HomeMy WebLinkAboutApplication- PermitNo. 7903
GARFIELD COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 8th Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
Job Address ] D t 1L]CJY1d.Q_12
Nature of Work Ui ldi Permit
Use of Bn+7din �' P C)3,040a
Contractor
AIL /6 116 L
civ\ craciL,
Amount of Perm Date
1 Sit a,a5
-1Q0,,,,\_
tm4214,
Y53.0
'r-3O� . r
a/40)
GARFIELD COUNTY BUILDING PERMIT APPLICATION
(5ARFWELI] COUNTY (GLENWOOD SPRINGS), COLORADO
TELEPHONE: (970) 943-8212
PERMIT NO.
qo3
INSPECTION LINE: (970)384.... 3470
PARCELISCHEDULE NO.
JOB ADDRESS: 0 0 f �t 190 •/ P&Rcl C" oo d a k C' 13
IJ�DrI�N�a,. /� BI OCICNo. r�
pill jier}�C+ 44 SUBDIVISS�ION TifOrF%fil ' d -'- ICJ
-tJ d �ilTt I
2
o II 11 a.eG�4A-4 4-1i
�j
ADDPI44 CI i £o 4 S 5 C-+�II�O,9x.,, r[p
Iz iVc -675,
'fv?o.s
3
CONISACIW[ l° ,. F
V-
AIIHI
PM
IM. /.//S
4
AaCm�crr�Ru�e
FWaYNA
PM
I]C Net
. .
5
sq. FT. OFBamuam ,5216, )3cy41
itz
K FI.0 L# ii,F>
1'
NO. OR=ORS
..-- & _› 1, Q / i9V--4-4 :4,9 .0.4 6 C
iv &---1-ii (70.4, s7 5/ rdvoef2e,:v-d ay\ cAzk..w.f'sr-o-c..q. Go (141,L,Le
8
cYAESOFWOISSo MEW aAf»Ir1ON oaTEPATER; oNOVE Cr osENovs
9
o,,araP.. .511.1011 COMMIS cAiscar. oraacal DOVILI
10
AoFsyswArPatnRr nClivaTTE gEwAin =paw. CSEIIIC3 SIN
V q5 1 OD .
VAWATlON UP w(SIE:7 AWVBIID YAWA1I ,9 -. 4'
SPEf'ML COMXIM8:
i
NOTICE
A SEPARATE ELDCTRZCAL PP..RMrr IS R-EQLRRgD ANT) MUST AE ISSLF!) EY WAFT STATE or
COLORAEO
THIS PERMrr BECOMES NULL AND VOID IF WORK OR. CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN(SO DAYS, OR IF CONSTRUCTION OR •
WORK IS SUSPENDEDOR ABANDONED FORA PERIOD OF 18O DAYS AT .ANY TIME
AFTER WORK cO .fl fEN EO.
I HEREBY CERTIFY TIIAT I HAVE READ AND EXAMINED TIES APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING THIS TYPE OF WORK WILT.. BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW RE[3ULATLNG CONSTRUCTION OR MB PERFORMANCE OF
GONSTRUCTI
.,._ —
PLAN °3EOKi EE.
1.03(06
' f
PERMIT FEE:
I,c‘i 2.2 S
ff q �p �_�
t! •f U "!
TOTAL FEE: ,I' RATS PERMIT IS UED:
Z G 2_7 . Z (i- 4(5 3. =308`0..??
OCC: GROUP: CONST: TYPE.
j�] v -1 ( f - = f —
1 ` 1�
2CININQ
SETBACKS:
I
S Owti T, Rlu.WhafZa1Ige�R . rad .; ••. + •••tiaa abava
J —c ^- c y + [ ar �} �� ,
r"`� 7 //
MANU. HOME:
ISDSNO. j& FEB.:
'
Sus7ds� Daft aos�Y�be 7 Dom,
AGREKMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE A( NT OF THE CONTRACTOR. OROWNERTO CONSTRUCT THE. STRUCTURE AS
MAILED ON PLANS AND SPECIFICATIONS SUBMITTED Td AND REVIEWED BY THE BUILDING—DEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, 'FEF, SIGNER HEREBY AGREES TO COMPLY 'WITH ALL BUILDING CODES AND LAN) USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 50.28.203 CRS AS AMENDED. TEE SIGNER FURTHER. AGREES THAT IF ME ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WTTIB IN THE. LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PF.RMLI' MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE Tr SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAF1TIR REQUIRING- THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BLEI.D NG OPERATION BEING CARRIED ON THEREUNDERWI N IN
VIOLATION OF THIS CODE OR ANY OTHRRORDIt►ANC$OR REGULATION OFTHIS JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND ST°ECLEICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. TIfl. RESPONSIBILITY FOR THESE PFEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY'WTfR THE ARCHIIF£i; DESIGNER, BUIIDERAND OWNER. C041. SAINTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT
OFTFIEOWNIia1 S INTEREST.
Grform.003 ryVIEREBY ACRNOM.EDCE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIALI
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold mmning water,
non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances; i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNI'11. A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # ' .
04)15, -
Signature Date
bpcont
ASPEN
GLEN
ASPEN GI.F,N Goi:E COMPANY
February 9, 2001
Mike Steele
Timberland Development
P.O. Box 655
Carbondale, CO 81623
Re: Midland Point Lot 25
Dear Mr. Steele,
Per the Design Review Committee meeting on February 1, 2001 for review of your plans
for llomesite MP -25, your plans have been approved conditional upon receipt of a
builders bond completion deposit in the amount of $5,000 and final application.
Three inspections need to occur during the construction of your home. Please call me at
(970) 963-4536 upon completion of foundation, dry -in and a final review. Once the final
walk through has taken place to determine if the completed work is in conformity' with
the approved plans, description and materials furnished for the Committee's review_ your
builders bond completion deposit will be returned.
Please keep in mind that a copy of your approved plans are kept on file for periodic
review by the Design Review Committee to assure compliance with your approved plans.
Any anticipated changes from your approved plans must be submitted to, reviewed by
and approved by the Design Review Committee prior to making any changes.
The Committee enjoyed reviewing your plans and looks forward to your home being, a
new addition to the Midland Point community. Thank you and please fi=ef free to contact
me or any other member on the Design Review Committee with questions or concerns.
Sincerely,
Jennifer C uccini
Committee Mewber
Ce: Design Review Committee
Brad Jordon, Jordon Architecture, Inc.
ASPEN GLEN REULErru7N CENTEr: 9929 STATE HIGHWAY 32 • CA} ] oN'I?AI,E, COI.ORAnO 81623 • 97O-963-45:ti6 • 1 SW -277-4)36
Aspen G!r•r: Goff C'nrrrpu,+v i,c err: rrfjille rc' of CI 1,6 C'or porrrrion of Amrrrc cr rrrrcl fhe 4.4r!re7..c• Comp'
-s
00(3 art- /- 'se
e- c -,Q- Arlt
A.o 'r►
Lt fog gy
e ti)) -
l °z
I S ZjD07,00
1-1.00
rz 83(4.00
S VZ,0a
a 39.4
-Lc "_-7:1
�6�0 .
1(53,67
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. Adequate and complete
information will prevent delays in the plan review process. Reviewing a plan and the discovery that
required information has not been provided by the applicant may result in the delay of the permit
issuance and in proceeding with building construction. The owner or contractor may be required to
provide this information before the plan review may proceed. This causes delays because other plans
that are in line for review may be given attention before the new information may be reviewed after it
has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. If you do not, it may be
helpful to obtain a hook titled "Dwelling Construction under the Uniform Building Code".
This book is available to you through this department at our cost. Also, please consider using
a design professional for assistance in your design and a construction professional for
construction of your project.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the completed
checklist at time of application for a permit.
1
January 1, 1999
Plans to be included for a Building Permit, must be on drafting paper at least 1 8"x24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A
section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to
7,000 F.D.S. and an 80 M_P.H. wind.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
1. Is a site plan included that indicates the distances of the proposed building or addition to
property 1inek other buildings, setback easements and utility easements?
Yes
2. Does the site plan include the location of the 1.S.D.S. (Individual Sewage Disposal System)
and the distances to property lines, wells (on subject property and adjacent properties),
streams or water courses?
Yes /VA -
3.
V f}3. Does the site plan indicate the location and direction of the County or private road accessing
the properly?
Yes !/
4. Do. the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes
5. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes
2
Do the plans indicate the size and location of ventilation openings for the attic, roofloist
spaces's and softs?
Yes
Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes te-
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction?
Yes
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
10. Does the building section drawing or other detail include the method of positive connection of
all columns and ares?
Yes
11. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing grade contours?
Yes
12. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase 11 certifications or phase H EPA certification?
Yes No r"---
13.
13. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes No
14. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform Building
Code?
Yes V No
15. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes # No
3
16. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any swface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safety glazing for these areas?
Yes No
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes i No
18. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes No
19. Do you understand that if you belong to a. homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written pemaission from
the association, do you understand that the plan check fee will not be refunded should the
architectural committee deny or reject your building plans?
Yes No
20. Will this be the only residential structure on the parcel?
Yes No If no -Explain:
21. Have two complete sets of construction drawings been submitted with the application?
Yes
22. Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.?
Yes tom` No
23. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes No
Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes i! No
25. Do you understand that approval for design and/or construction changes are required prior to
the application of these changes?
Yes L No
4
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at
the time of application and that you will be required to pay the "Permit Fee" as well as any
"School Impact" or "Septic System" fees required, at the time you pick up your building
permit?
Yes 1! No
27. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.nn.. the day before. Failure to give twenty-four (24) hour notice for inspections will
delay your inspection one (1) day. Inspections are to be called in to 384-5003.
Yes No
28. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy and occupancy of the building?
Yes 1 No
29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project compl ' g with the Uniform Building Code?
Yes No
30. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes ' No
31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be required
at time of applicable inspection.
Yes No
32. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance ofa
building permit? You . attention in this is appreciated.
Yes l� No
5
I hereby acknowledge that I have read, understand and answered these questions to the
best of my ability.
000 ,7-/,4 - 0 /
signature date
Phone: 4.' ?c,2C7 S (days); (evenings)
Project Name:
Project Address: 1-X2.0 /!J /- Y e:2 -&
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
8/00
6
'�rvdcwr Cd D. -%
• ray 4D u. e
▪ d7� 5`sc°1:-Ir
• amu ��
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued
. ... Zoned Area Permit No.7.7 .,,
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector end IMMEDIATELY BECOME NULL AND VOID. j
Use
Address o al Description 1
Owner iinI-14
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing 3--12- 0i 4S
Foundation -I=i..-6i 4.73
Underground Plumbing
Insulation 0.-3C)-453/ 40, -
1
Rough Plumbing. ,.
Drywall 6
Chimney & Vent Ps 3 -of kJ
Electric Final (by State Inspector)t;j l p`!/c
`�
Gas Piping 5=3f-)(
Final Li� 1 �_
Electric Rough (By St a Inspector} f 1[
Septic Final
Framing '-ii-, !
(To include Roof in place a d Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPR VED DO NOT DESTROY THIS CARD
Date/4413y .: -a` SJ
IF PLACED OUTSIDE - COVER WITH CLEAR ASTIC