HomeMy WebLinkAboutApplication-PermitI
Garfield County
Building & Planning Department
108 8th Street, Suite #401 Glenwood Springs, Co. 81601
Office:970·945-8212 Fax: 970·384-3470
Inspection Line: 970·384-5003
Building Permit No.
Parcel No: 2395-014-29-296 ____ =c:_
Locality:
Use of Building: ---s/f w/attached Q!lrage & covered fJ"Q"'nt:.cP.:::Oc::.:hc__ __
Owner: Warren, Darre~~J~o'--lle..._n_e __
Contractor: Hansen Construction ---'-'-~~
Fees: Plan Check: Septic:
Bldg Permit: RFTA:
Total Fees: _$ __ ~!.1!_~~.:J!_
Date:
750.00
I
'
( ~ t{\() {"'\ Cct t ~Dtf\ GARFIELD COUNTY BUILDING PERMIT APPLICATION ~ ~ I 08 81h Street. Suite 40 I, Glenwood Springs, Co 8160 I
1 \--1-e__\ -!-\" \ ~ tJ ~ ~ Phone: 970-945-8212 I Fax: 970-?84-3470 I Inspection Line: 970-384-5003
(.l_) (A 0\ W'\-VW.gar!tekJ-counLv.com
2
3
4
5
6
7
8
9 Describe Work:
10 Class of Work:
o Alteration o Addition
II Garage: Septic:
o Detached o ISDS
12 Driveway Permit: Owners valuation of Work: $
NOTICE
Autboritv. This application for a Building Penn it tnust be signed by the Owner of the property. dcscri~d above. or an authorized 11gent. I fthc signature below is not that of the Owner. a SCJllwatc
letter of authority. signed by the Ownn. must be provided with this ApplicMion.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the propcl1Y for purposes of inspections by the Building Department
Other Pe.-mits. Multiple sepamte permits may be required: ( 1} Stllte l:1eetriclll Permit. (2} County !SDS Permit (3) another permit n~quired for use on the pmpe11y identified abOHJ. e.g. State or
Con11ty Highway/ Road Access or a State Wastewater Discharge Permit.
Void Pemlit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180
days after commencement
CERTIFICATION
I hereby certifY that 1 have read this Application and that the information cm1tained above is true and conect I understand that the Building Department accepts the Applicatio11. along with the plans
aud specifications and other data submitted by me or on my behalf(submittals). b<~Sed upon my certification as to accuracy
Assuming completeness of the submittals and approval of this Application, a Building Pennit will he issued £-ranting pcrn1ission to me. as Ow11er. to construct the stmcturc(s) and f~cilitics detaili::d on
the submittals reviewed by the Building Deparlment.
In consider~tion oft he issuance of the Building Permit. 1 agree that I and my agents will comply with provisions of any federal. state or local law regu!ming the work and the Garfield County Bt!i!di11g
Code, ISDS regulations and applicable land use regulations (County Rcgu!ation(s)}. 1 acknowledge that the Building Pcnnit may be suspended or revoked. upon notice fi·om the County. if the locntion.
construction or usc of the structurc(s) and facility(iCs). descl'ibed above, arc not in compliance with County Regulation(s) or nny other applicable law
! hereby gmnt permission to the Building Deparlmcnt to enter the property. described above. to inspect the work. I funher ncknowledge that the issuance of the Building Permit docs not prevent the
Building omeial front ( I} requiring the correction of e1Tors in the submittals. if any. discovered after issuance: or (2) stOj)ping construction or use of the structurc(s) or facility(ics} if such is i11 violatit)n
of County Rcgulation(s) or any other applicable law.
Review of this App!icmion. including submittals. a inspcctio1 s of the work by the Building Depnrtmcnt do no! COIJstitutc an acccptnncc of responsibility or liability by the Colll\ty of errors, omissions
or discrepancies. As the Q. vner. 1 ncknowledge at responsibi ty for compliance with federal. state and local laws and County Regu!mions rest with me and my authol'i7ed agents. includintt lvithout
limitation my architect d6'si >ncr. engineer and! r builder.
I HERE:1~L )GETHAT 1 HAY: READ AN UNDERSTAND THE NOTICE & CERliFI~~r~ l~~l 8~-
0WNF;~Jir ATtiRE DATE
STAFF USE ONLY
Special C~itions:
ie;~
Adjusted Valuation: Plan Checl~. Fee:
/75', -5'12. . g4 '2., 5~
Manu home Fee: Mise Fees:
ISD.S Fee: Total Fees: Fees Paid: & Issue Date:
APPRO AL DATE DATE
The following items are required by Garfield County for a final Inspection:
I) A final Electrical Inspection from the Colorado State Electrical Inspector.
2) Permanent address assigned by Garfield County Building Department and posted at the
structure and where readily visible from access road.
3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows
installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent
kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all
necessary plumbing.
4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running
water, non-absorbent floors, walls finished, and privacy door.
5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks
over 30" high must be constructed to all!BC and IRC requirements including guardrails.
6) Outside grading completed so that water slopes away from the building;
7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of
extenuating circumstances., i.e. weather. Under such circumstances A Certificate of
Occupancy may be issued conditionally.
8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED.
OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED.
OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN
ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES
UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
C.O. for the building identified in the Building Permit.
VALUATION FEE DETERMINATION
Applicant
Address
Date
_,w";a7r~re:;;n:,--,-=:---------Subdivision
-;:1-'4::;59'-:':'R'-'iv..::e,_r B=en.:.:d:...W=ay'-______ Lot!Block
-"9-".1..::8.:.:.0..::8;,_ ___________ Contractor
Finished (Livable Area):
Main
Upper
Lower
Other
Total
Basement:
Unfinished
Square Feet
Valuation
Conversion of Unfinished to Finished
Total Valuation
Garage:
Carport:
Total Valuation
Crawl Space
Total Valuation
Decks/ Patios
Covered
Open
Total Valuation
Type of Construction:
Occupancy:
Valuation
Total Valnation
1457 sq.ft
706 sq.ft
sq.ft
sq.ft X $74.68
2163 sq.ft
sq.ft X $41.00
sq.ft X $33.68
622 sq.ft X $18.00
sq.ftX $12.00
sq.ft X $9.00
116 sq.ft X $24.00
sq.ft X $12.00
Commercial
sf X
sf X
sf X
sf X
sf X
sf X
Iron Bridge
296
161,532.84
0.00
11,196.00
0.00
2,784.00
0.00
175,512.84
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. When reviewing a plan and
it's discovered that required information has not been provided by the applicant, this will result in the
delay of the permit issuance and in proceeding with building construction. The owner or contractor shall
be required to provide this information before the plan review can proceed. Other plans that are in line
for review may be given attention before the new information may be reviewed after it has been
provided to the Building Department.
TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE
SUBMITTED FOR ALL APPLICATIONS.
Please review this document to determine if you have enough information to design your project
and provide adequate information to facilitate a plan review. Also, please consider using a design
professional for assistance in your design and a construction professional for construction of your
project. Any project with more than ten (l 0) occupants requires the plans to be sealed by a
Colorado Registered Design Professional.
To provide for a more understandable plan in order to determine compliance with the building, plumbing
and mechanical codes, applicants are requested to review the following checklist prior to and during
design. Applicants are required to indicate appropriately and to submit the completed checklist at
time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least l8"x24" and drawn
to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks,
balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and
original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house-rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed,
wind exposure B or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
All plans submitted must be incompliance with the 2003 IRC.
1. Is a site plan included that identifies the location of the proposed structure or addition and distances to
the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Propetties with slopes of
30% or greater must be shown on the site plan. (NOTE Section: 1 06.2) Any site plan for the
placement of any portion of a structure within 50 ft. of a property line and not within a previously
surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor
and have the surveyor's signature and professional stamp on the drawing. Any structure to be
built within a building envelope of a lot shown on a recorded subdivision plat shall include a
copy of the building envelope as it is shown on the final plat with the proposed structure located
within ~e envelope.
Yes
2. Does the site plan also include any other buildings on the propetty, setback easements and utility
easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the
property you are applying for a building permit on is located on a corner lot. Special setbacks do
apply. _
Yes 'f:-
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal
System) and the distances to the property lines, wells (on subject property and adjacent
properties), streams or water courses?
Yes__f;.. __
4. Does the site plan indicate the location and direction of the County or private road accessing the
property\:
Yes &
I
2
5. Are you aware that prior to submittal of a building permit application you are required to show proof
of a legal and adequate access to the site? This may include (but is not limited to) proof of your
right to use a private easement/right of way; A County Road and Bridge permit; a Colorado Dept.
of Highway Permit, including a Notice to Proceed; a permit from the federal government or any
combination. You can contact the Road & Bridge Department at 625-860 I. See phone book for
other ag'j:ies
Yes .
6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel
in accordance with the !RC or per stamped engineered design?
Yes ¥
7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the
clearance.z~equired between wood and earth?
Yes ~ No ____ __
8. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and
soffits?
Yes)(, No ______ __
~
9. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of
40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind
loads? V
Yes ___ -f_p.~----
I 0. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construcy_ion?
Yes ----{-'..-----
II. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists,
roof ra ers or joists or trusses?
Yes._-1-"~---
12. Does the building section drawing or other detail include the method of positive connection of all
columns and beams?
Yes 'f.
13. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top
of a flyoof? (Building height measurement usually not to exceed 25 feet)
Yes_-f+'~---
14. Does the plan include any stove or zero clearance fireplace planned for installation including make
and model and Colorado Phase II certifications or phase II EPA certification?
Yes No_-f'f"'--------
3
15. Does the plan include a masonry fireplace including a fireplace section indicating design to comply
with the IRC?
Yes No~~~~--------
16. Does the plan include a window schedule or other verification that egress/rescue windows from
sleeping rooms and/or basements comply with the requirements of the IRC?
Yes X
17. Does the plan include a window schedule or other verification that windows provide natural light and
ventilation for all habitable rooms?
Yes y..
18. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing
immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking
surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety
glazing for these areas?
Yes )c No ____________ __
19. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on
the plan?
Yes X
20. Do you understand that if you are building on a parcel of land created by the exemption process or the
subdivision process, are building plans in compliance with all plat notes and/or covenants?
Yes 'f..
21. Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to
obtain written permission from the association, if required by that association, prior to submitting
an application for a building permit? The building permit application will be accepted without
it, but you run the risk of the HOA bringing action to enforce the covenants, which can result in
revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans
have been reviewed by the Building Department prior to any action by the HOA that requires either
revocation or substantial modification of the plans.
Yes 'f-
22. Will this be the only residential structure on the parcel?
Yes 'y-. No lfno-Explain: ________ _
23. Have two (2) complete sets of construction drawings been submitted with the application?
Yes '{.
24. Do you und~and that the minimum dimension a home can be on a lot is 20ft. wide and 20ft. long?
Yes. __ -j--f\~--
4
25. Have you designed or had this plan designed while considering building and other construction code
requireJynts?
Yes __ ~!-"----
26. Do your plans comply with all zoning rules and regulations in the County related to your properties
zone distr~p
Yes __ -t_p,_,._ ___ _
27. Does the plan accurately indicate what you intend to construct and what will receive a final inspection
by the G.~field County Building DepaJtment?
Yes __ ~'-"----
28. Do you understand that approval for design and/or construction changes are required prior to the
application of these changes?
Yes '{-.
29. Do you understand that the Building Department will collect a "Plan Review" fee from you at the
time of application submittal and that you will be required to pay the "Permit Fee" as well as any
"Road Impact" or "Septic System" fees required, at the time you pick up your building permit?
Yes '(...
30. Are you aware that you must call in for an inspection by 3:30 the business day before the
requested inspection in order to receive it the following business day? Inspections will be
made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in
to 384-5003.
Yes ·p, No _____ _
31. Are you aware that requesting inspections on work that is not ready or not accessible will result in a
$50.00 re-{llspection fee?
Y es_--!f>.'-"----
32. Are you aware that you are required to call for all inspections required under the lRC including
approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the
buil~ding?
Yes ---
33. Are you aware that the Permit Application must be signed by the Owner or a written authority bei11g
given for an Agent and that the party responsible for the project must comply with the IRC?
Yes ·~
5
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and
Plumber to perform installations and hookups, unless you as the homeowner are performing the
work? The license number of the person performing the work will be required at time of
applicabl~irpection.
Yes. ____ -f'~-------------
35. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a
building permit application? Your attention in this is appreciated.
Yes )C
36. Do you know that the local fire district may require you to submit plans for their review of fire safety
issues?
Yes 'j-(please check with the building department about this requirement)
37. Do you understand that if you are planning on doing any excavating or grading to the property prior
to issuye of a building permit that you will be required to obtain a grading permit?
Yes -f~'-'=---
38. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees
have to be paid and the connections inspected by the service provider prior to the issuance of a
Certificate of Occupancy?
Yes X
I
I hereby acknowledge that I ,....,__,read, understand and answered these questions to the best of
my ability.
Date
Applicant
PLAN REVIEW CHECKLIST
u~ Date 'f~ld~05
/uilding
_A_ng gi neered Foundation
~Driveway Permit
/surveyed Site Plan
~Septic Permit and Setbacks
~ade/Topography 30%
~ch Residential Plan Review List
~urn Application Questionnaire
/subdivision Plat Notes
f.1 V\Fire Department Review -/
__ Valuation Determination/Fees
~ Line Plans/Stamps/Sticker
~ach Conditions
-~cation Signed
~~-'To Sigo Appli~"""
Parcel/Schedule No.
_ 40:Jnowload Letter-Manf. Hms.
_/s=::__ Sooiills Report
GENERAL NOTES:
Pla~g/Zoning
_vp;;;_D peri rty Line Setbacks ;..J. /(
t(/d 30ft Stream Setbacks
p:_k.Flood Plain
~ngHeight
~Sign-off
~mpact Fees ,f.ffY)r
_f.J_r/J:roA!DRC Approval
~e/Topography 40%
~ingissues
__ Subdivision Plat Notes
N 11119 0. ----------~~~----Assessor's Parcel No. 2395-014-29-296
Date ___ 9_12_4_12_00_8 __
BUILDING PERMIT CARD
Job Address ____ ...:.1....:.45::::9::....:...:R::.:iv..:::e~r .=B..:::e.:..:nd=....::.W::.:a:!y2., ..:::G:...:W~S::...:.../ :.:.lro.::..n:..:.:b::..:r:..:.:id::.;g....:e:..:.:P:..:.:U.::..D=-,o...:L.::..o:.:t..:::2:...:9..:.6 __________________________ _
Owner ________ __:_W:.:a:.:.r:.:re:..:.:n:.!.., ..:::O.=a:...:rr..:.e:.:.II..:.&:...:R..:.o:..:l::..:le:.:.:n:...:e ___ Address 330 Coryell Ridge Rd. GWS Phone # _______ __
Contractor Hansen Construction Address 410 lronbridge Dr. Phone # 970-384-3990
Setbacks: Front __________ Rear ___ ..:__ ____ RH _____ LH __________ Zoning ________ __
s/f w/ att. garage & cov. front porch
Soils Test ----------------------
Footing ------------------------
Foundation ___________________ _
Grout ______________ ~~~--~~
Underground Plumbing /a~-z.el-o[,9f~
Roug_h PlumQ_in{L :1-;-3-'"L-t7 9 "fKe..-c.J,
Frammg So 2.-O!l. Ml:1
Insulation c.r-t£r-CJ9 ;;=cw.
Roofing ---::=--:-:-::---=:------;;;.----------
Drywall · s= -/2:_.-o~
Gas Piping 4--"i9~~ P?fd
INSPECTIONS
NOTES
Weatherproofing -::::;:---=-:::--7'1---:::-----------
Mechanical S~ S'"-09~
Electrical Rough (State) lfit-oq or
Electrical Final (State) o-:-:---:;
Fina19'-;lf2-e:(i /Checklist C9_f1!e.leted? y«2
Certificate Occupancy # -:-::.(£2~~"'-=::!d~::;---=""'"---
Date IS':\lfO ID-13· Qj
Septic System # -------,-----------------
Date ------------------------Final ________________________ _
Other __________ ~--------------------
(continue on back)
GARFIELD COUNTY, COLORADO
INSPECTiON W~U ... NOT BE MADE UNlESS
THIS CA~O iS POStE!!l ON H~E JOB l,.o\-
Date Issued __ Q_.._-_,;}J'-=~-"""-O_'K _______ Permit No.-llltl~--------
AGREEMENT
In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations
related to the zoning, location; construction and erection of the proposed structured for which this permit is
granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location,
erection and construction of the above described structure, the permit may then b'e revoked by notice from the
County Building department and IMMEDIATELY BECOME NULL AND VOID.
_,.,-
Use 0Jr JDfOl:LQ!)n.£a~c lllll-l'l eO\JE~ PQ\\D t n~n-t PORch.
Address or Legal Description J.l:ri)q f<l'JFU1-.... _._D,_,b'-"-W"-'O."'-:j+---'("''"'\))"'"'-'~------------
Building Permit Type Rf.U-'w8l..ll'NU-L't-t_Lil_l.I_L.!.·---------------------------
This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection
INSPECTION RECORD
Footing Driveway
"··------·---··
Foundation I Grouting Insulation
5 -()1)-0q 0.W.
Underground Plumbing Drywall
10-~~-06 .\.W. 5-)L\-Oq ty). p.
Rough Plumbing Electric Final (by State Inspector)
[;)-d-q-(')11 ,\. w. 7-Z?'-o;T
{Prio!· to Final)
Rough Mechanical Septic Final
5.5-(Y:t D. \"1.
Gas Piping FINAL 'l-/3"-& 7 ';>?'"&.../
GJ-jq-oq J.W.
Electric Rough (by Stail:e ~nspecttod
{You Must Cal! For l'inallnspection)
(Prior to Framing) LJ-.1.1-~q 3F Notes C-C?. PtC:Uc/o/0
Framing 5.5.\)q D.M.
{to include Roof in place & Windows & Doors installed & Firestopping in place)
APPROVED
Date
THIS PERMIT IS NOT TRANSFERABLE
For Inspection Call970-384-5003 Office 970-945-8212
108 8th Street, Suite 401 Glenwood Springs, Colorado 81601
DO NOT DESTROY THIS CARD 9-j.t}-Q~orecTP:~!~La'~fGe
.(DO NOT LAMINATE)
,,
/ ,1/.s 7/?L.Lgp
COUNTY OF GARFIELD -BUILDING DEPARTMENT
CORRECTION NOTICE
108 8th St., Suite 401 Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at Ices-'l &we~ .151&11 J?
'
Permit No. ,//// Cj
/
El'?a11 for Re-lnspection
0 $50.00 Re-lnspection Fee must be paid prior to Re-lnspection
You are hereby notified that the above correction must be inspected
before covering.
When correction(s) have been made, call for inspection at 970-384-5003.
Date -+---1----1------""'-----+,-"'5>-20 ---:---.r-
Building Inspector -~~~i@::1...,:)1____1.~.£,~~~:::::=-..~
Phone (970) 945-8212
COUNTY OF GARFIELD -BUILDING DEPARTMENT
CORRECTION NOTICE
108 8th St., Suite 401 Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at ·~Ls-9 /f!V£/{ J5tZ4JJ? w;/
Permit No. -J-/_L'/-'--/-1-/-+f------------
I have this day inspected this structure and these
premises and found the following corrections needed:
Ef'6:1J..ftir Re-lnspection
(;f'(so.oo Re-lnspection Fee must be paid prior to Re-lnspection
You are hereby notified that the above correction must be inspected
before covering.
When correction(s) have been made, call for inspection at 970-384-5003.
Date /CZ -Z-6 20 Ox
Building Inspector 5 ;<:::;;; C ~
Phone (970) 945-8212
EXHlBIT A
THE ASPEN COLLECTION
FREEDOM PROGRAM CONSTRUCTION CONTRACT
:f}prif £.-. , 200_2_
THIS CONSTRUCTION CONTRACT ("Contract") is made and entered into between IRONBRIDGE ASPEN
COLLECTION LLC, a Colorado limited liability company ("Contractor"), whose address is 410 Ironbridge Road, Glenwood
Springs, olorrdo 81§QJ, w ose telephone number is (970) 945-4300, and whose facsimile number is (970) 928-8865, and
I w. ~: t:.r. en e. /;J f1 8/60f"Owner"), who'ffJ.OI6dddress is
{) e. f t:; . Q 'eliWM till CO, whose telephone number is y,rR.-rt~o59 , and whose
v . This Contract is' entered into thislnd. day of 4-pri I --, zoo's_ ("Effective
Date"). This Contract is entered into in connection with and pursuant to Contractor and Owner's Freedom Program Purchase and
Sale Agreement dated !fr i { 2..: ZOO 'i? , 200 i_. Terms defined in the Freedom Program Purchase and Sales Agreement
and used in this Contract shall hold the same definition in this Contract. The construction of the Residence on the Lot, each as
defined in the Freedom Program Purchase and Sale Agreement shall be referred to herein as (the "House").
1. Contactor's Scope of Work. Contractor's scope of work shall consist of construction services for the House as set forth
below, which collectively shall be referred to herein as the "Work."
2. Plans
a. Contractor has prepared the following drawings, consistent with other homes in the Project, as defined in the
Freedom Program Purchase and Sale Agreement, and constructed by Contractor:
i. {1121..--/)
ii.
iii. ______ (collectively, the "Plans").
3. Construction Services
a. Contractor shall procure and pay for all permits, licenses, approvals and inspections required for the House.
b. Contractor shalJ provide or cause to be provided all labor, materials, equipment and services to construct the House in
a workmanlike manner, consistent with homebuilding industry standards in Garfield County, pursuant to the Plans.
Contractor shall not be responsible for furnishing or constructing any improvements or performing any work unless
the same are specifically set forth in the Plans or in this Contract.
4. Owner's Responsibilities
a. Owner shall cooperate with Contractor in securing any penn its, licenses, approvals and inspections for the House.
b. Upon Contractor's request, Owner shall provide all "Requested Information" to Contractor in a timely manner, and
shall be available to meet with Contractor to approve plans and review the progress of the Work. Requested
lnfonnation shall include, but not necessarily be limited to:
i. proofoffinancing
ii. Design and Architectural Option selections by the associated design selection dates
iii. change order requests
iv. proof of necessary insurance
c. Owner specifically agrees and acknowledges that financing for the House is the sole and exclusive obligation of
Owner, and Owner's ability to obtain financing is not a condition precedent to Owner's obligations set forth in this
Contract. Owner represents that Owner is qualified to obtain such financing and/or has available funds in the amount
necessary to complete the House. Owner agrees to promptly seek and obtain any and all required financing for the
House. Owner agrees to provide Contractor with proof, satisfactory to Contractor, that Owner's financing for the
House has been finalized, and agrees that Contractor is not obligated to proceed with construction on the House until
such proof is delivered to Ccntmctcr a.."1d the Closing of the Lot has occuiTed.
Fonn Date: 2115/08
15 OF 23
d. Owner agrees not to let or enter into any other contracts in connection with the House or the Lot without the prior
written approval of Contractor. Owner acknowledges and agrees that entering into any contract or permitting any
other contractor onto the Lot may impede the Contractor's ability to manage the cost of the House and timely
complete performance of the Work as contemplated herein. Violation of this provision, shall, in addition to any other
remedies set forth herein, permit Contractor to exercise its termination rights as specified herein.
e. Within three (3) days after substantial completion of the Work, Owner shall notifY all utility suppliers that Owner is
responsible for utility expenses ftom and after the date of substantial completion.
5. Time
6.
7.
8.
a. Without limiting the foregoing, Owner agrees to provide all Requested Information to Contractor to start construction
within three (3) months of the date on which the Closing of the Lot occurs. Should Owner delay commencement
construction beyond said three (3) months, Owner shall pay Contractor the sum of Five Thousand Dollars
($5,000.00) per month, allocated for fractional portions of months ("Extension Fee"). The parties hereby agree that
Contractor's actual damages for such Owner delay cannot be calculated now with certainty, and that Liquidated
Damages are a reasonable estimate thereof.
b. Provided that Owner has complied with all of its obligations hereunder, including but not limited to timely payment
of all sums due to Contractor, and Owner has secured financing for the House and delivered satisfactory proof
thereof to Contractor, and Closing of the Lot has occurred, Contractor shall commence construction at the House Site
within sixty (60) days after the issuance of a building permit in the Owner's name, as evidenced by accurate
installation of the foundation forms (the "Commencement Date").
c. Substantial Completion ofthe House shall occur within ten (10) months after the Commencement Date (the
"Completion Date"). The Completion Date may be extended on account of:
i. labor disputes;
ii. fire or other damage to the House, including interior damage;
iii. material or labor shortages;
iv. transportation delays;
v. governmental action;
vi. unusual weather conditions;
vii. change orders or delays caused by Owner;
viii. the failure of Owner to provide information and/or approvals in a timely manner; or
ix. any other causes which are beyond Contractor's control or which may otherwise justifY the delay; and
x. Force Majeure events.
d. Without limiting the foregoing, Owner agrees to provide all required information to Contractor to substantially
complete construction by the Completion Date. Should either party delay Substantial Completion of the House
beyond the Completion Date, the delaying party shall pay the other party the sum of Five Thousand Dollars
($5,000.00) per month, allocated for fractional portions of months as an Extension Fee. The parties hereby agree that
actual damages for such delays cannot be calculated now with certainty, and that these Liquidated Damages are a
reasonable estimate thereof.
Ownership of Plans. Owner agrees and acknowledges that the Plans, and any amendments or revisions thereto, are and
shall remain the sole and exclusive property of Contractor, and Owner agrees not to sen, transfer, assign, use, copy or
share the same with any person or entity without the prior and express written consent of Contractor. which may be
withheld in Contractor's sole discretion.
Contract Price.
umo
• ~ Dollars ($ '}J,:{, . 0 ("Contract Price") for performance of
paid in accordance with the payfuent pro · IOns set forth in this Contract.
Owner acknowledges that upon the execution of any change orders during the course of construction, .the Contract
Price may increase, and in such event Owner shall pay to Contractor such increase upon execution of the change
order, and prior to Contractor's performance of any work in connection with the change order.
Payment Procedure.
a. Owner shall make, or cause Owner's lender to make, progress payments for the Work in accordance with the
schedule attached hereto as Exhibit A-1 ("Draw Schedule") or at any intermediate point based on the percentage of
cornplction of work at that time identified by !u:>pcdion. Progress payments shall be delivered to Contractor within
Form Date: 2/15/08
16 OF 23
five (5) days after Owner's receipt of Contractor's request for payment, which requests for payment shall include a
blanket lien waiver statement relating to all parties who provided labor and/or materials applicable to the previous
request for payment.
b. In the event that at any time the amount of Owner's loan available for distribution is less than the amount of the
Contract Price remaining to be paid, Owner shall deposit the difference into a construction control. account and
execute a customary construction control agreement with respect to the holding and distribution of said sum prior to
Contractor's obligation to commence or continue construction at the House Site. Owner shalJ be responsible for the
payment of any fees in connection with the construction control.
c. Within ten (10) days after substantial completion of the Work, Owner shall pay all remaining amounts due under this
Contract.
d. All monies not paid when due as provided herein shall bear interest atthe rate of eighteen percent (18%) per annum.
e. In the event any installment is not paid when due, Contractor may exercise any remedy set forth in this Contract or
exercise any other legal and/or equitable rights which may be necessary or appropriate to enforce this Contract.
9. Changes in the Work
a. Buyer understands, acknowledges and agrees that the Contract Price includes only the items set forth in the document
attached hereto as Exhibit B ("Features List"). These are referred to herein as ("Standard Selections").
b. Additions, upgrades, and/or optional items which are made available to Owner shall be selected, contracted and paid
for in a separate contract with Contractor or by Change Order.
c. Contractor may offer pre-designed and priced options for each Residence to Owner.
i. Options which change the architectural design ofthe Residence, such as an additional garage bay, are
referred to as architectural options ("Architectural Options").
ii. Options which change the materials and colors of the Residence, such as carpet type and/or color, are
referred to as design options ("Design Options").
m. Together these are often referred to as{"Options').
d. Changes to the Work that are not a pre-designed and priced Architectural Option or Design Options are referred to as
change orders ("Change Orders").
i. All change orders shall speciiy the following:
1. the change in the Work,
2. the adjustment to the Contract Price, if applicable, and
3. the adjustment to the Completion Date, if applicable.
e. Changes in the Work can only occur by purchasing an Architectural Option, purchasing a Design Option or by
written Change Order prepared and approved by Contractor.
f. Options will be offered to the Owner, provided the following conditions have been adhered to:
i. Options must be selected in a timely manner. Each Option is assigned one of three dates which are referred
to as Design Selection 1 ("DSI"), Design Selection 2 ("DS2") and Design Selection 3 ("DS3"). DSl is
seven (7) days after closing, DS2 is forty five ( 45) days after closing and DS3 is ninety (90) days after
closing.
ii. Should Owner fail to select Options on or before the applicable design selection date, Seller shall have the
right to either stop work, install the standard selection or deny the Option.
iii. Options and Change Orders shall be selected subsequent to the execution of this Agreement. Payment in the
amount of 100% ofthe price of each Option or Change Order shall be due when each Option or Change
Order is ordered.
g. ALL PAYMENTS FOR OPTIONS AND CHANGE ORDERS ARE NON-REFUNDABLE TO OWNER
h. All Option purchases and Change Orders shall be executed by both the Owner and the Contractor and paid for by
Owner, prior to the commencement of the work set forth therein.
i. In the event that any increase in the cost of construction arises because of a change in applicable governmental
regulations taking effect after the date of this Contract, such revision or condition shall be the basis for a Change
Order and Contractor shall receive appropriate compensation for making such change.
10. Possession and Use of the Lot. Upon the Closing ofthe Lot, Owner is deemed to have conveyed to Contractor an
absolute and exclusive right to possess and use the Lot. Owner shall not enter the Lot unless accompanied by an
authorized representative of Contractor. Owner shall not instruct, direct or otherwise contact Contractor's laborers,
subcontractors or consultants. Contractor shall permit access to the Lot by inspectors of Owner's lender. Contractor shall
return possession of the Lot to Owner at the time that all payments and obligations required of the Owner have been fully
paid and performed by the Owner. If possession of the House and Lot is taken by the Owner before Owner's obligations
set forth in this Contract are fully performed and without the prior written consent of Contractor, Owner shall be deemed
to have accepted the \Vork as complete and satisfa.::tory, in co nip Hance of all of Conttador \; ubiigaiions hertunder.
Fonn Date: 2115/08
170F 23
11. Walk Through.
a. Upon notice from Contractor to Owner, Owner and Contractor shall schedule a walk-through of Owner's home and
shall compile a list of any items which are materially not in accordance with approved plans and specifications, or do
not materially conform to Garfield County standards. Contractor shall repair, replace or otherwise remedy the items
within a reasonable time after Substantial Completion.
b. Notwithstanding the fact that additional work may be required to correct the items, if the House has reached
Substantial Completion, then no funds shall be withheld from Contractor for these items.
c. After Substantial Completion, the Limited Seller's Warranty included in the Freedom Program Purchase and Sale
Agreement shall apply.
12. No Assignment. This Contract shall not be assigned by Owner or Contractor to any other party except after the prior
written consent of Owner or Contractor, which consent may be reserved in 0Vvner's or Cont·actor's sole discretion. If
Owner or Contractor assigns any of Owner's or Contractor's rights under this Contract to any other party in violation of
this provision, said assignment shall be void and of no effect, and Owner shall be in default hereunder. Notwithstanding
the foregoing, Contractor consents to a collateral assignment of this Contract to Owner's lender pursuant to Owner's
agreement with its lender.
13. Insurance.
a. Owner shall procure and maintain during the term of this Contract the following policies of insurance:
i. Course of Construction insurance in the amount of the Contract Price;
ii. Homeowner's insurance, and a fire and extended risk insurance policy, covering the House and Lot, in an
amount not less than the Purchase Price, together with insurance covering loss or damage to Owner's
personal property, and Owner's personal liability for injuries which may be sustained within the Property;
and
m. Comprehensive General Liability insurance in the amount of$1,000,000.
b. Contractor shall maintain during the term of this Contract:
i. Workers compensation insurance, as required by law.
14. Termination of the Contract upon Termination of the Freedom Plan Purchase and Sale Agreement. This Contract shall
be deeined tenninated upon the termination of the Freedom Plan Purchase and Sale Agreement for any reason. In such
event, unless the cause of such tennination is the default of Contractor as seller under the Freedom Plan Purchase and
Sale Agreement, Contractor shall be entitled to retain all other amount(s) previously paid to Contractor or otherwise due
to Contractor under this Contract.
15. Contractor's Right to Stop Work and Terminate Contract. In addition to all other remedies set forth in.this Contract, in
the event that any payment is not made in full within five (5) days after such payment is due, or Owner fails to perform
any of its duties under this Contract within ten (I 0) days after written notice from Contractor, Contractor may stop the
Work until payment is made or Owner fulfills its duties. Should the Work be stopped for a period of fifteen (15) days or
more upon Owner's failure to make a progress payment or as a result of any other act, omission or neglect of the Owner,
then Contractor may, upon providing written notice to Owner, tenninate this Contract. Upon such tennination, the
Contractor may recover from the Owner payment for all work completed and for any loss sustained by the Contractor for
materials, equipment, tools, or machinery to the extent of actual loss thereon, plus an amount equal to the Contractor's
anticipated profit under this Contract, plus interest on the foregoing amounts at the rate of eighteen percent ( 18%) per
annum.
16. Alternative Dispute Resolution. Owner and Contractor agree to be bound by the alternative dispute resolution procedures
set forth in the Declaration. Any and all claims, disputes and controversies arising between Owner and Contractor,
whether before or after Closing, relating to this Contract or its subject matter, including, but not limited to, any alleged
construction defect, shall be submitted to final and binding arbitration.
17. Notices. All notices required by this Contract shall be in writing and shall be given by any of the following means to the
below listed addresses or fax numbers:
a. certified or registered mail, postage prepaid, return receipt requested, in which ca.<>e notice shall be deemed delivered
three (3) business days after the postmark date;
b. recognized commercial overnight courier, in. which ca:;e notice shaH be dt:ei.rH::J delivered one (1) business day after
Form Date: 2/IS/08
18 OF 23
receipt for delivery by the courier;
c. electronic maiJ transmission with confinned receipt,
d. telecopy transmittal ("fax''), in which case notice shall be deemed delivered upon fax confirmation of transmission to
the intended par1y; or
e.
f.
personal delivery, in which case the notice shall be effective when received.
Notice shall be given to Contractor to:
410 Ironbridge Dr.
G Jenwood Springs, CO 8 I 60 I
g. Notice shall b given to o; to· me, Watre.n.
~~~~~-~€> ed. z;j I ' I{!_() 'ffbt)(
h. Notice of change of address shall be delivered by written notice in the manner described in this section. Rejection or
other refusal to accept a notice or the inability to deliver a notice because of changed address of which no notice was
given shall be deemed to constitute receipt of the notice sent.
18. Contractor's Limited Warranty. Contractor shall provide a one-year limited warranty on the house as provided for in
the Freedom Program Purchase and Sales Agreement.
19. Contractor's Disclaimers. Contractor makes no representation or warranty, and shall in no event be responsible for the
following:
a. Hazardous materials (as defined by applicable Jaw) in the House or on the Lot;
b. Homeowner's association assessments and/or property taxes applicable to the Lot;
c. Owner's financing of the Work;
d. Any work or materials not supplied or installed by Contractor pursuant to this Contract; or
e. All of the matters described in the disclosures and disclaimers set forth in the Freedom Plan Purchase and Sale
Agreement, which disclosures and disclaimers are fully incorporated herein by this reference.
20. General Provisions.
a. This Contract shall be governed by the Jaws of the State of Colorado. Jurisdiction and venue for any action
concerning this Contract shall be in Garfield Coun1y, Colorado.
b. In the event of any litigation or other proceedings between the parties concerning this Contract, the prevailing party
shall be entitled to the payment by the nonprevailing par1y of all of its reasonable attorneys' fees, court costs, and
litigation expenses.
c. This Contract constitutes the entire agreement between the parties and any prior understandings, agreements or
representations of any kind whatsoever preceding the date of this Contract shall not be binding upon either par1y
except to the extent that they are specifically incorporated into this Contract.
d. This Contract shall be binding upon and inure to the benefit of the parties hereto and to their respective heirs,
representatives, successors and pennitted assignees. This Contract is intended for the exclusive benefit of Owner and
Contractor and is not intended and shall not be interpreted as conferring any benefit on any third par1y.
e. This Contract and any amendments to this Contract may be executed in any number of counterparts, each of which
shall be deemed an original and all taken together shall constitute one and the same agreement. Fax copies ofthis
Contract and any amendments to this Contract and fax signatures thereon shall have the same force, effect, and legal
status of originals.
f. If any provision of this Contract is or shall become invalid or unenforceable, the remaining provisions of this
Contract shall not be affected.
g. Time is of the essence in each and every tenn and provision of this Contract. All references to days herein shall be
deemed to refer to calendar days unless otherwise specified. In the event that the final date for performance of any
act required by this Contract falls on a Saturday, Sunday, or legal holiday, such act may be performed on the next day
which is not a Saturday, Sunday, or legal holiday.
h. The waiver of a breach of any provision in this Contract shall not be construed as a waiver of any other breach of the
same or other provision of this Contract, including the time of performance of any provision.
i. Owner understands that this Contract is a legally binding contract. Owner represents and warrants that Owner has
read the terms and conditions of this Contract, and has had a full and fair opportunity to consult with legal counsel of
Owner's own choosing concerning this Contract.
Fom1 Date: 2/15/08
19 OF 23
EXECUTED to be effective as of the date of the date first written above.
CONTRACTOR: OWNER:
IRONBRIDGE ASPEN COLLECTION LLC,
Fonn Date: 1115/08
200F 23
Form Date: 21J5/08
EXHIBIT A-1
(Draw Schedule insert)
21 OF 23
Plan No: 1202D
EXHIBIT A-1
DRAW SCHEDULE
lronbridge Aspen Collection, LLC
February 14, 2008
Foundation: Post Tension Slab on Grade
Description
Permits, Engineering, Survey
Sitework
Foundation
Framing
Roofing
Plumbing
Electrical
HVAC
Windows, Doors, Trim
Insulation
Exterior Finishes
Painting
Drywall
Flooring
Tile
Cabinets
Appliances
Landscaping (if applicable), Driveways, Sitework
General Conditions
Total Cost
Contractor Fee
Total Contractor Cost and Fee
% Cost
5% $ 13,189
4% $ 10,551
7% $ 18,464
20% $ 52,755
5% $ 13,189
5% $ 13,189
3% $ 7,913
4% $ 10,551
7% $ 18,464
1% $ 2,638
5% $ 13,189
6% $ 15,827
4% $ 10,551
3% $ 7,913
2% $ 5,276
2% $ 5,276
1% $ 2,638
7% $ 18,464
2% $ 5,276
93% $ 245,311
7% $ 18,464
100% $ 263,775
EXHIBITB
(Features List insert)
Fonn Date: 2115/08
220F 23
ffiONBRIDGE ASPEN COLLECTION LLC
February 7, 2008
ENERGY PERFORMANCE FEATURES
• Fully-engineered Air and Water Infiltration
Package
0 Double-paned Low-E Glass
0 Air Infiltration-protected Electrical
Outlets
0 Fully-wrapped and Sealed Window
Openings
0 Weather Stripping on Exterior Doors
0 Air Barrier Weather Stripping at
Foundation
0 Under-slab Vapor Barriers
• High-efficiency Furnace
• High-efficiency 48 Gallon Hot Water Heater
• Insulated Exterior Doors and Garage Door
• Outside Fresh Air Exchanger
ROOFING
• 40-year Asphalt Shingles
• Pre-finished Gutters and Downspouts
WINDOWS & DOORS
• Lifetime Warranty Energy Star-rated
Windows
• Double-paned Low-E Glass
• Thermatru Fiberglass Insulated Entry Door
ELECTRICAL
• Phone/Data/TV Ports in Kitchen, Great Room
and Master Bedroom
• Photo Cell Automatic Exterior Sconces
• Decorative Fixtures at Kitchen, Dining,
Bathrooms, Walk-in Closets
• Switched Outlets in Great Room and
Bedrooms
• Recessed Can Lights in Kitchen & Hallways
I of2
HEATING & VENTILATION
• Exhaust Fans: Energy Star-rated Whisper
Fans, Vented to Exterior
• Power~ vented Active Radon Mitigation
System
• Heated Garage
GARAGE DOORS
• Insulated Door
• Pre-wired Garage Door Opener Outlet
APPLIANCES
• GEGas Range
• Range Exhaust Hood
• Built-in GE Dishwasher
INTERIOR FINISHES AND FLOORING
• Hand-textured Painted Walls
• Square Drywall Corners
• 9-ft. Ceilings
• I 0-ft. Coffered Ceiling in Master Bedroom
• Vinyl Flooring at Kitchens, Bathrooms and
Mudrooms ·
• Carpeting in all Bedrooms and Great Room
• Ceramic Tile Tub Deck in Master Bath
• Full-height Fiberglass Shower and Tub
Enclosures
C;QLF CLUB AND MOUN'l?\lN COMMUNITY
IRONBRIDGE ASPEN COLLECTION LLC
February 7, 2008
INTERIOR DOORS, TRIM & CABINETS
• Interior Doors: Sante Fe Style Hollow Core
• Closets: Stained Rods and Painted Shelves
• Painted Baseboards and Door Casings
• Painted Extended. Window Sills and Aprons
• Laminate Countertops
• Cabinets: Hickory
o 30" Uppers at Kitchen
o Raised Panel Style Doors
o 36" High Vanities
o Adjustable Shelves
o Raised Bar Countertop
PLUMBING FIXTURES & SHOWER
ENCLOSURES
• Soaker Tub in Master Bath
• Pedestal Sink in Powder Rooms
• Icernaker-line to Refrigerator
• Mirror over all Vanity Cabinets
EXTERIOR
• Asphalt Driveway with Concrete Walk and
Covered Front Porches
• In-ground Drainage System
• Landscaping, Irrigation and Drainage
• Stucco, Stone & Rough-Sawn Wood Finishes
THE TOTAL NUMBER, DESIGN, LAYOUf AND LOCATION OF LOTS, LANDSCAPING, LAKES,
RESIDENCES AND UNIT MIX AND THE LOCATION, DESIGN AND LAYOUT OF
RECREATIONAL FACILITIES MAY BE CHANGED DUE TO A NUMBER OF CIRCUMSTANCES,
INCLUDING GOVERNMENTAL REQUIREMENTS, MARKET DEMAND AND COST
CONSTRAINTS. THERE IS NO ASSURANCE THAT THE FUTURE IMPROVEMENTS AND
FACILITIES DESCRJBED WILL BE CONSTRUCTED. DIMENSIONS AND RESIDENCE SIZE ARE
APPROXIMATE IN NATURE AND ARE NOT INTENDED FOR FINAL REFERENCE AS PLANS
ARE NOT TO SCALE. LB ROSE RANCH LLC, IRONBRJDGE HOMES LLC, IRONBRIDGE
MOUNTAIN COTTAGES LLC AND IRONBRJDGE ASPEN COLLECTION LLC RESERVE THE
RJGHT TO MAKE MODIFICATIONS IN LOT AND RESIDENCE PRJCES AND MAKE
MODIFICATIONS IN MA TERJALS AND SPECIFICATIONS AT ANY TIME WITHOUT PRIOR
NOTICE. OWNERSHIP OF A RESIDENCE OR LOT DOES NOT INCLUDE CLUB MEMBERSHIP
OR RIGHTS IN THE COUNTRY CLUB FACILITIES.
2 of2
EXHIBITB-1
PROJECT DOCUMENTS ACKNOWLEDGEMENT
The Purchaser, as witnessed by the signature(s) below, acknowledges that as specified in the Purchase and Sale Agreement,
Paragraph 5(A), Title Policy, will receive all recorded documents that relate to the Property from the Title Company within ten
days from mutual execution of the Contract Said documents are referred to as all Schedule B-2 exception documents as listed in
the Commitment to Provide a Title Insurance Policy.
Said Documents are provided on a computer disc, however the Buyer may request from the Title Company printed copies of any
or all documents provided on the disc.
As referenced in Paragraph 5(E) and 5(F), "Project Documents" and "The Aspen Collection Association", of the Purchase and Sale
Agreement, there are additional documents relating to the Property which are considered to be unrecorded documents that relate to
the Title of the Property. These documents are provided by the Seller and the IPOAffACA through the website of the community
which is accessible at www.ironbridgeclub.com by logging into the site under member's login by using the password 2345. By
signing below, the Purchaser acknowledges the ability to review and the receipt of said documents through the website listed
above during the Title Review Period. Purchaser may request printed copies of said documents in the event that they are unable to
access the documents through the website.
Date
Date
January 1, 2008
Fonn Date: 2115/08
23 OF 23
c~c!)tech
HEPWORTH-PAWLAK GEOTECHNICAL,
Hepworth~ Pawlak Geet:echnical, inc.
5DW County Road !54
Glenwood Springs, Colorado 81601
Phone,970-945-7988
Fax: 970-945-8454
email: hpgeo@hpgeotech.com
PRELThfiNARYGEOTECE}UCALSTUDY
PROPOSED IRONBRIDGE VILLAS
IRONBRIDGE DRIVE
GARFIELD COUNTY, COLORADO
Af¥>en ~nt:cJ-\~fl
~o~hep~
JOB NO. 105 115-6
SEPTEMBER 14, 2005
PREPARED FOR:
L.B. ROSERANCH,LLC
ATTN: AARON BEVJNGTON
410 IRONBRIDGE DRIVE
GLENWOOD SPRINGS, COLORADO 81601
Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989
TABLE OF CONTENTS
PURPOSE AND SCOPE OF STUDY ............................................................................ -1 -
PROPOSED CONSTRUCTION ..................................................................................... -1 -
SITE CONDITIONS ....................................................................................................... -2 -
FIELD EXPLORATION ...................................................................... : .......... ~ ............... -2-
SUBSURFACE C01\'DITIONS ................................................................................ , ..... -3-
ENGINEER.illG ANAL YS!S ......................................................................................... -4 -
DESIGN RECOMMENDATIONS ................................................................................. -5 -
FOUNDATIONS ......................................................................................................... -5 -
FOUNDATION AND RETAINING WALLS ............................................................ -6-
FLOOR SLABS .......................................................................................................... -8 -
UNDERDRAIN SYSTEM .................................... : ..................................................... -8 -
SITE GRADING ......................................................................................................... -9-
SURFACEDRAJNAGE ................................................................. ~ ................ , ........ -10-
PAVEMENT SECTION ........................................................................................... - 1 1 -
LIMITATIONS ................................................................................................ , ............ -11-
FIGURES 1 AND 2-LOCATION OF EXPLORATORY BORINGS
FIGURES 3 TIIR.OUGH 8-LOGS OFEXPLORATORYBORINGS
. FIGURE 9-LEGEND AND NOTES
FIGURES 10 TIIROUGH 16-SWELL-CONSOLIDATION TEST RESULTS
FIGURES 17 AND 18-GRADATION TEST RESULTS
TABLE 1-SUMMARY OF LABORATORY TEST RESliLTS
PURPOSE AND SCOPE OF STUDY
This report presents the results of a preliminary geotechnical study for the proposed
Ironbridge Villas to be located along Ironbridge Drive, Garfield County, Colorado. The
project site is shown on Figures 1 and2. The purpose of the study was to develop
recommendations for the foundation and grading designs. The study was conducted in
accordance with our agreement for professional enginee:dng services to L.B. Rose Ranch,
LLC dated June 30, 2005. We previously conducted geotechnical studies for planning and
. preliminary design of the Rose Raoch Development (now known as Ironbridge) and
presented our fwdings in reports dated October 29, 1997 and September 10, 1998, Job
No. 197 327.
A field exploration program consisting of exploratory borings was conducted to obtain
information on the subsurface conditions within the depth of expected foundation loading.
The potential for future ground subsidence due to deeper geologic conditions was to be
evaluated by others. Samples of the subsoils obtruned during ti:ui field exploration were
tested in the laboratory to determine their classification and other engineering
characteristics. The results of the field exploration and laboratory testing were analyzed
to develop recommendations for foundation types, depths and allowable pressures for the
proposed building foundation and for the subdivision grading. This report sun:unarizes
the data obtained during this study and presents our conclusions, design recommendations
and other geotechnical engineering considerations based on the proposed construction and
the subsurface conditions encountered.
PROPOSED CONSTRUCTION
The proposed Villas development is located in the central part of Ironbridge near the main
· club and other common.facilities and will consist of tightly spaced, single family
residences in two development areas as shown on Figures 1 and 2. The access roads and
ddves will connect to the existing and proposed Ironbridge Drive. The residences will be
2 story, wood frame structures constructed typically 8 to 1 0 feet apart. Ground floors will
Job No. 105 115-6
-2-
be structmal above crawlspace in ilie residences and slab-on-grade in ilie garages. The
entire development area will be elevated typically up to about 15 feet. The fill sections
will grade into the existing Ironb1idge Drive, the golf course 18th Hole and the Robertson
Ditch. The flll material will be obtained on the project site, likely from :he Phase 2
development. The Robertson Ditch will remain open but be improved by lining to reduce
leakage. After ilie subdivision grading, ilie excavation for the individual residences will
be relatively minor. We assume the residences wiil be relatively lightly loaded, typical of
the proposed type of construction.
If building loadings, location or development plans change significantly from those
described above, we should be notified to re-evaluate the recommendations contained in
this report
SITE CONDITIONS
The Villas development is located downhill to 1he east and souiliofthe existing pro shop
and oilier commons area, see Figures 1 and 2. The north Villas site was mainly vacant and
covered with field grass and weeds. The south Villas site is partly disturbed and covered
wiili grass and weeds wiili miscellaneous fill piles. The ground surfaceslope is about 5 to
7% wiili 20 feet of elevation di:ffurence across the north Villas site, and about 6 to 8%
with 30 feet of elevation difference across the south Villas site. The entire project site is
covered wiili debris fan deposits that generally increase in depth with increase in ground
surface elevation to tbe west. Bedrock oftbe Eagle Valley Evaporite outcrops to tbe west
of County Road 1 09 in the golf course fairway and the steep valley side.
FIELD EXPLORATION
The field exploration for ilie project was conducted between July 6 and 8, 2005. Twenty~
five exploratory borings were drilled at the locations shown on Figures 1 and 2 to
evaluate the subsurface conditions. The borings were advanced with 4 inch diameter
continuous flight auger powered by a truck-mounted CME-55 drill rig. The borings were
logged by a representative of Hepworth-Pawlak Geotechnical, 1nc.
JobNo.l05115-6
Samples of the subsoils were taken with a 1% inch and 2 inch LD. spoon samplers. The
samplers were driven into the subsoils at various depths with blows from a 140 pound
hammer falling 30 inches. This test is similar to the standard penetration test described by
ASTM Method D-1586. The penetration resistance values are an indication of the
relative density or consistency of the subsoils and hardness oftlle bedrock. Depths at
which the samples were taken and the penetration resista.11ce values are shown on the
Logs of Exploratory Borings, Figures 3 furough 8. The samples were returned to our
laboratory for review by the project engineer and testing.
SUBSURFACE CONDITIONS
Graphic logs of the subsurface conditions encountered at the site are shown on Figures 3
through 8. The subsoils, below a thin topsoil root zone, consist of a variable depth of
stratified silt, sand and gravel debris fan deposits overlying dense, river gravel alluvium.
About 3 to 4 feet of existing fill was encountered above the natural soils in Borings 5, 6, 7
and 15, located just east of the Robertson Ditch. The debris fan soils were typically
encountered between depths of 7 to 19 feet in the north parcel and between depths of 16
to 32 feet in the south parcel. In Borings 6 through 9 and 15 at the north parcel, the debris
fan soils were deeper than the adjacent area to the north, with depths of22 to 38 feet
before the gravel alluvium was encountered. Siltstone and gypsum bedrock of the Eagle
Valley Evaporite was encountered below the gravel alluvium at a depth of 42 feet in
Boring 6. The bedrock quality appeared poor to fair and included gypsum, but did not
appear to be a void or cavity. Drilling in the dense gravel alluvium with auger equipment
was difficult due to the cobbles and boulders and practical drilling refusal was typically
encountered in the deposit.
Laboratory testing pe1forrned on samples obtained from the borings included natural
moisture content and density, liquid and plastic lin1its and gradation analyses. Results of
swell-consolidation testing, presented on Figures 10 through 16, indicate the debris fan
soils are typically hydrocompressive and moderately to highly compressible under load
after wetting. Some of the clay soils showed a low expansion potential when wetted but
JobNo.l05!!5-6 .
-4-
the resulting heave potential is not expected to be sigulficant compared to the collapse
potential. Results of gradation analyses perfonned on small diameter drive samples
(minus 1~ inch fraction) ofthe debris fan soils are shown on Figures 17 and 18. The
laboratory testing is summarized in Table 1.
Free water was typically not encountered in the borings and the subsoils were relatively
dry. 1n Borings 6 through 9 and 15, the subsoils became moist with depth and free water
was encountered at depths between 26 and 36 feet in Borings 6 and 15.
ENGJNEERING ANALYSIS
Development of the Villas project as proposed should be feasible based on geotechnical
conditions. The upper 7 to 38 feet of soils encountered in the borings consist of debris fan
deposits that tend to collapse (settle under constant load) when wetted. The amount of
settlement will depend on the depth of the compressible soils and the wetted depth below
the foundation. The settlement potential and risk of excessive building distress can be
reduced by compaction of the soils to a certain depth below the foundation bearing level
and by heavily reinforcing the foundation to resist differential settlements. The
compaction should also extend to below driveway and utility areas. The soil compaction
can consist of the structural fill proposed to elevate the project site but relatively deep
structural fills will also have some potential for long tenn settlement. Proper grading and
compaction as presented below in Site Grading will help reduce the settlement risks. In
areas underlain by less than 10 to 15 feet of debris fan soils, rnaioly the northern part of
the north parcel, additional compaction below the building foundation should not.be
needed. A heavily reinforced mat foundation designed for large differential settlements or
a deep foundation that extends down to the underlying, dense river gravel alluvium could
also be used to reduce the settlement risk.
Eagle Valley Evaporite that underlies the project area is known to be associated with ·
sinkholes and localized ground subsidence in the Roaring Fork RiVer valley. A sinkhole
opened in the parking Jot of the Pro Shop to the northwest of the project site in January
2005 and other irregular bedrock conditions have been identified in the affordable
Job No. 105 1!5-6
housing site to the west of the Villas north parcel. Indications of ground subsidence were
not observed in the Villas development area that could indicate a risk of future ground
subsidence but the variable depth of debris fan soils in Borings 6 through 9 and 15 in the
north parcel could be the result of past subsidence. In our opinion, the risk of future
ground subsidence in the Villas project area is low and similar to other areas of the
Roaring Fork River valley where there have not been indications of ground subsidence.
We understand that the potential for future ground subsidence in the project area is being
evaluated by others. The southern part of the northern parcel should be further evaluated
for potential sinkhole development considering the variable subsurface profile
encountered in that area.
Recommendations for preliminary design of the proposed development are presented
below. When the building plans have been developed, we should review the information
for compliance with our recommendations.
DESIGN RECOMMENDATIONS
FOUNDATIONS
Considering the subsurface conditions encountered in the exploratory borings and the
nature of the proposed construction, we recommend the buildings be founded with spread
footings bearing on at least 5 feet of compacted on-site debris fan soils or compacted
structural fill. The feasibility of footings placed on the natural soils in the north parcel
where the debris fan soils are less than about 10 to 15 feet deep should be evaluated prior
to construction. 1f a mat foundation or deep foundation system is considered for building
support, we should be contacted for additional recommendations.
The design and construction criteria presented below should be observed for a spread
footing foundation system.
1) Footings placed on at least 5 feet of compacted fill in deeper debris fun
areas or on natural soils where thereis less than 10 to 15 feet of the natural
debris fan soils should be designed for an allowable bearing pressure of
Job No. I 05 115·6
-6-
1,500 psf. Based on experience, we expect initial settlement of footings
designed and constructed as discussed in this section will be about 1 inch
or less. Additional differential settlement between about 1 to 2 inches
could occur in deeper :fill areas or if the undisturbed debris fan soils are
wetted.
2) The footings should have a minimum width of 20 inches for continuous
walls and 2 feet for isolated pads.
3) Exterior footings and footings beneath unheated areas should be provided
with adequate soil c.over above their bearing elevation for frost protection.
J>lacement of foundations at least 36 inches below exterior grade is
1ypically used in this area.
4) The foundation should be constructed in a "box-like" configuration rather
than with isolated footings. The foundation walls should be heavily
reinforced top and bottom to span local anomalies such as by assuming an
unsupported length of at least 14 feet. Foundation walls acting as retaining
structures should also be designed to resist lateral earth pressures as
discussed in the "Foundation and Retaining Walls" section of this report.
5) The topsoil, existing undocumented fill and any loose or disturbed soils
should be removed. The soils should be subexcavated as needed to provide
at least 5 feet of structural fill below the footing bearing level compacted
to at least 98% of the maximum standard Proctor density within 2
percentage points of optimum moisture content. Where footings are placed
on the natural soils, the exposed soils in footing area should be moistened
and compacted.
6) A representative of the geotechnical engineer should evaluate the
compaction of the fill materials and observe all footing excavations prior
to concrete placement for bearing conditions.
FOUNDATION AND RETAJNJNG WALLS
Foundation walls and retaining stmctures which are laterally supported and can be
expected to Ulldergo only a slight amount of deflection should be designed for a lateral
lob No. 105 115·6
-7-
earth pressure computed on the basis of an equivalent fluid unit weight of at least 55 pcf
for backfill consisting of the on-site fme-grained soils. Cantilevered retaining structures
which are separate from the buildings and can be expected to deflect sufficiently to
mobilize the full active earth pressure condition should be designed for a lateral earth
pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcf for
backfill consisting of the on-site fine-grained soils.
All foundation and retaining structures should be designed for appropriate hydrostatic and
surcharge pressures such as adjacent footings, traffic, construction materials and
equipment. The pressures recommended above assume drained conditions behind the
walls and a horizontal backfill surface. The buildup of water behind a wall or an upward
sloping backfill surface will increase the lateral pressure imposed on a foundation wall or
retaining structure. An underdrain should be provided to prevent hydrostatic pressure
buildup behind walls. Site walls with a maximum backslope of2 horizontal to 1 vertical
should be designed for an active earth pressure of at least 60 pcf equivalent fluid uuit
weight.
Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum
standard Proctor density at a moisture content near optimum. Backfill in pavement and
walkway areas should be compacted to at least 95% of the maximum standard Proctor
density. Care should be taken not to overcompact the backfill or use large equipment
near the wall, since this could cause excessive lateral pressure on the wall Some
settlement of deep foundation wall backfill should be expected, even if the material is
placed correctly, and could result in distress to facilities constructed on the backfill.
The lateral resistance of foundation or retaining wall footings will be a combination of the
sliding resistance of the footing on the foundation materials and passive earth pressure
against the side of the footing. Resistance to sliding at the bottoms of the footings can be
calculated based on a coefficient of friction of 0.35. Passive pressure of compacted
backfill against the sides of the footings can be calculated using an equivalent fluid uuit
weight of 300 pcf. The coefficient of friction and ·passive pressure values recommended
above assume ultimate soil strength. Suitable factors of safety should be included in the
Job No. !05 1 !5-6
-8-
design to limit the strain which will occur at the ultimate strength, particularly in the case
of passive resistance. Fill placed against the sides of the footings to resist lateral loads
should be compacted to at least 95% of the maximum standard Proctor density at a
moisture content near optimum.
FLOOR SLABS
The natural on-site soils, exclusive of topsoil, and compacted structural fill can be used to
support lightly loaded slab-on-grade construction. The natural soils are compressible
when wetted and there could be some post-construction settlement. To reduce the effects
of some differential movement, nonstructural floor slabs should be separated from all
bearing walls and columns with expansion joints which allow unrestrained vertical
movement. Floor slab control joints should be used to reduce damage due to shrinkage
cracking. The requirements for joint spacing and slab reinforcement should be
established by the designer based on experience and the intended slab use. A minimum 4
inch layer of free-draining &ravel should be placed beneath basement level slabs to
facilitate drainage. This material should consist of minus 2 inch aggregate with at least
50% retained on the No.4 sieve and less than 2% passing the No. 200 sieve.
All fill materials for support of floor slabs above footing bearing level should be
compacted to at least 95% of maximum standard Proctor density at a moisture content
near optimum. Required fill can consist of the on-site soils devoid of vegetation, topsoil
and oversized rock.
UNDERDRAJNSYSTEM
Although free water was typically not encountered during our exploration, it has been our
experience in the area that local perched groundwater can develop during times of heavy
precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched
condition. We recommend below-grade construction, such as retaining walls and
basement areas, be protected from wetting and hydrostatic pressure buildup by an
Job No. 105 115-6
. 9.
underdrain system. An underdrain should not be provided around crawlspace and slab-on-
grade areas.
If installed, the drains should consist of drainpipe placed in the bottom of the wall backfill
surrounded above the invert level with free-draiillng granular material. The drain should
be placed at each level of excavation and at least 1 foot below lowest adjacent finish
grade and sloped at a rninirnurn 1% to a suitable gravity outlet. Free-draining gra_nular
material used in the underdrain system should contain less than 2% passing the No. 200
sieve, less than 50% passing the No. 4 sieve and have a maximurn size of 2 inches. The
drain gravel backfill should be at least 1 '/, feet deep. An impervious membrane, such as a
20 mil PVC liner, should be placed )leneath the drain gravel in a trough shape and
attached to the foundation wall with mastic to prevent wetting of the bearing soils.
SITE GRADING
Extensive grading of the Villas area is proposed as part of the development plan. In
addition, removal and replacement of the debris fan soils compacted is recommended in
shallow fill areas to reduce the risk of excessive differential settlements and building
distress. The structural fill should extend to at least 8 feet below design surface grade and
to at least 2 feet below the water and sewer pipe invert levels. In addition, the water and
sewer pipe joints should be mechanically restrained to reduce the.risk of joint separation
in the event of excessive settlement. Excavation and compaction below footing bearing
level may not be needed where the debris fan soils are less than 10 to 15 feet thick. The
structural ftll materials below footing bearing level should be compacted to at least 98%
of the. maximum standard Proctor density within 2 percentage points of optimum moisture
content. Prior to fill placement, the sub grade should be carefully prepared by removing
the existing fill, all vegetation and topsoil and compacting to at least 95% of the
maximurn standard Proctor density at near optimum moisture content. The fill should be
benched into slopes that exceed 20% grade. Based on our experience with the Phase 1
development, shrinkage of the debris fan soils due to compaction is expected to be about
15%to 20%.
Job No. 105 115·6
- J 0-
Permanent unretained cut and fill slopes should be graded at 2 horizontal to 1 vertical or
flatter and protected against erosion by revegetation or other means. Th_is office should
review site grading plans for the project prior to construction.
SURF ACE DRAINAGE
Precautions to prevent wetting of the bearing soils such as proper back...fil! construction,
positive backfill slopes, restricting landscape irrigation and use of roof gutters need to be
taken to help limit settlement and building distress. The following drainage precautions
should be observed during construction and maintained at all times after each residences
have been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior bacldill should be adjusted to near optimum moisture and
compacted to at least 95% of the maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. The slope
should be at least 6 inches in the first 5 feet in unpaved areas and at least 3
inches in the first 10 feet in paved areas. Drain gravel of retaining walls
should be capped wifu at least 2 feet of the on-site soils to reduce surface
water infiltration.
4) Roof gutters should be provided with downspouts that discharge beyond
the limits of the foundation wall backfilL
5) Landscaping wh.ich requires regular heavy irrigation, such as sod, should
be located at least 5 feet from fmmdation walls. Consideration should be
given to use ofxeriscape to reduce the potential for wetting of soils below
the building caused by irrigation.
Job No. 105 115-6
-11 -
PAVEMENT SECTION
The upper soils encountered at the site consist of low plasticity sand, silt and clay that are
considered a poor support of pavement sections. A Hveem stabilometer 'R' value of 15
was assumed for the native soils and required imported soils. The traffic loadings for the
Villas development have not been provided but are assumed to be relatively light for the
service traffic loading condition, after the construction phase. Based on these conditions,
a preliminary pavement section consisting of 3 inches of asphalt on 8 inches of CDOT
Class 6 base course for the main drives and 3 inches of asphalt on 6 inches of COOT
Class 6 base course for automobile only parking is reconnnended. We can review the
pavement section design when the roadway subgrade has been graded and the traffic
loadings have been determined.
LIMITATIONS
This study has been conducted in accordance with general! y accepted geotechnical
' . ' .
engineering principles and practices in this area at this time. We make no warranty either
express or implied. The conclusions and recommendations submitted in this report are
based upon the data obtained from the exploratory borings drilled at the locations
indicated on Figures 1 and 2, the proposed type of construction and our ez:perience in the
area Our services do not include determining the presence, prevention or possibility of
mold or other biological contaminants (MOBC) developing in the future. If the client is
concerned about MOBC, then a professional in this special field of practice should be
consulted. Our findings include interpolation and extrapolation of the subsurface
conditions identified at the exploratory borings and variations in the subsurface
conditions may not become evident until excavation is performed. If conditions
encountered during construction appear different from those described in this report, we
should be notified so that re-evaluation of the reconnnendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field services during
JobNo.I05115-6
(
-12-
construction to review and monitor the implementation of onr recommendations, and to
verifY that the reconnnendations have been appropriately intmpreted. Significant design
changes may require additional analysis or modifications to the reconnnendations
presented herein. We recommend on-site observation of excavations and foundation
bearing strata and testing of structural fill on a regular basis by a representative of the
geotechnical engineer.
Respectfully Submitted,
HEPWORTH· PAWLAK GEOTECHNICAL, fNC.
Steven L. Pawlak, P.E.
Reviewed by:
Daniel E. Hardin, P .E. .
SLP!ksw
cc: High Country Engineering-Attn: Scott Gregory
S.K. Peightal Engineers-Attn: Jack Albright
Job No. 105 115-6
\~
)
105115-6 ~ LOCATION OF EXPLORATORY BORINGS
HEPWORT>H'AWLAKG""""'HNJCAL VILLAS NORTH PARCEL Figure 1
105115-6 ~
HEPWOR'tl+PAWI..AK GEO'J'ECHJ'ilCAL
LOCATION OF EXPLORATORY BORINGS
VILLAS SOUTH PARCEL Figure 2
0
5
10
1i5
Q)
·"-i' /.C:
0.
())
0 15
20
25
105115-6
BORING 1
ELEV. = 5952'
20/12
wc~4.5
00=106
20/6,30/4
BORJNG2
ELEV. = 5950'
20/12
wc~s.2
00~93
-200~85
25/4,10/0
BORING3
ELEV. = 5944'
24/12
wc~s.1
00=94
Note: Explanation of symbols is shown on Figure 9.
BORING4
ELEV.= 5946'
25/12
WC=7.1
00=104
-200=83
LL~28
Pl=11
20/6,40/6
T
~ LOGS OF EXPLORATORY BORINGS
He worth-Powlak Geotethnlcal
0
5
10
1i5
())
ll..
' .c:
0.
15 Q)
0
20
25
Figure 3
BORINGS BORING6 BORING 7 BORINGS
ELEV.= 5950' ELEV.= 5953' ELEV.= 5954' ELEV. = 5946'
0 0
.,
;
11/12 7/12 29/12 15/12
5 WC=4.0 5
DD=107
16/12 14/12 30/12
WC=9.3
10 DD=100 WC=16.3
-200=54 DD=108
-200=62
17/12 12/12 32/12 7/12
15 WC=10.3 WC=6.6
·200=50 DD=117
-200=44
12/12
20 20
Ol Ol
Q)
I.L tf
·,' !.c
/Q.
Q) 10/12 7/12
0 25 .WC=18.2 WC=17.7 25
DD=108 DD=107
-200=73 -200=74
30 30
35
2
35
40 40
50/2 Note: Explanation of symbols is shown on Figure 9.
105115-6 ~ Ha worth-Powlok Geotechnlool
Figure 4 LOGS OF EXPLORATORY BORINGS
0
5
10
1i)
,:e
)~ '-a.
Q)
0 15
20
25
105115-6
BORING9
ELEV. = 5942'
24/12
18/12
28/12
10!12
WC=11.4
00=104
BORING 10
ELEV.= 5938'
18/12
WC=4.0
00=96
10/12
60/12
BORING 11
ELEV.= 5943'
9/12
11/12
WC=15.5
00=109
-200=76
7/12
3/6,15/6
Note: Explanation of symbols is shown on Figure 9.
BORING 12
ELEV. = 5938'
33/12
WC=6.1
00=117
43/12
14/12
~ LOGS OF EXPLORATORY BORINGS
He worth-Powlok Geotechnlcol
0
5
10
l
' %
15 ~
20
25
Figure 5
0
5
10
15
1i)
{}', 20 .
.c a
<I)
Cl
25
30
35
40
105115-6
BORING 13
ELEV. = 5944'
22/12
T
BORING 14
ELEV.= 5937'
26/12
WC=8.5
DD=109
-200=91
LL=31
Pl=13
20/6,30/3
BORING 15
ELEV.= 5950'
15/12
WC=14.3
DD=112
9/12
WC=14.5
-200=71
10/12
WC=14.4
DD=112
+4=17
-200=58
24/12
32/12
Note: Explanation of symbols is shown on Figure 9.
BORING 15
ELEV.= 5968'
15/6,35/5
47/12
33/12
WC=3.2
+4=34
-200=42
18/12
LOGS OF EXPLORATORY BORINGS
5
1i)
20 (])
U-
•
£ at
0
25
Figure 6
0
5
10
15
1i5
"' u..
'
£ .Q. '"' b
20
25
30
35
105115-6
BORING 17
ELEV.= 5963'
52112
34112
WC=5.9
DD=115
23/12
50/3
BORING 18
ELEV. = 5968'
38/12
40/12
WC=3.6
00=104
-200=58
42/12
WC=3.6
DD=109
45/12
BORING 19
ELEV.= 5962'
13/12
30/12
WC=1.7
DD=120
+4=38
-200=26
Note: Explanation of symbols is shown on Figure 9.
BORING20
ELEV.= 5967'
18/6,25/3
WC=1.9
DD=103
-200=36
55/12
~ LOGS OF EXPLORATORY BORINGS
He worth-Paw!ok Geoteehnlcol
1i5
tf
' .c
0.
Q)
20 0
Figure 7
0
5
10
15
iD
"' u..
.c
\D.
)ID
0
20
25
30
BORING21
ELEV.= 5976'
52/12
15/12
43/12
WC=3.3
DD=10B
15/12
105115-6
BORING22
ELEV.= 5957'
21!12
wc~s.3
+4=38
·200=23
30/6,25/3
28/12
40/12
WC=3.4
00=109
BORING23
ELEV. = 5985'
52/12
wc~1.3
·200=27
57/12
BORING24
ELEV.= 5985'
39/12
20/12
WC=2.6
·200=46
BORING25
ELEV.= 5990'
20/6,30/3
27/12
WC=4.6
00=105
-200=62
30/12
WC=4.1
DD=112
·200=64
50/6,10/0
Note: Explanation of symbols is shown on Figure 9.
LOGS OF EXPLORATORY BORINGS
0
]
5
10
15
iD
<D
Li.
'R
"' D
20
25
30
Figure 8
LEGEND:
39/12
0,2
T
NOTES:
FILL: silty sandy gravel, loose to medium dense, slightly moist, brown.
TOPSOIL; root zone, sandy silt, slightly moist, brown.
SILT AND CLAY (ML-CL); slightly sandy to sandy, scattered gravel, some sandy clay, stiff to very stiff, slightly
moist. very moist with depth at Borings 6, 7 and 15. mixed brown, slightly calcareous and porous, low plasticity.
SAND AND SILT {SM-ML): scattered gravel to gravelly, loose to medium dense, slightly moist, light brown.
SAND AND GRAVEL (SM-GM); silty, some sandy silt layers, medium dense, brown, subangular to rounded rook.
GRAVEL, COBBLES AND BOULDERS (GM-GP); slightly silty, dense, typically moist, wet at Borings 4 and 15,
brown, rounded rook.
SILTSTONE AND GYPSUM; medium hard to hard, moist, gray and white. Eagle Valley Evaporite.
Relatively undisturbed drive sample; 2-inch I. D. California liner sample.
Drive sample; standard penetration test (SPT), 1 3/8 inch 1.0. split spoon sample, ASTM D-1586.
Drive sample blow count; indicates that 39 blows of a 140 pound hammer falling 30 inches were
required to drive the California or SPT sampler 12 inches.
Free water level in boring and number of days following drilling measurement was taken.
Depth at which boring had caved when checked on July 8 , 2005.
Practical drilling refusal. Where shown above bottom of Jog, indicates that multiple attempts were
made to advance the boring.
1. Exploratory borings were drilled on July 6, 7 and 8, 2005 with 4-inch diameter continuous flight power auger.
2. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan
provided.
3. Elevations ot exploratory borings were obtained by interpolation between contours shown on the site plan provided.
4. The exploratory boring locations and elevations should be considered accurate only to the degree implied by the
method used.
5. The Jines between materials shown on the exploratory boring logs represent the approximate boundaries between
material types and transitions may be gradual.
6. Water level readings shown on the Jogs were made at the time and under the conditions indicated. Fluctuations in
water level may occur with time. Groundwater was only encountered in Borings 6 and 15.
7. Laboratory Testing Results:
WC = Water Content (%)
DD = Dry Density (pc~
+4 = Percent retained on the No. 4 sieve
105115-6
-200 = Percent passing No. 200 sieve
LL = Liquid Limit (%)
PI = Plasticity Index (%)
LEGEND AND NOTES Figure 9
Moisture Content = 4.5 perc ent
Dry Density = 106 pcf
Sample of: Sandy Silt and Clay
From: Boring 1 at 4 Feet
0
?f -c: 1
0 --.... Compression ·o; i"> "' upon
2'
"""
wetting 0. 2 E I" 0
0
3
\
0.1 1.0 10 100
APPLIED PRESSURE -ksf
105115-6 ~ch Hep;orth-Powlok Geotechnlcol
SWELL-CONSOLIDATION TEST RESULTS Figure 10
Moisture Content ~ 5.1 perc ent
Dry Density ~ 94 pcf
0 Sample of: Sandy Silt ---.... From: Boring 3 at 4 Feet
1
2
3
~ Compression
upon
4
wetting
5
6 * \ c:
0 ·v; 7 @ \ 0.
E
0
(.) 8
9
10
11 \
\
12
13 \
14 1\
15
0.1 1.0 10 100
APPLIED PRESSURE • ksf
105115-6 ~ech SWELL-CONSOLIDATION TEST RESULTS Figure 11
He;;,.orth-Powlok G:eotechn!col
I " Moisture Content = 4.0 perc ent
0
Dry Density = 107 pet
---Sample of: Very Silty Sand --I'-t--r-From: Boring 8 at 4 Feet
1
2
?fl.
Compression
upon
c 3 1'.. wetting
0
""'
'(ii
(1)
I'!
Q_
E 4
0 '\ 0
5 \
6 1\
7
0.1 1.0
APPLIED PRESSURE -ksf
10 100
.)
Moisture Content = 11.4 perce nt
Dry Density = 104 pcf
Sample of: Sandy Silt
From: Boring 9 at 19 Feet
0 -:--t--r-
* 1 P"" Compression
c ~ 0 upon
'(ii wetting
"' 2 ~ ~ E
""' 8 3 " D
4
0.1 1.0 10 100
APPLIED PRESSURE -ksf
105115-6 H& -SWELL-CONSOLIDATION TEST RESULTS Figure 12 Qttltecrl
HeoWorth-Powlok Geote.ehnteol
0
' r-r--___ . Moisture Content -4.0 percent
1
Dry Density ~ 96 pel
Sample of: Sandy Silt
From: Boring 10 at 4 Feet
2
---i--1--
* 3 Compression
c
0 ~ upon
'(il wetting "' 4 a '\ E
0
(.) 5
\
6 \
7 \
8
0.1 1.0
APPLIED PRESSURE-ksf
10 100
\
Moisture Content = 6.1 perce nt
Dry Density = 117 pel
<f.
Sample of: Sandy Silty Clay
c From: Boring 12 at 4 Feet
0 1 ·u;
c:
! ...._ ~
' 0
c: "'\ .......
J........, 0 ·u;
"' 1 ~
CL Expans on
E
0 upon
(.) wetting 2
0.1 1.0 10 100
APPLIED PRESSURE-ksf
105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 13
HeDWorth-Pawlok Geote~;hnieol
Moisture Content = 8.5 perc ent
Dry Density = 109 pcf
Sample of: Slightly Sandy Silty Clay
From: Boring 14 at 4 Feet
2
* c: -~ 1 r-..... c: ..... "' ~ ~ "' w ~ ' 0
c: ·~ "> 0 I'-·u;
"' 1 ' a
E i I::Xpans• li
0 upon
0 2 wetting
0.1 1.0
APPLIED PRESSURE-ks!
10 100
Moisture Content = 5.9 perce nt
Dry Density = 115 pol
Sample of: Sandy Silty Clay
From: Boring 17 at 9 Feet
0
'if.
c:
-~ 1
iii L--0.
X r-...... w
' 0
c Expansion !"--
0 upon "' 'ii5
"' 1 wetting
ts.
E
0 0
2
i 0.1 1.0 10 100
APPLIED PRESSURE -ks!
105115-6 ~. SWELL-CONSOLIDATION TEST RESULTS Figure 14
H£PWOR'Jl+? AWL..A)(; GECTECHNlCA.L
) Moisture Content = 3.6 percent
Dry Density = 109 pel
Sample of: Sandy Silt and Clay
From: Boring 18 at 14 Feet
0
* ~ c c;::
1
" ~ :-No movement
0 ·u;
"""
uoon
"' wetting 1'! 2 Q. '\ E
0
()
3
0.1 1.0 10 100
APPLIED PRESSURE-ksf
)
Moisture Content = 3.3 percent
Dry Density = 108 pcf
Sample of: Sandy Silt and Clay
From: Boring 21 at 14 Feet
0 Compression
* -!----" /
upon
1 1---~etting
" 0 ~ ·u;
"' 1!: 2 Q. ...._,
E "'-... 0
() "' 3
: 0.1 1.0 10 100
APPLIED PRESSURE -ksf
105115-6 ~ HePWorth-Pawlak Geottichnicol
SWELL-CONSOLIDATION TEST RESULTS. Figure 15
Moisture Content = 3.4 perce nt
Dry Density = 109 pet
Sample of: Sandy Silt and Clay
From: Boring 22 at 19 Feet
"If!. 0
c ---. r-
. Q .......... '
"' 1 "' a "' No movement
E upon
0 2
wetting
()
0.1 1.0 10 100
APPLIED PRESSURE-ksf
i
Moisture Content = 4.6 peree nt
Dry Density = 105 pet
Sample of: Sandy Silt and Clay
From: Boring 25 at 9 Feet
* 0
c: ~ ·§ r--. "' 1 a ~ ~ E f'-8 2
No' movement
upon
wetting
0.1 1.0 10 100
APPLIED PRESSURE-ksf
105115-6 ~
H!;!.:PWOR'rH-PAwu.KG£0't'ECHN1CAL
SWELL-CONSOLIDATION TEST RESULTS Figure 16
HYDROMETER ANALYSIS I SIEVE ANALYSIS I "! TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS f
24HR. 71iR
' 45 MIN. 15 MIN. 60MtN19MIN.4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8" 3/4" 1 W' 3" 5"S" 8"
0 ""
10 00
0 20 "' w C9 z 30 " 6
~ (f)
(f)
a: 40 ., £f.
!z 1-
50 soiiJ w
(.) ()
a: so " a: w w
CL CL
70 "
80 20
90 "
100 ' ·"' .002 .oos ... ,0[9 ·"' .074 ·'"' .$00 .800 ue "' 4,75 9.5 12.5 19.0 37.5 16.2 "' "" "' DIAMETER OF PARTICLES IN MILLIMETERS
CI.AYTOSilT I '''" '""'''' I §MVEt I cos"" flfi I MEDIUM fiNO: I 00/IAS£
GRAVEL 17% SAND 25 % SILT AND CLAY 58 %
LIQUID LIMIT % PLASTICITY INDEX %
SAMPLE OF: Sandy Gravelly Silt FROM: Boring 15 at 14 Feet
' HYDROMETER ANALYSIS I oiEVEANALYSIS i
:J/il.i. 7 R TIME READINGS l U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS i-24 15~1f".SOMIN19MIN4MIN.1 MIN. #200 11/2" 3" 5"6" 45 #100 #50 #30 #16 #8 #4 3/8" 3/4"
0 100
10 90
0 20 so
w (!)
z 30 70 z
~ (jj
40 so ~ a:
!z f-
50 50i\J w
(.) (.)
a: 60 40 ffi w
CL CL
70 30
80 20
90 10
100 0
.001 .002 .005 .009 .019 .037 ,074 .150 .300 .600 1.18 2.36 4.75 s.s,2.51s.o 37.5 76.2 121,52 203
DIAMETER OF PARTICLES IN MILLIMETERS
CLAYTOSU "'"' GAAiit:l COSSLES ""' MEOIIJM COAASE FINE co
GRAVEL 34% SAND 24 % SILT AND CLAY 42 %
LIQUID LIMIT % PLASTICITY INDEX %
" SAMPLE OF: Siltv Sand and Gravel FROM: Borina 16 at 14 Feet
105115-6 ~ GRADATION TEST RESULTS Figure 17
HE:PWORTI·H"AWl.AJ(GEOT'ECHNICA.l..
I HYDROMETER ANALYSIS I SIEVE ANALYSIS I "! TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS } ..
24H!t 7HR
45 MIN. 15 MIN. 60MlN:19M!N.4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8" 3/4' 1 1/Z' '? 5" 6' 8"
\ 0 "'
10 "
0 20 "' w <!l z 30 ro z
~ iii
(f)
a: 40 00 ri. .... .... z 50 " dJ w
ii (.)
50 "' a: w w
"-"-
70 so
80 "'
90 "
100 0 _,., -"" .oos .oos .019 "" ,1)74 ·'"' ·""' ·"" 1,16 ,, 4.75 9.S 12.5 19.0 37.5 , .. , "' 203
"' DIAMETER OF PARTICLES IN MILUMETERS
CtAY'OOc> OOBBUiS
GRAVEL 38% SAND 36 % SILT AND CLAY 26%
LIQUID LIMIT % PLASTICITY INDEX %
SAMPLE OF: Silty Sand and Gravel FROM: Boring 19 at 9 Feet
HYDROMETER ANALYSIS SIEVE ANALYSIS I
~ ~ 7 HR TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS ~· 15 MIN, 60MIN19MIN.4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8" 3/4' 1 1/2' 3" sus•
0 100
10 90
0 20 80
UJ (!)
z 30 70 z
ffi
iii
40 50 ~ a: .... .... z 50 50 iD w
(.) 0 a: 60 40 ffi UJ
"-"-
70 30
80 20
90 10
100 0
.001 .002 .005 .009 .019 .037 ,074 .150 .300 .600 1.18 2.36 4.75 9."J2.519.0 37.5 76.2 12j52 203
DIAMETER OF PARTICLES IN MILLIMETERS
''"""'' ' ' coaaco;
GRAVEL 38% SAND 39 % SILT AND CLAY 23 %
LIQUID LIMIT % PLASTICITY INDEX %
' SAMPLE OF: Siltv Sand and Gravel FROM: Borina 22 at 4 Feet
105115-6 ~ GRADATION TEST RESULTS Figure 18
HEPWOFm+PAWJ.AK GEO"''!CHNlCAL
···-·--'
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE 1 Job No. 105 115-6
SUMMARY OF LABORATORY TEST RESULTS
ag_e 0 p 1 f 3
SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED
MOISIURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. ZOO LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE
(ft) (%) locfl (%} (%) IPSF}
1 4 4.5 106 Sandy silty and clay
2 4 6.2 93 85 Sandy clayey silt
3 4 5.1 94 Sandy silt
4 4 7.1 104 83 28 11 Sandy silty clay
--
5 8 1h 9.3 100 54 Silt and sand witb gravel
6 14 10.3. 50 Very silty sand and gravel
24 18.2 106 73 Sandy silt
7 9 16.3 108 62 Sandy silt
24 17.7 107 74 Sandy silt
8 4 4.0 107 Very silty sand
14 6.6 117 44 Very silty sand
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE 1 Job No. 105 115-6
SUMMARY OF lABORATORY TEST RESULTS
age 0 p 2 f 3
SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED
MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE
(ft) (%) (pcf) (')'.1_ (',fo) (PSF)
9 19 11.4 104 Sandy silt
10 4 4.0 96 Sandy silt
11 9 15.5 109 76 Sandy clayey silt
12 4 6.1 117 Sandy silty clay
14 4 8.5 109 91 31 13 Slightly sandy silty clay
.
15 4 14.3 112 Sandy silty clay
10 . .14.5 71 Sandy silty clay
14 14.4 112 17 25 58 Sandy gravelly silt
16 14 3.2 34 24 42 Silty sand and gravel
17 9 5.9 115 Sandy silty clay
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE 1 Job No. 105 115·6
SUMMARY OF LABORATORY TEST RESULTS
p f age 3 o 3
SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERSERG UMITS UNCONFINED
MOISTURE DRY ·GRAVEL SAND PASSING UQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 UMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE
(ft) (%) (pcf) (%) (%) (PSF)
18 9 3.6 104 58 Sandy silt with gravel
14 3.6 109 Sandy silty and clay
19 9 1.7 120 38 36 . 26 Silty sand and gravel
20 4 1.9 103 36 Silty sand and gravel
21 14 3.3 108 Sandy silt and clay
22 4 3.3 38 39 23 . Silty sand and gravel
19 3.4 109 Sandy silt and clay
Silty sand and gravel
23 4 1.3 27 Silty sand and gravel
24 9 2.6 46 Very silty sand with gravel
25 9 4.6 105 62 Sandy silt and clay
14 4.1 112 64 Sandy silty and clay
Parcel Detail Page I of 4
Garfield County Assessor/Treasurer
Parcel Detail Information
Assessor/Treasurer Property Search I Assessor Subset Query I Assessor
Sales Search
Clerk & Recorder Reception Search
Basic Building Characteristics I Tax Information
Parcel Detail I Value Detail I Sales Detail I Residential/Commercial
Improvement Detail
Land Detail I Photographs I Mill Levy Revenues Detail
[I;] Account Parcel 2007 Mill
Number Number Levy a
I 090 II R043512 1123950142929611 64.976
Owner Name and Mailing Address
lw ARREN, DARRELL W & ROLLENE
j330 CORYELL RIDGE RD
jGLENWOOD SPRINGS, CO 81601
Assessor's Parcel Description
(Not to be used as a legal description)
jSECT,TWN,RNG: 1-7-89 SUB:IRONBRIDGE
IPUD, PHASE II, FILING I, 2 & 3
jLOT:296 PRE:R041509 BK:l596 PG:871
IBK:l565 PG:600 BK:l560 PG:438
jBK:l560 PG:431 BK:l057 PG:0745
jBK:l028 PG:768 BK:l028 PG:597
http :I lwww. garcoact. com/ assessor /parcel. asp ?ParcelN umber=23 9 50 14 292 96
I
I
I
I
I
I
I
I
I
I
7/24/2008
Parcel Detail Page 2 of 4
/BK:1006 PG:743 RECPT:752398 I
/RECPT:752397 BK: 1822 PG:287 I
/RECPT:702424 BK:1822 PG:283 I
/RECPT:702422 BK: 1822 PG:250 I
/RECPT:702421 BK:l782 PG:269 I
IRECPT:6944 79 BK: 1782 PG :264 I
/RECPT:694478 BK:1747 PG:1 I
jRECPT:686745 BK:1218 PG:738 I
/RECPT:572583 BK:1218 PG:715 I
IRECPT:572582 BK: 1217 PG:266 I
JRECPT:572131 BK:1206 PG:852 I
/RECPT:569200 BK:1206 PG:780 I
/RECPT:569199 BK:l206 PG:768 ,,
IRECPT:569197 BK:1206 PG:734 I
IRECPT:569195 BK:1206 PG:662 I
IRECPT:569194 BK:1206 PG:637 I
/RECPT:569192 BK:1206 PG:629 I
IRECPT:569191 BK:1206 PG:574 I
IRECPT:569190 BK:1063 PG:0578 I
/BK:1063 PG:0571 I
Location
Physical 11459 RIVER BEND WAY GLENWOOD SPRINGS! Address:
/Subdivision: IIIRONBRIDGE PUD, PHASE II, FILING 1, 2 & I
/Land Acres: Jlo
J Land Sq Ft: 1!4,265 I
I Section II Township II Range I
I 1 II 7 II 89 I
http://www. garcoact.com/ assessor/parcel.asp ?Parce IN umber=23 9 50 14 2 92 96 7/24/2008
Parcel Detail Page 3 of4
2008 Property Tax Valuation Information
II Actual Value II Assessed Value I
I Land: II 82,51 oil 23,9301
!Improvements: II oil ol
I Total: II 82,51 oil 23,9301
Additional Value Detail
Most Recent Sale
Sale Date: /17116/2008
Sale Price: 1145,700
Additional Sales Detail
Basic Building Characteristics
Number of Residential io I Buildings:
Number of Comm/lnd io I Buildings:
No Building Records Found
Tax Information
I Tax Year II Transaction Type II Amount I
I 2007 II Tax Payment: Second Half II ($640.66)1
I 2007 II Tax Payment: First Half 11 ($640.66)1
I 2007 II Tax Amount II $1,281.321
I 2006 II Tax Payment: Second Half II ($48.40)1
I 2006 II Tax Payment: First Half II ($48.40)1
I 2006 II Tax Amount II $96.801
http://www. garcoact.com/ assessor /parcel.asp ?Parce IN umber=23 9 50 14 2 92 96 7/24/2008