HomeMy WebLinkAboutAdministrative Permit - 4-15-2008" lllf~l~~o~·~~P\',',MJL~l'U'olllf,~~!I~·~.1~~~1M ~'Y IIIII
Receptionn: 746561
04/15/2008 02:45:47 PM Jean Alberico
1 of 2 Reo Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
ADMINISTRATIVE PERMIT
for
A tract of Land in Sections 7 & 18, Township 7
South, Range 88 West of the P. M also known as
82 County Road 113 owned by Aspen Equity
Group, LLC
Parcel1D: 2393-074-00-357
In accordance with and pursuant to Section 6.00 of the Garfield County Zoning Resolution of
1978, as amended, and Resolution No. 2006 -79 of the Board of County Commissioners of
Garfield County, State of Colorado, the Director of the Building and Planning Department
hereby authorizes, by Administrative Permit, the following activity:
The placement of construction grading in the
flood-fringe of the designated 100-year
floodplain of Cattle Creek for the construction of
mini-storage units
The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached
hereto), and shall be valid only during compliance with such conditions and other applicable
provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building
Code, and other regulations of the Board of County Commissioners of Garfield County,
Colorado. ·
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
Director
2
Ill\ ~P\ '~~~~1MH ,r.lU~f~~~~~~~r.fii.~W.I+IIf. ~~~~ IIIII
Reception~: 746250
04/09/2008 04:50:40 PM Jean Alberico
2 of 2 Rea Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
EXHIBIT A
FLOODPLAIN PERMIT-82 County Road 113, Carbondale, CO (Parcel
ID No. 239307400357)
1. All representations made in the application shall be considered conditions of
approval, unless modified by this Exhibit A
2. No alterations of the floodplain may be made other than the specific
improvements noted in the application and shown on drawings by Deric J.
Walter, PE 37110, and stamped January 03,2008.
3. All new construction or substantial improvements shall be designed (or
modified) and adequately anchored to prevent flotation, collapse or lateral
movement of the structure resulting from hydrodynamic and hydrostatic loads,
including the effects of buoyancy.
4. All new construction or substantial improvements shall be constructed with
materials resistant to flood damage.
5. All new construction or substantial improvements shall be constructed by
methods and practices that minimize flood damage.
6. All new construction or substantial improvements shall be constructed with
electrical, heating, ventilation, plumbing, and air conditioning equipment and
other service facilities that are designed and/or located so as to prevent water
from entering or accumulating within the components during conditions of
flooding.
7. All new and replacement water supply systems shall be designed to minimize
or eliminate infiltration of flood waters into the system.
8. New and replacement sanitary sewage systems shall be designed to minimize
or eliminate infiltration of floodwaters into the system and discharge from the
systems into floodwaters.
9. On-site waste disposal systems shall be located to avoid impairment to them
or contamination from them during flooding.
10. No disturbance of a regulated wetland will be allowed.