HomeMy WebLinkAboutApplication-PermitI
Garfield County
Building & Planning Department
108 8th Street, Suite #401 Glenwood Springs, Co. 81601
Offlce:970·945·8212 Fax: 970-384-3470
Inspection Line: 970·384-5003
Building Permit No.
Parcel No:
Locality:
Job Address: CR Parachute
Use of Building: Natural Gas Com~ress()r~Acoustical Enclosure# 9
Owner: Investments LLLP
Contractor: Williams Production RMT Co.
·-·---~---~---------
Fees: Plan Check: 217.91 Septic:
Bldg Permit: 335.25 Other Fees:
Total Fees: 553.16
Clerk: _ ~I\'X~lcr Date: Si=l&D~ ~ I
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 gth Street, Suite 401, Glenwood Springs, Co 81601
Phone: 970-945-82I2/ Fax: 970-384-3470 I Inspection Line: 970-384-5003
www.garfieldMcountv.com
questions and when permit is ready.
2
3
4
5
RMTCO.
rjNew o Alteration o Addition
o Attached o Detached
Authority. This application for a Building Permit must be signed by the Owner ofthe property, described above, or an authorized agent. If the signahne below is not that of the Owner, a separate
letter of authority, signed by the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued witllout proof of legal and adequate access to the property for purposes of inspections by the Building Department.
Otbl!r Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3) another pcnnit required for usc on the property identified above, e.g. State or
County Highway/ Road Access. or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days oftlle date of issuance and if work is suspended or abandoned for a period of 180
days after commencement.
CERTlFICATION
I hereby certify that I have read this Application and that the information contained above is nue and correct. I understand that the Building Department accepts the Application, along with the plans
and specifications and other data submitted by me or on my behalf (submittals), ba~ed upon my certification as to accuracy.
Assuming completeness of the Sllbmittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on
the submittals reviewed by the Building Departmenl
In consideration of the issuance of the Building Permit, I agree that I and my agents Wil! comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, lSDS regulations and applicable land use regulations (Cmmty Regu!ation(s)). I acknowledge that the Building Permit may be suspended or revoked, tlpon notice from the County, if the location,
construction or usc of the structure(s) and facility(ies), described above, arc not in compliance with County Regulation(s) or any other applicable Jaw.
I hereby grant permission to the Building Department to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the
Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structurc(s) or facility(ies) ifsuch is in violation
of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Department do not constitute an acceptance of responsibility or liability by the Cmmty of errors, omissions
or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal. state and local laws and County Regulations rest with me and my authorized agents, including without
limitation architect and/ or builder.
AND UNDERSTAND THE NOTICE & CERTlFICATION ABOVE:
STAFF USE ONLY
Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees:
2l7. ?/
ISDS Fee: Total Fees: Balance Due: ISDS No & Issued Date:
Zoning:
The following items are required by Garfield County for a final Inspection:
I) A final Electrical Inspection from the Colorado State Electrical Inspector.
2) Permanent address assigned by Garfield County Building Department and posted at the
structure and where readily visible fi·om access road.
3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows
installed; a complete kitchen with cabinets, sink with hot & cold nmning water, non-absorbent
kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all
necessary plumbing.
4) All batlu·ooms must be complete, with washbowl, tub or shower, toilet, hot and cold running
water, non-absorbent floors, walls finished, and plivacy door.
5) Steps over three (3) lisers, outside or inside must be must have handrails. Balconies and decks
over 30" high must be constructed to all IBC and IRC requirements including guardrails.
6) Outside grading completed so that water slopes away from the building;
7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of
extenuating circumstances., i.e. weather. Under such circumstances A Certificate of
Occupancy may be issued conditionally.
8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire Distlict, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED.
OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED.
OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN
ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES
UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
C.O. for the building identified in the Building Pennit.
8/7/08
OWNERS SIGNATURE DATE
Bapplicationdecember2007
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the issuance of
a permit it is important that complete infonnation be provided. When reviewing a plan and it's discovered that
required information has not been provided by the applicant, this will result in the delay of the permit issuance
and in proceeding with building construction. The owner or contractor shall be required to provide this
information before the plan review can proceed. Other plans that are in line for review may be given attention
before the new information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your project and
provide adequate information to facilitate a plan review. Also, please consider using a design
professional for assistance in your design and a construction professional for construction of your
PJQject. Any project with Ill ore than ten (1 0) occupants requires the plans to be sealed by a Colorado
Registered Design Professional.
To provide for a more understandable plan and in order to dete1mine compliance with the building, plumbing
and mechanical codes, applicants are requested to review the following checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks,
balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade
I
line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap,
(which is required), siding or any approved building material. Engineered foundations may be required.
Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to
withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B
or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC, IFGC, and IFC.
Applicants are required to indicate appropriately and to submit completed checklist at time of
application for a permit:
1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings,
setback easements, and utility easements showing distances to the property lines from each corner of
the proposed structure prepared by a licensed surveyor and has the surveyors signature and
professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan.
(NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a
property line and not within a previously surveyed building envelope on a subdivision final plat shall
be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the
drawing. Any structure to be built within a building envelope of a lot shown on a recorded
subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the
proposed structure located within the envelope.
Yes X . __ _
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System)
and distances to the property lines, wells (on subject property and adjacent properties), streams or
water courses? This information must be certified by a licensed surveyor with their signature and
professional stamp on the design.
Yes _ Not necessary for this project _x __
3. Does the site plan indicate the location and direction of the State, County or private road accessing the
property?
Yes_X __
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado
Registered Engineer?
Yes Not necessary for this project._X __
2
5. Are the plans submitted for application review construction drawings and not drawings that are stamped or
marked identifYing them as "Not for construction, for permit issuance only", "Approval drawings
only", "For permit issuance only" or similar language?
Yes X Not necessary for this project. __ _
6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in
accordance with the building code or per stamped engineered design?
Y es_X __ Not necessary for this project __
7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this
building?
Yes_X __ Not necessary for this project __
8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the
clearances required between wood and earth?
Yes __ Not necessary for project_X __
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and
soffits?
Yes_X __ Not necessary for this project __
I 0. Do the plans include design loads as required under the IBC or IRC for roof snow loads, (a minimum of 40
pounds per square foot in Garfield County)?
Yes_X __ Not necessary for this project __
II. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes __ Not necessary for this project~-
12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction?
Yes_X __ Not necessary for this project __
13. Is the wind speed and exposure design included in the plan?
Yes_X __ Not necessary for this project __
14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof
rafters or joists or busses?
Yes_X __ Not necessary for this project __
3
15. Does the building section drawing or other detail include the method of positive connection of all columns
and beams?
Yes_X __ Not necessary for this project __
16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed
grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof?
(Check applicable zone district for building height maximum)
Yes_X __ Not necessary for this project __
17. Does the plan include any stove or zero clearance fireplace planned for installation including make and
model and Colorado Phase II cettifications or Phase II EPA certification?
Yes __ Not necessary for this project_X __
18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with
the IBC or IRC?
Yes __ Not necessaty for this project_X __
19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping
rooms and/or basements comply with the requirements of the IBC or IRC?
Yes __ Not necessary for this project __
20. Does the plan include a window schedule or other verification that windows provide natural light and
ventilation for all habitable rooms?
Yes __ Not necessary for this project __
21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing
immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking
surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety
glazing for these areas?
Yes __ Not necessary for this project __
22. Do the plans include a complete design for all mechanical systems planned for installation in this building?
Yes __ No Not necessary for this project. __ _
4
23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in
the IBC Chapter 3)
Yes __ Not necessary for this project_X __
24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in
this building?
Yes __ Not necessaty for this project_X __
25. Is the location of all natural and liquid petroleum gas fumaces, boilers and water heaters indicated on the
plan?
Yes __ Not necessary for this project_X __
26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and
both sexes are employed, facilities for both sexes?
Yes __ Not necessary for this project_X __
27. Do the plans indicate that restrooms and access to the building are handicapped accessible?
Yes __ Not necessary for this project __
28. Have two (2) complete sets of construction drawings been submitted with the application?
Yes_X __
29. Have you designed or had this plan designed while considering building and other construction code
requirements?
Yes_X __
30. Does the plan accurately indicate what you intend to constmct and what will receive a final inspection by
the Garfield County Building Deprutment?
Yes_X __
31. Do your plans comply with all zoning mles and regulations in the County related to your zone district? For
comer lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks.
Yes._X __
32. Do you understand that approval for design and/or constmction changes are required prior to the
implementation of these changes?
Yes X
5
33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of
application and that you will be required to pay the "Petmit" fee as well as any "Septic System" or
"Road Impact" fees required, at the time you pick up your building permit?
Yes X
34. Are you aware that you are required to call for all inspections required under the IBC including approval on
a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building?
Yes X
35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for
an Agent and that the party responsible for the project must comply with the Unifonn Codes?
Yes X
36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested
inspection in order to receive it the following business day? Inspections will be made between
7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003.
Yes X
37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a
$50.00 re-inspection fee?
Yes_X __
38. Are you aware that prior to submittal of a building permit application you are required to show proof of a
legal and adequate access to the site? This may include (but is not limited to) proof of your right to use
a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway
Penni! including a Notice to Proceed; a permit from the federal government or any combination. You
can contact the Road & Bridge Department at 625-860 I. See Phone book for other agencies
Yes X
39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician .and Plumber
to perf01m installations and hookups? The license number will be required at time of inspection.
Yes X
40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/
Schedule Number for the Jot you are applying for this permit on prior to submittal of the building
permit application? Your attention in this is appreciated.
Yes X
41. Do you know that the local fire district may require you to submit plans for their review of fire safety
issues?
Yes_X __ (Please check with the building department about this requirement)
6
42. Do you understand that if you are planning on doing any excavating or grading to the property prior to
issuance of a building permit that you will be required to obtain a grading permit?
Yes _x__ Not necessary for this project __
43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project
with occupancy of more than I 0 persons as per Section 1 004 of the IBC to prepare the plans and
specifications for the project.
Yes Not Necessary for this project _x ____ _
I hereby acknowledge that I have read, understand, and answered these questions to the best of my
ability.
Phone: 970-625-5350 (days);
817108
Date
_________ (,evenings)
Project Name: Hyrup Compressor Station-Acoustical Encl. #9
Project Address:?? County Road 306 Parachute, CO 81635
Note:
On any of these questions you may be required to provide this information. If required inf01mation is not
supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the
permit.
*If you have answered "Not necessary for this project" on any of the questions and it is determined by the
Building Official that the information is necessary to review the application and plans to dete1mine minimum
compliance with the adopted codes, please expect the following:
A. The application may be placed behind more recent applications for building permits in the review process
and not reviewed until required information has been provided and the application rotates again to first position
for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
BpcommDec2007
7
~I 11114 ,~o. -----------Assessor's Parcel No. 2447-111-00-012
Date ___ 9_1_18_1_20_0_8 __
Job Address __ ....:C:.:R..:..:::3..::.06:::.J'c.:P...:a:..:r.::a=ch:.:.:u=.:t:::e __________________________ _
owner ____ -'H-"y,_r..:.:u.!:.p...:ln:.:.v:...:e:...:s:...:t:.:.m:...:e..:.:n...:ts:....:...l:...:Ll:.:.P ___ Address _ _:1....:.3..:.:3..:.:6 ..:.:M....:1....:/4:....:...R'--d-'-, ...:L_o.;_m_a:....:..._ Phone # 970-858-0427
Contractor Williams Production RMT Address 4289 CR 215, P'chute Phone # 970-263-2743
Setbacks: Front Rear _____ RHt _____ LH _____ Zoning ____ _
Natural Gas compressor Enclosure #9
· Soils Test------------
Footing-------------
Foundation ___________ _
Grout _____________ __
Underground Plumbing ______ _
Rough Plumbing ---------
Framing _________ ~---
Insulation ------------
Roofing-------------
Drywall ----------'-----
Gas Piping--------------
INSPECTIONS
NOTES
Weatherproofing ____________ _
Mechanical ______________ _
Electrical Rough (State)---------~
Electrical Final (State) __________ _
Fina_l. 3-17-/0 /Ch.ecklist C~~eted? ~
Cert1f1 cate Occu pane~# L111.-'bi-r---\,;-~:.,-=-----
Date _ --t1:i ·-. /0
I Septic System # ____________ _
Date -------------Final, ____________ _
Other __________________ _
(continue on back)
July I, 2008
Mr. Fred Jarman
Director
Garfield County Building and
Planning Department
I 08 8111 Street, 4111 Floor
Glenwood Springs, CO 81601
Dear Mr. Jarman,
EXPLORATION Bt PllODUCTION
!058 en #215
P. 0. Box 370
Par;~chwc, CO l1 I (i:\)"0370
970/285-9377
970/285-9573 f.1x
By tl1is letter Hyrup Investments, LLLP authorizes Williams Production RMT Co. to
represent us in any and all matters related to building permit applications and the special
use penn it application known as the Hyrup Compressor Station located in the
NWI/4NWI/4 of Section 12, Township 8 South, Range 96 West, of the 61h P.M. on
Garfield County Assessor's Parcel number 2447-l 11-00-012.
Tllis includes the preparation and submission of documents associated with the land use
application and representation of this application before the applicable appointed and
elected bom·ds.
Sincerely,
G·i'f.M~ 9~ '>lJa-<Y .
Phyllis Hyrup
Hyrup Investments, LLLP
Phil Vaughan Construction Management, Inc.
December 8, 2008
Mr. Andy Schwaller
Chief Building Official
1038 County Road 323
Rifle, CO 81650
Ph. 970-625-5350
Fax 970-625-4522
Email: phil@pvcmi.com
Garfield County Building Department
108 8th Street, 4th floor
Glenwood Springs, CO 81601
Dear Andy,
Thanks for taking time to speak last Friday, 12/5/08 regarding the Hyrup Compressor
Station building permits.
I have attached the Plot plan for the Hyrup Compressor Station for your reference.
As per our discussion, we would propose transferring the building permits for the
following acoustical enclosures to the 3 new compressors (Units C-316, C-317 & C-318)
proposed to be installed at the Hyrup Compressor Station Expansion:
C-303-Unit 7-Garfield County Building Permit 11111 issued 9118/08. Transfer to Unit
C-316.
C301-Unit 9-Garfield County Building Permit 11114 issue
C-318.
Please let me know of any questions that you may have.
Thanks again for your assistance.
Sincerely,
~~~~
Philip B. Vaughan
President
PVCMI
Page 1 of 1
~~~~ GEE!W:EOHNltl~L!.t
ENG[NEERING GRO!JP
February 22, 2010
Williams Production RMT
1058 County Rd. 215
Parachute CO 81636
Attention: Tom Fiore
Subject: Structural Fill Compaction Testing Review
Garfield County Permit Numbers 10816, 10817, 10818, 10819,
10820, 11111, 11112, 11113, 11114, 11272 and 11273
Hyrup Compressor Station
Garfield County, Colorado
GEG Job No. 3,127
As requested, Geotechnical Engineering Group (GEG) observed structural
fill compaction for the eleven Compressor foundations at Hyrup Compressor
Station project in Garfield County, Colorado on as requested, part-time basis on
February 6, 7, 8 and June 8, 2007, April 11, 2008, June 16,17 and August 7,
2009. We reviewed our records of compaction in preparation of this report. We
did confirm compaction test results met our recommendations at the time of
construction. In summary, our review of these eleven structures indicates
construction in conformance with our recommendations.
We appreciate the opportunity to provide geotechnical services. If we can
be of further service, please call.
Sincerely,
GEOTECHNICAL ENGINEERING GROUP, INC.
J h Digitally signed by John Withers
0 n ON;(n"'JohnWithers,
; , o"Geotechnlcal Engineering
• Group, Inc., ou, Withers-". :~;~j:~h5ers@geotechnlcalgrou
Date: 2010.02.22 14:29:55 ·07'00'
John P. Withers, P.E.
Engineer
JPW;jpw
(1 copy sent)
Geotechnical, Environmental and Materials Testing Consultants
Grand Junction -Montrose -Moab-Crested Butte -Rifle
(970) 245-4078 • fax (970) 245-7115 • geotechnicalgroup.com
2308 Interstate Avenue, Grand Junction, Colorado 81505
Parcel Detail
Garfield County Assessor/Treasurer
Parcel Detail Information
Page I of 4
Assessor~Treasurer Pt:.@!lrlY Search I A£sessor Sub~nUuery I A-~-~-~~QJ:lli:l!Jl.S Search
ClerkHH!l~order Rec~p1jpo_SBarch
Basic_BJJll~ing Charaot~r:.llitics I l~JDJJJrf!l!3Jion
Parct:JLDetail I YaluB Detail I SaledlBtail I R~-~jdBntiai/Com_mt:lr:_~::iallmprovementDeJ.illl
Land Detail I Phlltmlr;mhs I MilUBv'LIWV~HIJJlJ:JMail
IT ax Area II Account Number II Parcel Number II2DD7 Mill levy I
I D27 II R270265 II 244711100012 II 36.402 I
Owner Name and Mailing Address
IHYRUP PROPERTIES LLLP
jC/0 HYRUP. PHYLLIS J
11336 Ml/4 RD
jLDMA. CD 81524
Assessor's Parcel Description
(Not to be used as a legal description)
jSECT.TWN.RNG:II-8-96 DESC: N2NE.
jTHAT PART OF S2NE LYING IN GARFIELD
jCTY SECT.TWN.RNG:I2-8-S6 DESC:
IN2NW. THAT PART OF S2NW LYING IN
jGARFIELD CTY CDNT
jSECT.TWN.RNG:2-8-S6 DESC: E2SW.
jW2SE. SESE DESC: 40.0 AC. THAT PART
http:/ I www.garcoact.coml assessor I parcel.asp? ParceiNumber= 2 44711100 012
I
I
I
I
I
I
I
I
I
I
I
81712008
ParGel Detail Page 2 of 4
IDF SENW LYING IN GARFIELD CTY OESC: I
120.0 AC. OESC: 40 AC .. THAT PART OF I
IS2NE LYING IN GARFIELD CTY OESC:
lCD NT. 40.0 AC. OESC: EXCEPT A TR OF
lLANO CONT 20.0 AC AS OESC IN BK
11677 PG 108. BK:0362 PG:0258
IBK:0267 PG:OI03 BK:0213 PG:0372 I
IBK:I828 PG:833 RECPT:724077 BK:I828 I
IPG:830 RECPT:724076 BK:1823 PG:805 I
IRECPT:722811 BK:I802 PG:581 I
IRECPT:688405 BK:I705 PG:538 I
IRECPT:677843 BK:I685 PG:505 I
RECPT:673684 BK:I677 PG:I08
RECPT:671834 BK:I677 PG:I07
IRECPT:671833 BK:I663 PG:512
IRECPT:668788 BK:I287 PG:443
IRECPT:580708 BK:II08 PG:0857
IBK:I074 PG:0684 BK:0752 PG:0036
location
Physical Address: 113312 306 COUNTY RO PARACHUTE I
Subdivision: I
land Acres: 11480 I
land Sq Ft: I 0
Section II Township II Range I
2 II 8 II 86 I
II II 8 II 86 I
I 12 II 8 II 86 I
http:! I www.garcoaGt.Goml assessor I pmel.asp? ParGel Number= 2 44 71110 0012 817/2008
Parcel Detail
2DDB Property Tax Valuation Information
II Actual Value II
I land: II 32.53oll
I · Improvements: II oil
I Total: II 32.53oll
Additional Value Detail
Most Recent Sale
l
i=l ====S"'===al"'===e D"'===at~e: I
I Sale Price: I
Assessed Value I
9.4301
ol
9.43011
Basic Building Characteristics
I
I
I
I
I
I
I
Number of Residential
lo Buildings:
Number of Comm/lnd
lo Buildings:
No Building Records Found
Tax Information
Tax Year II Transaction Type
2007 II Tax Payment: Whole
2007 II Tax Amount
2008 II Tax Payment: Whole
2008 II Tax Amount
2005 I Tax Payment: Whole
2005 I Tax Amount
I
I
II Amount I
II ($343.28)1
II $343.281
II ($384.38)1
II $384.381
($385.28)
$385.28
http:/ I www.garcoact.com/ assessor I parcel.asp?Parcel Number= 2 44711100012
Page 3 of 4
817/2008
Parcel Detail
I 2004 II Tax Payment: Whole II ($1.237.20)1
2004 II Tax Amount II $1.237.201
2003 II Tax Payment: Whole II ($1.327.50)1
2003 II Tax Amount II $1.327.501
2002 II Tax Payment: Whole II ($1.334.86)1
2002 II Tax Amount II $1.334.861
I 2001 II Tax Payment: Whole II ($1.423.70)1
I 2001 II Tax Amount II $1.423.701
I 2DDD I Tax Payment: Second Half II ($688.75)1
I 2DDD Tax Payment: First Half II ($688.75)1
I 2DDD Tax Amount II $1.387.501
I 1888 II Tax Payment: Second Half II ($537.54)1
I 1888 II Tax Payment: First Half II ($537.54)1
I 1888 II Tax Amount II $1.075.081
To P_!llPi!g ~
Assessor Datablli>llll_~arch OP.tions I T rBE!~l!fllr_Uf!t~_bass Search 0Qtions
Ckck 6 Recordsr Databa~~JtlileclLOption:>.
G.a.rfi~ld GowntyHPm~ .. P~g~
Page 4 of 4
The Garfield County Assessor and T rsasurer's Offices make evary sffort to collsct and maintain
accurate data. Howsvsr. Good Turns SoftwarB and ths Garfield County Assessor and Treasurer's
Offices are unable to warrant any of the information harBin containsd.
Copyright @] 2005 -2008 Good Turns SoftwarB. All Rights Rsssrvsd.
Data bass 6 Wsb Design by yoodj urnsi!rltwar~.
http:/ I www.garcoact.com/ assessor I parcel.asp? Parcel Number= 2 447111 D 0 012 8/7/2008