Loading...
HomeMy WebLinkAbout1.22 Visual Impact AnalysisVisual Impact Analysis The visual impact of the Cerise Gravel Pit was evaluated as part of Resolution 2011-44. This analysis was based on a mining and reclamation plan that involved a very large overburden pile, and a large scale disturbance. Since these two major elements of the operation have changed, a new visual analysis has been conducted. The new analysis uses the same viewpoints, and baseline data, as the first analysis. Google Earth aerial data was used, along with inclusion of some trees to partially simulate the effect of vegetation on the views. Elevation differences between Wooden Deer Subdivision and the site means it is impossible to completely obscure the operations. Therefore, the operator has designed the mine plan to minimize disturbance as the operation goes on, and to leave the irrigated field portions of the property in place as long as possible. The buffering and screening plan in this application works with the reduced disturbance to mitigate the visual impacts of the Cerise Gravel Pit. Additionally, the new mining plan eliminates the visual impact of concrete and asphalt plants. On the following pages are screenshots from the visual models, both the original resolution, and ones from the amendment application. Each screenshot represents the view from a height of 5'8" off the ground from a particular view point. The Vantage Points map from the original resolution is also attached to this section for reference. 11/16/2010 5:00:03 PM - P:\23511\133-23511-10003\CAD\SHEETFILES\EXHIBITS\PHOTO LOCATIONS-02.DWG -THOMASY, BRYAN r �kI '.7 A REPRESENTS VANTAGE POINT LOCATION & DIRECTION TETRA TECH CERISE MINE VIEW STUDY GRAPHICS www.tetratech.com VANTAGE POINTS 1900 SOUTH SUNSET TREET, SUITE 1-F LONGMONT, COLORADO 80501 PHONE: (303) 772-5282 FAX: (303) 772-7039 Project No.: 133-23511-10003 Date: 11/16/10 Designed By: PH Figure 1 Bar Measures 1 inch Copyright: Tetra Tech Vantage Point 1 Original plan — Phase 1 New Mining Plan — Phase 1B Vantage Point 1 Original Plan — Phase 3 New Mining Plan — Phase 2 Vantage Point 1 Original Plan — Phase 4b New Mining Plan — Phase 4