HomeMy WebLinkAbout1.29 SPCC Plan25. SPCC PLAN
Since the total quantity of fuel to be kept at the Cerise Gravel Pit at any time is less than 1320
gallons, a SPCC is not applicable for the site as a whole. United Companies will maintain a 500
gallon fuel tank on site during peak operations in the summer. These tanks will be on a stand and
placed in a designated area near the scale. These tanks will be inside of circular water troughs
with enough capacity to handle 110% of the tank's volume.
SPCC Plans for the crusher plant and the wash plant will be with the specific plant brought on
site.