Building Permit No.
Parcel No: ···--···~--·""" _ __:=244 7 -111-00-0c.::12::_____
Locality:
Use of Building: Natur9)_ Gas Com_l)ressor Ac_qustical Enclosure#! _____ _
Owner: Investments LLLP
Contractor: Williams Production RMT Co. ---·····--·· ... . --
Fees: Plan Check: 217.91 Septic:
Bldg Permit: 335.25 Other Fees:
"~"·"-
Total Fees: $ 553.16 ··----
Clerk: ___ 5t~~\? ·······-Date: ~~~-m--I
3
4
5
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 811
! Street, Suite 401, Glenwood Springs, Co 81601
Phone: 970-945-8212/ Fax: 970-384-3470 I Inspection Line: 970-384-5003
www.garfieldMcountv.com
questions and when permit is ready.
RMTCO.
eJ New o Alteration 0
o Attached o Detached
Authority. This application for a Building Penuit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate
Jetter of authority, signed by the Owner, must be provided with this Application.
Legal Access. A Building Pennit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the B\Ji!ding Department.
Other Permits. Multiple separate penults may be required: (J) State Electrical Pennit, (2) County ISDS Pcnnit, (3) another pennit required for use on the property identified above, e.g. State or
County Highway/ Road Access or a State Wastewater Discharge Permit.
Void Permit, A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180
days after commencement.
CERTIFICATION
I hereby certify that I have read this A]lplication and that the information contained above is true and correct. I understand that the Building Department accepts the Application, along with the plans
and specifications and other data submitted by me or on my behalf (imbmittals), ba.~ed upon my certification as to accuracy.
Assuming completeness of the submittals and approval oftllis Application, a Building Permit v.rill be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on
the submittals reviewed by the Building Department.
In consideration of the issuance of the Building Permit, I agree that I and my agents Will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, ISDS regulations and applicable land use regulations (County Rcgulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location,
construction or use of the structurc(s) and facility(ics), described above, arc not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Department to enter the prCf>Crty, described above, to inspect the work. I further acknowledge tl1at tile issuance of the Building Permit does not prevent the
Building Official from: (I) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ics) if such is in violation
ofCountyRcgulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions
or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my autl1orized agents, including without
· · · and! or builder.
HAVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE:
ISDSFee: Total Fees:
55'6./ft,
Setbacks: OCC Group:
Q~l
BL DE.z~ ~~ -A. l-f,,Dg-\, " '-~
APPROVAL' DATE
STAFF USE ONLY
Balance Due: rrrrr•tc: ISDS No & Issued Date:
I ConstType: ~
~~1\/h
PL :P DEP~ '/ )/ l\ ..
APPROVAtl..
Zoning: · p 12! f'( ()b
IFtRRIJJ \
DATE
The following items are required by Garfield County for a final Inspection:
I) A final Electrical Inspection from the Colorado State Electrical Inspector.
2) Permanent address assigned by Garfield County Building Department and posted at the
structure and where readily visible from access road.
3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows
installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent
kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all
necessary plumbing.
4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running
water, non-absorbent floors, walls finished, and privacy door.
5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks
over 30" high must be constructed to all IBC and IRC requirements including guardrails.
6) Outside grading completed so that water slopes away from the building;
7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of
extenuating circumstances., i.e. weather. Under such circumstances A Certificate of
Occupancy may be issued conditionally.
8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED.
OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED.
OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN
ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES
UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
C.O. for the building identified in the Building Pe1mit.
~Q~~~~~~~-------~~~~\ __ __
OWNERS SIGNATURE D~E
Bapplicationdecember2007
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the issuance of
a permit it is important that complete information be provided. When reviewing a plan and it's discovered that
required inf01mation has not been provided by the applicant, this will result in the delay of the permit issuance
and in proceeding with building construction. The owner or contractor shall be required to provide this
information before the plan review can proceed. Other plans that are in line for review may be given attention
before the new information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your project and
provide adequate information to facilitate a plan review. Also, please consider using a design
professional for assistance in your design and a construction professional for construction of your
project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado
Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the building, plumbing
and mechanical codes, applicants are requested to review the following checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks,
balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade
1
line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap,
(which is required), siding or any approved building material. Engineered foundations may be required.
Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to
withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B
or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC, IFGC, and IFC.
Applicants are required to indicate appropriately and to submit completed checklist at time of
application for a permit:
1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings,
setback easements, and utility easements showing distances to the property lines from each comer of
the proposed structure prepared by a licensed surveyor and has the surveyors signature and
professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan.
(NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a
property line and not within a previously surveyed building envelope on a subdivision final plat shall
be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the
drawing. Any structure to be built within a building envelope of a lot shown on a recorded
subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the
proposed structure located within the envelope.
Yes._X __ _
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System)
and distances to the property lines, wells (on subject prope1ty and adjacent properties), streams or
water courses? This information must be certified by a licensed snrveyor with their signature and
professional stamp on the design.
Yes Not necessary for this project X __ _
3. Does the site plan indicate the location and direction of the State, County or private road accessing the
property?
Yes~-
4. Is the l.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado
Registered Engineer?
Yes ___ Not necessary for this project._X __
2
5. Are the plans submitted for application review construction drawings and not drawings that are stamped or
marked identifying them as "Not for construction, for permit issuance only", "Approval drawings
only", "For permit issuance only" or similar language?
Yes X Not necessary for this project __ _
6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in
accordance with the building code or per stamped engineered design?
Yes_X __ Not necessary for this project __
7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this
building?
Yes_X __ Not necessary for this project __
8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the
clearances required between wood and earth?
Yes __ Not necessary for project_X __
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and
soffits?
Y es_X __ Not necessary for this project __
10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40
pounds per square foot in Garfield County)?
Yes_X __ Not necessary for this project __
I I. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes __ Not necessary for this project_X __
12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction?
Yes_X __ Not necessary for this project __
13. Is the wind speed and exposure design included in the plan?
Yes_X __ Not necessary for this project __
14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof
rafters or joists or trusses?
Yes_X __ Not necessary for this project __
3
15. Does the building section drawing or other detail include the method of positive connection of an columns
and beams?
Yes_X __ Not necessary for this project __
16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed
grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof?
(Check applicable zone district for building height maximum)
Yes~ Not necessary for this project __
17. Does the plan include any stove or zero clearance fireplace planned for instaiJation including make and
model and Colorado Phase II certifications or Phase II EPA certification?
Yes __ Not necessaty for this project_X __
18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with
the IBC or IRC?
Yes __ Not necessary for this project_X __
19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping
rooms and/or basements comply with the requirements of the IBC or IRC?
Yes __ Not necessary for this project __
20. Does the plan include a window schedule or other verification that windows provide natural light and
ventilation for an habitable rooms?
Yes ___ Not necessary for this project __
21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing
immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking
surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety
glazing for these areas?
Yes __ Not necessary for this project __
22. Do the plans include a complete design for all mechanical systems platmed for instaiJation in this building?
Yes __ No Not necessary for this project. __ _
4
23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in
the IBC Chapter 3)
Yes __ Not necessary for this project.·_ X __
24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in
this building?
Yes __ Not necessary for this project_X __
25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the
plan?
Yes __ Not necessary for this project_X __
26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and
both sexes are employed, facilities for both sexes?
Yes __ Not necessary for this project_X __
27. Do the plans indicate that restrooms and access to the building are handicapped accessible?
Yes __ Not necessary for this project __
28. Have two (2) complete sets of construction drawings been submitted with the application?
Yes_X __
29. Have you designed or had this plan designed while considering building and other construction code
requirements?
Yes_X __
30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by
the Garfield County Building Department?
Yes_X __
31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For
corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks.
Yes._X __
32. Do you understand that approval for design and/or construction changes are required prior to the
implementation of these changes?
Yes_X __
5
33. Do you understand that the Building Depa1tment will collect a "Plan Review" fee from you at the time of
application and that you will be required to pay the "Permit" fee as well as any "Septic System" or
"Road Impact" fees required, at the time you pick up your building permit?
Yes_X __
34. Are you aware that you are required to call for all inspections required under the IBC including approval on
a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building?
Yes_X __
35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for
an Agent and that the party responsible for the project must comply with the Uniform Codes?
Yes X
36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested
inspection in order to receive it the following business day? Inspections will be made between
7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003.
Yes_X __
37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a
$50.00 re-inspection fee?
Yes X
38. Are you aware that prior to submittal of a building permit application you are required to show proof of a
legal and adequate access to the site? This may include (but is not limited to) proof of yom right to use
a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway
Pennit including a Notice to Proceed; a permit from the federal government or any combination. You
can contact the Road & Bridge Department at 625-860 I. See Phone book for other agencies
Yes_X __
39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber
to perform installations and hookups? The license number will be required at time of inspection.
Yes_X __
40. Are you aware, that on the front of the building permit application you will need to fill in the Parcell
Schedule Number for the lot you are applying for this permit on prior to submittal of the building
permit application? Your attention in this is appreciated.
Yes_X __
41. Do you know that the local fire district may require you to submit plans for their review of fire safety
issues?
Yes_X __ (Please check with the building department about this requirement)
6
42. Do you understand that if you are planning on doing any excavating or grading to the property prior to
issuance of a building permit that you will be required to obtain a grading permit?
Yes _x__ Not necessary for this project __
43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project
with occupancy of more than I 0 persons as per Section 1004 of the IBC to prepare the plans and
specifications for the project.
Yes Not Necessary for this project _x ____ _
I hereby acknowledge that I have read, understand, and answered these questions to the best of my
ability.
817/08
Signature Date
Phone: 970-625-5350 (days); ________ (evenings)
Project Name: Hyrup Compressor Station-Acoustical Encl. #7
Project Address: ?? County Road 306 Parachute, CO 81635
Note:
On any of these questions you may be required to provide this information. If required information is not
supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the
permit.
*If you have answered "Not necessary for this project" on any of the questions and it is detennined by the
Building Official that the info1mation is necessary to review the application and plans to determine minimum
compliance with the adopted codes, please expect the following:
A. The application may be placed behind more recent applications for building permits in the review process
and not reviewed until required information has been provided and the application rotates again to first position
for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
BpcommDec2007
7
N 11111
0. --------------------Assessor's Parcel No. 2447-111-00-012
Date 9/18/2008
I!U.BIIl.DING PERIJ\IUT CARD
Job Address ----~C~R~3~0~6~,~P~a~ra~c~h~u~te~---------------------------------------------------
Owner ________ H""-y_m_,_p_l_n_v_es_t_m_e_n_ts __ L_LL_P ______ Address 1336 M1/4 Rd, lorna Phone # 970-858-0427
Phone # 970-263-2743 Contractor Williams Production RMT Address 4289 CR 215, P'chute
Setbacks: Front ________ Rear _____ RH _____ LH _________ Zoning ---------
Natural Gas compressor Enclosure# 1
Soils Test ----------------------
Footing -------------------------
Foundation __________________ _
Grout ______________________ ___
Underground Plumbing ________ _
Rough Plumbing ---------------
Framing _____________________ _
Insulation -----------------------
Roofing---------------------
Drywall----------------------
Gas Piping-------------------
INSPECTIONS
NOTES
Weatherproofing _____________________ _
Mechanical ________________________ __
Electrical Rough (State)-------------------
E I ectri cal Final (State l-----------------::::----
Final 3-! ?r /O /Checklist CorlJ.Piited?~
Certificate Occu pane:# -'(o~·~:=k>· '"'.,.! 'L-:-:::::::---------
Date _Q--{~~0
Septic System # ---~--------------
Date ------------------------Final ______________________ _
Other _________________________ __
(continue on back)
~~~~ GEEl"lTEI!li+HSIII!l~l;u
ENGINSERING GRC!tiR
February 22, 2010
Williams Production RMT
1058 County Rd. 215
Parachute CO 81636
Attention: Tom Fiore
Subject: Structural Fill Compaction Testing Review
Garfield County Permit Numbers 10816, 10817, 10818, 10819,
10820, 11111, 11112, 11113, 11114, 11272 and 11273
Hyrup Compressor Station
Garfield County, Colorado
GEG Job No. 3,127
As requested, Geotechnical Engineering Group (GEG) observed structural
fill compaction for the eleven Compressor foundations at Hyrup Compressor
Station project in Garfield County, Colorado on as requested, part-time basis on
February 6, 7, 8 and June 8, 2007, April 11, 2008, June 16,17 and August 7,
2009. We reviewed our records of compaction in preparation of this report. We
did confirm compaction test results met our recommendations at the time of
construction. In summary, our review of these eleven structures indicates
construction in conformance with our recommendations.
We appreciate the opportunity to provide geotechnical services. If we can
be of further service, please call.
Sincerely,
GEOTECHNICAL ENGINEERING GROUP, INC.
John
Withers.··
Digitally signed by John Wlthers
DN:cn"'John Withers, > cmGeotechnlcal Engineering
Group, !nc. ou,
,ematl':')wlthers@lgeotedmlcalgrou
p.com,c..US
Date: 2010.02.2214:29:55..{17'00'
John P. Withers, P.E.
Engineer
JPW;jpw
{1 copy sent)
Geotechnical, Environmental and Materials Testing Consultants
Grand Junction -Montrose-Moab-Crested Butte-Rifle
(970) 245-4078 • fax (970) 245-7115 • geotechnicalgroup.com
2308 Interstate Avenue, Grand Junction, Colorado 81505
Phil Vaughan Construction Management, Inc.
1038 County Road 323
Rifle, CO 81650
Ph. 970-625-5350
Fax 970-625-4522
Email: phil@pvcmi.com
December 8, 2008
Mr. Andy Schwaller
Chief Building Official
Garfield County Building Department
108 8th Street, 4th floor
Glenwood Springs, CO 81601
Dear Andy.
Thanks for taking time to speak last Friday, 12/5/08 regarding the Hyrup Compressor
Station building permits.
I have attached the Plot plan for the Hyrup Compressor Station for your reference.
As per our discussion, we would propose transferring the building permits for the
following acoustical enclosures to the 3 new compressors (Units C-316, C-:317 & C-318)
proposed to be instal · ·
-03-Unit 7-Garfield County Building Permit 11111 issued 9/18/08. Transfer to Uni "
C-316.
C-302-Unit 8-Garfield County Building Permit 11113 issued 9/18/08. Transfer to Unit
C-317.
C301-Unit 9-Garfield County Building Permit 11114 issued 9/18/08. Transfer to Unit
C-318.
Please let me know of any questions that you may have.
Thanks again for your assistance.
Sincerely,
~~~~~r::;;;::::=--~
Philip B. Vaughan
President
PVCMI
Page 1 of 1
July I, 2008
Mr. Fred Jarman
Director
Garfield Cotmty Building and
P Janning Department
l 08 8111 Street, 4 11' Floor
Glenwood Springs, CO 81601
Dear Mr . .Jarman,
EXI'l.ORATION & PllODUCTJON
!058 CR #215
P. 0, !.lox 370
Paradm<t:, CO HJG;l:'i-0370
970/.!35-9377
\.!70/285-9573 f:~x
By this letter Hyrup Investments, LLLP authorizes Williams Production RMT Co. to
represent us in any and all matters related to building pennit applications and the special
use permit application known as the Hyrup Compressor Station located in the
NWl/4NWl/4 of Section 12, Township 8 South, Range 96 West, of the 6111 P.M. on
Garfield County Assessor's Parcel number 2447-111-00-012.
This includes the prepru:ation and submission of documents associated with the land use
application and representation of this application before the applicable appointed and
elected boards.
Sincerely,
G~.M~ fl ")~1{/v
Phyllis Hyrup
Hyrup Investments, LLLP
Parcel Detail
Garfield County Assessor/Treasurer
Parcel Detail Information
Page I of4
AssessiJr/T reasur~r PropertyJearch I A,ssessor Subset Uuery I Assessor S£JJg;; Search
Clerk H[~:L~,order RgQJption Se,a_rJ;h
Basic Building Charact~ristics I If:lx lnform<Jtion
P<u:~.Jll Detail I Yalue Detail I Sa_Lgfi_Detail I Residenti[:JI/Commer~li:!LimJlrovemenLOlliail
illd_Detail I Eh!liOJJWhl> I Mill Levy Revenues Det<JjJ
IT ax Area II Account Number II Parcel Number II2DD7 Mill Levy I
I D27 II R27D265 II 24471110DDI2 II 36.4D2 I
Owner Name and Mailing Address
jHYRUP PROPERTIES LLLP
jC/0 HYRUP. PHYLLIS J
11336 Ml/4 RD
ILDMA. CD 81524
Assessor's Parcel Description
(Not to be used as a legal description)
ISECUWN.RNG:II-8-86 DESC: N2NE.
jTHAT PART OF S2NE LYING IN GARFIELD
ICTY SECUWN.RNG:I2-8-96 DESC:
IN2NW. THAT PART OF S2NW LYING IN
/GARFIELD CTY CDNT
ISECUWN.RNG:2-8-86 DESC: E2SW.
IW2SE. SESE DESC: 4D.D AC. THAT PART
http:/ I www.garcoact.coml assessor I parcel.asp? Parce1Number=2 44 711100 012
I
I
I
I
I
I
I
I
I
I
I
81712008
Parcel Detail Page 2 of4
jOF SENW LYING IN GARFIELD CTY OESC: I
/20.0 AC. OESC: 40 AC .. THAT PART OF I
jS2NE LYING IN GARFIELD CTY DESC: I
\CONT. 40.0 AC. DESC: EXCEPT A TR OF I
\LAND CDNT 20.0 AC AS DESC IN BK I
\1677 PG 108. BK:0362 PG:D258 I
IBK:D267 PG:DI03 BK:D213 PG:0372 I
jBK:I828 PG:833 RECPT:724077 BK:I828 I
jPG:830 RECPT:724076 BK:I823 PG:805 I
IRECPT:722811 BK:I802 PG:581 I
IRECPT:688405 BK:I705 PG:538 I
jRECPT:677843 BK:I685 PG:505 I
IRECPT:673684 BK:I677 PG:I08 I
jRECPT:671834 BK:I677 PG:I07 I
jRECPT:671833 BK:I663 PG:512 I
jRECPT:668788 BK:I287 PG:443 I
jRECPT:580708 BK:II08 PG:0857 I
IBK:I074 PG:0684 BK:0752 PG:0036 I
location
I Physical Address: 113312 306 COUNTY RD PARACHUTE I
I Subdivision: I
I land Acres: 11480 I
I land Sq Ft: I 0
I Section II Township II Range I
I 2 II 8 II 86 I
I II II 8 II 86 I
I 12 II 8 II 86 I
http:// www.garcoact.com/ assessor I parcel.asp? Parcel Number= 2 4471110 0 012 8/7/2008
Parcel Detail
I
I
I
I
I
I
I
I
I
I
20118 Property Tax Valuation Information
II Actual Value II Assessed Value I
Land: II 32.53011 8.4301
Improvements: II oil ol
Total: II 32.53011 8.4301
Most Recent Sale
Sale Date: I
Sale Price: I
Basic Building Characteristics
Number of Residential jo Buildings:
Number of Comm/lnd
/o Buildings:
No Building Records Found
Tax Information
Tax Year II Transaction Type
2007 II Tax Payment: Whole
2007 II Tax Amount
2006 II Tax Payment: Whole
2006 II Tax Amount
2005 II Tax Payment: Whole
2005 II Tax Amount
II
I
I
II Amount I
II ($343.28)1
II $343.281
II ($384.36)j
II $384.361
II ($385.26)j
II $385.261
"
http://www.garcoact.com/ assessor I parcel.asp? ParceiNumber= 2 4471110 0012
Page 3 of 4
8/7/2008
Parcel Detail
I 2DD4 II Tax Payment: Whole II ($1.237.20)1
I 2DD4 II Tax Amount II $1.237.2DI
I 2DD3 II Tax Payment: Whole II ($1.327.5D)I
I 2DD3 II Tax Amount II $1.327.5DI
I 2DD2 II Tax Payment: Whole II ($1.334.98)1
I 2DD2 II Tax Amount II $1.334.981
I 2DDI II Tax Payment: Whole II ($1.423.70)1
2DDI II Tax Amount II $1.423.7DI1
2DDD II Tax Payment: Second Half II ($898.75)1
2DDD II Tax Payment: First Half II ($898.75)1
2DDD II Tax Amount I $1.397.5DI
1999 II Tax Payment: Second Half ($537.54)1
I 1999 II Tax Payment: First Half ($537.54)1
I 1999 II Tax Amount II $1.D75.D8I
loJJ_gfjlag~
Asses~gr Database Ssi:JI~bJlR.tions I Ir~Jl.~!lrer Datab§~iiLlear~h Dgtions
Clerk6_~flcorder Datab!l~~ Search DRtimi:'i
Garfi~ld.GqWJtYHome Pf:lg~
Page 4 of 4
The Garfield County Assessor and Treasurer's Offices make every effort to collect and maintain
accurate data. However. Good Turns Software and the Garfield County Assessor and Treasurer's
Offices are unable to warrant any of the information herein contained.
Copyright !ill 2DD5 -2DD8 Good Turns Software. All Rights Reserved.
Database H Web Design by GPodlw,ens_fulftwi3r~.
http:/ I www.garcoact.coml assessor I parcel.asp?ParceiNumber= 2 44 71110 0012 81712008