Loading...
HomeMy WebLinkAboutApplication- Permit.i • GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8th, Street, Suite 303 nn Gknwood Springs, CO 81601(970) 945-8212 Job Address a J�D.� l� a 1) s i LT , Co Nature of Work Building Permit No. 7773 Use of Building [ T AR ae- owner i -J1 R n m iNoke , Contractor ) tA') ._)1 -- Amount of Permits 3(3). 'Bp 3 -7 • a-.5 a -s ?.ice i .. 391.`/: Date t,2/° a Zi ., Clerk GARFIELD COUNTY BUILDING PERMIT APPLICATION GARFIELD COUNTY (OLENWOOD SPRINGS). COLORADO iEPHONE: (970) 9454212 INSPECTION LINE: (970)384-5003 PERMIT NO. 1 PARCEL/SCHEDULE NO. )B ADDRE88: c),I_ .6 C / i ! C4n g 1 6J LOT NO. BLOCK NO. SUBDIVISION/EXEMPTION IWCWINCTAINCINTW ae (Ten 'mu" a3"1 k sea w1G.26 -Son LAC NO: IQ. FT. LFa 1O SQ. FTS OF LOT OF WOOFS • WILOINO carciarworio aAaaw SL nADornoN ML114110N W1O%B naDpvi CARPORT: =NOM 10 ▪ OWTIMAY PA11RT • WIN IMAM ouPOIALGST 'True MAN VAAOFWII c +� ABRAM VNAAT10N1 ■O=CONDRIOls: NOTICE A SEPARATl; ELECTRICAL PERMIT I8. REQUIRED AND MUST BE ISSUED BY THE STATE OF 'MOSAIC. PHIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED 1S NOT OOMMENCED WITHIN 110 DAYS, OR IF CONSTRUCTION OR WORK 18 SUSPENDED OR ABANDONED FOR A PERIOD OF 110 DAYS AT ANY TIME AFTER WORK 18 COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW 7161 SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS (OVERND OTHIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NaT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THS PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. PLAN CHECK FEE: sr.2� PERMIT PEELk TOTAL FIE: DATE PERMIT ISSUED: CI G OCC: GROUP: CONST: TYPE: TONING: of OMNI, •... oullsorimodatomiavig a. Bwildis{ DggL 114 c2 (jt2971t ?' r K SETBACKS: 1/6 ISDS NO. & FES: AGREEMENT REMISSION 18 HEREBY GRANTED TO THE APPLICANT AS OWNS). CONTACTOR ANDioR TIM AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT T11E STRUCTURE AS WADED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT, N CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THIP SIGNER HEREBY MISERS TO COMPLY WITH AIL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY ARMED COUNTY PURSUANT TO AUTHORITY COVEN IN 30.21.201 CRS AS AMENDED. THE SIGNER FURTHER ACI<1EES THAT IF TITS ABOVE SAID ORDINANCES ARE NOT FULLY IOMPLTRD WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DE8C RIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM 7E COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. 7611 ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SNAIL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRNO TH1 IORRECTION OF ERRORS IN SAID PLANS. SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN W 'IOLAT1ON CF THIS CODE OR ANY OTHI3R ORDDIANCE OR REGULATION OF THIS JURISDICTION. 'PIE REVIEW OF THE SUBMITTED PIANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED T BREAFIHR 1X138 NOT CONS77T1TIE AN ACCEPTANCE OF ANY LESPONBIBIITTES OR LIABILITIES BY GARFIELD COUNTY FOR. ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY soR THESE ITEMS AND IMPLEMENTATION CONSTRUCTION RESTS SPECIFICALLY mum TIE ARCIMECT, DESIGNER BUI1DHIt AND OWNER. COMMENTS ARE MENDED TO BE CONSERVATIVE AND IN SUPPORT 771E OWNERS INTEREST. I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. £ITIALI The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; S. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. * * * *CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # .771-3 � -rte-ate Signature Date bpcont :a (-idAttpx ar t 2 /65 Cg. 09-37 1s,_a _. 39/- z, iktcka CA2k6k, Lorstn abs c.° aa -1 SLC± cD tb-C.- 9131/4mKpLJ LANAD ,Act (5\ok) cbQtitco.0 Asot.) LP k•kt r_M*3 tkIjk Qo C5,04. !vim �'. January 1, 1999 Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheating, house - rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40# per ft. up to 7,000 F.O.S. and an 80 M.P.H. wind. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. 1. Is a site plan included that indicates the distances of the proposed building or addition to property lines, other buildings, setback easements and utility easements? Yes ✓ 2. Does the site plan include the location of the I. S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties), streams or water courses? Yes 3. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes 4. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes 5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes 2 6. Do the plans indicate the size and location of ventilation openings for the attic, roofjoist spaces's and soffits? Yes 7. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Yes 8. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes 9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes 10. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes �.- 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes ✓`' 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase 11 certifications or phase II EPA certification? Yes No 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No 14. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? ✓ Yes No 15. Does the plan include a window schedule or other verification that windows provide natural light and vyntilation for all habitable rooms? Yes t/ No 3 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No t/ Lly Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No 18. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes No 19. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? If you do not have written permission from the association, do you understand that the plan check fee will not be refunded should the architectural committee deny or reject your building plans? Yes t/' No 20. Will this be the only residential structure on the parcel? Yes No l/ If no-Explain:QL0.e, - • V/101 /V 21. Have two (2) complete sets of construction drawings been submitted with the application? Yes ✓ 22. Do you understand that the minimum size a home can be on a lot is a 20ft. x 20ft.? Yes ✓ No 23. Have you designed or had this plan designed while considering building and other constructio�r ,code requirements? Yes No 24. Does the plan accurately indicate what you intend to construct and what will receive a final inspection bythe Garfield County Building Department? Yes i/ No 25. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes v' No 4 26. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "School Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes ✓ No 27. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay yo inspection one (1) day. Inspections are to be called in to 384-5003. Yes 1/ No 28. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes ✓ No 29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent ofthe Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for the project complying with the Uniform Building Code? Yes V No 30. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes No 31. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number ofthe person performing the work will be required at time ofjapplicable inspection. Yes ✓ No 5 X hereby acknowledge that I have read, understand and answered these questions to the best of my ability. signature Phone: t o f- SObl (days); Project Name:Q n (Arne Project Address: Notes: date 1(2) • `S/ 3?-- (evenings) If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. bpminreq 7/00 6