HomeMy WebLinkAbout06.01 Water eMails ZancanellaFrom: Thomas Zancanella<tzancanella@za-enginecring.com>
Subject: Hawk Ridge
Date: June 5, 2015 at 2:06:40 PM MDT
To: "kirkwilliams@hangar45.com" <kirkwilliams@hangar45.com>
Cc: Sonny Canterbury <Sonny@za-engineering.com>, Tony Zancanella <awz@za-
engineering.com>
Kirk
Hawk Ridge is currently built out to about 12 of the 17 units. The
attached augmentation plan 90 cw102 states that a guest house is
allowed and is provided for in paragraph 8 C 1.
The plan provides for 350 gpd for the main residence plus 115 gpd
for a guest house. The decree does not specifically limit the size of
either the main house or the guest house.
If you assume 465 total gpd of use for both residences you should
be fine for the project you proposed below however you are still
subject to the limits of the decree for in house and outside uses .
Also Keep in mind that Hawk Ridge has limited tank storage so I
would plan on using residential fire sprinklers to meet the fire code
NFPA 13D.
Call if you have questions.
'Thomas1�t- Zancanda
Thomas A Zancanella I P.E.
Office: 970.945.5700 I Fax: 970.945.1253
j�,i@za-engineering com
Zancanella & Associates Inc. Engineering Consultants
1011 Grand Avenue I Glenwood Springs, CO 81601
CONFIDENTIALITY NOTICE: This e-mail message. including any attachments, is for the sole use of the intended
recipient(s) and may contain confidential, privileged or proprietary information. Any unauthorized review. use, disclosure
or distribution is prohibited. if you aro not the intended recipient. immediately contact the sender by reply e-mail and
destroy all copies of the original message
Sonny
--Original Message