HomeMy WebLinkAbout1.15 Water Supply
Article 4-203.M
Water Supply and
Distribution Plan
Ursa Operating Company
Speakman A Booster
Compressor
OA Project No. 015-3104
760 Horizon Drive, Suite 102 TEL 970.263.7800
Grand Junction, CO 81506 FAX 970.263.7456 www.olssonassociates.com
Water Supply and Distribution Plan
Ursa Operating Company, LLC
Speakman A Booster Compressor
Section 4-203.M. Water Supply and Distribution Plan.
The Ursa Speakman A Booster Compressor facility does not require potable water source for
personnel or freshwater for sanitary facilities, landscaping or day to day operations of the facility.
The operations of the facility will be similar to other natural gas operations in Garfield County. No
potable water will be provided at this facility. The proposed use is an unmanned facility with
personnel onsite only for short intervals. Personnel provide their own potable water carried in
their vehicles. Ursa makes potable water available at their field office to staff and contractors.
Sanitary facilities will not require a source of water and will be provided by portable toilets located
on site and at numerous sites in the field per OSHA standards. Landscaping is not being
proposed, and a water system is not required to maintain any plantings. The Speakman A Booster
Compressor facility does not use potable or fresh water in its daily operation.
Ursa Operating Company LLC
Speakman A Booster Compressor
Water Supply and Distribution Plan Page 2
THIS PAGE LEFT BLANK FOR TWO-SIDED DUPLICATION.