Loading...
HomeMy WebLinkAboutApplication-PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Offlce:970·945·8212 Fax: 970-384-3470 Inspection Line: 970·384-5003 Building Permit No. Parcel No: Locality: Job Address: CR Parachute Use of Building: Natural Gas Com~ress()r~Acoustical Enclosure# 9 Owner: Investments LLLP Contractor: Williams Production RMT Co. ·-·---~---~--------- Fees: Plan Check: 217.91 Septic: Bldg Permit: 335.25 Other Fees: Total Fees: 553.16 Clerk: _ ~I\'X~lcr Date: Si=l&D~ ~ I GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 gth Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-82I2/ Fax: 970-384-3470 I Inspection Line: 970-384-5003 www.garfieldMcountv.com questions and when permit is ready. 2 3 4 5 RMTCO. rjNew o Alteration o Addition o Attached o Detached Authority. This application for a Building Permit must be signed by the Owner ofthe property, described above, or an authorized agent. If the signahne below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued witllout proof of legal and adequate access to the property for purposes of inspections by the Building Department. Otbl!r Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3) another pcnnit required for usc on the property identified above, e.g. State or County Highway/ Road Access. or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days oftlle date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTlFICATION I hereby certify that I have read this Application and that the information contained above is nue and correct. I understand that the Building Department accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), ba~ed upon my certification as to accuracy. Assuming completeness of the Sllbmittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Departmenl In consideration of the issuance of the Building Permit, I agree that I and my agents Wil! comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, lSDS regulations and applicable land use regulations (Cmmty Regu!ation(s)). I acknowledge that the Building Permit may be suspended or revoked, tlpon notice from the County, if the location, construction or usc of the structure(s) and facility(ies), described above, arc not in compliance with County Regulation(s) or any other applicable Jaw. I hereby grant permission to the Building Department to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structurc(s) or facility(ies) ifsuch is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Department do not constitute an acceptance of responsibility or liability by the Cmmty of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal. state and local laws and County Regulations rest with me and my authorized agents, including without limitation architect and/ or builder. AND UNDERSTAND THE NOTICE & CERTlFICATION ABOVE: STAFF USE ONLY Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees: 2l7. ?/ ISDS Fee: Total Fees: Balance Due: ISDS No & Issued Date: Zoning: The following items are required by Garfield County for a final Inspection: I) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible fi·om access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold nmning water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All batlu·ooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and plivacy door. 5) Steps over three (3) lisers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire Distlict, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Pennit. 8/7/08 OWNERS SIGNATURE DATE Bapplicationdecember2007 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete infonnation be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your PJQject. Any project with Ill ore than ten (1 0) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to dete1mine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade I line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC, IFGC, and IFC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes X . __ _ 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes _ Not necessary for this project _x __ 3. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes_X __ 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes Not necessary for this project._X __ 2 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifYing them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes X Not necessary for this project. __ _ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the building code or per stamped engineered design? Y es_X __ Not necessary for this project __ 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes_X __ Not necessary for this project __ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes __ Not necessary for project_X __ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes_X __ Not necessary for this project __ I 0. Do the plans include design loads as required under the IBC or IRC for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County)? Yes_X __ Not necessary for this project __ II. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes __ Not necessary for this project~- 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes_X __ Not necessary for this project __ 13. Is the wind speed and exposure design included in the plan? Yes_X __ Not necessary for this project __ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or busses? Yes_X __ Not necessary for this project __ 3 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes_X __ Not necessary for this project __ 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes_X __ Not necessary for this project __ 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II cettifications or Phase II EPA certification? Yes __ Not necessary for this project_X __ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes __ Not necessaty for this project_X __ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes __ Not necessary for this project __ 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes __ Not necessary for this project __ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes __ Not necessary for this project __ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes __ No Not necessary for this project. __ _ 4 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes __ Not necessary for this project_X __ 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes __ Not necessaty for this project_X __ 25. Is the location of all natural and liquid petroleum gas fumaces, boilers and water heaters indicated on the plan? Yes __ Not necessary for this project_X __ 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes __ Not necessary for this project_X __ 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes __ Not necessary for this project __ 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes_X __ 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes_X __ 30. Does the plan accurately indicate what you intend to constmct and what will receive a final inspection by the Garfield County Building Deprutment? Yes_X __ 31. Do your plans comply with all zoning mles and regulations in the County related to your zone district? For comer lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes._X __ 32. Do you understand that approval for design and/or constmction changes are required prior to the implementation of these changes? Yes X 5 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Petmit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes X 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes X 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Unifonn Codes? Yes X 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes X 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes_X __ 38. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway Penni! including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-860 I. See Phone book for other agencies Yes X 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician .and Plumber to perf01m installations and hookups? The license number will be required at time of inspection. Yes X 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the Jot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes X 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes_X __ (Please check with the building department about this requirement) 6 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes _x__ Not necessary for this project __ 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than I 0 persons as per Section 1 004 of the IBC to prepare the plans and specifications for the project. Yes Not Necessary for this project _x ____ _ I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Phone: 970-625-5350 (days); 817108 Date _________ (,evenings) Project Name: Hyrup Compressor Station-Acoustical Encl. #9 Project Address:?? County Road 306 Parachute, CO 81635 Note: On any of these questions you may be required to provide this information. If required inf01mation is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to dete1mine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. BpcommDec2007 7 ~I 11114 ,~o. -----------Assessor's Parcel No. 2447-111-00-012 Date ___ 9_1_18_1_20_0_8 __ Job Address __ ....:C:.:R..:..:::3..::.06:::.J'c.:P...:a:..:r.::a=ch:.:.:u=.:t:::e __________________________ _ owner ____ -'H-"y,_r..:.:u.!:.p...:ln:.:.v:...:e:...:s:...:t:.:.m:...:e..:.:n...:ts:....:...l:...:Ll:.:.P ___ Address _ _:1....:.3..:.:3..:.:6 ..:.:M....:1....:/4:....:...R'--d-'-, ...:L_o.;_m_a:....:..._ Phone # 970-858-0427 Contractor Williams Production RMT Address 4289 CR 215, P'chute Phone # 970-263-2743 Setbacks: Front Rear _____ RHt _____ LH _____ Zoning ____ _ Natural Gas compressor Enclosure #9 · Soils Test------------ Footing------------- Foundation ___________ _ Grout _____________ __ Underground Plumbing ______ _ Rough Plumbing --------- Framing _________ ~--- Insulation ------------ Roofing------------- Drywall ----------'----- Gas Piping-------------- INSPECTIONS NOTES Weatherproofing ____________ _ Mechanical ______________ _ Electrical Rough (State)---------~ Electrical Final (State) __________ _ Fina_l. 3-17-/0 /Ch.ecklist C~~eted? ~ Cert1f1 cate Occu pane~# L111.-'bi-r---\,;-~:.,-=----- Date _ --t1:i ·-. /0 I Septic System # ____________ _ Date -------------Final, ____________ _ Other __________________ _ (continue on back) July I, 2008 Mr. Fred Jarman Director Garfield County Building and Planning Department I 08 8111 Street, 4111 Floor Glenwood Springs, CO 81601 Dear Mr. Jarman, EXPLORATION Bt PllODUCTION !058 en #215 P. 0. Box 370 Par;~chwc, CO l1 I (i:\)"0370 970/285-9377 970/285-9573 f.1x By tl1is letter Hyrup Investments, LLLP authorizes Williams Production RMT Co. to represent us in any and all matters related to building permit applications and the special use penn it application known as the Hyrup Compressor Station located in the NWI/4NWI/4 of Section 12, Township 8 South, Range 96 West, of the 61h P.M. on Garfield County Assessor's Parcel number 2447-l 11-00-012. Tllis includes the preparation and submission of documents associated with the land use application and representation of this application before the applicable appointed and elected bom·ds. Sincerely, G·i'f.M~ 9~ '>lJa-<Y . Phyllis Hyrup Hyrup Investments, LLLP Phil Vaughan Construction Management, Inc. December 8, 2008 Mr. Andy Schwaller Chief Building Official 1038 County Road 323 Rifle, CO 81650 Ph. 970-625-5350 Fax 970-625-4522 Email: phil@pvcmi.com Garfield County Building Department 108 8th Street, 4th floor Glenwood Springs, CO 81601 Dear Andy, Thanks for taking time to speak last Friday, 12/5/08 regarding the Hyrup Compressor Station building permits. I have attached the Plot plan for the Hyrup Compressor Station for your reference. As per our discussion, we would propose transferring the building permits for the following acoustical enclosures to the 3 new compressors (Units C-316, C-317 & C-318) proposed to be installed at the Hyrup Compressor Station Expansion: C-303-Unit 7-Garfield County Building Permit 11111 issued 9118/08. Transfer to Unit C-316. C301-Unit 9-Garfield County Building Permit 11114 issue C-318. Please let me know of any questions that you may have. Thanks again for your assistance. Sincerely, ~~~~ Philip B. Vaughan President PVCMI Page 1 of 1 ~~~~ GEE!W:EOHNltl~L!.t ENG[NEERING GRO!JP February 22, 2010 Williams Production RMT 1058 County Rd. 215 Parachute CO 81636 Attention: Tom Fiore Subject: Structural Fill Compaction Testing Review Garfield County Permit Numbers 10816, 10817, 10818, 10819, 10820, 11111, 11112, 11113, 11114, 11272 and 11273 Hyrup Compressor Station Garfield County, Colorado GEG Job No. 3,127 As requested, Geotechnical Engineering Group (GEG) observed structural fill compaction for the eleven Compressor foundations at Hyrup Compressor Station project in Garfield County, Colorado on as requested, part-time basis on February 6, 7, 8 and June 8, 2007, April 11, 2008, June 16,17 and August 7, 2009. We reviewed our records of compaction in preparation of this report. We did confirm compaction test results met our recommendations at the time of construction. In summary, our review of these eleven structures indicates construction in conformance with our recommendations. We appreciate the opportunity to provide geotechnical services. If we can be of further service, please call. Sincerely, GEOTECHNICAL ENGINEERING GROUP, INC. J h Digitally signed by John Withers 0 n ON;(n"'JohnWithers, ; , o"Geotechnlcal Engineering • Group, Inc., ou, Withers-". :~;~j:~h5ers@geotechnlcalgrou Date: 2010.02.22 14:29:55 ·07'00' John P. Withers, P.E. Engineer JPW;jpw (1 copy sent) Geotechnical, Environmental and Materials Testing Consultants Grand Junction -Montrose -Moab-Crested Butte -Rifle (970) 245-4078 • fax (970) 245-7115 • geotechnicalgroup.com 2308 Interstate Avenue, Grand Junction, Colorado 81505 Parcel Detail Garfield County Assessor/Treasurer Parcel Detail Information Page I of 4 Assessor~Treasurer Pt:.@!lrlY Search I A£sessor Sub~nUuery I A-~-~-~~QJ:lli:l!Jl.S Search ClerkHH!l~order Rec~p1jpo_SBarch Basic_BJJll~ing Charaot~r:.llitics I l~JDJJJrf!l!3Jion Parct:JLDetail I YaluB Detail I SaledlBtail I R~-~jdBntiai/Com_mt:lr:_~::iallmprovementDeJ.illl Land Detail I Phlltmlr;mhs I MilUBv'LIWV~HIJJlJ:JMail IT ax Area II Account Number II Parcel Number II2DD7 Mill levy I I D27 II R270265 II 244711100012 II 36.402 I Owner Name and Mailing Address IHYRUP PROPERTIES LLLP jC/0 HYRUP. PHYLLIS J 11336 Ml/4 RD jLDMA. CD 81524 Assessor's Parcel Description (Not to be used as a legal description) jSECT.TWN.RNG:II-8-96 DESC: N2NE. jTHAT PART OF S2NE LYING IN GARFIELD jCTY SECT.TWN.RNG:I2-8-S6 DESC: IN2NW. THAT PART OF S2NW LYING IN jGARFIELD CTY CDNT jSECT.TWN.RNG:2-8-S6 DESC: E2SW. jW2SE. SESE DESC: 40.0 AC. THAT PART http:/ I www.garcoact.coml assessor I parcel.asp? ParceiNumber= 2 44711100 012 I I I I I I I I I I I 81712008 ParGel Detail Page 2 of 4 IDF SENW LYING IN GARFIELD CTY OESC: I 120.0 AC. OESC: 40 AC .. THAT PART OF I IS2NE LYING IN GARFIELD CTY OESC: lCD NT. 40.0 AC. OESC: EXCEPT A TR OF lLANO CONT 20.0 AC AS OESC IN BK 11677 PG 108. BK:0362 PG:0258 IBK:0267 PG:OI03 BK:0213 PG:0372 I IBK:I828 PG:833 RECPT:724077 BK:I828 I IPG:830 RECPT:724076 BK:1823 PG:805 I IRECPT:722811 BK:I802 PG:581 I IRECPT:688405 BK:I705 PG:538 I IRECPT:677843 BK:I685 PG:505 I RECPT:673684 BK:I677 PG:I08 RECPT:671834 BK:I677 PG:I07 IRECPT:671833 BK:I663 PG:512 IRECPT:668788 BK:I287 PG:443 IRECPT:580708 BK:II08 PG:0857 IBK:I074 PG:0684 BK:0752 PG:0036 location Physical Address: 113312 306 COUNTY RO PARACHUTE I Subdivision: I land Acres: 11480 I land Sq Ft: I 0 Section II Township II Range I 2 II 8 II 86 I II II 8 II 86 I I 12 II 8 II 86 I http:! I www.garcoaGt.Goml assessor I pmel.asp? ParGel Number= 2 44 71110 0012 817/2008 Parcel Detail 2DDB Property Tax Valuation Information II Actual Value II I land: II 32.53oll I · Improvements: II oil I Total: II 32.53oll Additional Value Detail Most Recent Sale l i=l ====S"'===al"'===e D"'===at~e: I I Sale Price: I Assessed Value I 9.4301 ol 9.43011 Basic Building Characteristics I I I I I I I Number of Residential lo Buildings: Number of Comm/lnd lo Buildings: No Building Records Found Tax Information Tax Year II Transaction Type 2007 II Tax Payment: Whole 2007 II Tax Amount 2008 II Tax Payment: Whole 2008 II Tax Amount 2005 I Tax Payment: Whole 2005 I Tax Amount I I II Amount I II ($343.28)1 II $343.281 II ($384.38)1 II $384.381 ($385.28) $385.28 http:/ I www.garcoact.com/ assessor I parcel.asp?Parcel Number= 2 44711100012 Page 3 of 4 817/2008 Parcel Detail I 2004 II Tax Payment: Whole II ($1.237.20)1 2004 II Tax Amount II $1.237.201 2003 II Tax Payment: Whole II ($1.327.50)1 2003 II Tax Amount II $1.327.501 2002 II Tax Payment: Whole II ($1.334.86)1 2002 II Tax Amount II $1.334.861 I 2001 II Tax Payment: Whole II ($1.423.70)1 I 2001 II Tax Amount II $1.423.701 I 2DDD I Tax Payment: Second Half II ($688.75)1 I 2DDD Tax Payment: First Half II ($688.75)1 I 2DDD Tax Amount II $1.387.501 I 1888 II Tax Payment: Second Half II ($537.54)1 I 1888 II Tax Payment: First Half II ($537.54)1 I 1888 II Tax Amount II $1.075.081 To P_!llPi!g ~ Assessor Datablli>llll_~arch OP.tions I T rBE!~l!fllr_Uf!t~_bass Search 0Qtions Ckck 6 Recordsr Databa~~JtlileclLOption:>. G.a.rfi~ld GowntyHPm~ .. P~g~ Page 4 of 4 The Garfield County Assessor and T rsasurer's Offices make evary sffort to collsct and maintain accurate data. Howsvsr. Good Turns SoftwarB and ths Garfield County Assessor and Treasurer's Offices are unable to warrant any of the information harBin containsd. Copyright @] 2005 -2008 Good Turns SoftwarB. All Rights Rsssrvsd. Data bass 6 Wsb Design by yoodj urnsi!rltwar~. http:/ I www.garcoact.com/ assessor I parcel.asp? Parcel Number= 2 447111 D 0 012 8/7/2008