGS VILLAS NORTH PARCEL \ Figure 1 105115-6 ~ HEP"WORn+PAWl..AK GEOTECHNtCAL LOCATION OF EXPLORATORY BORINGS VILLAS SOUTH PARCEL Figure 2 \ 0 5 10 ll ,u.. i' /.r::. 15. Q) 0 15 20 25 105115-6 BORING 1 ELEV. = 5952' 20/12 WC=4.5 DD=106 20/6,30/4 BORING2 ELEV.= 5950' 20/12 WC=6.2 DD=93 ·200=85 25/4,10/0 BORING3 ELEV.= 5944' 24/12 WC=5.1 DD=94 Note: Explanation of symbols is shown on Figure 9. BORING4 ELEV.= 5946' 25112 WC=7.1 DD=104 -200=83 LL=28 Pl=11 20/6,40/6 T ~ LOGS OF EXPLORATORY BORINGS He worth-Pawlak Geotechnlcal 0 5 10 1i5 '" lL ' '3. 15 "' 0 20 25 Figure 3 0 5 10 15 20 1i) Q) LL 25 30 35 105115-6 5 ELEV.~ 5950' 11!12 16/12 WC=9.3 00=100 -200=54 17/12 2 12/12 WC=10.3 -200=50 10/12 .wc~1s.2 00=106 -200=73 7 ELEV.~ 5954' 7/12 14/12 WC=16.3 DD=108 -200=62 32/12 7/12 WC=17.7 00=107 -200=74 .. 8 ELEV. ~ 5946' 29/12 WC=4.0 DD=107 30/12 7/12 WC=6.6 DD=117 -200=44 12/12 0 5 20 1i) Q) l.1.. ' 'f (!) 25 0 30 35 40 50/2 Note: Explanation of symbols is shown on Figure 9. LOGS OF EXPLORATORY BORINGS Figure 4 0 5 10 1il Q) u.. )i Q) 0 15 20 25 105115-6 BORING9 ELEV. = 5942' 24112 18/12 28/12 10/12 WC=11.4 DD=104 BORING 10 ELEV.= 5938' 18/12 WC=4.0 DD=96 10/12 60/12 BORING 11 ELEV.= 5943' 9/12 11/12 WC=15.5 00=109 -200=76 7/12 3/6,15/6 Note: Explanation of symbols is shown on Figure 9. BORING 12 ELEV.= 5938' 33/12 WC=6.1 DD=117 43/12 14/12 ~ LOGS OF EXPLORATORY BORINGS He: worth-Pawlok Geotechnlcol 0 5 10 ~ ' r: 0. (l) 15 0 20 25 Figure 5 0 5 10 15 li) iT 20 25 30 35 40 105115-6 BORING 13 ELEV. = 5944' 22/12 BORING 14 ELEV.= 5937' 28/12 WC=8.5 DD=109 -200=91 LL=31 Pl=13 20/6,30/3 BORING 15 ELEV. = 5950' 15/12 WC=14.3 DD=112 9/12 WC=14.5 -200=71 10/12 WC=14.4 DD=112 +4=17 -200=58 24/12 32/12 Note: Explanation of symbols is shown on Figure 9. BORING 16 ELEV.= 5968' 15/6.35/5 47/12 33/12 WC=3.2 +4=34 -200=42 18/12 LOGS OF EXPLORATORY BORINGS 5 15 1i) 20 .f .c 15. Q) 0 25 Figure 6 0 5 10 15 1D "' u.. £ \~ .0 20 25 30 35 105115-6 BORING 17 ELEV. = 5963' 52/12 34/12 WC=5.9 DD=115 23/12 50/3 BORING 18 ELEV. = 5968' 38112 40/12 WC=3.6 DD=104 -200=58 42/12 WC=3.6 DD=109 45/12 BORING 19 ELEV.= 5962' 13/12 30/12 WC=1.7 DD=120 +4=38 -200=26 Note: Explanation of symbols is shown on Figure 9. BORING20 ELEV.= 5967' 18/6,25/3 WC=1.9 DD=103 -200=36 55/12 ~ LOGS OF EXPLORATORY BORINGS He worth-Pawlak Geoteclmlcol 5 15 £ Q_ "' 20 0 Figure 7 il u... ' £ \@-·o 0 5 10 15 20 25 30 BORING21 ELEV. = 5976' 52/12 15/12 43/12 WC=3.3 00=108 15/12 BORING 22 BORING 23 BORING 24 ELEV.= 5957' ELEV.= 5985' ELEV.= 5985' 21!12 52/12 39/12 WC=3.3 WC=1.3 +4=38 -200=27 -200=23 30/6,25/3 57/12 20/12 WC=2.6 -200=46 28/12 40/12 WC=3.4 00=109 Note: Explanation of symbols is shown on Figure 9. BORING25 ELEV.= 5990' 20/6,30/3 27/12 WC=4.6 00=105 -200=62 30/12 WC=4.1 00=112 -200=64 50/6,10/0 105115-6 ~ LOGS OF EXPLORATORY BORINGS Ht!:PWOR'11+PAWLAK GEOTECHNICA.l. 0 ] 5 10 15 1i) ()) LL. ' t "' 0 20 25 30 Figure 8 LEGEND: 39/12 0,2 - T NOTES: FILL; silty sandy gravel, loose to medium dense, slightly moist, brown. TOPSOIL; root zone, sandy silt, slightly moist, brown. SILT AND CLAY (ML-CL); slightly sandy to sandy, scattered gravel, some sandy clay, stiff to very still, slightly moist. very moist with depth at Borings 6, 7 and 15, mixed brown, slightly calcareous and porous, low plasticity. SAND AND SILT (SM-ML); scattered gravel to gravelly, loose to medium dense, slightly moist, light brown. SAND AND GRAVEL (SM-GM); silty, some sandy silt layers, medium dense, brown, subangular to rounded rook. GRAVEL, COBBLES AND BOULDERS (GM-GP); slightly silty, dense, typically moist, wet at Borings 4 and 15, brown, rounded rock. SILTSTONE AND GYPSUM: medium hard to hard, moist, gray and white. Eagle Valley Evaporite. Relatively undisturbed drive sample; 2-inch I. D. California liner sample. Drive sample: standard penetration test (SPT), 1 3/8 inch J.D. split spoon sample, ASTM D-1586. Drive sample blow count; indicates that 39 blows of a 140 pound hammer falling 30 inches were required to drive the California or SPT sampler 12 inches. Free water level in boring and number of days following drilling measurement was taken. Depth at which boring had caved when checked on July 8 , 2005. Practical drilling refusal. Where shown above bottom of log, indicates that multiple attempts were made to advance the boring. 1. Exploratory borings were drilled on July 6, 7 and 8, 2005 with 4-inch diameter continuous flight power auger. 2. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan provided. 3. Elevations of exploratory borings were obtained by interpolation between contours shown on the site plan provided. 4. The exploratory boring locations and elevations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory boring logs represent the approximate boundaries between material types and transitions may be gradual. 6. Water level readings shown on the logs were made at the time and under the conditions indicated. Fluctuations in water level may occur with time. Groundwater was only encountered in Borings 6 and 15. 7. Laboratory Testing Results: WC = Water Content (%) DD = Dry Density (pet) +4 = Percent retained on the No. 4 sieve 105115-6 H~ -Gertectl HePWorth-Powlok Geotechnlc:o\ -200 = Percent passing No. 200 sieve LL = Liquid Limit (%) Pi = Plasticity Index (%) LEGEND AND NOTES Figure 9 ' Moisture Content = 4.5 perc ent Dry Density = 106 pcf Sample of: Sandy Silt and Clay From: Boring 1 at 4 Feet 0 * r- c: 1 0 -..... Compression ·w ~ "" upon ~ 1'-, wetting a. 2 E "' 0 0 3 i 0.1 1.0 10 100 APPLIED PRESSURE-ksf 105115-6 d£tech SWELL-CONSOLIDATION TEST RESULTS Figure 10 He-;;,.orth-Powlok Geotechnlcol Moisture Content = 5.1 perc ent Dry Density = 94 pcf 0 Sample of: Sandy Silt ---.... From: Boring 3 at 4 Feet 1 2 3 ~ Compression upon 4 wetting 5 6 * \ c: .Q "' 7 ~ \ "-E ; 0 8 i () 9 10 11 \ \ 12 \ 13 14 1\ 15 0.1 1.0 10 100 APPLIED PRESSURE -ksf 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 11 H,.;:;y,orth-Powlak (;:eotechnlcol I ,, Moisture Content ~ 4,0 perc ent 0 Dry Density = 107 pel ---Sample of: Very Silty Sand r-1--t-r-From: Boring 8 at 4 Feet 1 2 Compression * upon c 3 ~ wetting ·~ ~ "' !!! 0. E 4 8 '\ 5 \ 6 1\ 7 0.1 1.0 10 100 APPLIED PRESSURE-ksf Moisture Content = 11A perc ent Dry Density = 104 pcf Sample of: Sandy Silt From: Boring 9 at 19 Feet 0 --r- "if!. 1 ~ Compression c ~ 0 upon "iii wetting "' 2 !!! ~ 0. E ""' 8 3 ') 4 0.1 1.0 APPLIED PRESSURE -ksl 10 100 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 12 Hepworth Pawlak Geoteehnlc:o! 0 1--Moisture Content 4.0 percent -1---Dry Density = 96 pel 1 Sample of: Sandy Silt From: Boring 10 at 4 Feet 2 --1--1--- 1ft 3 Compression c -~ "" upon "' 4 wetting ~ ""' Q_ E 8 5 \ 6 \ 7 \ 8 0.1 1.0 10 100 APPLIED PRESSURE-ksf Moisture Content= 6.1 perc ent Dry Density = 117 pel * Sample of: Sandy Silty Clay c: From: Boring 12 at 4 Feet .Q 1 f!! 8_ ill -......., ' 0 c: ~ ,....., J.... .Q "' "' 1 :!:: Q_ Ex pans on E 0 upon 0 2 wetting 0.1 1.0 10 100 APPLIED PRESSURE -ksf 105115-6 ~ch SWELL-CONSOLIDATION TEST RESULTS Figure 13 He~orth-Pawlok Geotechnlcol Moisture Content = 8.5 perc ent Dry Density = 109 pel Sample of: Slightly Sandy Silty Clay From: Boring 14 at 4 Feet 2 * c -~ 1 r--.. c ..... <1) ~ D. ~ .Jj 0-' 0 c ~ "> -~ !\\ "' 1 I!! Q. . 1::Xpans1 j1 E 0 upon 0 wetting 2 0.1 1.0 APPLIED PRESSURE -ksf 10 100 Moisture Content = 5.9 perce nt Dry Density = 115 pcf Sample of: Sandy Silty Clay From: Boring 17 at 9 Feet 0 "if'. c 0 1 "(ii c "' ~ 0. tl5 !'--.. ' 0 t---.. c Expansion "' 0 upon ~ "(ii "' 1 wetting ~ 0. E 0 0 2 ' 0.1 1.0 10 100 APPLIED PRESSURE -ksf 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 14 HEPWOR'lfWAWLAK GE0"1"ECHNJCAL \, Moisture Content = 3.6 percent Dry Density = 109 pcf Sample of: Sandy Silt and Clay From: Boring 18 at 14 Feet 0 ?fl. "-.... c F 1 " ~ No movement 0 ·a; ~'-... upon "' a 2 wetting E 0 () 3 0.1 1.0 10 100 APPLIED PRESSURE-ksf ') Moisture Content = 3.3 percent Dry Density = 108 pcf Sample of: Sandy Silt and Clay From: Boring 21 at 14 Feet 0 Compression * 1-----v upon 1 ;....--1--f-;,etting c: ~ 0 ·a; "' !!< 2 D. ......, E """ 0 () ' 3 0.1 1.0 APPLIED PRESSURE -ks! 10 100 105115-6 ~ HePWorth-Pawlak Geotf:lchoicot SWELL-CONSOLIDATION TEST RESULTS. Figure 15 Moisture Content = 3.4 perc ent Dry Density = 109 pet Sample of: Sandy Silt and Clay From: Boring 22 at 19 Feet *-0 ~ -f-.. ~---~--c 0 r---., '(); 1 "' !!? "' No movement 0. E upon 0 2 wetting 0 0.1 1.0 10 100 APPLIED PRESSURE -ksf I Moisture Content = 4.6 perc ent Dry Density = 105 pcf Sample of: Sandy Silt and Clay From: Boring 25 at 9 Feet * 0 c "' 0 '(); '-~ 1 ~ f--... E i", 0 0 2 No'movement upon welling 0.1 1.0 10 100 APPLIED PRESSURE-ksf 105115-6 ~d-. HEPWOR'O+PAWLAK GEO'f'ECHNlCAL. SWELL-CONSOLIDATION TEST RESULTS Figure 16 HYDROMETER ANALYS!S SIEVE ANALYSIS I j TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS I 24HR. 7HR ' 45 MIN.15 MIN. 60MIN19M!N.4MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8" 3/4' 1 1/2'' 3" 5''6' 8" 0 100 10 " Cl 20 "' UJ CJ z 30 " z ~ i'ii 40 00 ~ 0: !Z 1- 50 " m G 0 0: 60 " 0: UJ lU CL CL 70 " 80 "' 90 " 100 0 "" .002 .005 ·"" ,()\9 ·"' .(}74 ·'" "" ""' 1.\8 "' 4.?& 9.5 12.5 19.0 37.6 76.2 "' "" "' DIAMETER OF PARTICLES IN MILLIMETERS CLA'I'fOSilT I ""'' !cOAl& I ""' I MEOJUM ""' !;lAAVE~ I COARSE I COOB<fS GRAVEL 17% SAND 25 % SILT AND CLAY 58 % LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Sandy Gravelly Sill FROM: Boring 15 at 14 Feet ' HYDROMETER ANALYSIS SIEVE ANALYSIS 24 . 7 HR TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS J. 45 \h. 15 MIN.60MINl9MIN.4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8' 3/4" 1 1/2' 3" 5'6' 0 100 10 90 0 20 so w (!) z 30 70 z 8 Vi (/) 40 60 <( 0: CL 1-1-z 50 so m w () () 0: 60 40 ffi w CL [L 70 30 80 20 90 10 100 0 .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 9.S,2.5 19.0 37.5 76.2 12t52 203 DIAMETER OF PARTICLES IN MILLIMETERS CLAYTOstT ""' GAA '! COSBLES ""' MeDIUM co FINE COM GRAVEL 34% SAND 24 % SILT AND CLAY 42 % LIQUID LIMIT % PLASTICITY INDEX % " SAMPLE OF: SillY Sand and Gravel FROM: Berino 16 at 14 Feet 10511&-6 ~ HEPWORT'I+PAW\..AK G£0"fl;CHNICA.l.. GRADATION TEST RESULTS Figure 17 I HYDROMETER ANALYSIS I S!EVEANALYS!S I 24~. 7HR TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS _I 45 MIN. 15 MIN. 60MfN19MIN.4 MIN. 1 MIN. #200 #100 #50 1130 #16 #8 #4 3/8" 3/4' 1 1/2: 3' 5" 6' 8" \ 0 ""' 10 " @ 20 " G z 30 10 z ffi ii3 w a: 40 00 if. 1-1- cti 50 " m ffi 0 60 "' a: w Q_ Q_ 70 "' 80 " 90 " 100 ' _.,, ... .oos .009 .019 m; .074 -'"' .000 '""' 1.16 '-" 4.75 9.5 12.5 19.0 37.5 ,., "' "' "' DIAMETER OF PARTICLES IN MILLIMETERS CW'O·C' I COSBI.ES GRAVEL 38% SAND 36 % SILT AND CLAY 26 % LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Silty Sand and Gravel FROM: Boring 19 at 9 Feet HYDROMETER ANALYSIS I SIEVE ANALYSIS f 4 R 7 HR TIME READINGS I U.S. STANDARD SERIES I ClEAR SQUARE OPENINGS ~. ~ ~-IN. 15 MIN, 60MIN19MIN.4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8' 3/4' 1 1/'Z' 3" 5"6' 100 10 90 0 20 80 LU 0 z 30 70 z ffi ii3 w a: 40 60 if. 1-1-z 50 50 m w 0 0 a: 60 40 ffi LU Q_ Q_ 70 30 80 20 90 10 100 0 .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 9.512.519.0 37.5 76.2 12"752 203 DIAMETER OF PARTICLES IN MILLIMETERS CLAYlOS'~i '"' GRA.VH COBBlE$ FIN!: MEOW COAASE FINE COARSE GRAVEL 38 % SAND 39 % SILT AND CLAY 23 % LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Silty Sand and Gravel FROM: Borinn 22 at 4 Feet 105115-6 ~ GRADATION TEST RESULTS Figure 18 He::PWoRT'l+PAWf.AK GEOT!:CHNlCAL HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115-6 SUMMARY OF LABORATORY TEST RESULTS ~e 0 p 1 f 3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG liMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH BEDROCK TYPE (Ofo) (%) SIEVE (ft) (%) (pcf) (%) (%) (PSFl 1 4 4.5 106 Sandy silty and clay 2 4 6.2 93 85 Sandy clayey silt 3 4 5.1 94 Sandy silt 4 4 7.1 104 83 28 11 Sandy silty clay 5 81h. 9.3 100 54 Silt and sand with gravel 6 14 10.3. 50 Very silty sand and gravel 24 18.2 106 73 Sandy silt 7 9 16.3 108 62 Sandy silt 24 17.7 107 74 Sandy silt 8 4 4.0 107 Very silty sand 14 6.6 117 44 Very silty sand HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115-6 SUMMARY OF lABORATORY TEST RESULTS aye 0 p z f 3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING LIQUID PlASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE (ft) (%) (pcf) (%) (%) (PSF) 9 19 11.4 104 Sandy silt 10 4 4.0 96 Sandy silt 11 9 15.5 109 76 Sandy clayey silt 12 4 6.1 117 Sandy silty clay 14 4 8.5 109 91 31 13 Slightly sandy silty clay 15 4 14.3 112 Sandy silty clay 10 . .14.5 71 Sandy silty clay 14 14.4 112 17 25 58 Sandy gravelly silt 16 14 3.2 34 24 42 Silty sand and gravel 17 9 5.9 115 Sandy silty clay HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115-6 SUMMARY OF LABORATORY TEST RESULTS ~e 0 p 3 f3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG UMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING UQU!O PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 UMIT INDEX STRENGTH BEDROCK 1YPE (%) (%) SIEVE (It) . (%) ~ (%) (%) (PSFl 18 9 3.6 104 58 Sandy silt with gravel 14 3.6 109 Sandy silty and clay 19 9 1.7 120 38 36 . 26 Silty sand and gravel 20 4 1.9 103 36 Silty sand and gravel 21 14 3.3 108 Sandy silt and clay 22 4 3.3 38 39 23 Silty sand and gravel 19 3.4 109 Sandy silt and clay Silty sand and gravel 23 4 1.3 27 Silty sand and gravel 24 9 2.6 46 Very silty sand with gravel 25 9 4.6 105 62 Sandy silt and clay 14 4.1 112 64 Sandy silty and clay EXHIBIT A THE Al!J'J<N.(;:{!J,I:Jl:CTI!l~L c·~ , ..•• ·• FREEDOM PROA~~f~'I'~'W~l1 C9~'I'Mj:'!') THIS CONSTRUCTION CONTRACT ("Contract") is made and entered into between IRONBRIDGE ASPEN COLLECTION LLC, a Colorado limited liability company ("Contractor"), whose address is 410 lronbridge Road, Glenwood Springs, Colorado 8I601, whose telephone number is (970) 945-4300, and whose facsimile number is (970) 928-8865, and Vc..N..Jl K.Sg.cl-o1'nt l-\e~nn 1\e:\\1.2} ("Owner"), whose add~ is :i I b2. lOt k Lo.x\e. , Ba..sa.L-1: g; le <-I , whose telephone number is .f.JcJ':Jjk'-l,.~'lllla::J whose facsimile number is ;;:·:;:-~f . This Contract is entered into this ~Y of A.pril.. , 2~(!:jl,~ve Date"). This Contract is entered into in connection with and pursuant to Contractor and Owner's Freedom Program Purchase and Sale Agreement dated A.p·/t \ 1-\_ , 2006 Terms defined in the Freedom Program Purchase and Sales Agreement and used in this Contract shall hold the same definition in this Contract. The construction of the Residence on the Lot, each as defined in the Freedom Program Purchase and Sale Agreement shall be referred to herein as (the "House"). J. Contactor's Scope of Work. Contractor's scope of work shall consist of construction services for the House as set forth below, which collectively shall be referred to herein as the "Work." 2. Plans a. Contractor has prepared the following drawings. consistent with other homes in the Project, as defined in the Freedom Program Purchase and Sale Agreement, and constructed by Contractor: i. z:z..o 2... .1> ii. iii. _____ (collectively, the "Plans"). 3. Construction Services a. Contractor shall procure and pay for all permits, licenses, approvals and inspections required for the House. b. Contractor shall provide or cause to be provided all labor, materials~ equipment and services to construct the House in a workmanlike manner, consistent with homebuilding industry standards in Garfield County, pursuant to the Plans. Contractor shall not be responsible for furnishing or constructing any improvements or performing any work unless the same are specifically set forth in the Plans or in this Contract 4. Owner's Responsibilities a. Owner shall cooperate with Contractor in securing any permits, licenses) approvals and inspections for the House. b. Upon Contractor)s request, Owner shall provide all "Requested Information" to Contractor in a timely manner) and shall be available to meet with ContTactor to approve plans and review the progress of the Work. Requested Information shall include, but not necessarily be limited to: i. proof of financing H. Design and Architectural Option selections by the associated design selection dates iii. change order requests iv. proof of necessary insurance c. Owner specifically agrees and acknowledges that financing for the House is the sole and exclusive obligation of Owner) and Owner's ability to obtain financing is not a condition precedent to Owner's obligations set forth in this Contract. Owner represents that Owner is qualified to obtain such financing and/or has available funds in the amount necessary to complete the House. Owner agrees to promptly seek and obtain any and all required financing for the House. Owner agrees to provide Contractor with proof, satisfactory to Contractor, that Owner's financing for the House has been finalized, and agrees that Contractor is not obligated to proceed with construction on the House until such proof is delivered to Contractor and the Closing of the Lot has occurred. Form Date: 2!15/08 15 OF 23 d. Owner agrees not to let or enter into any other contracts in connection with the House or the Lot without the prior written approval of Contractor. Owner acknowledges and agrees that entering into any contract or permitting any other contractor onto the Lot may impede the Contractor's ability to manage the cost of the House and timely complete performance of the Work as contemplated herein. Violation of this provision, shall, in addition to any other remedies set forth herein, penn it Contractor to exercise its termination rights as specified herein. e. Within three (3) days after substantial completion of the Work~ Owner shall notify all utility suppliers that Owner is responsible for utility expenses from and after the date of substantial completion. 5. Time a. Without limiting the foregoing, Owner agrees to provide all Requested Information to Contractor to start construction within three (3) months of the date on which the Closing of the Lot occurs. Should Owner delay commencement construction beyond said three (3) months, Owner shall pay Contractor the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months ("Extension Fee"). The parties hereby agree that Contractor's actual damages for such Owner delay cannot be calculated now with certainty, and that Liquidated Damages are a reasonable estimate thereof. b. Provided that Owner has complied with all of its obllgations hereunder, including but not limited to timely payment of all sums due to Contractor, and Owner has secured financing for the House and delivered satisfactory proof thereof to Contractor, and Closing of the Lot has occurred, Contractor shall commence construction at the House Site within sixty (60) days after the issuance of a building pennit in the Owner's name, as evidenced by accurate installation of the foundation forms (the 1'Commencement Date"). c. Substantial Completion of the House shall occur within ten (1 0) months after the Commencement Date (the "Completion Date"). The Completion Date may be extended on account of: i. labor disputes; ii. fire or other damage to the House, including interior damage; iii. material or labor shortages; iv. transportation delays; v. governmental action; vi. unusual weather conditions; vii. change orders or delays caused by Owner; viii. the failure of Owner to provide infonnation and/or approvals in a timely manner; or ix. any other causes which are beyond Contractor's control or which may otherwise justify the delay; and x. Force Majeure events. d. Without limiting the foregoing, Owner agrees to provide all required information to Contractor to substantially complete construction by the Completion Date. Should either party delay Substantial Completion ofthe House beyond the Completion Date, the delaying party shall pay the other party the sum of Five Thousand Dollars ($.5,000.00) per month, allocated for fractional portions of months as an Extension Fee. The parties hereby agree that actual damages for such delays cannot be calculated now with certainty, and that these Liquidated Damages are a reasonable estimate thereof. 6, Ownership of Plans. Owner agrees and acknowledges that the Plans, and any amendments or revisions thereto, are and shall remain the sole and excJusive property of Contractor, and Owner agrees not to sell, transfer, assign, use, copy or share the same with any person or entity without the prior and express written consent of Contractor, which may be withheld in Contractor's sole discretion. 7. Contract Price. a. Owner shall pay Contractor the sum o~a kvlldred+wud:y {, ve th.ouJo..nd, -tu lm~ qoe, Y"\O{J 0 C -Dollars ($:.zM> 0:1./ .00) ("ContractPfiCe'iib(iicrfonnance of the Work~ich amount shall be paid in accordance with the payment provisions set forth in this Contract. b. Owner acknowledges that upon the execution of any change orders during the course of construction, the Contract Price may increase, and in such event Owner shall pay to Contractor such increase upon execution of the change order, and prior to Contractor's performance of any work in connection with the change order. 8. Payment Procedure. a. Owner shall make, or cause Owner's lender to make, progress payments for the Work in accordance with the schedule attached hereto as Exhibit A-1 ("Draw Schedule") or at any intermediate point based on the percentage of completion of work at that time identified by inspection. Progress payments shall be delivered to Contractor within fonn Date: 2115108 16 OF 23 five {5) days after Owner's receipt of Contractor's request for payment, which requests for payment shall include a blanket lien waiver statement relating to all parties who provided labor and/or materials applicable to the previous request for payment. b. In the event that at any time the amount of Owner's loan available for distribution is less than the amount of the Contract Price remaining to be paid, Owner shall deposit the difference into a construction control account and execute a customary construction control agreement with respect to the holding and distribution of said sum prior to Contractor's obligation to commence or continue construction at the House Site. Owner shall be responsible for the payment of any fees in connection with the construction control. c. Within ten (IO) days after substantial completion of the Work, Owner shall pay all remaining amounts due under this Contract. d. All monies not paid when due as provided herein shall bear interest at the rate of eighteen percent (18%) per annum. e. In the event any installment is not paid when due, Contractor may exercise any remedy set forth in this Contract or exercise any other legal and/or equitable rights which may be necessary or appropriate to enforce this Contract. 9. Changes in the Work a. Buyer understands, acknowledges and agrees that the Contract Price includes only the items set forth in the document attached hereto as Exhibit B {"Features List"). These are referred to herein as (~<Standard Selections"). b. Additions, upgrades, and/or optional items which are made available to Owner shall be selected, contracted and paid for in a separate contract with Contractor or by Change Order. c. Contractor may offer pre~designed and priced options for each Residence to Owner. i. Options which change the architectural design of the Residence, such as an additional garage bay, are referred to as architectural options ("Architectural Options"). ii. Options which change the materials and colors of the Residence, such as carpet type and/or color, are referred to as design options {"Design Options"). m. Together these are often referred to as ("Options'). d. Changes to the Work that are not a pre~designed and priced Architectural Option or Design Options are referred to as change orders ("Change Orders"). i. All change orders shall specifY the following: l. the change in the Work, 2. the adjustment to the Contract Price, if applicable, and 3. the adjustment to the Completion Date~ if applicable. e. Changes in the Work can only occur by purchasing an Architectural Option, purchasing a Design Option or by written Change Order prepared and approved by Contractor. f. Options will be offered to the Owner, provided the following conditions have been adhered to: i. Options must be selected in a timely manner. Each Option is assigned one of three dates which are referred to as Design Selection I ("DSI"), Design Selection 2 ("DS2") and Design Selection 3 ("DS3"). DSI is seven (7) days after closing, DS2 is forty five (45) days after closing and DS3 is ninety (90) days after closing. ii. Should Owner fail to select Options on or before the applicable design selection date, SeHer shaH have the right to either stop work, install the standard selection or deny the Option. iii. Options and Change Orders shall be selected subsequent to the execution of this Agreement. Payment in the amount of 1 00% of the price of each Option or Change Order shaH be due when each Option or Change Order is ordered. g. ALL PAYMENTS FOR OPTIONS AND CHANGE ORDERS ARE NON-REFUNDABLE TO OWNER h. All Option purchases and Change Orders shall be executed by both the Owner and the Contractor and paid for by Owner, prior to the commencement of the work set forth therein. i. In the event that any increase in the cost of construction arises because of a change in applicable governmental regulations taking effect after the date of this Contract, such revision or condition shall be the basis for a Change Order and Contractor shall receive appropriate compensation for making such change. 10. Possession and Use of the Lot. Upon the Closing of the Lot, Owner is deemed to have conveyed to Contractor an absolute and exclusive right to possess and use the Lot. Owner shall not enter the Lot unless accompanied by an authorized representative of Contractor. Owner shall not instruct, direct or otherwise contact Contractor's laborers, subcontractors or consultants. Contractor shall pennit access to the Lot by inspectors of Owner's lender. Contractor shall return possession of the Lot to Owner at the time that all payments and obligations required of the Owner have been fully paid and performed by the Owner. If possession of the House and Lot' is taken by the Owner before Owner's obligations set forth in this Contract are fully performed and without the prior written consent of Contractor. Owner shall be deemed to have accepted the Work as complete and satisfactory, in compliance of all of Contractor's obligations hereunder. Fonn Date: 2/15/08 170F23 11. Walk Through. a. Upon notice from Contractor to Owner, Owner and Contractor shall schedule a walkwthrough of Owner's home and shall compile a list of any items which are materially not in accordance with approved plans and specifications, or do not materially conform to Garfield County standards. Contractor shall repair, replace or otherwise remedy the items within a reasonable time after Substantial Completion. b. Notwithstanding the fact that additional work may be required to correct the items, if the House has reached Substantial Completion, then no funds shall be withheld from Contractor for these items. c. After Substantial Completion, the Limited Seller's Warranty included in the Freedom Program Purchase and Sale Agreement shall apply. 12. No Assignment. This Contract shall not be assigned by Owner or Contractor to any other party except after the prior written consent of Owner or Contractor, which consent may be reserved in Owner's or Contractor's sole discretion. If Owner or Contractor assigns any of Owner's or Contractor's rights under this Contract to any other party in violation of this provision, said assignment shall be void and of no effect, and Owner shall be in default hereunder. Notwithstanding the foregoing, Contractor consents to a collateral assignment of this Contract to Owner's lender pursuant to Owner's agreement with its lender. 13. Insurance. a. Owner shall procure and maintain during the term of this Contract the following policies of insurance: i. Course of Construction insurance in the amount of the Contract Price; ii. Homeowner's insurance, and a fire and extended risk insurance policy~ covering the House and Lot, in an amount not less than the Purchase Price, together with insurance <::overing Joss or damage to Owner's personal property, and Owner's personal liability for injuries which may be sustained within the Property; and 111. Comprehensive General Liability insurance in the amount of$1 ,000,000. b. Contractor shall maintain during the tenn of this Contract: i. Workers compensation insurance, as required by law. 14. Termination of the Contract upon Termination of the Freedom Plan Purchase and Sale Agreement. This Contract shall be deemed terminated upon the termination ofthe Freedom Plan Purcha~e and Sale Agreement for any reason. In such event, unless the cause of such termination is the default of Contractor as selJer under the Freedom Plan Purchase and Sale Agreement, Contractor shaH be entitled to retain all other amount(s) previously paid to Contractor or otherwise due to Contractor under this Contract. 15. Contractor's Right to Stop Work and Tenninate Contract. In addition to all other remedies set forth in this Contract, in the event that any payment is not made in full within five (5) days after such payment is due, or Owner fails to perform any of its duties under this Contract within ten (1 0) days after written notice from Contractor, Contractor may stop the Work until payment is made or Owner fulfills its duties. Should the Work be stopped for a period of fifteen (15) days or more upon Owner•s failure to make a progress payment or as a result of any other act, omission or neglect of the Owner, then Contractor may, upon providing written notice to Owner, terminate this Contract. Upon such tennination, the Contractor may recover from the Owner payment for all work completed and for any loss sustained by the Contractor for materials, equipment, tools, or machinery to the extent of actual loss thereon, plus an amount equal to the Contractor's anticipated profit under this Contract, plus interest on the foregoing amounts at the rate of eighteen percent (18%) per annum. 16. Alternative Dispute Resolution. Owner and Contractor agree to be bound by the alternative dispute resolution procedures set forth in the Declaration. Any and·aiJ claims, disputes and controversies arising between Owner and Contractor, whether before or after Closing, relating to this Contract or its subject matter, including, but not limited to) any alleged construction defect, shaH be submitted to final and binding arbitration. 17. Notices. All notices required by this Contract shall be in writing and shall be given by any of the following means to the below 1 is ted addresses or fax numbers: a. certified or registered mail, postage prepaid) return receipt requested, in which case notice shall be deemed delivered three (3) business days after the postmark date; b. recognized commercial overnight courier, in which case notice shall be deemed delivered one ( l) business day after Form Date: 2/15/0S 18 OF 23 receipt for delivery by the courier; c. electronic mail transmission with confinned receipt, d. telecopy transmittal ("fax"), in which case notice shall be deemed delivered upon fax confirmation of transmission to the intended party; or e. personal delivery, in which case the notice shall be effective when received. f. Notice shall be given to Contractor to: 410 lronbridge Dr. Glenwood Springs, CO 81601 g. Notice shall be given t9 Owner to: • ~• ,_ _ _ 0 ;_,. t I .. DAn! el 5arh::U 10 .t '• 'll!/Q' )UJ1 "' """"\ toz.. c~7., 1 K.et~..\<..e.o..lo...ni {Q ho+rn~ · c:~ h. Notice of chanii''5r;~!r~ ~all be~~li~:ft}~n notice in the manner described in this section. Rejection or other refusal to accept a notice or the inability to deliver a notice because of changed address of which no notice was given shall be deemed to constitute receipt of the notice sent. 18. Contractor's Limited Warranty. Contractor shall provide a one~year limited warranty on the house as provided for in the Freedom Program Purchase and Sales Agreement. 19. Contractor's Disclaimers. Contractor makes no representation or warranty, and shall in no event be responsible for the following: a. Hazardous materials (as defined by applicable law) in the House or on the Lo~ b. Homeowner~s association assessments andfor property taxes applicable to the Lot; c. Owner's finanCing of the Work; d. Any work or materials not supplied or installed by Contractor pursuant to this Contract; or e. All of the matters described in the disclosures and disclaimers set forth in the Freedom Plan Purchase and Sale Agreement, which disclosures and disclaimers are fully incorporated herein by this reference. 20. General Provisions. a. This Contract shall be governed by the laws of the State of Colorado. Jurisdiction and venue for any action concerning this Contract shall be in Garfield County, Colorado. b. In the event of any litigation or other proceedings between the parties concerning this Contract. the prevailing party shall be entitled to the payment by the nonprevailing party of all of its reasonable attorneys• fees~ court costs, and litigation expenses. c. This Contract constitutes the entire agreement between the parties and any prior understandings, agreement~ or representations of any kind whatsoever preceding the date of this Contract shall not be binding upon either party except to the extent that they are specifically incorporated into this Contract. d. This Contract shall be binding upon and inure to the benefit of the parties hereto and to their respective heirs) representatives, successors and permitted assignees. This Contract is intended for the exclusive benefit of Owner and Contractor and is not intended and shall not be interpreted as conferring any benefit on any third party. e. This Contract and any amendments to this Contract may be executed in any number of counterparts, each of which shall be deemed an original and all taken together shall constitute one and the same agreement. Fax copies of this Contract and any amendments to this Contract and fax signatures thereon shall have the same force, effect, and legal status of originals. f. If any provision of this Contract is or shaH become invalid or unenforceable, the remaining provisions of this Contract shall not be affected. g. Time is of the essence in each and every tenn and provision of this Contract. All references to days herein shall be deemed to refer to calendar days unless otherwise specified. ln the event that the final date for perfonnance of any act required by this Contract falls on a Saturday, Sunday, or legal holiday, such act may be perfonned on the next day which is not a Saturday~ Sunday, or legal holiday. h. The waiver of a breach of any provision in this Contract shall not be construed as a waiver of any other breach of the same or other provision of this Contract, including the time of performance of any provision. i. Owner understands that this Contract is a legally binding con1ract. Owner represents and warrants that Owner bas read the terms and conditions of this Contract, and has had a full and fair opportunity to consult with legal counsel of Owner's own choosing concerning this Contract. Fonn Date: 2115/08 19 OF 23 EXECUTED to be effective as of the date of the date first written above. CONTRACTOR: OWNER: IRONBRIDGE ASPEN COLLECTION LLC, foml Date: :211.5/08 200F23 Fomt Date: 2/lS/08 EXHIBIT A-! (Draw Schedule insert) 21 OF 23 EXHIBIT A-1 DRAW SCHEDULE lronbridge Aspen Collection, LLC February 14, 2008 Plan No: 2202 D Foundation: Post Tension Slab on Grade Descrietion % Cost Pennits, Engineering, Survey 5% $ 11,251 Sitework 4% $ 9,001 Foundation 7% $ 15,751 Framing 20% $ 45,004 Roofing 5% $ 11,251 Plumbing 5% $ 11,251 Electrical 3% $ 6,751 HVAC 4% $ 9,001 Windows, Doors, Trim 7% $ 15,751 Insulation 1% $ 2,250 Exterior Finishes 5% $ 11,251 Painting 6% $ 13,501 Drywall 4% $ 9,001 Flooring 3% $ 6,751 Tile 2% $ 4,500 Cabinets 2% $ 4,500 Appliances 1% $ 2,250 Landscaping (if applicable), Driveways, Sitework 7% $ 15,751 General Conditions 2% $ 4500 Total Cost 93% $ 209,269 Contractor Fee 7% $ 15,751 Total Contractor Cost and Fee 100% $ 225,021 Forn1 Date: 2/15/08 EXHIBITB (Features List insert) 22 OF 23 GOLF CLUB AND MOUNTAIN COMMUNITY IRONBRIDGE ASPEN CO(,LECTION LLC February 7, 2008 ENERGY PERFORMANCE FEATURES • Fully-engineered Air and Water Infiltration Package o Double-paned Low-E Glass o Air Infiltration-protected Electrical Outlets o Fully-wrapped and Sealed Window Openings o Weather Stripping on Exterior Doors o Air Barrier Weather Stripping at Foundation o Under-slab Vapor Barriers • High-efficiency Fwnace • High-efficiency 48 Gallon Hot Water Heater • Insulated Exterior Doors and Garage Door • Outside Fresh Air Exchanger ROOFING • 40-year Asphalt Shingles • Pre-finished Gutters and Downspouts WINDOWS&DOORS • Lifetime Warranty Energy Star-rated Windows • Double-paned Low-E Glass • ThermatruFiberglass Insulated Entry Door ELECTRICAL • Phone/Data/TV Ports in Kirohen, Grest Room and Master Bedroom • Photo Cell Automatic Exterior Sconces • Decorative Fixtures at Kirohen, Dining. Bathrooms, Walk-in Closets • Swirohed Outlets in Great Room and Bedrooms • Recessed Can Lights in Kirohen & Hallways 1 of2 HEATING & VENTILATION • Exhaust Fans: Energy Star-rated Whisper Fans, Vented to Exrorior • Power-vented Active Radon Mitigation System • Heated Garage GARAGE DOORS • lnsulated Door • J>re.wtrad Garage Doer Opener Outlet APPLIANCES • GE Gas Range • Range Exhaust Hood • Built-in GE Dishwasher INTERIOR FINISHES AND FLOORING • Hand-textured Painted Walls • Square Drywall Comers • 9-ft. Ceiliogs • I ()..ft. Coffered Ceiling in Master Bedroom • Vinyl Flooring at Kirobens, Bathrooms and Mudrooms • Carpeting in all Bedrooms and Great Room • Ceramic Tile Tub Deck in Master Balli • Fnll-height Fiberglass Shower and Tub Enclosures GOLF CLUB AND MOUN1:i'\IN COMMUNITY IRONBRIDGE ASPEN COLLECTION LLC February 7, 2008 INTERIOR DOORS, TRlM & CABINETS • Interior Doors: Sante Fe Style Hollow Core • Closets: Stained Rods and Painted Shelves • Painted Baseboards aod Door Casings • Painted Extended Window Sills and Aprons • Laminate Countertops • Cabinets: Hickory o 30" Uppers at Kitchen o Raised Panel Style Doors o 36" High Vanities o Adjustable Shelves o Raised Bar Countertop PLUMBING FIXTURES & SHOWER ENCLOSURES o Soaker Tub in Master Bath • Pedestal Sink in Powder Rooms • Icemaker-Iine to Refrigerator • Mirror over all Vanity Cabinets EXTERIOR • Asphalt Driveway with Concrete Walk and Covered Front Porches • In-ground Drainage System • Landscaping, lnigation and Drainage • Stucco, StoiW & Rough-Sawn Wood Finishes 1HE TOTAL NUMBER, DESIGN, LAYOUT AND LOCATION OF LOTS, LANDSCAPING, LAKES, RESIDENCES AND UNIT MIX AND 1HE LOCATION, DESIGN AND LAYOUT OF RECREATIONAL FACILITIES MAY BE CHANGED DUE TO A NUMBER OF CIRCUMSTANCES, INCLUDING GOVERNMENTAL REQUIREMENTS, MARKET DEMAND AND COST CONSTRAINTS. THERE IS NO ASSURANCE THAT 1HE FUTURE IMPROVEMENTS AND FACILITIES DESCRIBED WILL BE CONSTRUCTED. DIMENSIONS AND RESIDENCE SIZE ARE APPROXIMATE IN NATURE AND ARE NOT INTENDED FOR FINAL REFERENCE AS PLANS ARE NOT TO SCALE. LB ROSE RANCH LLC, IRONBRIDGE HOMES LLC, IRONBRIDGE MOUNTAIN COTTAGES LLC AND IRONBRIDGE ASPEN COLLECTION LLC RESERVE 1HE RIGHT TO MAKE MODIFICATIONS IN LOT AND RESIDENCE PRICES AND MAKE MODIFICATIONS IN MATERIALS AND SPECIFICATIONS AT ANY TIME WITiiOUT PRIOR NOTICE. OWNERSHIP OF A RESIDENCE OR LOT DOES NOT INCLUDE CLUB MEMBERSHIP OR RIGHTS IN THE COUNTRY CLUB FACILITIES. 2of2 EXHIBITB-1 PROJECT DOCUMENTS ACKNOWLEDGEMENT The Purchaser, as witnessed by the signature(s) below, acknowledges that as specified in the Purchase and Sale Agreement, Paragraph 5(A), Title Policy, will receive all recorded documents that relate to the Property from the Title Company within ten days from mutual execution of the Contract. Said documents are referred to as all Schedule B~2 exception documents as listed in the Commitment to Provide a Title Jnsurance Policy. Said Documents are provided on a computer disc, however the Buyer may request from the Title Company printed copies of any or all documents provided on the disc. As referenced in Paragraph 5(E) and 5(F), "Project Documents" and "The Aspen Collection Association", of the Purchase and Sale Agreement, there are additional documents relating to the Property which are considered to be unrecorded documents that relate to the Title of the Property. These documents are provided by the Seller and the IPOA/TACA through the website of the community which is accessible at www.ironbridgecJub.com by logging into the site under member's login by using the password 2345. By signing below, the Purchaser acknowledges the ability to review and the receipt of said documents through the website listed above during the Title Review Period. Purchaser may request printed copies of said documents in the event that they arc unable to access the documents through the website. 'Date tfl-t/oR' January I, 2008 Fonn Date: 2115/08 23 OF 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 n CHAFFIN LIGHT Real Estate ChafrmLightReal Estate • POBox 650 • Basalt, CO 81621 • Phone: 970-927-8080 • Fax: 970-927-3944 DIFFERENT BROKERAGE RELATIONSHJPS ARE AVAILABLE WHICH INCLUDE SELLER AGENCY, BUYER AGENCY OR TRANSACTION-BROKERAGE. BRO~GE DISCLOSURE TO T'BUYER DTENANT DEFINITIONS OF WORKING RELATIONSJDPS For purposes of this disclosure, seller also means landlord (which includes sublandlord) and buyer also means tenant (which iucludes subtenant). Seller's Agent: A seller's agent works solely on bebalf of the seller to promote the interests of the seller with the utmost good fuith, loyalty and fidelity. The agent negotiates on bebalf of and aets as an advocate for the seller. The seller's agent must disclose to potential buyers all adverse material facts actually known by the seller's agent about the properly. A separate written listing agreement is required which sets forth the duties and obligations of the broker and the seller. Buyer's Agent: A buyer's agent works solely on bebalf of the buyer to promote the interests of the buyer with the utmost good fuith, loyalty and fidelity. The agent negotiates on behalf of and acts as an advocate fur the buyer. The buyer's agent must disclose to potential sellers all adverse material facts actually known by the buyer's agent, including the buyer's financial ability to perform the terms of the transaction and, if a residential properlY, whether the buyer intends to occupy the properlY. A separate written buyer agency agreement is required which sets forlh the duties and ooligations of the broker and the buyer. Transaction-Broker: A transaction-broker assists the buyer or seller or both throughout a real estate transaction by perfornting terms of auy written or oral agreement, fully infurnting the parties, presenting all olfers and assisting the pariies with any contracts, including the closing of the transaction, without being an agent or advocate for any of the parties. A transaction- broker must use reasonable skill and care in the perfOrmance of auy oral or written agreement, and must make the same disclosures as agents about all adverse material facts actually known by the transaction-broker concerning a prOJlCriY or a buyer's financial ability to perform the terms of a transaction and, if a residential properlY, whether the buyer intends to occupy the properlY. No written agreement is required. Customer: A customer is a pariY to a real estate transaction with whom the broker has no brokerage relationship becanse such pariY bas not engaged or employed the broker, either as the party's agent or as the par!Y's transaction-broker. RELA TIONSJDP BETWEEN BROKER AND BUYER Broker and Boyer referenced below have NOT entered into a buyer agency agreement. The working relationship specified below is for a specific proper!Y described as: or real estate which substantially meets the following requirements: CHECK ONE BOX ONLY: ~ Customer: Broker is the seller's agentandBuyer is a customer. D Customer for Broker's Uslings-Transaction-Brokerage for Other Propel1ies: When Broker is the seller's agent, Buyer is a customer. When Broker is not the seller's agent, Broker is a transaction-broker assisting in the transaction. PREPARED BY: Bob Jacobson, Managing Broker Brokerage Disclosure to Buyerffenant. Colorado Real Estate Commission 8024-1 ().06 Rea!FA$T® Software, ®2006, Version 6.16. Software Reglsto!Odto:Mart< Qvelslreet, c.-Light Real Eslato Page1 of2 0 Traosaction-Brokerage Only: Broker is a transaction-broker assisting in the transaction. 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 If Broker is acting as a transaction-broker, Bnyer consents to Broker's disclosure of Bnyer's oonfidential infonnation to the snpetvising broker or designee for the prupose of proper supeJVision, provided such supervising broker or designee shall not further disclose such infonnation without consent of Bnyer, or use such infonnation to the detriment of Buyer. THIS IS NOT A CONTRACT. BUYER ACKNOWLEDGEMENT; Buyer acknowledges that Bnyer has received this Brokerage Disclosure to Bnyer on Ar;(t l 9, Z.OOK 68 69 70 71 72 73 74 75 76 77 78 79 BROKER ACKNOWLEDGEMENT: On 1..\ ) L\ l 0 ~ , Broker provi~ ,.,_~.. _ &€)'A0--'113iPJ;;,A<. ~::::,"'-1 ,cu.f\ with this Brokerage Disclosure to Buyer at J: e.c.n 'o ('/ +er oaLQ.:::, { e (\ -k.r (location) and retained a ropy for Broker's records. Brokerage Ftnn's Name: Chaffin Light aeal Estate PO Box 650 Signature Fax: (970)927-3944 PREPARED BY: Bob Jacobson, Managing Qroker Brokerage Disclosure to Buyertr'-!nant. Colorado Real Estate Commission BD24-10.0S Rea1FA$T® Software, ®2008, Version 6.16. Software Registered to: Mark Overstreet, Chaffin Light Real Esbrte Date Page2of2 Parcel Detail Page I of 4 Garfield County Assessor/Treasurer Parcel Detail Information Assessor/Treasurer Property Search I Assessor Subset Query I Assessor Sales Search Clerk & Recorder Reception Search Basic Building Characteristics I Tax Information Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Land Detail I Photographs I Mill Levy Revenues Detail [1;] Account Parcel 2007 Mill Number Number Levy a I 090 II R043506 ll239sot42929o II 64.976 Owner Name and Mailing Address !SARTAIN, DANIEL K & REILLY, MEGHAN 14102 ELK LANE /BASALT, CO 81621 Assessor's Parcel Description (Not to be used as a legal description) ISECT,TWN,RNG: 1-7-89 SUB:IRONBRIDGE /PUD, PHASE II, FILING 1, 2 & 3 ILOT:290 PRE:R041509 BK:1596 PG:871 IBK:1565 PG:600 BK:1560 PG:438 IBK:1560 PG:431 BK:1057 PG:0745 IBK: 1028 PG:768 BK: 1028 PG:597 http:/ /www.garcoact.com/assessor/parcel.asp?ParcelN umber=2395.0 14 29290 I I I I I I I I I I 7/3/2008 Parcel Detail Page 2 of4 jBK:1006 PG:743 RECPT:750280 I jRECPT:750279 BK:1822 PG:287 I jRECPT:702424 BK: 1822 PG:283 I IRECPT:702422 BK: 1822 PG:250 I JRECPT:702421 BK: 1782 PG:269 I !RECPT:6944 79 BK: 1782 PG:264 I IRECPT:694478 BK:1747 PG:1 I !RECPT:686745 BK:1218 PG:738 I jRECPT:572583 BK:1218 PG:715 I IRECPT:572582 BK: 1217 PG:266 I JRECPT:572131 BK:1206 PG:852 I jRECPT:569200 BK: 1206 PG:780 I JRECPT:569199 BK:1206 PG:768 I JRECPT:569197 BK:1206 PG:734 I JRECPT:569195 BK:1206 PG:662 I JRECPT:569194 BK:1206 PG:637 I IRECPT:569192 BK:1206 PG:629 I JRECPT:569191 BK:1206 PG:574 I JRECPT:569190 BK:1063 PG:0578 I IBK:l063 PG:0571 I Location PhysicaiiJ1315 RIVER BEND WAY GLENWOOD SPRINGS! Address: !Subdivision: JIIRONBRIDGE PUD, PHASE II, FILING 1, 2 & I !Land Acres: Jlo I I Land Sq Ft: 114,005 II I Section II Township II Range I I 1 II 7 II 89 I http://www.garcoact.com/assessor/parcel.asp?Parce!Number=23950!429290 7/3/2008 Parcel Detail Page 3 of4 2008 Property Tax Valuation Information II Actual Value II Assessed Value [ I Land: [[ 82,510[[ 23,930[ [Improvements: [[ oil ol I Total: II 82,51 oil 23,9301 Additional Value Detail Most Recent Sale Sale Date: 1[6/3/2008 Sale Price: 1[279,000 Additional Sales Detail Basic Building Characteristics Number of Residential lo I Buildings: Number ofComm/lnd lo I Buildings: No Building Records Found Tax Information [Tax Year [[ Transaction Type II Amount I I 2007 II Tax Payment: Second Half II ($640.66)1 I 2007 II Tax Payment: First Half II ($640.66)) I 2007 II Tax Amount II $1,281.321 I 2006 II Tax Payment: Second Half II ($45.38)1 I 2006 II Tax Payment: First Half II ($45.38)1 I 2006 II Tax Amount II $90.761 http://www .garcoact.com/assessor/parcel.asp?ParcelN umber=23950 14 29290 7/3/2008