HomeMy WebLinkAboutApplication - Void Permit Info2Andy Schwaller
From: Andy Schwaller
Sent:
To:
Monday, September 28, 2015 10:40 AM
'Phil Vaughan'; David Bartholomew
Cc: 'Lynn Cass (lynn.cass@wpxenergy.com}'; 'Ashlee Fechino
(ashlee.fechino@wpxenergy.com)'
Subject: RE: WPX Energy-Trail Ridge Employee Housing Facility-Building Permit Expiration
Hi Phil ,
We will extend the permits for the requested 180 days . Hopefully thing will also change with the natural gas market
during this period.
Andy Schwaller
Building Official
Garfield County
From: Phil Vaughan [mailto:phil@pvcmi.com]
Sent: Tuesday, September 22, 2015 7:14 AM
To: David Bartholomew; Andy Schwaller
Cc: 'Lynn Cass (lynn.cass@wpxenergy.com)'; 'Ashlee Fechino (ashlee.fechino@wpxenergy.com)'
Subject: WPX Energy-Trail Ridge Employee Housing Facility-Building Permit Expiration
Dave and Andy,
I hope that you are doing well today.
I received the attached letter yesterday in regards to the following building permits:
A . BLC0-12-14 -3 492-Freezer/Refrigerator Unit
B. BLC0-12-14-3493-Generator Skid
C. BLC0 -12-14-3494-Camp-6 units
D. SEPT-1-15-3497-On-site wastewater treatment system
WPX Energy is in the process of determining when construction of the Trail Ridge Employee Housing Facility will occur.
The low price of natural gas, and other factors, have delayed the construction of the Trail Ridge Employee Housing
facility. An extension of the permits would maintain the plan preparation and engineering conducted by WPX Energy,
the Ga rfie ld Cou nty Pla n Rev iew, and t he pl a n review fees paid for by WPX Energy.
We would respectfully request a 180 day extension of the 4 building permits listed above.
Thank you and please contact me with questions.
Sincerely,
Phil Vaughan
Phil Vaughan Construction Management, Inc.
1038 County Road 323
1
Timothy Uphoff
17m7CR 5
Rifle. CO R1650
September 17. 2015
Garfield County
Community Development
I08 8th Street. Suite 401, Glenwood Spring~. CO 81601
Office: 970-945-8212 Fax : 970-:\84 -3470
Re : PERMITS# BLC0-12-14-3492. BLC0-12-14-3493. BLC0-12-14-3494. SFPT-1-Vi-3497
Dear Mr. Uphoff.
In review of our building permit application files, we found your application which was filed at
least 180 days ago. As per the 2009 International Building Code. Section R105.3.2: An
application for a permit for any proposed work shall be deemed to have been abandoned 180
days after the date of filing unless such application has been pursued in good faith or a permit
has been issued ....
Please be advised, building permits are deemed active for 180 days from date of issuance, and
will remain active for 180 days from the date of an inspection. If no activity occurs within the
180 days, the permit will be deemed expired. As per the 2009 International Building Code,
Section Rl05 .5. the building official may grant one or more extensions oftime. for no more than
180 days each. The extension shall be requested in writing and Justifiable cause demonstrated.
In hopes of issuing your permit, please contact us within ten ( l 0) business days of the date of this
letter regarding your application. If we do not hear from you. we will deem your application
abandoned and dispose of your file and plans.
Thank you for your timely response in this matter.
Regards.
David Bartholomew, Plans Examiner
Garfield County Building & Planning
Cc: Andy Schwaller, Building Official
Phil Vaughn. PVCMI
WPX Energy. Ashlee Fechino
Community Development Department
108 9th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
.,.,Please contact Phil Vaughan at 9 70-625-5350 with questio ns an
TYPE OF CONSTRUCTION
IX Commercia~Multi-Family , D Demolition
D Manufactured Home (SF or Duplex} r-o-Residential (SF, Duplex, or Townhom_e_} ___ JQ
~-s-~ 3-;1 .. 1~
;tt>J YL IJ~ A:. S. ~J ?LCT
Reroof
INVOLVED PARTIES
. James Uphoff
Property Owner: Eva C. UphofTTrust dated August 7, 2013 and T1mothYPhone: ( } 970-625-5350
Mailing Address: c/o PVCMI 1038 County Road 323 Rifle, CO 81650
Contractor: HB Rentals c/o David Logan Phone: ( 970 )_2_4_2-4_5_5_5 ____ _
I Mailing Address: 598 23 1 /2 Road Grand Junction, CO 81505
Architect: Johnson Carter Architects, PC c/o JefT Johnson Phone: ( 970 )_6.-.2..-.5 ..... -0 .... 58 .... o.._ ____ _
Mailing Address: 136 East 3rd SI. Rine, CO 81650
Engineer: Oddo Engineering, Inc c/o Bob Oddo Phone: ( 970 945-1006
Mailing Address: 713 Cooper Ave. Glenwood Springs, CO 8160 I
Manufactured Home Installer: ____________ Phone:( ___ --------
Mailing Address:------------------------------
PROJECT NAME AND LOCATION ,._ _____ ------ ----- --------------------1
Describe Work: Installation of 6 Colorado Division of Housing approved manufactured units for use as the
WPX Energy Trail Ridge Employee Housing Facility
I Job Address: Scection 3, Township 5 South, Range 97 Wcsl oflhc 6th P.M. Garfield County, CO Latitude 39°38'57
1
931 "N
Longitude i08°15'43.878"W
Assessor's Parcel Number: 2 l 3Z-lll 2-llll-lllll Sub. Lot Block --
Owner's Valuation of Work:$ 22,000.00 set unit/micropiles Property Size (Sq.Ft or Acres): 598.78+/-acres
Height: I 0.67 ft.
I
Sq.Ft of Building: 3,980 s.f. #of Floors: I
Class of Work: l2J New I D Alteration I 0Addition D Repair j D Move/Relocation
Garage: D Attached D Detached
Septic: J2i OWTS D Community
Type of Heat: I D Natural-Gas -I D Propane CJ Electric I D Other
.----------r D Permit#:
-Driveway Permit: CJ Exempt
l_
I NOTICE I
Authorltv. This application for a Building Permit must be signed by the Owner of the property, described above, or J
an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
Vold Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. In consideration of the issuance of the Building Permit, l agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS
regulations and applicable land use regulations (County Regulation(s)l. I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that I have read and understand the Notice and Certification above as well as
have provided the required information which is correct and accurate to the best of my knowledge.
~~~~ -~~~ _11_12_s1_14 _____ _
Property Owner Print and Sign Philip B. Vaughan-Agent Date
OFFICIAL USE ONLY
Special Conditions:
Adjusted Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Misc Fees:
?~820.~ 3Z-6.5'J 5DZ·1'5 400 . 00 -
Total Fees: Fees Paid: Balance Due: BP No: OWTSNo:
1 z.i. e. ca-e ~1-.0t Jool.B7 16LCO, ~q'14
Setbacks: OCCGroup: Const Type: Zoning:
F'.z5 £$"', ~z> f<-Z :Jr£, ~ .,, ,,
BUILDING/ PLANNING DIVISION :
Signed Approval Date
~. ~1.:i-=r ,ol I M/c, riti~\ t'f