HomeMy WebLinkAbout4-203.M Water Supply PlanArticle 4-203.M
Water Supply and
Distribution Plan
Encana Oil & Gas (USA) Inc
K19NE Storage Facility
(Laydown Yard)
OAProject No. 014-2797
O LSSCO N
ASSOCIATES
Water Supply and Distribution Plan
Encana Oil & Gas (USA) Inc.
K19NE Storage Facility (Laydown Yard)
SECTION 4-203.M. WATER SUPPLY AND DISTRIBUTION PLAN.
The Encana Energy K19NE Storage Facility does not require potable water source for
personnel or freshwater for sanitary facilities, landscaping or day to day operations of the
facility.
The operations of the facility will be similar to other natural gas operations in relatively
remote areas of Garfield County. No potable water will be provided at this facility. The
proposed use is an unmanned facility with personnel onsite only for short intervals.
Personnel provide their own potable water carried in their vehicles. Encana makes potable
water available at their field office to staff and contractors.
Sanitary facilities will not require a source of water and will be provided by portable toilets
located at numerous sites in the field per OSHA standards. Landscaping is not being
proposed and a water system is not required to maintain any plantings. The storage facility
does not use water in its daily operation.
760 Horizon Drive, Suite 102 TEL 970.263.7800
Grand Junction, CO 81506
FAX 970.263.7456 www.olssonassociates.com
THIS PAGE LEFT BLANK FOR TWO-SIDED DUPLICATION.